Overview
Trigger: Generally, sponsored projects are invoiced on a cost reimbursable (resource-related billing) basis;
however, some awards require specific billings of predetermined amounts on set dates. This Business
Process Procedure (and FI_SD_VA41a) will document the steps necessary to set up scheduled billings for
these awards so that invoices are produced at the predetermined dates and amounts.
R/3 supports two basic types of fixed amount billing methods. The first type of billing method is milestone
(ZMP is the R/3 billing type). In the traditional milestone project, invoicing occurs as a major phase or
milestone of the project is completed. For example you might have a contract requiring billing 1/3 of the
contract amount upon completion of the field research, a second 1/3 at completion of the draft report, with
the balance due when the research report is accepted by the sponsor. Although these technical completion
dates may vary, the award document normally gives estimated dates that are used to initially set up the
payment schedule in R/3. In addition, UT will use milestone billing for (1) contracts with irregular invoice
amounts on preset dates, and (2) quarterly, semi-annual, or annual fixed amount invoicing. For example:
$10,000 is to be billed at the start of the contract, $15,000 at the contract midpoint, and $25,000 at the
contract conclusion. Another example would be $5,000 is to be billed each calendar quarter during the term
of the contract.
The second type of fixed amount invoicing is scheduled billings (ZSCH is the R/3 billing type). In this award,
a constant amount is invoiced monthly. For example, $1,000 is to be billed on the first day of the month over
the life of the contract. This BBP to document scheduled billings is FI_SD_VA41a, “Create a sales contract-
scheduled”.
This is a very complex set of procedures. Several data fields are not applicable to UT and will not be
completed on all screens. In addition, the user will navigate the various screens using three different
methods.
Procedural Steps
1.1. Access transaction by:
1.2. On screen “Create Contract: Initial Screen”, enter information in the fields as specified in the table
below:
(Note: On above table, in column “R/O/C” ; “R” = Required, “O” = Optional, “C” = Conditional)
Last changed on: Last changed by: Version: 4.6B Page:
01/15/01 Gail White Page 3 of 11
BUSINESS PROCESS PROCEDURE
Title: Milestone billing
Organization/Area: SD
EUP Category:
File Name: FI_SD_VA41 Create Release: R/3 4.6B
a sales contract-
Milestone.DOC
Responsibility: CBO staff and Status: Ready for review by team
Controller’s Office
1.3. On the “Create Milestone Billing: Overview” screen, enter the information on the table below. If you
receive a pricing error: Mandatory condition Ek01 is missing. Don’t worry. This is only a warning. The
information will be added at a later step. Proceed on to step 1.4.
1.4.
project billings
Target The target quantity for an item in a R Please enter 1. Generally, UT has only
quantity sales contract. one item in its contracts.
Press the enter key to clear messages
and to continue
1.4 Tricky step. You must select the item by clicking on the left box. Then use the “Go
to>item>conditions” menu path at the top of the screen to continue.
On this screen, enter the rate of the contract and the condition type of the billings. The rate is the total of the
milestone billings. EK01, actual costs, is UT’s only condition type. In our example, EK01 was entered into
the condition field and $500 was imputed as the rate.
There are two methods to proceed at this point. The scheduled milestone items can be entered in either of
two places: (1) Create milestone billing: header data (Go back to the main screen and follow the menu path
Last changed on: Last changed by: Version: 4.6B Page:
01/15/01 Gail White Page 7 of 11
BUSINESS PROCESS PROCEDURE
Title: Milestone billing
Organization/Area: SD
EUP Category:
File Name: FI_SD_VA41 Create Release: R/3 4.6B
a sales contract-
Milestone.DOC
Responsibility: CBO staff and Status: Ready for review by team
Controller’s Office
Go to>Header> Billing Plan), or (2) Create milestone billing: item data. (Click on the “Billing Plan” tab.
Either way will work. The only difference between the two screens is that the “item data” version of the
screen has a small checkbox labeled “HeadBillPlan”. If this “item data” screen is used, this checkbox must
be clicked off, or blank. Press enter to continue.
The intent is to give the option of having multiple WBS elements on one billing plan by entering on the
header. If each WBS element line should have a different billing plan, then the item level should be used.
Now schedule each milestone billing. On this screen, enter the milestone invoice date, relationship, and
amount. Once all the billings have been scheduled, push the enter key.
1.13 After adding the WBS element, click on the save icon.
1.14. Finished!
You may have to wait as the computer compiles the sales contract. If you are successful, a message similar
to “Milestone Billing 400000004 has been saved” will be printed at the bottom of the screen.
Congratulations, you are done.
CONDITIONS/STEPS
CONDITIONS & VARIATIONS EXPECTED RESULTS ACTUAL RESULTS OK /
ERROR
Comments:
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________