Beruflich Dokumente
Kultur Dokumente
EA
2/14/2013
C-12
EA
EA
EA
EA
C-13
k. Room no. (011) m. Room no. (013) n. Room no. (014) o. Room no. (015) p. Room no. (016) q. Room no. (017)
2/14/2013
2/14/2013
C-15
BUILDING 603 Supply and install 15A, 220V wall outlets, duplex outlet grounding type and shall be GE brand or approved equal as per the attached drawings. The job includes installation of power outlets, conduits & fittings, electrical 3.10 metal boxes, complete mounting accessories, installation and termination of wires from outlets to panel board. The Sub-contractor shall submit a sample to OPM/SANG for approval prior to installation a. Room no. (001) b. Room no. (002) c. Room no. (003) d. Room no. (004) e. Room no. (005) f. Room no. (006) EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA C-16 6 6 6 4 6 6 4 6 6 4 6 4 4 6 6 4 10
g. Room no. (007) h. Room no. (008) i. j. Room no. (009) Room no. (010)
m. Room no. (013) n. Room no. (014) o. Room no. (015) Room no. (016) p. Room no. (017)
2/14/2013
2/14/2013
C-17
D NGMS Area
Total Cost (SAR)
2/14/2013
C-18
D NGMS Area
Total Cost (SAR)
2/14/2013
C-19
D NGMS Area
Total Cost (SAR)
2/14/2013
C-20
D NGMS Area
Total Cost (SAR)
2/14/2013
C-21
D NGMS Area
Total Cost (SAR)
2/14/2013
C-22
D NGMS Area
Total Cost (SAR)
2/14/2013
C-23