S No. A 1 2 3 4 B 1 C 1 2 3 4 5 D 1 2 3 4 D 1 2 3
Activity/ Process DOCUMENTATION Verification of Documentation Verification of correct Issue of Construction Drawings Verification of Approved Method Statement Verification of Material Approvals (OPC, Bentonite, water) MATERIALS Inspection of Material Storage/ Stacking BATCHING & MIXING Callibation of BM1000 mixer for volumetric batching of water Batching of Materials for Mixing Mixing Duration Marsch Viscosity of Grout Material Mud Ballance Density of Grout Material PRE-INJECTION CHECKS Identify the Injection Point on Plan and record it. Inspection of Grout pipe on sheet pile and its grout receiving coupling against choking Availability of enough material in Stock to undertake grouting for certain stretch of cut off wall Inspection of Functioning of Injection pump and grout pipe connections. DURING INJECTION CHECKS Injection flow rate Injection quantaty System Pressure and injection pressure attained during Injection VERIFICATION INSPECTION TESTING SUPERVISION
Verifying Document
Responsible Agencies
Approved docuemnt log Approved docuemnt log Approved docuemnt log Material Approval Sheet
Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer
to be in Dry conditions
Daily Report
T S S T T C C R R
Grout Mix Design Grout Mix Design Grout Mix Design Grout Mix Design Grout Mix Design
Daily Injection Report Daily Injection Report Daily Injection Report Daily Injection Report Daily Injection Report
Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer
I S S S
C R R C
Daily Injection Report Daily Injection Report Daily Injection Report Daily Injection Report
Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer Action SPT/ Bauer
S I I F F
_______________ PREPARED BY
____________________ REVIEWED BY
___________________ ISSUED BY
05-09-11 Rev 00
130635870.xlsx.ms_office
Injection Injected Grout Volume [litre] Quantity [L] 50 100 150 200 250 300 350 400 450 Remarks
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
250 350 350 250 350 350 300 350 400 350 400 250 350 350 250 350
2 3 4 5
OTHER
6 7
QUALITY TESTS
8
YES
TESTS PERFORMED
NO
9 10
GROUT VISCOSITY
GROUT DENSITY
38 1.2
SECONDS
11 12 13
g/cc
QUANTITY
14 15
38
38
TONS TONS
16
BENTONITE
TONS
05-09-11 Rev 00