2 Check for Dust Caps on all the Unused Ports 3 Routing of Patch cords
6. Servo Stabilizer
Sl. No. Activity 1 Checking the Three Phase As per Spec. output Voltage 2 Cleaning of Unit including Properly clean Isolation Transformer 3 Check the Neutral Voltage < 3Volts with respect to Ground
NA
1 Check the Front Panel Output Volt Meter 2 Check Front Panel Output Amp. Meter 3 Manual bypass of Stabiliser (which is applicable for Tyco make only) 4 Check the DG battery charging through PIU 5 Condition of the MCB's & Load Cables 6 Tightness of MCB & cable connection 7 Check the Auto function of DG set through PIU unit (on DC low and High Temperature condition) 8 Check the Neutral Voltage with respect to Ground
any overheating
< 3Volts
8.Air Conditioner
Sl. No. 1 2 3 4 5 6 Activity Check all bolts & nuts Main switch & fuses Terminal connection Thermostat working Grill Temperature Load Current of Compressor 1 Spec. Tightend properly Tightend properly Cleaned &Tightend properly Properly working 18 +/- 1 Manufacturer recommendations as per the tonnage of the AirConditioner Manufacturer recommendations as per the tonnage of the AirConditioner Proper Cleaning
Spec.
Measured Value NA NA NA NA
Status
8 Filter Cleaning
8.1 PEC type Air Conditioner Sl. No. Activity 1 Set Temperature 2 Room Temperature 3 Set Humidity RH %
Measured Value
Status
4 Acutal Humidity RH %
At 50+ 5% RH
No Active alarms
No Active alarms
10.Diesel Generator
Sl. No. Activity Mounting pads , Bolt and Nuts Check for Output Voltage Per Phase Check for DG battery Servicing of 15kva Tightened Within the range of 385Volts to 430Volts It should be within the range of 12V to 13V 1)Change Mob oil & filter after 6 months from the last date of Service or 500 hours running whichever is earlier.2) Change diesel filter after 250hrs or 3 months whichever comes first 3)DG top overhauling period after 5000hrs & Major overhauling period after 10000hrs 1)Change Mob oil & filter after 6 months from the last date of Service or 300 hours running whichever is earlier. Spec. Measured Value Status
Servicing of 50kva
Sl. No.
Activity
Spec.
Measured Value
Status
1 Availability of Rack space Actual 2 Rack space or Power The requirement of power Requirement by Planning dept. and Rack space to be
3 Availability of Fiber
intimated by Planning by before three months (if not available required Rack space and power at site then site /Infra upgradation to be done ) Minimum of 5 pairs of dark Fibers (Else plan for upgradation)
Note : Activities Mentioned in the Weekly PMT to be carried out apart from the above
* Also use the vendor provided Manual (of infra products like DG, Battery etc.) for conducting the PM activ
ntenance Report
Date .. Territory
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
quipments
ROOT CAUSE (For the Out of Spec. cases)
Remarks
the monthly & add in the qtly PM along with measurement sheet