Sie sind auf Seite 1von 2

GATP Confi Flow

1. Integration model for ATP check & ATP customizing. (Tcode: cfm1- Generate & cfm2- Activate in R/3).

2. Integration model for Transaction data ie , sales order. (Tcode: cfm1- Generate & cfm2- Activate in R/3).

3. Integration model for Master data ie, plant & material (Tcode: cfm1- Generate & cfm2- Activate in R/3).

3.Distribution definition -APO-IMG-INTEGRATION WITH SAP COMPONENTS-BASIC SETTINGS FOR DATA TRANSFER-PUBLICATION--MAINTAIN DISTRIBUTION DEFINITION. for SO it is 53 and plant xxxx & logical system.

4.Based on the strategy group or MRP Group etc in R/3 material master the check mode in the APO product master should have been updated with the check mode. ( Requirement class). (/SAPAPO/MAT1 - Product ).

5. Check instructions - ( Check mode + Business event) based on the check mode key you have to do the settings.

Eg: if the check mode is 050 and the business event for Sales order is A then we need to the settings for 050 & A.

Production Issue
We intend to use GATP in APO. When Sales Person enters any SO and presses for availibility check, it should trigger availibility check in APO. in APO we intend to use RBA with Location substituation rule. Settings are
) Integration Model for Plant.material and SO are created and activated 2 Created Integration Model for ATP check and ATP customizing 3) Created Check Instruction in APO for check Mode : 050 and Business event : A 4) Created Check Control with ATP Group : 2 and Business Event : A 5) Created all necessary configuration for Location substituation under RBA configuration. Currently when we create a sales order and selects the item for availibility check , it does a local ATP check in ECC , but it does not trigger GATP in APO.

Solution: goto transaction CFM5 and search for an ACTIVE IMO with "ATP check" flag for your product/location combination. Afterwards check that
the APOKZ is set in table MARC for the same combination.

If the APOKZ = 1 or 2, the system should trigger the ATP check in APO.

2) see the ECC Delivery Proposal Screen when you press the ATP check button. May be RFC connection is not working correctly yet or the ATP
check is not triggered at all.

3) check for blocked or otherwise unprocessed queues. SMQ1 in ERP. SMQ1 shoould have zero entries

Das könnte Ihnen auch gefallen