Stability Analysis of Training Wall at Foundation Level:

957.00 m
946.35 m
956.00 m
946.35 m
10.65 m
2.00 m
0.75
7.99 m
0.24 g
0.16 g
2.00 t/m
3
1.00 t/m
3
14. Characteristic strength of concrete (f
ck
) 2500.00 t/m
2
15. Water level during diversion 944.00 m
16. Angle of internal friction 46.00 deg
2.00m
957.00
2.67m
7.24m 956.00
10.65m
W1
9.65m
W3
W2
946.35
B A
5.99m
7.99m
2.00m
957.00
2.67m
W1 -1.76m 944.00
10.65m
-2.35m
W3
W2
946.35 B A
5.99m
7.99m
0.75
NAFRA HYDRO-ELECTRIC PROJECT
The stability analysis of Training Wall along the left side of the stilling basin just downstream of the rockfill dam has
been carried out as per IS 12720-1993 and IS 1893-1984.
Basic data:
1. Top of the Training Wall Level
2. Foundation level
3. Elevation where the stability is checked
3. Maximum Water level
4. Total Height of the Training Wall (h)
5. Top width
10. Design horizontal seismic coefficient (
h
)
8. Slope provided in the wall
11. Design vertical seismic coefficient (
v
)
12. Unit weight of concrete
0.75
13. Unit weight of water (w)
9. Base width of wall (B)
Figure 1-Training wall
Annexure A
1
1
Inertia force (saturated weight of structure)
Horizontal earthquake Force: = 0.6 x w x
h
Moments = 0.9 x w x h x
h
Sr.No Force Lever Arm Moment
1 H1=0.6*42.6*0.24 6.13 T 5.32 49.00 Tm
2 H2=0.6*47.8*0.24 6.88 T 2.66 27.48 Tm
Vertical earthquake Force:
1 V1=42.6*0.16 = 6.82 T
2 V2=47.8*0.12 = 5.73 T
0.16
0.12
10.65m
7.98m
Uplift at water level 958m
U1=(956-946.35)*7.99*1= 77.08 T
Uplift at water level 944m
38.54 T
Hydrostatic Force:
46.561 T
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
Total 90.40 T 233.51 Tm
Force Lever Arm Moment
The Resultant x = Mv-Mh
W
= (233.51-0)/90.4
= 2.583
The resultant in this case does not pass through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 2.583 m
e= 1.411 m
6e/B = 1.060
23.31 t/sq.m
-0.68 t/sq.m Stress at point - A= (W/B)*(1-(6e/B)) =
Construction stage condition (Load combination A) :
Horizontal Forces
The stresses at the heel and Toe of the structure are calculated as below:
Stress at point - B= (W/B)*(1+(6e/B)) =
Inertia Forces
Uplift Force:
Vertical Forces
Wp=0.5*(944-946.35)*(944-946.35)*1=
U1=0.5*(956-946.35)*7.99*1=
(


E
=
B
e
B
V
p
6
1
. min . max
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
4 U1=0.5*(944-946.35)*7.99*1= 38.54 T 2.66 102.61 Tm
Total 51.86 T 130.89 Tm
Force Lever Arm Moment
3 Wp=0.5*(956-946.35)*(956-946.35)*1= 46.56 T 3.22 149.77 Tm
Total 46.56 T 149.77 Tm
The Resultant x = Mv-Mh
W
= (130.89+149.77 )/51.86
= 5.412
The resultant in this case passes through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 5.412 m
e= -1.418 m
6e/B = -1.065
-0.38 t/sq.m
12.04 t/sq.m
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
3 W3=0.5*9.65*7.237*1 34.92 T 5.57 194.68 Tm
4 U1=(956-946.35)*7.99*1 77.08 T 3.99 307.84 Tm
Total 48.24 T 120.35 Tm
The Resultant x = Mv-Mh
W
= (120.35-0 )/48.24
= 2.495
The resultant in this case does not pass through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 2.495 m
e= 1.499 m
6e/B = 1.126
12.84 t/sq.m
-0.76 t/sq.m
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
Normal Operation condition (Load combination B) :
Flood operation condition (Load combination C) :
Stress at point - B= (W/B)*(1+(6e/B)) =
Stress at point - A= (W/B)*(1-(6e/B)) =
Vertical Forces
The stresses at the heel and Toe of the structure are calculated as below:
Stress at point - A= (W/B)*(1-(6e/B)) =
Vertical Forces
Stress at point - B= (W/B)*(1+(6e/B)) =
The stresses at the heel and Toe of the structure are calculated as below:
Horizontal Forces
(


E
=
B
e
B
V
p
6
1
. min . max
(


E
=
B
e
B
V
p
6
1
. min . max
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
3 V1 6.82 T 1.00 6.82 Tm
4 V2 5.73 T 3.99 22.90 Tm
Total 77.85 T 203.79 Tm
Force Lever Arm Moment
5 H1 6.13 T 5.32 49.00 Tm
6 H2 6.88 T 2.66 27.48 Tm
Total 13.02 T 76.47 Tm
The Resultant x = Mv-Mh
W
= (203.79-76.47)
= 2.618
The resultant in this case does not pass through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 2.618 m
e= 1.376 m
6e/B = 1.034
19.82 t/sq.m
-0.33 t/sq.m
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
Factor of safety against sliding:
90.40 t/m
12.55 t/m
1.04
30.00 t/sq.m
7.99 sq.m
1.20
2.40
13.02 t/m
So, F = 12.831 > 1 Safe in sliding
Load combination A + earthquake (load combination D) :
tan'= Coefficient of internal friction of the material '=46
0
C= Cohesion at contact between rock and concrete (Assumed)
A= Area under consideration for cohesion
The stresses at the heel and Toe of the structure are calculated as below:
F
c
= Partial factor of safety in respect of cohesion (as per IS:12720)
Vertical Forces
w= Total downward force on the training wall =
F=[[{(90.4-12.55)*1.04}/1.2]+{(30*7.99)/2.4}]/13.02
Horizontal Forces
F

= Partial factor of safety in respect of friction (as per IS:12720)


u= Total upward force =
Stress at point - B= (W/B)*(1+(6e/B)) =
Stress at point - A= (W/B)*(1-(6e/B)) =
F= Factor of safety against sliding
P= Total horizontal force
(


E
=
B
e
B
V
p
6
1
. min . max
P
Fc
CA u w
F
|
|
.
|
+

\
|
=
F
tan ) (
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
4 U1 38.54 T 2.66 102.61 Tm
5 V1 6.82 T 1.00 6.82 Tm
6 V2 5.73 T 3.99 22.90 Tm
Total 39.31 T 101.18 Tm
Force Lever Arm Moment
7 H1 6.13 T 5.32 49.00 Tm
Wp 46.56 T 3.22 149.77 Tm
8 H2 6.88 T 2.66 27.48 Tm
Total 59.58 T 226.25 Tm
The Resultant x = Mv-Mh
W
= (101.18-226.25)
= 9.599
The resultant in this case passes through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 9.599 m
e= -5.605 m
6e/B = -4.211
-15.80 t/sq.m
25.64 t/sq.m
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
Factor of safety against sliding:
90.40 t/m
12.55 t/m
1.04
30.00 t/sq.m
7.99 sq.m
1.20
2.40
13.02 t/m
So, F = 12.831 > 1 Safe in sliding
Sr.No Force Lever Arm Moment
1 W1=10.65*2*2 42.60 T 1.00 42.60 Tm
2 W2=0.5*(10.65-2.67)*5.99*2 47.80 T 3.99 190.91 Tm
3 W3=0.5*-2.35*-1.763*1 2.07 T 8.57 194.68 Tm
4 U1=(956-946.35)*7.99*1 77.08 T 3.99 307.84 Tm
Vertical Forces
F

= Partial factor of safety in respect of friction (as per IS:12720)


F
c
= Partial factor of safety in respect of cohesion (as per IS:12720)
P= Total horizontal force
F=[[{(90.4-12.55)*1.04}/1.2]+{(30*7.99)/2.4}]/13.02
Load combination B+ earthquake (load combination E) :
Vertical Forces
Horizontal Forces
The stresses at the heel and Toe of the structure are calculated as below:
Stress at point - B= (W/B)*(1+(6e/B)) =
Sudden drawdown condition (Load combination F) :
A= Area under consideration for cohesion
Stress at point - A= (W/B)*(1-(6e/B)) =
F= Factor of safety against sliding
w= Total downward force on the training wall =
u= Total upward force =
tan'= Coefficient of internal friction of the material '=46
0
C= Cohesion at contact between rock and concrete (Assumed)
(


E
=
B
e
B
V
p
6
1
. min . max
P
Fc
CA u w
F
|
|
.
|
+

\
|
=
F
tan ) (
Total 15.39 T 120.35 Tm
The Resultant x = Mv-Mh
W
= (120.35-0 )/15.39
= 7.819
The resultant in this case passes through the middle third of the base
Where,
e= Eccentricity of the resultant force from the center of the base.
V = Total vertical force.
B = Base width. = 7.99m
x
-
= 7.819 m
e= -3.826 m
6e/B = -2.874
-3.61 t/sq.m
7.46 t/sq.m
The stresses at the Heel and Toe of the structure are within the permissible limits as per IS-12720.
The stresses at the heel and Toe of the structure are calculated as below:
Stress at point - B= (W/B)*(1+(6e/B)) =
Stress at point - A= (W/B)*(1-(6e/B)) =
(


E
=