Beruflich Dokumente
Kultur Dokumente
Com SEMESTER-2
ASSIGNMENT
Name :.. Registration No. :. Learning Center :. Learning Center Code : Course :. Subject :. Semester :. Module No. :. Date of submission :. Marks awarded :.
Directorate of Distance Education Signature of Sikkim Manipal University Center Signature of Evaluator II Floor, Syndicate House Manipal- 576104
Signature of Coordinator
Comments by the Subject Evaluator: (Subject expert will give comments on overall content, reliability, correctness and appropriateness of information provided)
Suggestions for improvement: (Subject expert will give areas of improvement and possible ways/ methods to follow to improve)
Master of Commerce - M.Com -Semester 2 MCC 202-Advanced Cost Accounting 4 credits (BKID: B1472) Assignment (60 Marks)
Answer the following questions. Each question carries 10 marks. 1. What are the different types of cost sheet? Highlight its importance. (10 Marks - Approximately 500 to 600 words) 2. What is contract costing? Discuss briefly the method of contract costing. (10 Marks - Approximately 500 to 600 words) 3. Discuss the principles to be followed for cost determination under process costing. (10 Marks - Approximately 500 to 600 words) 4. What are the problems with the ABC system? (10 Marks - Approximately 500 to 600 words) 5. The following information is obtained from the costing records of a factory: Actual total overheads Actual hours worked Budgeted rate of recovery of overheads is Re. 1 per hour On verification it was found that 25% of the unabsorbed overheads was due to increase in cost of indirect material and indirect labour and 75% was due to inefficiency in the factory. Show the effects on cost of units produced. 6. From the following particulars, prepare the Cost Sheet for Job No. 75 and find out the value of the job: Materials issued for the job Direct Expenses Rs. 6,000 Rs.500 Productive Wages Rs.4,600 Rs. 3,75,000 Units Produced 2,50,000 Units sold Units in work-in-progress 9,800 9,000 200
Provide 60% on productive wages for works on cost and 12 % on works cost for office on cost. Profit to be realised on the selling price 15%