Beruflich Dokumente
Kultur Dokumente
RAJASTHAN CIRCLE
Prepared By:
Yash Sinha ,
UMTS TEAM Rajasthan Circle
Date : 29/09/2012
The below BAR chart indicates the Success Rate for RRC, HSDPA, HSUPA and R99:
100
99.80247311
99.5
99
98.55745252
98.49047026
98.5
98
97.5929836
97.5
97
96.5
96
100
99.54172105
99
98
97.45444232
96.99882477
97
96.22048558
96
95
94
Now we dig up the major cause for the RAB Failure in PS Mode , and found that the RAB Failure
was mainly due to UL CE cong.
Details of RAB Failure in Ajmer RNC :
0
638
268
1602
0
VS.RAB.FailEstabPS.TNL
VS.RAB.FailEstabPS.ULCE.Cong
VS.RAB.FailEstabPS.ULIUBBand.Cong
VS.RAB.FailEstabPS.ULPower.Cong
VS.RAB.FailEstabPS.UuNoReply
Below is the list of sites which were having PS RAB , RRC cong. The Card relocation and addition
was done for the sites indicated in green color which reduced the overall CE Cong. in Jaipur RNC.
CE Hardware addition.
LDR Parameter change.
User BIT Rate reduction.
Parameter optimization for Power and Code Cong. removal.
Physical Optimization activity performed on the cells.
The details of each breakthrough and impact observed after the changes is covered as
below :
Post KPI of Kumbhamarg Site after the CE card addition: the below graph indicates that
the major improvement has been observed after the CE Card addition on the sites having high
CE Cong. ratio on RRC and RAB. It is due to the High CE requirement for HSUPA and R99
Services.
89.44
87.3287.76
85.72
85.69
84.56 83.7184.1084.39
82.73
82.27
82.27
81.59
81.47 81.46
81.08
80.80
79.95
78.38
76.72
89.37
88.65
88.21
85.00
80.00
75.00
75.86
77.08
73.21
72.44 72.47
72.0571.39
71.03
70.00
66.05
65.00
60.00
24-Aug
29-Aug
3-Sep
8-Sep
RC-G-AJMR-RNC-01-HU
13-Sep
18-Sep
23-Sep
RC-G-JIPR-RNC-01-HU
HSUPA Payload(MB)
PS R99UL Payload(MB)
28-Sep
3-Oct
Site wise analysis where the LDR parameters were changed in the Ajmer RNC :
It can be clearly seen as per the above graph that the VS.RAB.FAILESTABPS.UL.CE.CONG. counter value
has been decreased significantly after the changes implemented on 26th Sept 2012 , these sites were
contributing the 80 to 90 % of CE cong at the RNC level.
1.1.3
2000
VS.RB.PS.Bkg.UL.64
1500
VS.RB.PS.Int.UL.32
1000
VS.RB.PS.Int.UL.64
500
09/12/2012 00:00
09/12/2012 01:00
09/12/2012 02:00
09/12/2012 03:00
09/12/2012 04:00
09/12/2012 05:00
09/12/2012 06:00
09/12/2012 07:00
09/12/2012 08:00
09/12/2012 09:00
09/12/2012 10:00
09/12/2012 11:00
09/12/2012 12:00
09/12/2012 13:00
09/12/2012 14:00
09/12/2012 15:00
09/12/2012 16:00
09/12/2012 17:00
09/12/2012 18:00
09/12/2012 19:00
09/12/2012 20:00
09/12/2012 21:00
09/12/2012 22:00
09/12/2012 23:00
The below graph indicates the Average no. of Radio bearers hourly in the UL direction for Background
and Interactive class After the Parameter changes.
2000
1800
1600
1400
1200
1000
800
600
400
200
0
VS.RB.PS.Bkg.UL.32
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Int.UL.32
VS.RB.PS.Int.UL.64
The changes at the RNC for the parameter UlBeTraffInitBitrate setted to D32 was done at 16:00 Hrs.
After the changes we can clearly see that the 64 RB has reduced on both Bkg , Interactive and 32 RB has
take the initial call attempts from 64 RB.
The Below graph indicates the Payload (MB) and R99 Throughput (bps) , It can be clearly seen from the
below graph that the PS 128 UL Payload increases as the Busy Hour approaches since the data download
and the CE bit rate reduction is functional.
5000
40
4500
35
4000
30
3500
3000
25
2500
20
2000
15
1500
PS128
R99UL
Payload(MB)
PS384
R99UL
Payload(MB)
10
1000
0
09/13/2012 01:00
09/13/2012 02:00
09/13/2012 03:00
09/13/2012 04:00
09/13/2012 05:00
09/13/2012 06:00
09/13/2012 07:00
09/13/2012 08:00
09/13/2012 09:00
09/13/2012 10:00
09/13/2012 11:00
09/13/2012 12:00
09/13/2012 13:00
09/13/2012 14:00
09/13/2012 15:00
09/13/2012 16:00
09/13/2012 17:00
09/13/2012 18:00
09/13/2012 19:00
09/13/2012 20:00
09/13/2012 21:00
09/13/2012 22:00
09/13/2012 23:00
500
PS64 R99UL
Payload(MB)
VS.PS.Throu
ghput.UL64.
bps
The below chart indicates the LDR BE Rate reduction and the UL R99 Payload.
300
250
200
150
100
50
0
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
VS.LC
C.LDR.
UL.BE
RateD
own
PS
R99UL
Paylo
ad(M
B)
Hourly details of PS RB : The below graph will indicate the PS RB Details at diff. hours on 13 th Sept
2012.
The below bar chart indicated the Average RB Users on the diff. SF.
1. Bar Chart Indicating the RB @ 13/09/2012, 16:00 Hrs
2000
1800
1600
1400
1200
1000
800
600
400
200
0
VS.RB.PS.Bkg.UL.1
28
VS.RB.PS.Bkg.UL.1
44
VS.RB.PS.Bkg.UL.1
6
VS.RB.PS.Bkg.UL.2
56
VS.RB.PS.Bkg.UL.3
2
VS.RB.PS.Bkg.UL.3
84
VS.RB.PS.Bkg.UL.6
4
VS.RB.PS.Bkg.UL.8
The above chart indicates the high UL 64 RB as Initialbit rate was UL64.
VS.RB.PS.Bkg.UL.128
1000
800
VS.RB.PS.Bkg.UL.144
600
VS.RB.PS.Bkg.UL.16
400
VS.RB.PS.Bkg.UL.256
200
0
VS.RB.PS.Bkg.UL.32
VS.RB.PS.Bkg.UL.384
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Bkg.UL.8
The above chart indicates the high UL 32 RB as Initialbit rate after implementation.
VS.RB.PS.Bkg.UL.128
VS.RB.PS.Bkg.UL.144
VS.RB.PS.Bkg.UL.16
VS.RB.PS.Bkg.UL.256
VS.RB.PS.Bkg.UL.32
VS.RB.PS.Bkg.UL.384
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Bkg.UL.8
The above chart indicates the high UL 32 and UL 64 RB at DBH Hour, after implementation.
VS.RRC.Rej.ULCE.Cong
3500
3000
2500
2000
VS.RAB.FailEstabCS.UL
CE.Cong
1500
1000
500
VS.RAB.FailEstabPS.UL
CE.Cong
The PS RAB Cong. Due to UL CE was 4253 @ 22:00 Hrs and 2332 @ 23:00 Hrs (DBH)
If we compare the DBH hour data of 13th and previous days we find a reduction of around 3K .
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/11/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
2. RNC WISE RRC and RAB Cong. Analysis on 12th and 11th Sept 2012 :
14000
12000
10000
VS.RRC.Rej.ULCE.Con
g
8000
6000
VS.RAB.FailEstabCS.U
LCE.Cong
4000
2000
VS.RAB.FailEstabPS.U
LCE.Cong
1. RB wise details @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.
30
25
20
15
VS.RB.PS.Bkg.UL.32
10
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Int.UL.32
VS.RB.PS.Int.UL.64
2. RB wise details @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
30
25
20
15
VS.RB.PS.Bkg.UL.32
10
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Int.UL.32
VS.RB.PS.Int.UL.64
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
1. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
300
250
VS.RRC.Rej.UL
CE.Cong
200
150
100
VS.RAB.FailEst
abCS.ULCE.Co
ng
50
0
VS.RAB.FailEst
abPS.ULCE.Co
ng
PS R99UL
Payload(MB)
2. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
200
180
160
140
120
100
80
60
40
20
0
300
VS.RRC.Rej
.ULCE.Con
g
VS.RAB.Fai
lEstabCS.U
LCE.Cong
VS.RAB.Fai
lEstabPS.U
LCE.Cong
PS R99UL
Payload(M
B)
250
200
150
100
50
0
3. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
14
12
10
J Congestion
Analysis -RRC
Congestion Ratio
8
6
4
0
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
J Congestion
Analysis - PS RAB
Congestion Ratio
4. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
8
7
6
5
4
3
2
1
0
J
Congestio
n Analysis
-RRC
Congestio
n Ratio
J
Congestio
n Analysis
- PS RAB
Congestio
n Ratio
120
VS.RRC.Rej.ULCE.Cong
100
VS.RAB.FailEstabCS.ULCE.Cong
80
60
VS.RAB.FailEstabPS.ULCE.Cong
PS R99UL Payload(MB)
40
20
0
2. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/13/2012
09/14/2012
09/14/2012
09/14/2012
09/14/2012
09/14/2012
09/14/2012
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00:00
02:00
04:00
06:00
08:00
10:00
3500
140
3000
120
2500
100
2000
80
1500
60
1000
40
500
20
VS.RRC.Rej.ULCE.Cong
VS.RAB.FailEstabCS.ULCE.Cong
VS.RAB.FailEstabPS.ULCE.Cong
PS R99UL Payload(MB)
3. UL CE Cong. @ 12th Sept 2012 of site SITAPURA having high Cong. in UL.
80
70
J Congestion
Analysis -RRC
Congestion
Ratio
60
50
40
30
20
10
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0
J Congestion
Analysis - PS
RAB Congestion
Ratio
4. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.
60
50
40
30
20
10
0
J
Congestion
Analysis RRC
Congestion
Ratio
J
Congestion
Analysis PS RAB
Congestion
Ratio
Details Of R99 Upload during the DT , 200 MB File was being UP Loaded on the Sendspace Server.
1.1.4
After the addition of CE card it has been observed that the Power and code cong. tends to rise sharply
on the sites, so to counter that we alter the below parameters.
Thank You