Load Survey Flow Measurement Location & Alignment Fixing Alignment Survey & Head Measurement
Components Components
Mechanical Electrical
Components Network
MHP Components
(Electro-mechanical Components)
Transmission/Distribution
MHP
Intake
Canal
sil De
B ting
n asi
Canal
Crossing
Cr os s ing
Forebay
Forbay
Sp ilw ay
Anchor Block
Anchor Block Support Pier
Canal
Sp
Riv
ay ilw
Kh
er/ K
ho
la
sa ol
il Ta e rac
Power House
Power House
Tailrace
Major Civil Components Of Micro Hydro Scheme
MHP
MHP Components
MHP
MHP Components
Desilting Basin
MHP
MHP Components
Canal
MHP
MHP Components
Forebay
MHP
MHP Components
SUPPORT STRUCTURES
MHP
MHP Components
MHP
MHP Components
Transmission Line
Forbay Trasrack Air Vent Pipe Anchor Block Expansion Joint
Penstock pipe
H.T. Lightning Arrestor L.T. Lightning Arrestor
Support Pire
Penstock Pipe
Expansion Joint
Anchor Block
R Y B
ELC
Drop- out Fuse
Transformer Generator
ELC Board
H. T. Line L. T. Line MCCB Transformer ( T1) 400/11000 V, 15kVA T. Plate form Danger Plate Ground Level
Earthing
Generator Turbine
Turbine
Power House
MHP
MHP Components
Electro-Mechanical Arrangement
Pressure Gauge
Generator
MHP
MHP Components
Electro-Mechanical Arrangement
ELC=
Balast Tank
Turbine
Genrator
IGC/ELC/Governor
MHP
MHP Components
Transmission/Distribution Network
Distribution Line
MHP
MHP Components
Transmission/Distribution
MHP
MHP Components
Site Survey To gather the detailed information and measurement of the site for the suitability of the installation of a micro hydro plant.
MHP
MHP Components
Optimum Water
(Contd...)
Transmission/distribution Protection
Environmental Economical
MHP
aspects;
Demand survey
This survey is mainly the preparation of potential consumers list with their power demand.
Count the number of households, shops, lodges, offices, temples, schools, industries etc. Calculate the power needed for each consumer (in terms of the numbers of bulbs or tube lights,
radio, TV, fans and other appliances).
MHP
Flow Measurement
To find the available discharge in the source (river/stream) for power generation
MHP
MHP Components
Flow Measurement Method Bucket method Conductivity method (Salt dilution method) Weir method Current meter method Float Method Ultrasonic method
MHP MHP Components
Applicability
Bucket method : < 30 lps Conductivity meter: 30 lps to 2000 lps Weir Method:
Current meter: > 2000 lps Float method: Rough method (only for estimate) Ultrasonic method: for discharge in penstock pipe/Canal
Flow Estimation
To estimate the available discharge for the power generation throughout the year. Common Methods used in Nepal:
MHP
Flow estimation
MIP method for catchment area less than 100 km2 For catchment area larger than 100 km2 along with the MIP method, WECS/DHM method could be used Lower values derived from the above two methods should be adopted 11 month exceedance flow should be compared with measured flow of detailed feasibility study
MHP
Developed by M. Mac Donald (consulting firm) in 1990. Country divided into 7 hydrological regions. Based on wading measurements by Department of Hydrology and Meteorology, non-dimensional regional hydrographs were developed for each region. The month of April was used for non-dimensionalizing. Coefficients for each month for each region have been developed
INPUT
Low flow measurement
MHP
MHP Components
MIP Method
Month Non dimensional flow or Region 3 2.71 1.88 1.38 1.00 600 (15 April) 1.88 3.13 13.54 25.00 20.83 10.42 5.00 3.75 Factor = 600/1 e.g. Jan flow = 600x2.71 = 1626 l/s Measured flow (l/s) Factor Estimated mean monthly flows (m3/s) 1.626 1,128 0.828 0.600 1.128 1.878 8.124 15.000 12.498 6.252 3.000 2.250 4.526
MHP Components
January February March April May June July August September October November December Annual Avg.
MHP
Discharge measurement between November & May (dry season) No rain during the past 3 days from the day of flow measurement flow (Qd) at river for 11 months excedence. Consider seepage (5-10%) + environmental flows (10-15%). Thus, need to use at most 85% of the 11 months exceedance flow. +- 10% tolerance on Qd at commissioning.
MHP Components
MHP
Possible to divert the flow either naturally or by constructing a simple and low height weir
Headrace Canal
Safe from high flood, landslip, tension cracks, falling rocks etc.
MHP
MHP Components
Forebay
Spillways
MHP
MHP Components
(Contd)
Stable, safe, straight as possible with minimum number of bends and steeper terrain (30 -45)
Powerhouse adequate space, safe from floods & safe to discharge the tail water back into the stream.
MHP MHP Components
Common Methods:
Abney Level Auto Level Theodolite Total Station
Environmental Consideration
Necessary precautions need to be made during the survey & project implementation period in order to reduce the environmental impacts.
MHP
MHP Components
Head (m)
Discharge (l/s)
MHP
MHP Components
Power Equation
P = * g*Q*H*
Where, P = Power (Watt) = Density of water (kg/m3) g = Acceleration due to gravity (m/sec2) Q = Discharge (l/sec) H = Head (meter) = Overall efficiency
MHP MHP Components
Reporting
Flow Calculation Estimation of Discharge Design Discharge Demand Supply Analysis End Use Application Design & Drawings (sizes of structures/equipment) ; Cost/financial analysis and Conclusion and Recommendations.
MHP Components
MHP
Thanks!!!