Beruflich Dokumente
Kultur Dokumente
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
MECHANICAL WORKS
Reference :
Dwg. No. 003M201
H V A C
TO COLLECTION SR 225,700
shahzad 1 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
TO COLLECTION SR 109,700
shahzad 2 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
TO COLLECTION SR 240,736
shahzad 3 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
TO COLLECTION SR 19,328
shahzad 4 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
TO COLLECTION SR 9,025
shahzad 5 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
HVAC…cont'd.
COLLECTION:
Page 1 225,700
Page 2 109,700
Page 3 240,736
Page 4 19,328
Page 5 9,025
TOTAL 604,489
TO COLLECTION SR
shahzad 6 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
PLUMBING
SANITARY FIXTURES
WATER SUPPLY
TO COLLECTION SR 47,890
shahzad 7 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
Gate valves
19 50mm 4 No 450 1,800
Glob valve
Check valve
24 50mmDia. 2 No 380 760
TO COLLECTION SR 34,502
shahzad 8 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
Supply and installation valves box inclluding all
material and accessories required.
TO COLLECTION SR 179,420
shahzad 9 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
DRAINAGE
TO COLLECTION SR 87,955
shahzad 10 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
32,225
shahzad 11 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
55 Kitchen equipment 1 Ls
TO COLLECTION SR 0
shahzad 12 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
v 1.5" 20 Met.
w 1.25" 8 Met.
x 1" 23 Met.
y 0.75" 33 Met.
1a HOOD-1,1860x2400mm 1 Nos.
1b HOOD-2,5000x1300mm 1 Nos.
TO COLLECTION SR 0
shahzad 13 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
Plumbing…cont'd.
COLLECTION:
Page 7 47,890
Page 8 34,502
Page 9 179,420
Page 10 87,955
Page 11 32,225
Page 12 0
Page 13 0
TOTAL 381,992
TO COLLECTION SR
shahzad 14 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
FIRE PROTECTION
1 supply and installation of Fire extinguisher with all 2 Nos. 200 400
material and asseccories.EF-1
TO COLLECTION SR 400
shahzad 15 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
Fire protection…cont'd.
COLLECTION:
Page 15 400
TOTAL 400
shahzad 16 of 17 02/15/2009
MR. SALEH AWAIR VILLA-OBHUR(JEDDAH)
B03-MAIN KITCHEN
UNIT TOTAL
ITEM DESCRIPTION QTY. UNIT COST COST
S U M M A R Y :
HAVC 604,489
PLUMBING 381,992
shahzad 17 of 17 02/15/2009