SGT5-4000F for Low Ambient Temperature Operating Conditions

Jan Slad Juergen Voss Russia Power 2012, Moscow March 5 - 7, 2012

Siemens AG 2012. AllCopyright notice Protection notice / rights reserved.

What I will cover today

Background to SGT5-4000F for low ambient temperature operating conditions Technical solutions and hardware configuration for reliable start-up and operation under cold ambient conditions Impact of cold ambient conditions on the gas turbine and plant components

Page 2

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Cold Ambient Projects in Russia with the SGT5-4000F Gas Turbine

Cherepovets Kirishi Mosenergo Nyaganskaya Yajva Novosalavatskaya Serovskaya

Yuzhnouralskaya

Page 3

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Design Features of the SGT5-4000F Gas Turbine


Compressor 15 stages with CDA airfoils and side wall correction. One variable guide vane row Rotor Hirth serration and single tie bolt Quick thermal response due to internal flow passages Combustion System annular; low pattern factor Dry low NOx burners with dual fuel capability Turbine 4 stages; film cooling; TBCs SX (blade 1) and SX/DS 2 (blade 2) Engine Excellent thermal balance due to quick and stiff rotor and conical turbine flow path Quick start up and hot restart capability due to excellent thermal balance
Page 4 Russia Power 2012, March 05-07 Jan Slad
Siemens AG 2012. All rights reserved.

Air Pre-Heater overview

Air pre-heater installed in CCPP gas turbine air intake.

Example from project executed in 2009

Page 5

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Air Pre-Heater Simplified System Diagram

Page 6

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Design Features of the SGT5-4000F Gas Turbine


Compressor 15 stages with CDA airfoils and side wall correction. One variable guide vane row Rotor Hirth serration and single tie bolt Quick thermal response due to internal flow passages Combustion System annular; low pattern factor Dry low NOx burners with dual fuel capability Turbine 4 stages; film cooling; TBCs SX (blade 1) and SX/DS 2 (blade 2) Engine Excellent thermal balance due to quick and stiff rotor and conical turbine flow path Quick start up and hot restart capability due to excellent thermal balance
Page 7 Russia Power 2012, March 05-07 Jan Slad
Siemens AG 2012. All rights reserved.

Air Pre-Heater overview

Air pre-heater installed in CCPP gas turbine air intake.

Example from project executed in 2009

Page 8

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Summary

Background to SGT5-4000F for low ambient temperature operating conditions Technical solutions and hardware configuration for reliable start-up and operation under cold ambient conditions Impact of cold ambient conditions on the gas turbine and plant components

Page 9

Russia Power 2012, March 05-07

Jan Slad

Siemens AG 2012. All rights reserved.

Thank you for your attention

Siemens is a reliable partner who turns plans into plants


Page 10 Russia Power 2012, March 05-07 Jan Slad
Siemens AG 2012. All rights reserved.

Disclaimer

This document contains forward-looking statements and information that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as expects, anticipates, intends, plans, believes, seeks, estimates, will or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SECs website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated. Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.