OLUKA BEN PLOT 2 NTINDA P.O BOX 6199 Kampala, Uganda Mobile No.: +256-781416840/+256-792416840/+256-701308140 E-mail: b.olukaben@yahoo.com/benoluka10@gmail.

com PERSONAL PROFILE I am adaptable and enthusiastic individual, who has been in the field concerning electrical, IT and Telecommunication projects running across the country but having passion of exploring and creating new ideas and challenging tasks. I am positive and self motivated person with ability to produce excellent and quality output. I am ecstatic, reliable, hardworking and ready for challenges. EDUCATION BACKGROUND 2009-2011, Department of Information Technology, Uganda Institute of Information and Communication Technology. Diploma in Telecommunication Engineering CGPA 4.36 My studies was dealt with concern of public and high rate of developing and expanding communication medias, some course units that played major role; Engineering project. Data Communication and Networking Mobile Radio Technologies. Book keeping and Entrepreneur Skills. Computer Hardware and Maintenance. Workshop Practice. Introduction to Satellite Technologies. Computer Programming. 2007-2008 Uganda Advanced Certificate of Education. A-Level, Old Kampala Senior Secondary School. Subjects done: Physics, Economics, Mathematics and Entrepreneurship. 2003-2006 Uganda Certificate of Education. O-Level, Ngora High School Subjects done: English, Mathematics, History, Geography, Commerce, Chemistry, Biology, Technical Drawing. WORKING EXPERIENCE January 2013-February 2013: Huawei ATN/CX radio Installation under SIYO electronics. Main duties: Installation of the chassis ATN 910/ATN 950 to the 19 inch or ETSI cabinet and these involves fixing the float nuts to the 19 inch cabinet or ETSI cabinet. Installation of the protection grounding cable and various according to where ATN is to be installed either 19 inch or ETSI cabinet.

Oluka Ben

Page 1

Installation of power cable by ensuring that color code blue should be positive that carries 48volts and black carries 0 volts. Maximum working current should be 6.5amperes to protect the ATN radio. Installation of the E1 cable from the ATN to the DDF rack. Installation of the optic fiber which should pick the link from the far end. Ensuring that the routing of power and grounding cable should be separate from the signal cable. Its mandatory to ensure proper power supply and current to the ATN radio. The cables should be labeled to ensure proper routing and identification in time of maintenance. Checking all the termination made for cable connectivity like power, E1 and Optic fiber Report drafting and writing.

November 2012-January 2013: ORANGE INALA Technologies Installation under QTE Main duties

Configuring of SAM2 version from V2.26 to V2.34 by uploading the new version to comply with the standards of the SAM2 version.
Terminating all the site alarms to where they are monitored and this includes; motion sensors, gate sensors, fuel probes, tank lid sensor, water sensor, ACM, Utility grid meter , MPF are all monitored at the SAM2 RMS02 units. Running all alarms cables through underground conduits by ensuring that they are laid at about 6 inches down. Termination of mains phase and frequency(MPF) to monitor the mains or phase related failures. Monitoring of generators and mains contacts on load plus running(the mains could be running but not loading or generator could be running but not loading so we need to monitor both running and loading). Ensuring that the voltage powering the SAM2 RMSO3 should be 48Vdc from battery backup system. Utility grid should also be monitored to ensure and establish power consumption at the site. All alarms(motion and gate sensor) are terminated to the cable termination unit(CTU) at SAM2 RMS03 where they are monitored at the NOC centre. Motion sensor is configured in such a way that it views the gate, generator any movements at the site. By using proper color coding to ensure safety and operation of the systems and units. Motion sensor is installed in a way that it has to be at about 1.8 meters above ground level to ensure proper functionality.

September -November 2012 WARID Site Installation under SIYO electronics Main Duties: Setting up link between the far end and near end by ensuring proper power to the ODUs of about approx. 3.4Volts. Creating and making connectors for IF and feeder cables for microwave and panel antennas.
Oluka Ben

Page 2

Upgrade of site coverage and increasing in the channels by creating in E1. Earthing all the equipments on the sites to ensure safety by using proper earthing kits like earthing rod and earthing bar for general earthing. Bonding of connectors, earthing points of feeders and IF to ensure proof from water. Running the RF cables from panel to the transmission cabinet( involves jumper cables and feeder cables). Running power cables for both AC power and DC power from DB and Batteries respectively. Powering the site equipments by ensuring proper power to ensure that no equipment is blown. Hoisting of panel antenna to the correct poles of the tower to ensure proper coverage to the right azimuth. Ensuring that the panel is at the correct coverage and to face where is densely populated area with correct MDT.

May 2012: POWER MAINTENANCE FOR WARID TELECOM UGANDA Main duties:

Battery integrity tests on load on MSC 1(Crane Chambers) and MSC 2(Bugolobi) on behalf of Warid within 3 days. Power Audit for all site equipments, and this involved cable size and capacity identification, tracing energy flow for both AC and DC from the primary sources plus secondary sources up to the final loads which involved designing line diagrams to show the energy flow. Node identification for all equipments, their function and capacity
Test the charging voltage for the cross and individual batteries on each bank. Test and record the load voltage for each bank and individual batteries at given time interval. Identify the faulty and good batteries upon carrying load test for individual batteries. Ensure that the rectifier and UPS load voltages do not drop below 48V and 480V respectively. Comment and recommend upon test carried out basing on individual batteries Identify Battery Backup unit like UPS (Uninterrupted Power System) and Rectifier system. Report drafting and writing.

Skills Acquired: Capable to work with high voltages in electrical field Ability to work for extra hours to achieve the maximum output Able to carry on the responsibilities and accomplish them Technical knowledge when dealing with more sensitive sites for WARID FEB-MARCH 2012 Site Auditing Project for WARID TELECOM contracted by NETIS Main Duties: General condition and comments on road access.

Testing the earthing of the site using a megometer. Page 3

Oluka Ben

Testing if the equipments on site are receiving power from AC or DC and continuity and voltages of the aviation lights Testing for the operation of the sites lights and switches (security lights , equipment internal lights ,sockets and photo sensors)
Checking on the monitoring and alarm systems, there condition and comment.

Testing the Air Cons if they can swap as per the time intervals.
Conducting battery load test document the result, check on corrosion and connectivity of battery terminals.

Power Audit for all site equipments, and this involved cable size and capacity identification, tracing energy flow for both AC and DC from the primary sources plus secondary sources up to the final loads which involved designing line diagrams to show the energy flow. Node identification for all equipments, their function and capacity
Checking on general operation of batteries and carrying out battery charging system. Checking on electrical installation like DBs, CBs and electrical meter. General generator functionality and carryout three phase test like red phase, white phase and blue phase. Providing photos to evidence on general information about the site audited.

Report drafting and writing.

Skills Acquired: Attained electrical knowledge on three phases, battery load test, manual and automatic operation of the generator and alarm clearing techniques. Developed ability to work as group with effective communication and executed tasks as group

Punctuality at work place and project meetings.


Exposed to Telecoms equipments like alarm systems, rectifier cabinets and generators. Being analytical in solving and rectifying problems. Acquired knowledge in Auto CAD when drawing site layout and tower.

AUG-DEC 2011 Site Auditing Project for MTN TELECOM Company contracted to HUAWEI Main Duties:

Confirming the configurations of the BTS radios. Using the BTS site master to test for power measurements, DTF (Distance to Fault), Return losses, VSWR (Voltage Standing Wave Ratio) and sweeping tests. Measuring the azimuth and tilts of the antennas on the site Testing the alarms on the site like the smoke, door intrusion ,cabinet ,generator and fuel alarms Testing the operation of the security and aviation lights and confirming the voltages they use on site. Confirming the transmission and proper BTS terminations on the krone blocks. Checking and clarifying the states of access roads towards the site.

Oluka Ben

Page 4

Confirming the firmness of the tower. Experience in site sweeping and BTS Transmission power testing using site master plus a power tester machine. Tributary testing for continuation (MTN Site Audit). Base Transceiver Station installation. Casting of Generator sets, Radio Base Stations/Base Transceiver Station slabs.
Checking and recording IDU+ODU configuration. General condition and comment on access road to the site. Measuring and recording the azimuth, mechanical down tilts and electrical down tilts of panel antenna. Identifying and comment on site general Earthing condition and provide photos. Identifying and differentiate types of technologies installed like CDMA, 2G, 3G and Wimax.

Report drafting and writing.

Skills Acquired: Gained strong practical skills in MS-word, and Excel. Flexible and ability to work at any given condition and place. Able to associate with any group of people. Acquired knowledge on dealing with Telecoms software like OMT for ERICCSON RADIOS and LCT for HUAWEI RADIOS. Able to calibrate site master to carryout VSWR, Return Loss and Distance to Fault Ratio. MAY-JUNE 2009 Boom Internet Cafe And Computer Training Center, Certificate in Computer Applications. Applications done: Microsoft Word. Microsoft Excel. Microsoft Access. Microsoft PowerPoint. As a course done at Boom I was guaranteed part time job dealing in: Customer delivery with internet services using NET TIME to manage package requested by customer. Solving problems involved in internet slowdown and failure which inconveniences customers. Access in dealing with other devices like scanners, printers and photocopies. Acquired knowledge in access internet and computer solution criteria. Reliable in creating business cards and typing for companies projects. Due to my quality work and punctuality in the office I was also guarantee as computer application trainer to the students.

Oluka Ben

Page 5

TECHNICAL SKILLS Familiar with windows 7, vista and ultimate and I am in position to write project proposals and reports. I was able to build circuit with passive and active components that was capable of muting audio system when phone rings, currently learning Auto Cad skills in wide coverage. INTERESTS AND OTHER ACTIVITIES I am a person with self-esteem to respect and care for others by sharing their success and failures. Love to read self-motivate books that build me emotionally and mentally like How to Enjoy in plenty. REFEREES Mr. DUNSTAN KIGENYI Operations Manager ENTHUSIA GROUP LTD PLOT 63 NAGURU DRIVE Tel: +256-777197074/+256-701493110 Mr. MUZAMMIL WEPUKULU Administrator SIYO Electronics Tel: +256-777230718/+256-704557354 ENGINEER LUBANGAKENE COLLIN Field Engineer SPOVO LTD Tel: +256-777197074/+256-701493110