Beruflich Dokumente
Kultur Dokumente
Stream
Issue / Task
Priority
13 Commercial
Medium
21 Commercial
Medium
24 Commercial 29 Commerical
Medium High 2
30 Commerical
Emergency MT
High
31 Commerical
Medium
36 Commerical
Medium
38 Commerical
High 3
helps to automated the job monitoring Produce Champion Report RESA Purge Analyze tables GO locking report Secromento store Outage Dotcom issue
Current Status
Next Steps
Assigned To
JOS requested for item details which is the output of this report
Arun
Need to discuss with Nikhil about the automation mail for dex order failure with 10 min interval (suggested by JOS) Nikhil has to provide the test results by weekend
Nikhil/Arun
yet to be started To check the current design and come up with a plan if its not supporting
Nikhil Monica/Nikhil
Nikhil/jos
On hold
Nikhil/jos
moved in prod
Moncia
Work around has moved in PROD but sill needs confirm solution
Ramya
- Pick with Jos on Monday meeting Discuss with Jos on requirements Analysing the data and timing Need to change the script Ameet has to provide ETA expected date is 13 and 14 oct
Nikhil Jos/Ameet Nikhil BABU Need to discuss with Nikhil and Abhijit Ameet Need to discuss with Girish the project
Status
To be released in INT Nikhil took a next step to fix DEX failires from RMS end, Nikhil to provide progress
5-Oct-12
Pending with Santosh Daily Monitoring is going on, Fix to be tested Test feed given Testing in Delta with New Eway(RIB to involved) Nikhil to send data to Selva
5-Oct-12
5-Oct-12 11-Oct-12
12-Oct
check with Murali DBA to provide and Javed. Jos to the list moved check when this is to Prod required CIR to be raised Released to Int Another code fix released to Int. still open check with DBA on Java memory 5-Oct-12
CIR to be raised
Discuss with Jos on 27.08 Jos has clarified, Jos to validate thet come back with ETA Ameet to take query forward Pending CR with DBA yet to be tested in Develpoment in INT progress