Sie sind auf Seite 1von 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SATR NUMBER

SAUDI ARAMCO TEST REPORT


Verify Pneumatic Test Medium (Air, Nitrogen & Inert Gas) & Bubble Solution (for Leak Testing)
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-A-2004
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED TEST DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL TEST DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A

ACCEPTANCE CRITERIA Test Medium (Pneumatic & Associated Leak Tests) The test medium used for pneumatic test is clean air or inert gas. Note 1: Oxygen and other flammable or toxic gases are prohibited Note 2: Bottled air or inert gas come from an approved source and have certificates to attest to their purity and quality. Air Purity for compressor supplied air is verified by checking filter condition, oil and moisture content at supply source. Air is not used to test equipment or piping systems that have been in flammable service without approval of Loss Prevention Dept. Mgr. Bubble Solution (for Leak Testing) The bubble forming solution shall produce a film that does not break away from the area to be tested, and the bubbles formed shall not break rapidly due to air drying or low surface tension. Note: Household soap or detergent use is prohibited per ASME V, Article 10, Mandatory Appendix 1, Para. I-1032 a) Approved Bubble forming solutions are compatible for Test Conditions relative to Temperature Ratings & Chloride Content. Note: Data sheet for SNOOP (example of an approved solution) meets ASME V, Art 10, Mandatory App 1, Para. I-1032 b) & I-1071) See Sample Data Sheet in Attachment 1

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A1

GI-002.102, Para. 5.3

A2

GI-002.102, Para. 5.3 SAES-A-004, Para. 5.2.2

A3

B1

SAES-A-004, Para. 5.6.1

B2

SAES-A-004, Para. 5.6.1

REMARKS:

REFERENCE DOCUMENTS: 1. SA General Instruction Manual, GI-002.102, Pressure Testing Safely, (22 July, 2001) 2. SAES-A-004, General Requirements for Pressure Testing, (30 March, 2005) 3. ASME V, Nondestructive Examination, (2004 Edition, July 2005 Addenda)

Contractor / Third-Party
Technician Performing Test*
Name, Title, Department, Company, Initials and Date: Test Performed Successfully and Results are Acceptable: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Witnessed Test Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Implementation of Test and Analysis of Results

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 1 of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Verify Pneumatic Test Medium (Air, Nitrogen & Inert Gas) & Bubble Solution (for Leak Testing)

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-A-2004

1-Dec-06

MECH-

Attachment 1 -- Sample Data Sheet

Page 2 of 2

Das könnte Ihnen auch gefallen