Seminar on GREEN MANAGEMENT & Corporate Competitiveness ~ Tradeoff or Opportunities ?

JBIC Partnership Forum in Asia

50 Year Golden Year Indonesia ~ Japan Friendship

on Environment Management
Contribution of CO2 Reduction in Manufacturing & Logistic Activities
by Hidematsu Ibaragi (President Director) I Made Dana M.T (Senior General Manager)
Jakarta, November 4, 2008

TOYOTA WAY

TOYOTA MOTOR MANUFACTURING INDONESIA TOYOTA MOTOR MANUFACTURING INDONESIA

Presentation Outline
Page

1. INTRODUCTION.....................................................................................
* TMMIN Company Profile & Product Line Up..

3 3 5 5 10 11 12 26

2. TOYOTA POLICY ON ENVIRONMENT.


a. Toyota Global Vision b. TMMIN Environment Action Plan (Focus Item)

3. IMPLEMENTATION OF TMMIN ENVIRONMENT ACTIVITIES. > CO2 Reduction in Manufacturing & Logistic Activities. 4. CONCLUSION.

TOYOTA MOTOR MANUFACTURING INDONESIA

1. INTRODUCTION

Company Profile
Head Office
Jl. Yos Sudarso, Sunter II, Jakarta 14330 Phone (62-21) 6515551 (hunting), Fax. (62-21) 6515360

Total Employee
5,271 persons

Share Holders
Toyota Motor Corporation (95%), PT Astra International Tbk (5%)

Production Facility

Sunter I Plant :
Engine Plant (13,000 Units/Month) Packing Plant (5000 Units/Month) AREA : Land 41,527 m2

Sunter II Plant :
Casting Plant (1,000 Tons/Month) Stamping Plant (8,000 Units/Month) U-IMV Packing Plant (4,200 Units/Month) AREA : Land 129,275 m2

Karawang Plant :
Integrated Mfg. Facility Stamping, Welding, Painting, Assembling CAPACITY AREA : 100,000 Units/Year : Land 100 HA (Used 30 HA)

TOYOTA MOTOR MANUFACTURING INDONESIA

TMMIN Product Line Up


Starting of Production June 2008

Domestic Starting of Production Oct 2006

Domestic & Export Starting of Production Aug 2004

Domestic & Export

2004

2005

2006

2007

2008

TOYOTA MOTOR MANUFACTURING INDONESIA

Basic Toyota Global Vision Environmental Mission 2) Approach to Business Process


eo u u s f E tion Dev latio nv elo n iro pm nm en en t tal Inf orm ati on

a. Toyota Global Vision a. Toyota Global Vision

2. TOYOTA POLICY ON ENVIRONMENT

Th M e Ad ost in mi W r Re orl ed gio d & na Mo l Ha noz En rmo ukur vir ny i in G on wi lob me th S nt OC al W N C s ar m atu H om ing re S um plian Re D ocia an R ce so urc isc l C es with los on our R es ur trib ce eg
TOYOTA MOTOR MANUFACTURING INDONESIA

Approach 1) Approach to Environment Issue

Toyota Global Vision

Cycles of Nature Monozukuri in harmony with cycle of nature

Monozukuri means more than simply manufacturing products, but instead covers a set of activities and processes, from development through production to sales and service, that create added value to fully satisfy our customers.

TOYOTA MOTOR MANUFACTURING INDONESIA

Toyota Global Vision

Cycle of Industry Service of Social Development

TOYOTA MOTOR MANUFACTURING INDONESIA

Toyota Product Development


Ultimate Eco-Car
Issue

CO2 reduction
Issue

Alternative fuel HV Diesel HV

FCHV Plug-in HV THS II

Hybrid Technology
Energy issues Biofuels Synthetic fuels CNG DPNR Common rail DI D-4 Lean burn VVT-i EV

Issue

Air quality issues

Alternative fuel engines

Diesel engines

Gasoline engines

Electrical energy

Hybrid technology boosts performance for all powertrain systems


8 TOYOTA MOTOR MANUFACTURING INDONESIA

Toyota Global Environment Action Plan


Environment Focus Item
3. Substance of Concern Energy/ 2. Atmospheric Global Warming Quality
Reduce the discharge of substances (SoC)

4. Energy (Global Warming)


Reduce CO2 emissions in each country & region

Implement initiatives to reduce VOC emission

Recycling Substances Substances of of Concern Resources Of Concern

Reduction of Waste & Water

The Fourth Toyota The Fourth Toyota Environmental Action Plan Environmental Action Plan

1. Cooperation with Society


Disclosures of environmental information & two way communication

Management
Strengthen consolidated environment management

: Focus Explanation

Toyota Earth Charter


9 TOYOTA MOTOR MANUFACTURING INDONESIA

2. TOYOTA POLICY ON ENVIRONMENT b. TMMIN Environment Action Plan ( (Focus Item) b. TMMIN Environment Action Plan Focus Item)
1.Cooperation 1.Cooperation With Society With Society 2.Atmospheric 2.Atmospheric Quality Quality 3.Substance 3.Substance of Concern of Concern
CSR & Community Development Activities Reduce VOC (Volatile Organic Compound) from Painting process Incinerator Recovery Thinner Introduce ESG top coat stack Eliminate SoC in Part (4 heavy metal parameter) SoC free for Investigation & switch over Innova~Fortuner Reduce CO2 emission in manufacturing & logistic activities Manufacturing Alternative Energy Logistic Grasp CO2 data Fuel & truck efficiency Packing materials reduction Target Setting & PDCA Regional No.1 Local No.1 Zero Emission Zero Waste

Water borne

SoC free for Avanza

Follow up control & regular audit

4.Energy / / 4.Energy Global Warming Global Warming

Energy efficiency for process

Continuous improvement to reduce electric & fuel consumption (PDCA)

Recycling Recycling Environmental Environmental Management Management

Reduce water consumption & waste minimization Optimize reuse water Waste recycle (Hazardous) Waste Water Management Soil & Air Pollution

Continuous Cleaner Production Environment Performance

Implement ISO 14001 incorporated with Toyota Global EMS

Oct. 2007
10

2008

2009

2010

2011

TOYOTA MOTOR MANUFACTURING INDONESIA

3. IMPLEMENTATION OF TMMIN ENVIRONMENT ACTIVITIES


(Example & Focus Points)

3.1 Cooperation with Society 3.2 Atmospheric quality 3.3 Substance of Concern (SoC) 3.4 Energy / Global Warming

11

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.1 Cooperation with Society Objective : 1. Empowerment Community Surrounding TMMIN business 2. Perform TMMIN's concern and contribution to the country & society

Example 1)

Greenery Program
Plantation in surrounding TMMIN Location : Karawang Residence

Example 2)

Toyota Eco Youth Program

Environmental Improvement Contest for Senior High School student Scope : National (30 School, 13 Provinces)

Impact :
12

Contribution to local community Build trust with local groups Positive atmosphere
TOYOTA MOTOR MANUFACTURING INDONESIA

3. IMPLEMENTATION OF TMMIN ENVIRONMENT ACTIVITIES


(Example & Focus Points)

3.1 Cooperation with Society 3.2 Atmospheric quality 3.3 Substance of Concern (SoC) 3.4 Energy / Global Warming

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.2 Atmospheric quality


What is VOC ?
V OC Evaporated Organic Chemical

Reduce VOC (Volatile Organic Compound) from Painting


Improvement Example :
Optimizing use for Painting Robots
1. SURFACER ROBOT

Sunlight
Photochemical smog Suspended particulate matter (SPM)

Process
Recovery Thinner 2007

Use of Solvents Paints & Coating

Respiratory illnesses
(Impact of VOC)
Painting Process

2006

2. CLEAR ROBOT

TMMIN VOC (Emission) Reduction Achievement


68 65
67.16 64.21
gr / m2
= Actual = Target

70

Tack Time Change VOC Reduction : 1.01 g/m2

Change gravity to pump system VOC Reduction : 3.09 g/m2 2008

60
59.45
60

Application ESG (Electronic Static Gun)

55

Target 50
50

Major Activity

2006 Optimizing Paint Robot

2007 Recovery Thinner

2008 Application Electronic Static Gun

2009 Incinerator for top coat stack

2010 Water borne

ESG Application on Spray Clear (6 Guns) VOC Reduction : 1.22 g/m2

TOYOTA MOTOR MANUFACTURING INDONESIA

3. IMPLEMENTATION OF TMMIN ENVIRONMENT ACTIVITIES


(Example & Focus Points)

3.1 Cooperation with Society 3.2 Atmospheric quality 3.3 Substance of Concern (SoC) 3.4 Energy / Global Warming

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.3 Substance of Concern (SoC)


Progress Status 2007~2008
No 1 Vehicle Innova, Fortuner Total Part (SoC content) 130 parts Status SoC Free 100% Remark as 1 Agt 2008

Eliminate SoC in Part : Lead (Pb), Cadmium (Cd), Mercury (Hg), Hexavalent Cromium (Cr6+)
Part Example : Bracket Exhaust Tail
CR 6+ CR 6+

Avanza

20 parts

On Progress

Target complete 2009 Dec 2009


Before (SoC content) (SoC After (SoC Free) (SoC

Total Suppliers (SoC) 97 Companies


2 Companies (Remaining) 20 Parts

Total Parts (SoC) Avanza


Bulb
Pb, Cd Pb,

Stay Head Rest


CR 6+

95 Companies (SoC Free)

Innova Fortuner

130 Parts (SoC Free)

TOYOTA MOTOR MANUFACTURING INDONESIA

3. IMPLEMENTATION OF TMMIN ENVIRONMENT ACTIVITIES


(Example & Focus Points)

3.1 Cooperation with Society 3.2 Atmospheric quality 3.3 Substance of Concern (SoC) 3.4 Energy / Global Warming

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.4 Energy / Global Warming


TMMIN CO2 Reduction Activities TMMIN CO2 Reduction Activities

Reduce CO2 emissions Reduce CO2 emissions Manufacturing Manufacturing

Reduce CO2 emissions Reduce CO2 emissions Logistic Logistic

B1
Internal Logistic Internal Logistic

B2

External Logistic External Logistic Logistic Logistic

a. Local Parts Delivery System b. Packing Container Efficiency Up

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities


A. CO2 Reduction in Manufacturing Activities
FY 2007 ~ 2008 : Utilization of alternative energy

CO2 Generated
Ton CO2/Unit

0.48 0.45 0.43


as Sept 0 8

Reduction Target 15% 0.414 0.407


Target

0.6 0.5 0.4 0.3 0.2 Replacement of Diesel Oil with Natural Gas

CO2 reduction : 274 ton CO2 / Month Total Invest :Rp. 11.5 Billion Cost reduction : Rp. 1,4 Billion/Month

06

07

08 Year

09

10

Return on Investment : 9 Months

Future Activity : > Improve process for energy efficiency

TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.4 Energy / Global Warming


TMMIN CO2 Reduction Activities TMMIN CO2 Reduction Activities

Reduce CO2 emissions Reduce CO2 emissions Manufacturing Manufacturing

Reduce CO2 emissions Reduce CO2 emissions Logistic Logistic

B1
Internal Logistic Internal Logistic

B2

External Logistic External Logistic Logistic Logistic

a. Local Parts Delivery System b. Packing Container Efficiency Up

TOYOTA MOTOR MANUFACTURING INDONESIA

B1. CO2 Reduction in Internal Logistic Activities

TMMIN

CO2

CO2

PRODUCTION LINE

Volume
(Stock, Space)

Supplier

Store

Lead Time (L/T) BASIC THINKING Volume & L/T


Machine Machine Man Man by 4 M Analysis
(Man, Machine, Material, Method)

Forklift Forklift Towing Towing Operator Operator Others Others


Forklift Forklift Towing Towing Operator Operator Others Others
Forklift Forklift Towing Towing Operator Operator Others Others

REDUCE VOLUME & REDUCE VOLUME & LEAD TIME LEAD TIME
COST COST REDUCTION REDUCTION CO2 CO2 REDUCTION REDUCTION

Time
TOYOTA MOTOR MANUFACTURING INDONESIA

Internal Logistic Improvement Example

REDUCE FORKLIFT OPERATION at ENGINE PLANT LOGISTIC SYSTEM


BEFORE
C R A N K S H A F T M A C H IN IN G L IN E
C R A N K S H A F T M A C H IN IN G L IN E

AFTER
M A C H IN IN G

FORKLIFT SPACE : :2,154 m2 FORKLIFT SPACE 2,154 m2 FORKLIFT : :33Units FORKLIFT Units COST/DAY : :Rp. 216,000 COST/DAY Rp. 216,000 CO2 2: :690 Kg/Day CO 690 Kg/Day
CAM SHAFT M A C H IN IN G L IN E M A C H IN IN G C Y L IN D E R B L O C K L IN E FINISH GOOD ENGINE

C Y L IN D E R H E A D M A C H IN IN G L IN E

BIG PART AREA

EMPTY PALLET AREA SHORTAGE TANK

BIG PART AREA TRANSIT AREA


PART DEFFECT AREA

FORKLIFT SPACE : :1,820 m2 FORKLIFT SPACE 1,820 m2 FORKLIFT : :22Units FORKLIFT Units COST/DAY : :Rp. 144,000 COST/DAY Rp. 144,000 CO2 2: :460 Kg/Day CO 460 Kg/Day
CAM SHAFT M A C H I N I N G L IN E FINISH GOOD ENGINE C Y L IN D E R B L O C K L IN E

C Y L IN D E R H E A D M A C H I N I N G L I N E

BIG PART AREA

EMPTY PALLET AREA SHORTAGE TANK

BIG PART AREA TRANSIT AREA


PART DEFFECT AREA

DELIVERY KARAWANG

DELIVERY KARAWANG

SUB MAIN LINE

BP
RECEIVING CHECK RECEIVING CHECK

SUB MAIN LINE

BP
RECEIVING CHECK RECEIVING CHECK

BP
PACKING AREA PALLET SAFETY STOCK PALLET SAFETY STOCK MACHINING PART MACHINING PART

BP
PACKING AREA PALLET SAFETY STOCK PALLET SAFETY STOCK MACHINING PARTPART MACHINING

PREPARE ENGINE COLLECT AREA TEMPORARY AREA

RECEIVING 1 F
RECEIVING CHECK RECEIVING CHECK

PREPARE ENGINE COLLECT AREA TEMPORARY AREA

RECEIVING 1 F
RECEIVING CHECK RECEIVING CHECK

BP

BP

BP

BP

B B

BP

BP

BP

BP

B B

RECEIVING CHECK

RECEIVING CHECK

RECEIVING CHECK

RECEIVING CHECK

EMPTY STORE

EMPTY STORE

UNBOXING AREA
ASSY LINE TR

EMPTY STORE

RECEIVING 1 E
RECEIVING CHECK RECEIVING CHECK

UNBOXING AREA

EMPTY STORE

RECEIVING 1 E
RECEIVING CHECK RECEIVING CHECK

OVER FLOW
FREE LOCATION RACK
TEST BENCH TR
B

TEST BENCH TR

WAITING LANE
BP
AREA TRAINNING CENTER

Utilize Towing or Manual Handling


B

ASSY LINE TR

OVER FLOW
FREE LOCATION RACK

WAITING LANE
FREE LOCATION RACK

BP

FREE LOCATION RACK

BP

BP

1 2

1 2

AREA TRAINNING CENTER

EMPTY BOX READY DELIVERY TO SUPPLIER

EMPTY BOX READY DELIVERY TO SUPPLIER

A A A

PROGRESS LANE 4 AREA 5


M121 M121 M126 M126 J004 J004 M125 M125

A A

PROGRESS LANE 4 AREA 5


A M121 M121 M126 M126 J004 J004 M125 M125

J040 J076 J011 J023 M18C M18B M18A J020 J040 J076 J011 J023 M18C M18B M18A J020

PC STORE AREA

P1B P1B 15 14

OK M

M M 010 009

P1B P1B P1B P1B P1B P1B 12 11 10 09 08 07

J016 M J016

6 7 76
B

KANBAN ROOM
KANBAN ROOM OASIS LOGISTIC TR

J040 J076 J011 J023 M18C M18B M18A J020 P1B P1B J040 J076PC STORE AREA M18A J011 J023 M18C M18B

15
J020

14

OK M

M M 010 009

P1B P1B P1B P1B P1B P1B 12 11 10 09 08 07

J016 M J016

6 7 76
B

KANBAN ROOM
KANBAN ROOM OASIS LOGISTIC TR

PC STORE AREA

0051 O K M

PC STORE AREA

0051 O K M

8
START

8
START

9
P3A 27 P3A 26 P3A 25 P3A 24 P3A 23 P3A 22 P3A 21

9
P3A 27 P3A 26 P3A 25 P3A 24 P3A 23 P3A 22 P3A 21

P2A P2A P2A P2A PC STORE AREA17 20 19 18

P2A 16

P2A 15

P2A 14

P2A 13

P1A

P1A 10

P1A
9

11

PC STORE6 AREA 8 7 5

P1A

P1A

P1A

P1A

P1A 4

P1A 3

P1A 2

P1A 1

10 11

PC STORE AREA17 20 19 18

P2A

P2A

P2A

P2A

P2A

P2A 15

P2A 14

P2A
13

P1A
11

P1A 10

P1A 9

16

PC STORE6 AREA 8 7 5

P1A

P1A

P1A

P1A

P1A
4

P1A 3

P1A 2

P1A
1

10 11

OASIS ASSY TR

OASIS ASSY TR

START

12

START

12
Remarks : = Area Forklift

- TOWING A = FILL IN LOCAL PART - TOWING B = FILL IN IMPORT & SUPPLY

Remarks :

= Area Forklift

- TOWING A = FILL IN LOCAL PART - TOWING B = FILL IN IMPORT & SUPPLY

: Forklift need : Forkliftless

1) Productivity : Space Reduction for Forklift Operation : 334 m2 Forklift Reduction : 1 Unit 2) Safety : Reduce potential forklift (car) accident 3) Environment : CO2 Reduction : 230 Kg/Day 4) Cost : Reduction : Rp. 72,000/Day TOYOTA MOTOR MANUFACTURING INDONESIA

3. Implementation of TMMIN Environment Activities 3.4 Energy / Global Warming


TMMIN CO2 Reduction Activities TMMIN CO2 Reduction Activities

Reduce CO2 emissions Reduce CO2 emissions Manufacturing Manufacturing

Reduce CO2 emissions Reduce CO2 emissions Logistic Logistic

B1
Internal Logistic Internal Logistic

B2

External Logistic External Logistic Logistic Logistic

a. Local Parts Delivery System b. Packing Container Efficiency Up

TOYOTA MOTOR MANUFACTURING INDONESIA

B2. a. CO2 Reduction in External Logistic Activities TMMINs Logistics Supply Chain
B.2a
CO2

EXTERNAL LOGISTICS EXTERNAL LOGISTICS B.2b


CO2 CO2

Local Supply Parts (LSP) Export


Port

Volume

TMMIN Production Plant Import Parts (MSP/JSP)


Port

Importer

CO2 CO2

Tact Time :
Main Distributor

Lead Time (1)

Lead Time (2)

Working Hours No. of Production/Sales

BASIC THINKING
Volume & L/T
Machine Machine

by 4 M Analysis
(Man, Machine, Material, Method)

Volume & L/T


Same Concept
Machine Machine

by 4 M Analysis
(Man, Machine, Material, Method)
REDUCE VOLUME REDUCE VOLUME
(Truck Efficiency, Lot) (Truck Efficiency, Lot)

Truck Truck Efficiency Efficiency Operator // Operator Driver Driver


Truck Truck Efficiency Efficiency Operator // Operator Driver Driver

Truck Truck Efficiency Efficiency Operator // Operator Driver Driver


Container efficiency Container efficiency Part Module Part Module
Truck Truck Efficiency Efficiency Operator // Operator Driver Driver
Container efficiency Container efficiency Part Module Part Module

(Waiting time, Stagnant time, etc) (Waiting time, Stagnant time, etc)

&& LEAD TIME LEAD TIME

Man Man Material Material

Man Man Material Material

COST COST REDUCTION REDUCTION

CO2 CO2 REDUCTION REDUCTION

Part, Stock Part, Stock

Part, Stock Part, Stock

Time

Time 2 TOYOTA MOTOR MANUFACTURING INDONESIA

Truck Transportation ( Example )

TMMIN LOCAL SUPPLIER MAP SUNTER


TMMIN

CIBITUNG/CIKARANG BEKASI
TMMIN

TANGERANG

KARAWANG/CIKAMPEK

BOGOR
2

= TMMIN Direct Supplier = TMMIN Milkrun Supplier TOYOTA MOTOR MANUFACTURING INDONESIA

External Logistic Improvement ( Example )

LOCAL PARTS DELIVERY SYSTEM


Before : Direct Delivery
29 Km 28 Km 25 Km Cikarang 33 Km 36 Km 39 Km Cibitung Cibitung

After : Grouping Delivery

TOTAL ACHIEVEMENT UP TO SEPT 2008

Distance Reduction 43200


33 Km
42400

1,128 Km/day
42,560 41,433

TMMIN
Karawang Plant

Cikarang

TMMIN
Karawang Plant 46 Km

41600

40800

Before
10400 Fuel Reduction

After

6 Delivery/Day, 190Km
Empty Space

2 Delivery/Day, 79Km
9600

262 L/day

9,874 Loading Efficiency : 89%


8800

9,613
Before After

Empty Space

CO2 Emission Reduction


27 26 25 24 23

28

68O Kg/day
25.9 25.2

Before After TOYOTA MOTOR MANUFACTURING INDONESIA

B2. b. Packing Container Efficiency Up TMMINs Logistics Supply Chain


B.2a
CO2

EXTERNAL LOGISTICS EXTERNAL LOGISTICS B.2b


CO2 CO2

Local Supply Parts (LSP) Export


Port

Volume

TMMIN Production Plant Import Parts (MSP/JSP)


Port

Importer

CO2 CO2 Main Distributor

Lead Time (2)

BASIC THINKING
Volume & L/T
Machine Machine

by 4 M Analysis
(Man, Machine, Material, Method)

Volume & L/T


Same Concept
Machine Machine

by 4 M Analysis
(Man, Machine, Material, Method)
REDUCE VOLUME REDUCE VOLUME
(Truck Efficiency, Lot) (Truck Efficiency, Lot)

Truck Truck Efficiency Efficiency Operator // Operator Driver Driver


Truck Truck Efficiency Efficiency Operator // Operator Driver Driver

Truck Truck Efficiency Efficiency Operator // Operator Driver Driver


Container efficiency Container efficiency Part Module Part Module
Truck Truck Efficiency Efficiency Operator // Operator Driver Driver
Container efficiency Container efficiency Part Module Part Module

(Waiting time, Stagnant time, etc) (Waiting time, Stagnant time, etc)

&& LEAD TIME LEAD TIME

Man Man Material Material

Man Man Material Material

COST COST REDUCTION REDUCTION

CO2 CO2 REDUCTION REDUCTION

Part, Stock Part, Stock

Part, Stock Part, Stock

Time

TOYOTA MOTOR MANUFACTURING INDONESIA 2

Time

Packing Improvement Example

PACKING CONTAINER EFFICIENCY UP (CKD Export to Philippine)


Before : Direct Delivery After : Milk Run Delivery
ACHIEVEMENT UP TO SEPT 2008 CONTAINER EFFICIENCY
96% 94%

94 %

TMMIN Packing

Importer

TMMIN Packing

92%

Importer

90% 88%

66 Container/Day

54 Container/Day

8 6%

86% 84%

0 82%

B efore

A fter

EMPTY SPACE

NO EMPTY SPACE

NUMBER 100
80 60 40 20 0

OF CONTAINER

20 Cont./day

Before

After

CO2 EMISSION REDUCTION

Trucking :

3150 Kg/Day
Shipping (130 Ton/Cont):

674,700 Kg/Day
2 TOYOTA MOTOR MANUFACTURING INDONESIA

4. Conclusion

1. Environment conservation is important to be done to save the earth & as corporate social responsibility (CSR) 2. Environment management activities aligned with company goal to reduce cost and increase efficiency 3. To achieve cost reduction & CO2 reduction in manufacturing and logistic activities, it will maximize achievement of corporate competitiveness

TOYOTA MOTOR MANUFACTURING INDONESIA

TOYOTA MOTOR MANUFACTURING INDONESIA