Sie sind auf Seite 1von 2

ISTQB Foundation Level Practice Test : Part - 1

Date / Time
January 21, 2013 11:41 am

Student Score
95% (19 points)

Passing Score
65% (13 points)

Result
Congratulations, you have passed the mock test.

#
1

Question
Which of the following is NOT part of configuration management?

Correct Answer
Auditing conformance to ISO 9000 ; A Failure ; Calculating expected outputs ; Testing a released system that has been changed ;

Student Answer
Auditing conformance to ISO 9000 ; A Failure ; Calculating expected outputs ; Testing a released system that has been changed ;

Result
Correct

Points Awarded
1

A deviation from the specified or 2 expected behavior that is visible to end-users is known as_________ A typical commercial test execution tool would be able to perform all of 3 the following, Except ______________ Maintenance Testing is _______________

Correct

Correct

Correct

Non-functional system testing includes_______________

Testing quality Testing quality attributes of attributes of the system the system including including performance performance and usability ; and usability ; Performed by customers at their own site ; Inspection is appropriate even when there are no written documents ; Performed by customers at the software developer's site ; Inspection is appropriate even when there are no written documents ;

Correct

Beta testing is ________________________

Incorrect

Which of the following statements is NOT true?

Correct

8 9

Incidents would not be raised against________________ Static analysis Can not find _______________

Improvements Improvements suggested by suggested by users ; users ; Memory Leaks Memory Leaks ; ; It depends on It depends on

Correct Correct Correct

1 1 1

10 When should testing be stopped?

the risks for the system being tested ; 11 Expected results are __________________ The main focus of acceptance testing is ________________

the risks for the system being tested ; Correct 1

Most useful Most useful when specified when specified in advance ; in advance ; Testing from a Testing from a business business perspective ; perspective ;

12

Correct

Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the 13 following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries? Which of the following items would 14 not come under Configuration Management?

10000, 50000, 10000, 50000, 99999 ; 99999 ;

Correct

Live Data ;

Live Data ;

Correct

The difference between re-testing 15 and regression testing is ________________

Re-testing Re-testing ensures the ensures the original fault original fault has been has been removed; removed; regression regression testing looks testing looks for unexpected for unexpected side-effects ; side-effects ; LCSAJ ; LCSAJ ; Black box test design techniques all have an associated test measurement technique ;

Correct

16

Which of the following techniques is NOT a Black Box Technique?

Correct

Black box test design techniques all Which of the following statements 17 have an about component testing is FALSE? associated test measurement technique ; IEEE 829 test plan documentation 18 standard contains all of the following except ______________ 19 What is the purpose of a test completion criterion?

Correct

Test Test Specifications ; Specifications ; To determine when to stop testing ; To determine when to stop testing ;

Correct

Correct

20

Functional system testing is______________

Testing the Testing the end to end end to end functionality of functionality of the system as the system as a whole ; a whole ;

Correct

Das könnte Ihnen auch gefallen