Sr.No Material IS Code Name of Test Equipments Acceptance criteria Purpose of test

Methods of Physical Tests for Hydraulic Cement:Determination of Le-chatelier Find the expansive
1 Cement IS:4031(Part 3):1988 Expansion<10 mm
Soundness apparatus properties of cement
Methods of Physical Tests for Hydraulic Cement:Determination of Vicat Water requirement for
IS:4031(Part 4):1988 30%
Consistency of Standard Cement Paste Apparatus hydration of cement
Initial setting not less than
Methods of Physical Tests for Hydraulic Cement:Determination of Initial & Vicat Placement & Hardening
IS:4031(Part 5):1988 30 min. &Final not more
Final Setting Time Apparatus to gain strength
than 600 min.
Find the Maximum Dry
Methods of Physical Tests for Soils:Determination of Water Content-Dry Compaction OMC=12 to 16 % MDD Density (M.D.D) &
2 Soil IS:2720(Part 7):1980
Density relation using light compaction Test Apparatus about 1.9 g/cc Optimum Moisture
Content( O.M.C)
Find the Maximum Dry
Methods of Physical Tests for Soils:Determination of Water Content-Dry Compaction OMC=12 to 16 % MDD Density (M.D.D) &
IS:2720(Part 8):1980
Density relation using heavy compaction Test Apparatus about 1.9 g/cc Optimum Moisture
Content( O.M.C)

<10% Exceptionally
Aggregate Strong, 10-20% Strong, 10-
Find the Toughness of
3 Aggregate IS:2386(Part 4):1963 Methods of Test For Aggregates for Concrete:Mechanical Properties Impact Testing 30% Satisfactory for road
the Aggregate
Machine surfacing,>35% Weak for
road surfacing

Find The Resistance of


Aggregate
30% for roads & 45% for the Aggregate under
IS:2386(Part 4):1963 Methods of Test For Aggregates for Concrete:Mechanical Properties Crushing Test
other structures gradually applied
Apparatus
compressive load
To determine particle
FM 2.0 to 3.5 For Coarse
Sieves & Sieve size distribution in a
IS:2386(Part 1):1963 Methods of Test For Aggregates for Concrete:Particle Size & Shape Aggregates & 5.5 to 8.0
Shaker sample of aggregate
For Fine Aggregate
i.e.gradation

LABORATORY TESTS CARRIED OUT FOR CONCRETE FOR FIELD QUALITY ASSURANCE

Sr.No Material IS Code Name of Test Equipments Acceptance criteria Purpose of test
<10% Exceptionally
Aggregate Strong, 10-20% Strong, 10-
Find the Toughness of
1 Aggregate IS:2386(Part 4):1963 Methods of Test For Aggregates for Concrete:Mechanical Properties Impact Testing 30% Satisfactory for road
the Aggregate
Machine surfacing,>35% Weak for
road surfacing
Find The Resistance of
Aggregate
30% for roads & 45% for the Aggregate under
IS:2386(Part 4):1963 Methods of Test For Aggregates for Concrete:Mechanical Properties Crushing Test
other structures gradually applied
Apparatus
compressive load
To determine particle
FM 2.0 to 3.5 For Coarse
Sieves & Sieve size distribution in a
IS:2386(Part 1):1963 Methods of Test For Aggregates for Concrete:Particle Size & Shape Aggregates & 5.5 to 8.0
Shaker sample of aggregate
For Fine Aggregate
i.e.gradation
Slump Test To find out the
2 Concrete IS:1199:1959 Methods of Sampling & Analysis of Concrete
Apparatus workability
Compression
To find out the
IS:516:1959 Methods of tests for Strength of Concrete Testing
workability
Machine
Assess the uniformity of
Concrete & likely
Rebound
IS:13311(Part 2):1992 Non-Destructive Testing of Concrete-Methods of Test Compressive
Hammer
strength(within the 20%
range)
 Tests  that  can be caried out  at FQA Laboratory Mundra.
Cost per  
Package 
 Sr. sample test  Reference for rate 
Material  Name of Test Cost
No   justification 
in Rs.
in Rs.
Geo Engineering Services 
laboratory Adipur Having 
 Soundness 200.00
its Corporate office at 
Vadodara

Geo Engineering Services 
laboratory Adipur Having 
  Consistency of Standard Cement Paste 200.00
its Corporate office at 
Vadodara

Geo Engineering Services 
laboratory Adipur Having 
  Initial & Final Setting Time 200.00
its Corporate office at 
Vadodara

Geo Engineering Services 
Compressive Strength of Cement laboratory Adipur Having 
1 Cement 720.00 3125.00
(3 Days age) its Corporate office at 
Vadodara

Geo Engineering Services 
Compressive Strength of Cement laboratory Adipur Having 
720.00
(7 Days age) its Corporate office at 
Vadodara

Geo Engineering Services 
Compressive Strength of Cement laboratory Adipur Having 
720.00
(14 Days age) its Corporate office at 
Vadodara

Geo Engineering Services 
Compressive Strength of Cement laboratory Adipur Having 
720.00
(28 Days age) its Corporate office at 
Vadodara
City and Industrial 
  Water Content­Dry Density relation  Development 
2 Soil 900.00 NA
using heavy compaction Corporation,Navi Mumbai, 
Maharastra

Geo Engineering Services 
Coarse Aggregates [20 mm]  laboratory Adipur Having 
180.00
Impact value its Corporate office at 
Vadodara

Geo Engineering Services 
Coarse Aggregates [20 mm]  laboratory Adipur Having 
200.00
Crushing value its Corporate office at 
Vadodara

Geo Engineering Services 
Coarse Aggregates [10 mm]  laboratory Adipur Having 
180.00
Impact value its Corporate office at 
Vadodara

Geo Engineering Services 
Coarse Aggregates [20 mm]  laboratory Adipur Having 
180.00
Impact value its Corporate office at 
Vadodara

Geo Engineering Services 
Fine Aggregates [10 mm]  laboratory Adipur Having 
200.00
Gradation, particle Size & Shape its Corporate office at 
Vadodara

Geo Engineering Services 
 Coarse Aggregates [20 mm] laboratory Adipur Having 
325.00
Gradation particle, Size & Shape its Corporate office at 
Vadodara

Geo Engineering Services 
Moisture Content  laboratory Adipur Having 
200.00
( Sand ) its Corporate office at 
Vadodara

Geo Engineering Services 
Moisture Content  laboratory Adipur Having 
200.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara
Geo Engineering Services 
Moisture Content  laboratory Adipur Having 
200.00
( Coarse Aggregates 10 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Water Absorption  laboratory Adipur Having 
300.00
( Sand ) its Corporate office at 
Vadodara

Geo Engineering Services 
Water Absorption laboratory Adipur Having 
3 Aggregate 300.00 1750.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Water Absorption laboratory Adipur Having 
300.00
( Coarse Aggregates 10 mm ) its Corporate office at 
Vadodara

Geo Engineering Services 
Elongation laboratory Adipur Having 
180.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Elongation laboratory Adipur Having 
180.00
( Coarse Aggregates 10 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Flakiness laboratory Adipur Having 
180.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Flakiness laboratory Adipur Having 
180.00
( Coarse Aggregates 10 mm) its Corporate office at 
Vadodara

City and Industrial 
Silt Content Development 
80.00
[Sand] Corporation,Navi Mumbai, 
Maharastra
Geo Engineering Services 
Loose Bulk Density laboratory Adipur Having 
180.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Loose Bulk Density laboratory Adipur Having 
180.00
( Coarse Aggregates 10 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Rodded Bulk Density laboratory Adipur Having 
180.00
( Coarse Aggregates 20 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Rodded Bulk Density laboratory Adipur Having 
180.00
( Coarse Aggregates 10 mm) its Corporate office at 
Vadodara

Geo Engineering Services 
Workability of Concrete in terms of  laboratory Adipur Having 
300.00 NA
slump in mm its Corporate office at 
Vadodara

Characteristic Compressive  Strength  Geo Engineering Services 
of Concrete(3 Days age) laboratory Adipur Having 
200.00
[The rate is for one set.One set shall  its Corporate office at 
consist three number cubes.] Vadodara

Characteristic Compressive  Strength  Geo Engineering Services 
of Concrete(7 Days age) laboratory Adipur Having 
200.00
[The rate is for one set.One set shall  its Corporate office at 
consist three number cubes.] Vadodara
720.00
Characteristic Compressive  Strength  Geo Engineering Services 
of Concrete(14 Days age) laboratory Adipur Having 
4 Concrete 200.00
[The rate is for one set.One set shall  its Corporate office at 
consist three number cubes.] Vadodara

Characteristic Compressive  Strength  Geo Engineering Services 
of Concrete(28 Days age) laboratory Adipur Having 
200.00
[The rate is for one set.One set shall  its Corporate office at 
consist three number cubes.] Vadodara
Geo Engineering Services 
laboratory Adipur Having 
Mix Design with 3 trials 7000.00 NA
its Corporate office at 
Vadodara
Non­Destructive Testing of Concrete 
Geo Engineering Services 
with Rebound hammer 
laboratory Adipur Having 
Characteristic Compressive  Strength  900.00 NA
its Corporate office at 
of Concrete(upto 90 days) 
Vadodara
One location  
City and Industrial 
Construction  Determination of cologarithm of  Development 
5 400.00 NA
Water  hydrogen ions  Corporation,Navi Mumbai, 
Maharastra
It is proposed that monthly subcription/registration  be made mandatory for each contractor , including 
the contractors having their own testing facilities at site , at monthly rate of Rs.5000.00 .
This shall have the advantage of collection of amount .The pay back period of expenditure incurred for 
installing the laboratory  and the staff expenditure to run it can comfortably be met from the amount so 
collected having basic fundamental that the requisite tests to monitor Quality can be performed as per 
Approved FQP.
The flexibility can be explored for minor civil works by charging them with the actual tests performed 
during the contract period. 
 

[K.P.Chakerwarti]
DGM Civil ­FQA
APL Mundra

GM Civil please …

AVP please ... 

VP please…
 Tests  that  can be carried out  at FQA Laboratory Mundra.
Schedule of testing charges
Rate as per  Our FQA Lab. 
Rate as per  Rate as per 
 Sr. CIDCO, Navi  proposed 
Material  GES,Adipur NCCBM,Bhuj
No Mumbai rate
[in Rs.] [in Rs.]
[in Rs.] in Rs. 

 Soundness 250.00 300.00

1800.00

  Consistency of Standard Cement Paste 150.00 180.00

  Initial & Final Setting Time 200.00 500.00 200.00

1 Cement 990.00
Compressive Strength of Cement
1 Cement (3 Days age) 990.00
600.00 600.00 720.00
One sample shall mean testing of three 
cubes.

Compressive Strength of Cement
(7 Days age)
600.00 600.00 720.00
One sample shall mean testing of three 
cubes.

Compressive Strength of Cement
(14 Days age)
600.00 600.00 720.00
One sample shall mean testing of three 
cubes.

Compressive Strength of Cement
(28 Days age)
600.00 600.00 720.00
One sample shall mean testing of three 
cubes.
  Water Content­Dry Density relation 
2 Soil 1150.00 Not available Not available  1150.00
using heavy compaction

Coarse Aggregates [20 mm] 
150.00 1000.00 180.00
Impact value

Coarse Aggregates [20 mm] 
150.00 1000.00 180.00
Crushing value

Coarse Aggregates [10 mm] 
150.00 1000.00 180.00
Impact value

500.00
500.00

Coarse Aggregates [20 mm] 
150.00 1000.00 180.00
Impact value

Fine Aggregates [10 mm] 
150.00 500.00 180.00
Gradation, particle Size & Shape

 Coarse Aggregates [20 mm]
150.00 500.00 180.00
Gradation particle, Size & Shape

Moisture Content 
Not available Not available  400.00 200.00
( Sand )
Moisture Content 
500.00 150.00 400.00 180.00
( Coarse Aggregates 20 mm)

Moisture Content 
500.00 150.00 400.00 180.00
( Coarse Aggregates 10 mm)

Water Absorption 
Not available Not available  400.00 300.00
( Sand )

Water Absorption
3 Aggregate 500.00 150.00 400.00 180.00
( Coarse Aggregates 20 mm)
Water Absorption
500.00 150.00 400.00 150.00
( Coarse Aggregates 10 mm )

Elongation
150.00 150.00 250.00 180.00
( Coarse Aggregates 20 mm)

Elongation
150.00 150.00 250.00 180.00
( Coarse Aggregates 10 mm)

Flakiness
150.00 150.00 250.00 180.00
( Coarse Aggregates 20 mm)
Flakiness
150.00 150.00 250.00 180.00
( Coarse Aggregates 10 mm)

Silt Content
50.00 150.00 500.00 60.00
[Sand]

Loose Bulk Density
150.00 400.00 180.00
( Coarse Aggregates 20 mm)

500.00

Loose Bulk Density
150.00 400.00 180.00
( Coarse Aggregates 10 mm)
Rodded Bulk Density
150.00 400.00 180.00
( Coarse Aggregates 20 mm)

500.00

Rodded Bulk Density
150.00 400.00 180.00
( Coarse Aggregates 10 mm)

Workability of Concrete in terms of 
slump in mm
Not available Not available Not available  100.00
[One sample shall indicate one 
occasion only]

Characteristic Compressive  Strength 
of Concrete(3 Days age)
150.00 150.00 2400.00 180.00
[The rate is for one set.One set shall 
consist three number cubes.]
Characteristic Compressive  Strength 
of Concrete(7 Days age)
150.00 150.00 2400.00 180.00
[The rate is for one set.One set shall 
consist three number cubes.]

Characteristic Compressive  Strength 
of Concrete(14 Days age)
4 Concrete 150.00 150.00 2400.00 180.00
[The rate is for one set.One set shall 
consist three number cubes.]

Characteristic Compressive  Strength 
of Concrete(28 Days age)
150.00 150.00 2400.00 180.00
[The rate is for one set.One set shall 
consist three number cubes.]

Mix Design with 3 trials 2000.00 6500.00 25000.00 7800.00


Non­Destructive Testing of Concrete 
with Rebound hammer 
Characteristic Compressive  Strength Not available  750.00 1250.00 900.00
of Concrete(upto 90 days) 
One location  

Construction  Determination of cologarithm of 
5 300.00 Indivual rate is not available  360.00
Water  hydrogen ions 

In view to simplify the processes  for reconcialtion of payments and the tests carried out , lump sum amount as advance towards the tests is propose
per month from each agency whom so ever it is applicable .The tests shall be made mandatotry for all the Contracts being awared by Mundra . 
Further it is proposed that these tests be made mandatory to all the working agencies of EPC Contract  though they have their own lab set up but the
for them the the amount shall be fixed  @Rs.5000.00 per month
  at FQA Laboratory Mundra.
ing charges

Justification  in 
context to our FQA Lab.  References for rate justification 
proposed rates 

1. City and Industrial Development 
Corporation[CIDCO]Laboratory,
Navi Mumbai, Maharastra
There is no separate  2. Geo Engineering Services [GES]Laboratory, 
mention of rates for  Adipur 
individual tests in  having its Corporate office at 
CIDCO Navi Mumbai and   Vadodara,Gujarat
 NCCBM,Bhuj which seem  and 
to be  on higher side  3. National Council for Cement and Building  
hence the rates at par  Materials [NCCBM]Laboratory,Bhuj
with GES Adipur are 
considered and the  1. City and Industrial Development 
Proposed Rates are  Corporation[CIDCO]Laboratory,
realistics considering  Navi Mumbai, Maharastra
the expenditure ought   2. Geo Engineering Services [GES]Laboratory, 
to be made on  Adipur 
transportation. having its Corporate office at 
Vadodara,Gujarat
and 
3. National Council for Cement and Building  
Materials [NCCBM]Laboratory,Bhuj
There is no separate 
mention of rates for 
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
the  Navi Mumbai, Maharastra
Rates of NCCBM,Bhuj are 2. Geo Engineering Services [GES]Laboratory, 
on higher side hence the Adipur 
rates at par with GES  having its Corporate office at 
Adipur are considered  Vadodara,Gujarat
and the Proposed Rates  and 
are realistics  3. National Council for Cement and Building  
considering the  Materials [NCCBM]Laboratory,Bhuj
expenditure ought  to be 
made on transportation.
There is no separate 
mention of rates for 
1. City and Industrial Development 
individual tests in 
Corporation[CIDCO]Laboratory,
CIDCO Navi Mumbai 
Navi Mumbai, Maharastra
hence the rates at par 
2. Geo Engineering Services [GES]Laboratory, 
with GES Adipur and 
Adipur 
NCCBM Bhuj are 
having its Corporate office at 
considered and the 
Vadodara,Gujarat
Proposed Rates are 
and 
realistics considering 
3. National Council for Cement and Building  
the expenditure ought  
Materials [NCCBM]Laboratory,Bhuj
to be made on 
There is no separate 
transportation.
mention of rates for 
1. City and Industrial Development 
individual tests in 
Corporation[CIDCO]Laboratory,
CIDCO Navi Mumbai 
Navi Mumbai, Maharastra
hence the rates at par 
2. Geo Engineering Services [GES]Laboratory, 
with GES Adipur and 
Adipur 
NCCBM Bhuj are 
having its Corporate office at 
considered and the 
Vadodara,Gujarat
Proposed Rates are 
and 
realistics considering 
3. National Council for Cement and Building  
the expenditure ought  
Materials [NCCBM]Laboratory,Bhuj
to be made on 
There is no separate 
transportation.
mention of rates for 
1. City and Industrial Development 
individual tests in 
Corporation[CIDCO]Laboratory,
CIDCO Navi Mumbai 
Navi Mumbai, Maharastra
hence the rates at par 
2. Geo Engineering Services [GES]Laboratory, 
with GES Adipur and 
Adipur 
NCCBM Bhuj are 
having its Corporate office at 
considered and the 
Vadodara,Gujarat
Proposed Rates are 
and 
realistics considering 
3. National Council for Cement and Building  
the expenditure ought  
Materials [NCCBM]Laboratory,Bhuj
to be made on 
There is no separate 
transportation.
mention of rates for 
1. City and Industrial Development 
individual tests in 
Corporation[CIDCO]Laboratory,
CIDCO Navi Mumbai 
Navi Mumbai, Maharastra
hence the rates at par 
2. Geo Engineering Services [GES]Laboratory, 
with GES Adipur and 
Adipur 
NCCBM Bhuj are 
having its Corporate office at 
considered and the 
Vadodara,Gujarat
Proposed Rates are 
and 
realistics considering 
3. National Council for Cement and Building  
the expenditure ought  
Materials [NCCBM]Laboratory,Bhuj
to be made on 
transportation.
Tests for MDD, OMC, 
LL,PI shall be carried 
out hence the test 
1. City and Industrial Development 
charges comensurate with 
Corporation[CIDCO]Laboratory,
the test efforts 
Navi Mumbai, Maharastra
required to be put in. 
The rate is proposed at 
par with that of CIDCO 
Navi Mumbai
There is no separate 
mention of rates for 
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
There is no separate 
to be made on 
mention of rates for 
transportation
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
There is no separate 
to be made on 
mention of rates for 
transportation
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
to be made on 
transportation
There is no separate 
mention of rates for 
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
There is no separate 
to be made on 
mention of rates for 
transportation
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
There is no separate 
to be made on 
mention of rates for 
transportation
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
Rates of NCCBM,Bhuj are Navi Mumbai, Maharastra
on higher side, hence  2. Geo Engineering Services [GES]Laboratory, 
the rates at par with  Adipur 
GES Adipur are  having its Corporate office at 
considered and the  Vadodara,Gujarat
Proposed Rates are  and 
realistics considering  3. National Council for Cement and Building  
the expenditure ought   Materials [NCCBM]Laboratory,Bhuj
to be made on 
transportation

The test charges 
comensurate with the 
1.   National Council for Cement and 
cost of chemicals and  
Building  Materials [NCCBM]Laboratory,Bhuj
efforts required to be 
put in.
Rates of CIDCO Navi 
1. City and Industrial Development 
Mumbai and NCCBM,Bhuj 
Corporation[CIDCO]Laboratory,
are on higher side hence 
Navi Mumbai, Maharastra
the rates at par with 
2. Geo Engineering Services [GES]Laboratory, 
GES Adipur are 
Adipur 
considered and the 
having its Corporate office at 
Proposed Rates are 
Vadodara,Gujarat
realistics considering 
and 
the expenditure ought  
3. National Council for Cement and Building  
to be made on 
Materials [NCCBM]Laboratory,Bhuj
transportation

Rates of CIDCO Navi 
1. City and Industrial Development 
Mumbai and NCCBM,Bhuj 
Corporation[CIDCO]Laboratory,
are on higher side hence 
Navi Mumbai, Maharastra
the rates at par with 
2. Geo Engineering Services [GES]Laboratory, 
GES Adipur are 
Adipur 
considered and the 
having its Corporate office at 
Proposed Rates are 
Vadodara,Gujarat
realistics considering 
and 
the expenditure ought  
3. National Council for Cement and Building  
to be made on 
Materials [NCCBM]Laboratory,Bhuj
transportation

The test shall be carried out by the use of oven and consumption of 
power , hence the proposed rate is realiatic.

Rates of CIDCO Navi 
1. City and Industrial Development 
Mumbai and NCCBM,Bhuj 
Corporation[CIDCO]Laboratory,
are on higher side hence 
Navi Mumbai, Maharastra
the rates at par with 
2. Geo Engineering Services [GES]Laboratory, 
GES Adipur are 
Adipur 
considered and the 
having its Corporate office at 
Proposed Rates are 
Vadodara,Gujarat
realistics considering 
and 
the expenditure ought  
3. National Council for Cement and Building  
to be made on 
Materials [NCCBM]Laboratory,Bhuj
transportation
Rates of CIDCO Navi 
1. City and Industrial Development 
Mumbai and NCCBM,Bhuj 
Corporation[CIDCO]Laboratory,
are on higher side hence 
Navi Mumbai, Maharastra
the rates at par with 
2. Geo Engineering Services [GES]Laboratory, 
GES Adipur are 
Adipur 
considered and the 
having its Corporate office at 
Proposed Rates are 
Vadodara,Gujarat
realistics considering 
and 
the expenditure ought  
3. National Council for Cement and Building  
to be made on 
Materials [NCCBM]Laboratory,Bhuj
transportation

Rates of NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with GES  Navi Mumbai, Maharastra
Adipur  and CIDCO Navi  2. Geo Engineering Services [GES]Laboratory, 
Mumbai are considered  Adipur 
and the Proposed Rates  having its Corporate office at 
are realistics  Vadodara,Gujarat
considering the  and 
expenditure ought  to be 3. National Council for Cement and Building  
made on transportation Materials [NCCBM]Laboratory,Bhuj

Rates of NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with GES  Navi Mumbai, Maharastra
Adipur and CIDCO Navi  2. Geo Engineering Services [GES]Laboratory, 
Mumbai are considered  Adipur 
and the Proposed Rates  having its Corporate office at 
are realistics  Vadodara,Gujarat
considering the  and 
expenditure ought  to be 3. National Council for Cement and Building  
made on transportation Materials [NCCBM]Laboratory,Bhuj

Rates of NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with GES  Navi Mumbai, Maharastra
Adipur and CIDCO Navi  2. Geo Engineering Services [GES]Laboratory, 
Mumbai are considered  Adipur 
and the Proposed Rates  having its Corporate office at 
are realistics  Vadodara,Gujarat
considering the  and 
expenditure ought  to be 3. National Council for Cement and Building  
made on transportation Materials [NCCBM]Laboratory,Bhuj
Rates of NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with GES  Navi Mumbai, Maharastra
Adipur and CIDCO Navi  2. Geo Engineering Services [GES]Laboratory, 
Mumbai are considered  Adipur 
and the Proposed Rates  having its Corporate office at 
are realistics  Vadodara,Gujarat
considering the  and 
expenditure ought  to be 3. National Council for Cement and Building  
made on transportation Materials [NCCBM]Laboratory,Bhuj

Rates of GES Adipur and  1. City and Industrial Development 
NCCBM,Bhuj are on higher Corporation[CIDCO]Laboratory,
side hence the rates at Navi Mumbai, Maharastra
par with CIDCO Navi  2. Geo Engineering Services [GES]Laboratory, 
Mumbai are considered  Adipur 
and the Proposed Rates  having its Corporate office at 
are realistics  Vadodara,Gujarat
considering the  and 
expenditure ought  to be 3. National Council for Cement and Building  
made on transportation Materials [NCCBM]Laboratory,Bhuj
There is no separate 
mention of rates for 
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
the  Navi Mumbai, Maharastra
Rates of NCCBM,Bhuj are 2. Geo Engineering Services [GES]Laboratory, 
on higher side hence the Adipur 
rates at par with GES  having its Corporate office at 
Adipur are considered  Vadodara,Gujarat
and the Proposed Rates  and 
are realistics  3. National Council for Cement and Building  
considering the  Materials [NCCBM]Laboratory,Bhuj
There is no separate 
expenditure ought  to be 
mention of rates for 
made on transportation.
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
the  Navi Mumbai, Maharastra
Rates of NCCBM,Bhuj are 2. Geo Engineering Services [GES]Laboratory, 
on higher side hence the Adipur 
rates at par with GES  having its Corporate office at 
Adipur are considered  Vadodara,Gujarat
and the Proposed Rates  and 
are realistics  3. National Council for Cement and Building  
considering the  Materials [NCCBM]Laboratory,Bhuj
expenditure ought  to be 
made on transportation.
There is no separate 
mention of rates for 
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
the  Navi Mumbai, Maharastra
Rates of NCCBM,Bhuj are 2. Geo Engineering Services [GES]Laboratory, 
on higher side hence the Adipur 
rates at par with GES  having its Corporate office at 
Adipur are considered  Vadodara,Gujarat
and the Proposed Rates  and 
are realistics  3. National Council for Cement and Building  
considering the  Materials [NCCBM]Laboratory,Bhuj
There is no separate 
expenditure ought  to be 
mention of rates for 
made on transportation.
individual tests in  1. City and Industrial Development 
CIDCO Navi Mumbai and  Corporation[CIDCO]Laboratory,
the  Navi Mumbai, Maharastra
Rates of NCCBM,Bhuj are 2. Geo Engineering Services [GES]Laboratory, 
on higher side hence the Adipur 
rates at par with GES  having its Corporate office at 
Adipur are considered  Vadodara,Gujarat
and the Proposed Rates  and 
are realistics  3. National Council for Cement and Building  
considering the  Materials [NCCBM]Laboratory,Bhuj
expenditure ought  to be 
made on transportation.

The concrete in progress shall be tested at site of pour

Rates of NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with CIDCO Navi Mumbai, Maharastra
Navi Mumbai are  2. Geo Engineering Services [GES]Laboratory, 
considered and the  Adipur 
Proposed Rates are  having its Corporate office at 
realistics considering  Vadodara,Gujarat
the expenditure ought   and 
to be made on  3. National Council for Cement and Building  
transportation Materials [NCCBM]Laboratory,Bhuj
Rates ofNCCBM,Bhuj are  1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with CIDCO Navi Mumbai, Maharastra
Navi Mumbai are  2. Geo Engineering Services [GES]Laboratory, 
considered and the  Adipur 
Proposed Rates are  having its Corporate office at 
realistics considering  Vadodara,Gujarat
the expenditure ought   and 
to be made on  3. National Council for Cement and Building  
transportation Materials [NCCBM]Laboratory,Bhuj

Rates of  NCCBM,Bhuj are 1. City and Industrial Development 
on higher side hence the Corporation[CIDCO]Laboratory,
rates at par with CIDCO Navi Mumbai, Maharastra
Navi Mumbai are  2. Geo Engineering Services [GES]Laboratory, 
considered and the  Adipur 
Proposed Rates are  having its Corporate office at 
realistics considering  Vadodara,Gujarat
the expenditure ought   and 
to be made on  3. National Council for Cement and Building  
transportation Materials [NCCBM]Laboratory,Bhuj

Rates of   NCCBM,Bhuj  1. City and Industrial Development 
are on higher side hence Corporation[CIDCO]Laboratory,
the rates at par with  Navi Mumbai, Maharastra
CIDCO Navi Mumbai are  2. Geo Engineering Services [GES]Laboratory, 
considered and the  Adipur 
Proposed Rates are  having its Corporate office at 
realistics considering  Vadodara,Gujarat
the expenditure ought   and 
to be made on  3. National Council for Cement and Building  
transportation Materials [NCCBM]Laboratory,Bhuj

The rate of CIDCO 
NaviMumbai seems  1. City and Industrial Development 
unrealistic and the rate Corporation[CIDCO]Laboratory,
of NCCBM Bhuj is on  Navi Mumbai, Maharastra
higher side hence the  2. Geo Engineering Services [GES]Laboratory, 
rate at per with GES  Adipur 
Adipur is considered and having its Corporate office at 
  the Proposed Rates are Vadodara,Gujarat
realistics considering  and 
the expenditure ought   3. National Council for Cement and Building  
to be made on  Materials [NCCBM]Laboratory,Bhuj
transportation
Rates of   NCCBM,Bhuj  1. City and Industrial Development 
are on higher side hence Corporation[CIDCO]Laboratory,
the rates at par with  Navi Mumbai, Maharastra
GES Adipur are  2. Geo Engineering Services [GES]Laboratory, 
considered and the  Adipur 
Proposed Rates are  having its Corporate office at 
realistics considering  Vadodara,Gujarat
the expenditure ought   and 
to be made on  3. National Council for Cement and Building  
transportation Materials [NCCBM]Laboratory,Bhuj

In the absence of 
1. City and Industrial Development 
availabilty of rates of 
Corporation[CIDCO]Laboratory,
NCCBM and GES  for 
Navi Mumbai, Maharastra
comparision , the rate 
2. Geo Engineering Services [GES]Laboratory, 
at par with CIDCO Navi 
Adipur 
Mumbai is considered and 
having its Corporate office at 
the Proposed Rates are 
Vadodara,Gujarat
realistics considering 
and 
the expenditure ought  
3. National Council for Cement and Building  
to be made on 
Materials [NCCBM]Laboratory,Bhuj
transportation

lump sum amount as advance towards the tests is proposed to be collected @ Rs 10,000.00 
for all the Contracts being awared by Mundra . 
Contract  though they have their own lab set up but the relaxartion is propsecd that 

[K.P.Chakerwarti]
DGM Civil ­FQA
APL Mundra