SYNCHRONIZING WITH GRID Ensure that ammonia PCC 1A feeding is from TP 31 Ensure that CPP PCC 9 feeding is room

room TC 2 Ensure that UREA is fed from SWB 11 Ensure that SAPA is fed from SWB 11 and also TG I NGR is closed Trip MSS tie breaker from CPP control room Trip Bus coupler A from CPP control room. Trip Bus coupler B from CPP control room After TG I turbine is brought to rated speed, close PMG of TG I in TG I AVR panel Select excitation control of TG I in Auto mode Close field circuit breaker of TG I, the TG I voltage automatically comes to 9 KV. Adjust the voltage of TG I in order to match grid voltage using AVR voltage setter. Close TG I generator circuit breaker. Set load limiter for TG I. Close Bus coupler A from CPP control room Close Bus coupler B from CPP control room Select the Auto/Manual /DLC switch of MSS bus tie breaker in Manual mode and check whether the synchroscope rotates in FAST direction Inform ammonia and OSB control room about the syn Line up second Incomer in MSS with RPT link dropped Select the Auto/Manual/DLC switch of MSS bus tie breaker in Auto mode, the Bus tie breaker automatically closes at the point of syn. After ensuring that the syn has taken place switch on TG I APFR. Select Auto/ Manual/DLC switch of Bus tie breaker in DLC mode. Switch ON TSD and inform of TSD selection to MSS. After load on TG I has increased, inform CPP control room and switch OFF second incomer in MSS.

SYN OF TG 2 WITH GRID Ensure that ammonia PCC 1A feeding is from TP 31. Ensure that CPP PCC 9 feeding is from TC II. Ensure that UREA is fed from SWB11. Ensure that SAPA is fed from SWB 11. Ensure that TG II NGR is closed. Trip MSS tie breaker from CPP control room, Trip Bus coupler A from CPP control room Trip Bus coupler B from CPP control room After TG II turbine is brought to rated speed, close PMG of TG II in TG II AVR panel Select excitation control of TG II in Auto mode Close field circuit breaker of TG II . The TG II voltage automatically comes to 9 KV, adjust the voltage of TG II in order to match grid voltage using AVR voltage setter. Close TG II generator circuit breaker

Set load limiter for TG II Close Bus coupler A breaker from CPP control room Close Bus coupler B breaker from CPP control room Select Auto/Manual/DLC switch of MSS tie breaker in Manual mode and check whether the synchroscope rotates on FAST direction. Inform ammonia and OSB control rooms about the sync Line up second incomer in mss with RPT links dropped. Select Auto/Manual/DLC switch of MSS bus tie breaker in Auto mode . The bus tie breaker automatically closes at the point of sync. After ensuring that the sync has taken place, switch ON TG II APFR. Select Auto/Manual/DLC switch of Bus tie breaker in DLC mode Switch ON TSD and inform of TSD selection to MSS. After load on TG II has increased, inform CPP control room, and switch OFF second Incomer in MSS.

Syn of TG II with grid and TG I combination. Syn of TG I with grid and TG II combination Syn of TG I and TG II combination with grid after grid power resumption Action for during grid power failure when TG I is running parallel with grid. Normaling Action for during grid power failure when TG II is running in parallel with grid. Normalizing Action for during grid power failure when TG I and TG II are running in parallel with grid Normalizing Action for during TG I tripping when TG I is running in parallel with grid Normalizing Action for during TG II tripping when TG II is in parallel with grid Normalizing Action for TG II and TG II tripping when both are in parallel with grid. Normalizing Action for during total power failure

Primary injection test


1. Discharge the feeder first. 2. Note down the details of substation and feeder, CT ratio and relay setting 3. Ensure that the actuation of the particular relay does not affect other relays or feeders. 4. Short buses of R & Y phases at one side of CT. 5. Connect the probes of test kit across R & Y phases at the other end of CT. 6. Open the relay cover at the front panel. 7. Apply 50% of the CT rated current with primary injection test kit 8. Measure the current at the relay terminals, ammeters and confirm the CT ratio according to the wiring connection and note down the values in the check list. 9. Repeat the procedures from 3 to 8 for other combination of phases also. 10. Apply 20% of current setting to R phase CT alone and measure the current at the relay terminal and ammeter and confirm the ratio, notedown the observations in the check list. 11. Apply 20% of current setting to B & Y phases CT alone and measure the current at the relay terminal and ammeter and confirm the ratio, notedown the observations in the check list. 12. Clean the relay casing 13. Replace the relay cover 14. Remove the current probes 15. Ensure that tools are removed and box up the panel door

Secondary injection test


Remove the relay from the casing Note down the relay details like sl.no, plug setting and time setting in the check list. Apply 200% of CT current setting to the relay and note down the relay operating time and confirm it with the time as per the graph. Apply 400 % , 60% , 800% and 1000% of the current setting to the relay and note down the relay operating time, confirm it with the time as per the graph Apply 200 % of the relay setting for each plug setting of the relay and note down the operating time of the relay. The operating time for all the plug settings must be equal Apply 90 % of the rated current to the relay and slowly raise the current and observe the disc pick current. The pick up current must be between 105% and 130% of the relay setting Check the IR value of the relay, check the tightness of the terminals and contacts condition Normalize the relay setting and TMS setting Replace the relay in the casing and push back the cover Return the permit

Secondary injection to directional o/c relays

Remove the relay from the casing Note down the details like sl. No and plug setting and time setting in the check list Apply 200 % of current setting to the relay and note down the relay operating time Confirm it with the time as per the graph Apply 400%, 600%, 800% and 1000% of the current setting to the relay and note down the relay operating time. Confirm it with the time as per the graph Apply 200% of the relay setting for each plug setting of the relay and note down the operating time of the relay. The operating time for all the plugsetting must be equal Apply 90% of the rated current to the relay and slowly raise the current and observe the disc pick up current The pick up current must be between 105 % and 130 % or the relay setting Observe the current dir for each of the above check up and ensure the operation of directional also Check the ir. Value , check the tightness of the relay terminals and contacts condition Normalize the relay setting and tms setting Replace the relay in the casing and push back the cover. Return the permit

Secondary injection foe instantaneous relays

*Remove