Sie sind auf Seite 1von 2

TO, JMD HVAC BORIVALI, MUMBAI.

DATED:23.01.2013.

SUBJECT: Quotation of Your Job In VT (Tata Office) G. I Ductings, Duct Dampers, Grills, Insulation. SR.NO ITEMS/ DESCRIPTION Supply Rate Of Materials 49/- Per Sqft

1 Charges For G. I Ducting In 24 Guage (0.60) With


Materials Like G. I Sheet, 8mm Full Trading Rods, 1 X 1 Support Angle, Normal Fasteners & Nut Bolds. 1mm To 750mm Slip Joint. Charges For G. I Ducting In 22 Guage (0.70) With Materials Like G. I Sheet, 8mm Full Trading Rods, 1 X 1 M.S Support Angle, Normal Fasteners & Nut Bolds. 751mm To 1500mm Flange Joint. Charges For G. I Ducting In 20 Guage With Materials Like G. I Sheet, 8mm Full Trading Rods, 1.5 X 1.5 M. S Support Angle, Normal Fasteners & Nut Bolds. 1500mm To 2400 Flange Joints. Acoustic Insulation 48Kg Density 12mm Thick With Nut Bold, Aluminum Perforated Jally Nitrle Rubber Supply & Fixing 9mm Thick In Ducting. Made Accoflex Nitrle Rubber Supply & Fixing 13mm Thick In Ducting. Under Take Nitrle Rubber Supply & Fixing 19mm Thick Cloth Canvass Supply & Fixing Upto 30

55/-Per Sqft

72/-Per Sqft

5 6 6a 7 8

32/-Per Sqft 38/- Per Sqft 45/- Per Sqft 56/- Per Sqft 1050 Per Nos 1250 Per Nos 1400 Per Nos 1600 Per Nos

8a Cloth Canvass Supply & Fixing Above 30 To 60 8b Rexine Canvass Supply & Fixing Upto 30 8c Rexine Canvass Supply & Fixing Above 30 To 60

9 Fixing Of Voice Control Damper 10 Grill Fixing Till 900mm Size 10 Charges For Extra Rods & M. S Supports Angles For
Supporting With Welding & Paint Charges

85/- Per Sqft 48/Running Feet 16000/-

Supply Rate 285/- Per Sqft Supply Rate 250/- Per Sqft

TERMS & CONDITION.


1. Work Order Should Be Released Before Starting The Job With All This Points Included. 2. Any Esic Or PF Of Labour Will Be Bear By you. 3. Safety Equipments If Required Then Only Helmets & Safety Shoes Will Be Supplied By us. 4. We Will Supply Full Trading Rod Till B.O.D 1200 Not More Than That, After That It Will Charged Extra. 5. Scaff Folding 2.5 Per Sqft Will Be Charged If Height Is More Than 12 Feet. 6. After Main Ducting Hanging Up Measurement Will Be Done By You [Measurement Satisfying ] 7. Any Ducting Will Be Cancelled Or Change As Per Drawing You Will Have To Bear The Loss, & New Work Will Be Done On Writing Basis By Your Super Visior. 8. Idol Labour Will Be Charged 600 Tinsmith & 450 Helpers Per Day, Any Reason Due To Location Or Work Permit. 9. Payments Terms Should Be 50% When The Materials Will Be Dumped At Your Site 30% When The Ducting Is Hanged Up Half & Then Continuous With The Running Bills.

Hope You Will Looks Our Terms & Condition With The Following Rates & Work Will Be Smoother.

For, S. A SHEET METAL WORKS.

Das könnte Ihnen auch gefallen