PROCEDURE MANUAL

Post Weld Heat Treatment

Copyright 2008 SWI Valve Co., Ltd. All rights reserved.

www.swivalve.com

ISO 9001 : 2000 EDITION

HEAT TREATMENT PROCEDURE


ISSUE REVISION REV. NO. PERFORM DOC. NO. PREPARED BY REVIEWED & APPROVED BY JUN 13, 2003 DEC 20, 2003 A DEC 20, 2003 SW-HTP-01 T. M. LEE Y. P. CHO

SWI Valve Co.,Ltd.


HEAD OFFICE & PLANT 1023-2, Kwanyang-dong, Anyang, Kyungki-do, Korea Tel : 82-31-422-7495 7 Fax : 82-31-422-7498 Home page : www.swivalve.com

QUALITY ASSURANCE
HEAT TREATMENT PROCEDURE
1.0 SCOPE

DOC NO. PAGE

SW-HTP-01 1 3

1.1 This procedure defines the heat treatment required by the material specification and postweld heat treatment(PWHT) of pressure rating parts of the valve of SWI Valve Co.,Ltd.(SWI) 1.2 This procedure shall be applied to the manufacturing process. 2.0 APPLICABLE SPECIFICATIONS STANDARDS & CODES 2.1 ASME B31.3 "CHEMICAL PLANT AND PETROLEUM REFINERY PIPING" 2.2 Applicable material Specification. (ASTM) 3.0 HEAT TREATMENT & POSTWELDED HEAT TREATMENT(PWHT) PROCEDURE 3.1 Preparation 1) The forging & Cast steel shall be free of the scales, oil, grease, rust and other foreign adherents. 2) Loading 3.2 Heating After loading, temperature and time shall be prepared in according to the rules. 3.3 Holding 3.4 Cooling 4.0 INSPECTION The inspection after heat treatment and PWHT shall be performed on below test. 1) Visual 2) Heating Rate 3) Holding Time 4) Cooling Rate 5) Hardness Test

QUALITY ASSURANCE
HEAT TREATMENT PROCEDURE
5.0 GENERAL SKETCH OF HEAT TREATMENT CURVE

DOC NO. PAGE

SW-HTP-01 2 3

FORGING STEEL HEAT TREATMRNT TEMPERATURE STANDARD


Method Material ASTM A105 A350-LF2
Max. 150/Hr 300 Holding Time : 1 Hr/in Temp.

NORMALIZING

STRESS RELIEVING / PWHT

88025

Temp.

65025

Air Cooling 300

Max. 150/Hr

Max. 100/Hr

Holding Time : 1 Hr/inch

Method Material ASTM A182-F5 A182-F9


Temp.

NORMALIZING

TEMPERING / P.W.H.T

98025

Temp.

73025

Max. 150/Hr 300

Air Cooling 300

Max. 150/Hr

Max. 100/Hr

Holding Time : 1 Hr/inch

Holding Time : 1 Hr/in P.W.H.T Holding Time : 2 Hr

Method Material ASTM A182-F11 A182-F22


Temp.

NORMALIZING

TEMPERING / P.W.H.T

93025

Temp.

73025

Max. 150/Hr 300

Air Cooling 300

Max. 150/Hr

Max. 100/Hr

Holding Time : 1 Hr/inch

Holding Time : 1 Hr/in P.W.H.T Holding Time : 2 Hr

QUALITY ASSURANCE
HEAT TREATMENT PROCEDURE

DOC NO. PAGE

SW-HTP-01 3 3

FORGING STEEL HEAT TREATMRNT TEMPERATURE STANDARD


Method Material ASTM A182-F304 A182-F304L A182-F316 A182-F316L A182-F347 A351-CF3 A351-CF3M A351-CF8 A351-CF8C A351-CF8M
Temp.

SOLUTION
Min. 1040

STRESS RELIEVING / PWHT


Min. 1040

Temp.

Max. 150/Hr 300

Water Cooling 300

Max. 150/Hr

Water Cooling

Holding Time : 1 Hr/inch

Holding Time : 1 Hr/inch

Method Material ASTM A216-WCB A352-LCB


Temp.

NORMALIZING

STRESS RELIEVING

91025

Temp.

65025

Max. 150/Hr 300

Air Cooling 300

Max. 150/Hr

Max. 100/Hr

Holding Time : 1 Hr/in

Holding Time : 1 Hr/inch

Method Material ASTM A217-C5 A217-C12 A217-WC6 A217-WC9


300 Temp.

NORMALIZING

TEMPERING/STRESS RELIEVING

95025

Temp.

73025

Max. 150/Hr

Air Cooling 300

Max. 150/Hr

Max. 100/Hr

Holding Time : 1 Hr/inch

Holding Time : 1 Hr/in