Grade of concrete M25 ,ESP Unit N
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Load in KN strength in
N /mm2

1 710.00 31.56

2 14-Apr-08 ESP Raft - M 10.,9 in M 35 760.00 33.78

3 620.00 27.56

4 700.00 31.11

5 15-Apr-08 ESP Raft - M 8,7 in M 35 690.00 30.67

6 1000.00 44.44

7 850.00 37.78

8 24-Apr-08 ESP Raft - M 5,6 840.00 37.33

9 780.00 34.67

10 950.00 42.22

11 25-Apr-08 ESP Raft - M 3 620.00 27.56

12 890.00 39.56

13 600.00 26.67

14 26-Apr-08 ESP Raft - M 2 550.00 24.44

15 710.00 31.56

16 660.00 29.33

17 29-Apr-08 ESP Raft - M 1 570.00 25.33

18 460.00 20.44

19 610.00 27.11

20 1-May-08 ESP Raft - T 1,S1,R1 740.00 32.89

21 580.00 25.78

22 860.00 38.22

23 3-May-08 ESP Raft - Q 1, P1 840.00 37.33

24 620.00 27.56

25 820.00 36.44

26 10-May-08 ESP Raft - Q 2, P2 ,R2 880.00 39.11


10-May-08 ESP Raft - Q 2, P2 ,R2

27 850.00 37.78

28 690.00 30.67

29 13-May-08 ESP Raft - S 2, T2 670.00 29.78

30 670.00 29.78

31 960.00 42.67

32 16-May-08 ESP Raft - S 3 T3 , R 3 700.00 31.11

33 650.00 28.89

34 805.00 35.78

35 17-May-08 ESP Raft - Q 3 P 3 800.00 35.56

36 820.00 36.44
37 690.00 30.67

38 20-May-08 ESP Raft - T 4 S 4 670.00 29.78

39 810.00 36.00

40 850.00 37.78

41 22-May-08 ESP Raft - T 5 -6 870.00 38.67

42 850.00 37.78

43 870.00 38.67

44 23-May-08 ESP Raft - Q 4, R 4, P 4 800.00 35.56

45 790.00 35.11

46 1200.00 53.33

47 26-May-08 ESP Raft - S 5-6 1000.00 44.44

48 1150.00 51.11

49 1010.00 44.89

50 28-May-08 ESP Raft - R 5-6 1040.00 46.22

51 1070.00 47.56

52 1110.00 49.33

53 29-May-08 ESP Raft - T 10.,S10,Q10 1100.00 48.89

54 990.00 44.00

55 890.00 39.56

56 31-May-08 ESP Raft - P 10.,Q10, R10, P 5-6 910.00 40.44

57 1020.00 45.33

58 780.00 34.67

2-Jun-08 ESP Raft - P-9, R 9, Q 9


59 2-Jun-08 ESP Raft - P-9, R 9, Q 9 750.00 33.33

60 760.00 33.78

61 910.00 40.44

62 3-Jun-08 ESP Raft - S-9, T 9 900.00 40.00

63 880.00 39.11

64 960.00 42.67

65 5-Jun-08 ESP Raft - R 7-8 , S 7-8 790.00 35.11

66 960.00 42.67

67 980.00 43.56

68 6-Jun-08 ESP Raft - Q8 1060.00 47.11


69 1000.00 44.44

70 870.00 38.67

71 7-Jun-08 ESP Raft - Q 7,T 7-8 780.00 34.67

72 750.00 33.33

73 810.00 36.00

74 11-Jun-08 ESP Raft - P 7-8 800.00 35.56

75 780.00 34.67

76 620.00 27.56

77 20-Jun-08 ESP Pedastal P1,Q1,R1,S1,T1, M1 590.00 26.22

78 630.00 28.00

79 680.00 30.22

80 23-Jun-08 ESP Pedastal P2,Q2 690.00 30.67

81 700.00 31.11

82 700.00 31.11

83 24-Jun-08 ESP Pedastal R 2,S 2,T 2, M 2 680.00 30.22

84 690.00 30.67

85 710.00 31.56
ESP Pedastal R 3,P 3, Q 3,S3,T 3, M
86 30-Jun-08 740.00 32.89
3
87 760.00 33.78

88 770.00 34.22
ESP Pedastal R 4,P 4, Q 4,S4,T 4, M
89 1-Jul-08 790.00 35.11
4
90 760.00 33.78
91 740.00 32.89

92 3-Jul-08 ESP Wall R 1 to S1 770.00 34.22

93 720.00 32.00

94 690.00 30.67
ESP Pedastal R 5,P 5, Q 5,S 5,T 5, M
95 7-Jul-08 710.00 31.56
5
96 670.00 29.78

97 700.00 31.11
ESP Wall P 2 to P 3,S 3 to S 4 ,
98 8-Jul-08 740.00 32.89
R 2 to S 2, M 2 to M 3
99 720.00 32.00

100 750.00 33.33


ESP Pedastal R 6,P 6, Q 6,S 6,T 6, M
101 9-Jul-08 780.00 34.67
6
102 750.00 33.33

103 780.00 34.67


ESP Wall S 2 to S 3,M 3 to M 4 ,
104 10-Jul-08 750.00 33.33

105 770.00 34.22

106 690.00 30.67


ESP Wall Q 2 to Q 3,Q 3 to Q 4 ,
107 11-Jul-08 630.00 28.00

108 670.00 29.78

109 750.00 33.33


ESP Pedastal R 7,P 7, Q 7,S 7,T 7, M
110 12-Jul-08 770.00 34.22
7
111 740.00 32.89

112 820.00 36.44


ESP Pedastal R 8,P 8, Q 8,S 8,T 8, M
113 14-Jul-08 8 720.00 32.00
ESP Wall R 4 to S 4
114 750.00 33.33

115 640.00 28.44


ESP Wall R 2 to R 3,R 3 to S 3
116 15-Jul-08 800.00 35.56

117 660.00 29.33

118 900.00 40.00


ESP Wall R 6 to S 6
119 16-Jul-08 ESP Pedastal R 9,P 9, Q 9,S 9,T 9, M 900.00 40.00
9
120 790.00 35.11

121 710.00 31.56


ESP Wall P 3 to P 4
122 17-Jul-08 ESP Pedastal R 10,P 10, Q 10,S 10,T 760.00 33.78
10, M 10
ESP Wall P 3 to P 4
17-Jul-08 ESP Pedastal R 10,P 10, Q 10,S 10,T
10, M 10
123 720.00 32.00

124 660.00 29.33


ESP Wall R 7 to S 7,T 7to T 8,M 7 to
125 18-Jul-08 M8 710.00 31.56

126 690.00 30.67

127 710.00 31.56


ESP Wall R 8 to S 8,M 8 to M 9
128 19-Jul-08 710.00 31.56

129 700.00 31.11

130 720.00 32.00


ESP Wall S 7 to S 8, S 8 to S 9
131 24-Jul-08 710.00 31.56

132 700.00 31.11


133 730.00 32.44
ESP Wall R 5 to S 5 , R 3 to R 4.R 7
134 26-Jul-08 to R 8, Q 8 to Q 9, R 9 to S 9 710.00 31.56

135 700.00 31.11

136 710.00 31.56


ESP Wall R 10 to S 10
137 28-Jul-08 730.00 32.44

138 780.00 34.67

139 720.00 32.00


ESP Wall T 8 to T 9
140 1-Aug-08 700.00 31.11

141 710.00 31.56

142 720.00 32.00


ESP Wall R 3 to R 4.P 7 to P 8, P 8
143 4-Aug-08 to P 9, Q 8 to Q 9 700.00 31.11

144 690.00 30.67

145 710.00 31.56

146 710.00 31.56

147 710.00 31.56

148 710.00 31.56

149 710.00 31.56

150 710.00 31.56

TO CONFORM THE DATE OF UPDATING


LEFT OUT
e of concrete M25 ,ESP Unit No 5
ve strength at age of 28 days
Average
Compressive Average compressive Standard of CCS in Coefficient Result and remarks
strength in strength of the sample deviation N/mm 2 of variation
kg/cm2 in Kg/cm2

309.24

331.02 303.44

270.04

304.89

300.53 346.99

435.56

370.22

365.87 358.61

339.73

413.78

270.04 357.16

387.64

261.33

239.56 270.04

309.24

287.47

248.27 245.36

200.36

265.69

322.31 280.21

252.62

374.58

365.87 336.83

270.04

357.16

383.29 370.22

The SD and CoV are slightly


5.77 32.28 17.87 on higher side.
370.22

370.22

300.53

291.82 294.73
The SD and CoV are slightly
291.82 5.77 32.28 17.87 on higher side.
418.13

304.89 335.38

283.11

350.62

348.44 352.07

357.16
300.53

291.82 315.05

352.80

370.22

378.93 373.13

370.22

378.93

348.44 357.16

344.09

522.67

435.56 486.37

500.89

439.91

452.98 452.98

466.04

483.47

479.11 464.59

431.20

387.64

396.36 409.42

444.27

339.73

332.47
The SD and CoV are on
6.65 39.58 16.80 higher side.
326.67 332.47
The SD and CoV are on
331.02 6.65 39.58 16.80 higher side.
396.36

392.00 390.55

383.29

418.13

344.09 393.45

418.13

426.84

461.69 441.36
435.56

378.93

339.73 348.44

326.67

352.80

348.44 346.99

339.73

270.04

256.98 267.14

274.40

296.18

300.53 300.53

304.89

304.89

296.18 300.53

300.53

309.24

322.31 320.86

331.02

335.38

344.09 336.83
Degree of Quality control is
331.02 5.35 35.17 15.21 satisfactory
322.31

335.38 323.76

313.60

300.53

309.24 300.53

291.82

304.89

322.31 313.60

313.60

326.67
339.73 331.02

326.67

339.73

326.67 333.93

335.38

300.53

274.40 288.92

291.82

326.67

335.38 328.12

322.31

357.16

313.60 332.47

326.67

278.76

348.44 304.89

287.47

392.00

392.00 376.03
Degree of Quality control is
344.09 2.82 32.99 8.55 good
309.24

331.02 317.96
317.96

313.60

287.47

309.24 299.08

300.53

309.24

309.24 307.79

304.89

313.60

309.24 309.24

304.89
317.96

309.24 310.70

304.89

309.24

317.96 322.31

339.73

313.60

304.89 309.24

309.24

313.60

304.89 306.34

300.53

309.24
Degree of Quality control is
309.24 309.24
good Based on calculation
309.24 with figures appearing in
Bold red which are
309.24 presumtive figures.
In actual there are 24
309.24 309.24 observations therefore 6
observations are presumed
309.24 0.91 31.64 2.89 as an average.

ONFORM THE DATE OF UPDATING ,THEREFORE


UPDATED 29.12.2008
Grade of concrete M30 Boiler , Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 1070.00 47.56 466.04

2 27-May-08 Bolier -Raft J-10 1080.00 48.00 470.40

3 1130.00 50.22 492.18

4 1050.00 46.67 457.33

5 31-May-08 Boiler Raft J-3 J 9 1100.00 48.89 479.11

6 1070.00 47.56 466.04

7 970.00 43.11 422.49

8 3-Jun-08 Boiler Raft -J 3 1120.00 49.78 487.82

9 1120.00 49.78 487.82

10 1190.00 52.89 518.31

11 4-Jun-08 Boiler Raft -J 7 1190.00 52.89 518.31

12 1150.00 51.11 500.89

13 1010.00 44.89 439.91

14 4-Jun-08 Boiler Raft -J 7 1090.00 48.44 474.76

15 1190.00 52.89 518.31

16 850.00 37.78 370.22

17 5-Jun-08 Boiler Raft -J 6 590.00 26.22 256.98

18 790.00 35.11 344.09

19 1000.00 44.44 435.56

20 6-Jun-08 Boiler Raft -J 9 1060.00 47.11 461.69

21 920.00 40.89 400.71

22 780.00 34.67 339.73

23 7-Jun-08 Boiler Raft -J 4 800.00 35.56 348.44

24 790.00 35.11 344.09

25 780.00 34.67 339.73

26 9-Jun-08 Boiler Raft -J 5 770.00 34.22 335.38

27 820.00 36.44 357.16


28 830.00 36.89 361.51

29 9-Jun-08 Boiler Raft -J 5 790.00 35.11 344.09

30 760.00 33.78 331.02

31 690.00 30.67 300.53

32 10-Jun-08 Boiler Raft -J 7 680.00 30.22 296.18

33 800.00 35.56 348.44

34 850.00 37.78 370.22

35 10-Jun-08 Boiler Raft -J 7 790.00 35.11 344.09

36 720.00 32.00 313.60

37 930.00 41.33 405.07


38 12-Jun-08 Boiler Raft-J 5 920.00 40.89 400.71

39 870.00 38.67 378.93

40 870.00 38.67 378.93

41 12-Jun-08 Boiler Raft -J 5 840.00 37.33 365.87

42 790.00 35.11 344.09

43 750.00 33.33 326.67

44 17-Jun-08 Boiler Raft -J 4 750.00 33.33 326.67

45 760.00 33.78 331.02

46 890.00 39.56 387.64

47 26-Jun-08 Boiler Raft 890.00 39.56 387.64

48 870.00 38.67 378.93

49 890.00 39.56 387.64

50 26-Jun-08 Boiler Raft 880.00 39.11 383.29

51 880.00 39.11 383.29

52 870.00 38.67 378.93

53 26-Jun-08 Boiler Raft 880.00 39.11 383.29

54 890.00 39.56 387.64

55 900.00 40.00 392.00

56 12-Jul-08 Boiler Raft 890.00 39.56 387.64

57 910.00 40.44 396.36

58 920.00 40.89 400.71

59 12-Jul-08 Boiler Raft 900.00 40.00 392.00


12-Jul-08 Boiler Raft

60 920.00 40.89 400.71

61 710.00 31.56 309.24

62 15-Jul-08 Boiler Raft J 8 790.00 35.11 344.09

63 760.00 33.78 331.02

64 750.00 33.33 326.67

65 15-Jul-08 Boiler Raft J 8 820.00 36.44 357.16

66 800.00 35.56 348.44

67 750.00 33.33 326.67

68 15-Jul-08 Boiler Raft J 8 720.00 32.00 313.60

69 780.00 34.67 339.73


70 750.00 33.33 326.67

71 15-Jul-08 Boiler Raft J 8 860.00 38.22 374.58

72 750.00 33.33 326.67

73 720.00 32.00 313.60

74 15-Jul-08 Boiler Raft J 8 820.00 36.44 357.16

75 770.00 34.22 335.38

76 790.00 35.11 344.09

77 15-Jul-08 Boiler Raft J 8 730.00 32.44 317.96

78 730.00 32.44 317.96

79 770.00 34.22 335.38

80 15-Jul-08 Boiler Raft J 8 830.00 36.89 361.51

81 860.00 38.22 374.58

82 740.00 32.89 322.31

83 16-Jul-08 Boiler Raft J 8 740.00 32.89 322.31

84 800.00 35.56 348.44

85 790.00 35.11 344.09

86 16-Jul-08 Boiler Raft J 8 860.00 38.22 374.58

87 830.00 36.89 361.51

88 650.00 28.89 283.11

89 16-Jul-08 Boiler Raft J 8 740.00 32.89 322.31

90 700.00 31.11 304.89

91 810.00 36.00 352.80

16-Jul-08 Boiler Raft J 8


92 16-Jul-08 Boiler Raft J 8 740.00 32.89 322.31

93 880.00 39.11 383.29

94 890.00 39.56 387.64

95 16-Jul-08 Boiler Raft J 8 760.00 33.78 331.02

96 780.00 34.67 339.73

97 840.00 37.33 365.87

98 16-Jul-08 Boiler Raft J 8 790.00 35.11 344.09

99 740.00 32.89 322.31

100 730.00 32.44 317.96

101 16-Jul-08 Boiler Raft J 8 780.00 34.67 339.73


102 790.00 35.11 344.09

103 890.00 39.56 387.64

104 16-Jul-08 Boiler Raft J 8 910.00 40.44 396.36

105 880.00 39.11 383.29

106 780.00 34.67 339.73

107 17-Jul-08 Boiler Raft J 8 820.00 36.44 357.16

108 810.00 36.00 352.80

109 840.00 37.33 365.87

110 17-Jul-08 Boiler Raft J 8 770.00 34.22 335.38

111 810.00 36.00 352.80

112 710.00 31.56 309.24

113 17-Jul-08 Boiler Raft J 8 760.00 33.78 331.02

114 720.00 32.00 313.60

115 750.00 33.33 326.67

116 17-Jul-08 Boiler Raft J 8 920.00 40.89 400.71

117 800.00 35.56 348.44

118 850.00 37.78 370.22

119 17-Jul-08 Boiler Raft J 8 750.00 33.33 326.67

120 770.00 34.22 335.38

121 730.00 32.44 317.96

122 17-Jul-08 Boiler Raft J 8 740.00 32.89 322.31

123 800.00 35.56 348.44


124 760.00 33.78 331.02

125 17-Jul-08 Boiler Raft J 8 700.00 31.11 304.89

126 750.00 33.33 326.67

127 840.00 37.33 365.87

128 3-Aug-08 Shear wall 820.00 36.44 357.16

129 790.00 35.11 344.09

130 780.00 34.67 339.73

131 5-Aug-08 Shear wall 800.00 35.56 348.44

132 780.00 34.67 339.73

133 770.00 34.22 335.38


134 8-Aug-08 Shear wall 800.00 35.56 348.44

135 790.00 35.11 344.09

136 810.00 36.00 352.80

137 9-Aug-08 Boiler Raft 780.00 34.67 339.73

138 820.00 36.44 357.16

139 810.00 36.00 352.80

140 11-Aug-08 Boiler Raft J1 830.00 36.89 361.51

141 800.00 35.56 348.44

142 840.00 37.33 365.87

143 11-Aug-08 Boiler Raft J1 820.00 36.44 357.16

144 790.00 35.11 344.09

145 760.00 33.78 331.02

146 11-Aug-08 Boiler Raft J1 790.00 35.11 344.09

147 820.00 36.44 357.16

148 810.00 36.00 352.80

149 11-Aug-08 Boiler Raft J1 790.00 35.11 344.09

150 800.00 35.56 348.44

151 820.00 36.44 357.16

152 11-Aug-08 Boiler Raft J1 830.00 36.89 361.51

153 790.00 35.11 344.09

154 810.00 36.00 352.80

155 11-Aug-08 Boiler Raft J1 830.00 36.89 361.51


11-Aug-08 Boiler Raft J1

156 780.00 34.67 339.73

157 770.00 34.22 335.38

158 18-Aug-08 Boiler Raft J11 790.00 35.11 344.09

159 790.00 35.11 344.09

160 800.00 35.56 348.44

161 18-Aug-08 Boiler Raft J11 800.00 35.56 348.44

162 820.00 36.44 357.16

163 810.00 36.00 352.80

164 18-Aug-08 Boiler Raft J11 800.00 35.56 348.44

165 820.00 36.44 357.16


166 850.00 37.78 370.22

167 18-Aug-08 Boiler Raft J11 800.00 35.56 348.44

168 810.00 36.00 352.80

169 790.00 35.11 344.09

170 19-Aug-08 Boiler Raft J1 810.00 36.00 352.80

171 800.00 35.56 348.44

172 820.00 36.44 357.16

173 19-Aug-08 Boiler Raft J1 800.00 35.56 348.44

174 790.00 35.11 344.09

175 790.00 35.11 344.09

176 19-Aug-08 Boiler Raft J1 780.00 34.67 339.73

177 800.00 35.56 348.44

178 830.00 36.89 361.51

179 19-Aug-08 Boiler Raft J1 820.00 36.44 357.16

180 800.00 35.56 348.44

181 790.00 35.11 344.09

182 19-Aug-08 Boiler Raft J1 790.00 35.11 344.09

183 750.00 33.33 326.67

184 800.00 35.56 348.44

185 20-Aug-08 Boiler Raft J1 790.00 35.11 344.09

186 780.00 34.67 339.73

187 800.00 35.56 348.44

20-Aug-08 Boiler Raft J1


188 20-Aug-08 Boiler Raft J1 790.00 35.11 344.09

189 810.00 36.00 352.80

190 780.00 34.67 339.73

191 20-Aug-08 Boiler Raft J1 740.00 32.89 322.31

192 520.00 23.11 226.49

193 840.00 37.33 365.87

194 21-Aug-08 Boiler Raft J11 810.00 36.00 352.80

195 800.00 35.56 348.44

196 800.00 35.56 348.44

197 21-Aug-08 Boiler Raft J11 810.00 36.00 352.80


198 800.00 35.56 348.44

199 800.00 35.56 348.44

200 21-Aug-08 Boiler Raft J11 810.00 36.00 352.80

201 780.00 34.67 339.73

202 820.00 36.44 357.16

203 22-Aug-08 Boiler Raft J12 850.00 37.78 370.22

204 830.00 36.89 361.51

205 850.00 37.78 370.22

206 22-Aug-08 Boiler Raft J12 840.00 37.33 365.87

207 820.00 36.44 357.16

208 820.00 36.44 357.16

209 22-Aug-08 Boiler Raft J12 770.00 34.22 335.38

210 800.00 35.56 348.44

211 800.00 35.56 348.44

212 22-Aug-08 Boiler Raft J12 810.00 36.00 352.80

213 780.00 34.67 339.73

214 790.00 35.11 344.09

215 22-Aug-08 Boiler Raft J12 770.00 34.22 335.38

216 750.00 33.33 326.67

217 770.00 34.22 335.38

218 26-Aug-08 Boiler Raft J6 790.00 35.11 344.09

219 800.00 35.56 348.44


220 810.00 36.00 352.80

221 26-Aug-08 Boiler Raft J6 830.00 36.89 361.51

222 800.00 35.56 348.44

223 820.00 36.44 357.16

224 26-Aug-08 Boiler Raft J6 820.00 36.44 357.16

225 800.00 35.56 348.44

226 840.00 37.33 365.87

227 29-Aug-08 Boiler Shear Wall 830.00 36.89 361.51

228 810.00 36.00 352.80

229 880.00 39.11 383.29


230 30-Aug-08 Boiler Shear Wall 870.00 38.67 378.93

231 850.00 37.78 370.22

232 850.00 37.78 370.22

233 30-Aug-08 Boiler Shear Wall 840.00 37.33 365.87

234 810.00 36.00 352.80

235 800.00 35.56 348.44

236 31-Aug-08 Boiler Raft 820.00 36.44 357.16

237 760.00 33.78 331.02

238 800.00 35.56 348.44

239 1-Sep-08 Boiler Plinth beam 770.00 34.22 335.38

240 850.00 37.78 370.22

241 850.00 37.78 370.22

242 2-Sep-08 Boiler Raft J10 830.00 36.89 361.51

243 800.00 35.56 348.44

244 800.00 35.56 348.44

245 2-Sep-08 Boiler Raft J10 820.00 36.44 357.16

246 840.00 37.33 365.87

247 830.00 36.89 361.51

248 2-Sep-08 Boiler Raft J10 810.00 36.00 352.80

249 850.00 37.78 370.22

250 800.00 35.56 348.44

251 2-Sep-08 Boiler Raft J10 780.00 34.67 339.73


2-Sep-08 Boiler Raft J10

252 850.00 37.78 370.22

253 790.00 35.11 344.09

254 3-Sep-08 Boiler Raft J10 820.00 36.44 357.16

255 850.00 37.78 370.22

256 770.00 34.22 335.38

257 3-Sep-08 Boiler Raft J10 820.00 36.44 357.16

258 840.00 37.33 365.87

259 770.00 34.22 335.38

260 3-Sep-08 Boiler Raft J10 830.00 36.89 361.51

261 850.00 37.78 370.22


262 850.00 37.78 370.22

263 4-Sep-08 Boiler Shear Wall 820.00 36.44 357.16

264 800.00 35.56 348.44

265 800.00 35.56 348.44


Boiler Shear Wall
266 23-Sep-08 840.00 37.33 365.87
LB/48-LB /38.5
267 860.00 38.22 374.58

268 870.00 38.67 378.93


Boiler Shear Wall
269 23-Sep-08 880.00 39.11 383.29
LB/38.5-KB /38.5
270 890.00 39.56 387.64

271 840.00 37.33 365.87


Boiler Shear Wall
272 29-Sep-08 LB/24-LB /9.5,LB/0- 860.00 38.22 374.58
LB/9.5
273 820.00 36.44 357.16

274 840.00 37.33 365.87


Boiler Shear Wall LB/0-
275 1-Oct-08 860.00 38.22 374.58
MB / 0
276 830.00 36.89 361.51

277 Boiler Shear Wall HB / 840.00 37.33 365.87


19.5-HB/ 38.5,HB / 38.5
278 4-Oct-08 -HB/48,JB/9.5- 870.00 38.67 378.93
HB/9.5,JB/38.5-
279 HB/38.5 880.00 39.11 383.29

280 830.00 36.89 361.51


Boiler Shear Wall
281 6-Oct-08 HB/9.5-HB/19.5, 770.00 34.22 335.38
Waterpit raft
282 780.00 34.67 339.73

283 870.00 38.67 378.93


Boiler Shear Wall HB/0-
7-Oct-08 HB/9.5, Condensate
Pump pit
Boiler Shear Wall HB/0-
284 7-Oct-08 HB/9.5, Condensate 850.00 37.78 370.22
Pump pit
285 890.00 39.56 387.64

286 870.00 38.67 378.93

287 11-Oct-08 Beam C -D / 5,6,7 850.00 37.78 370.22

288 880.00 39.11 383.29

289 850.00 37.78 370.22


Auxiliary Beam A B
290 16-Oct-08 870.00 38.67 378.93
[4nos.]
291 830.00 36.89 361.51

292 820.00 36.44 357.16

293 22-Oct-08 Boiler Raft J17 ,H/9 850.00 37.78 370.22


294 830.00 36.89 361.51

295 820.00 36.44 357.16

296 24-Oct-08 Tie Beam C -D / 3 840.00 37.33 365.87

297 870.00 38.67 378.93

298 830.00 36.89 361.51

299 25-Oct-08 Boiler Raft J16 800.00 35.56 348.44

300 790.00 35.11 344.09

301 790.00 35.11 344.09

302 25-Oct-08 Boiler Raft J16 830.00 36.89 361.51

303 850.00 37.78 370.22

304 860.00 38.22 374.58

305 25-Oct-08 Boiler Raft J16 810.00 36.00 352.80

306 850.00 37.78 370.22

307 800.00 35.56 348.44

308 25-Oct-08 Boiler Raft J16 840.00 37.33 365.87

309 810.00 36.00 352.80

310 780.00 34.67 339.73

311 25-Oct-08 Boiler Raft J16 820.00 36.44 357.16

312 800.00 35.56 348.44

313 790.00 35.11 344.09

314 26-Oct-08 Boiler Raft J16 750.00 33.33 326.67

315 800.00 35.56 348.44


316 810.00 36.00 352.80

317 26-Oct-08 Boiler Raft J16 780.00 34.67 339.73

318 800.00 35.56 348.44

319 840.00 37.33 365.87

320 27-Oct-08 Boiler Raft J1 -J4 Beam 870.00 38.67 378.93

321 850.00 37.78 370.22

322 840.00 37.33 365.87

323 31-Oct-08 Boiler Raft C10 820.00 36.44 357.16

324 810.00 36.00 352.80

325 880.00 39.11 383.29


326 3-Nov-08 Boiler Raft J1 860.00 38.22 374.58

327 840.00 37.33 365.87

328 800.00 35.56 348.44

329 7-Nov-08 Boiler Raft A11 830.00 36.89 361.51

330 810.00 36.00 352.80

331 800.00 35.56 348.44

332 14-Nov-08 Boiler Raft C11 790.00 35.11 344.09

333 840.00 37.33 365.87

334 0.00 0.00 0.00

335 0.00 0.00 0.00

336 0.00 0.00 0.00

337 0.00 0.00 0.00

338 0.00 0.00 0.00

339 0.00 0.00 0.00

340 0.00 0.00 0.00

341 0.00 0.00 0.00

342 0.00 0.00 0.00

343 0.00 0.00 0.00

344 0.00 0.00 0.00

345 0.00 0.00 0.00

346 0.00 0.00 0.00

347 0.00 0.00 0.00


348 0.00 0.00 0.00

349 0.00 0.00 0.00

350 0.00 0.00 0.00

351 0.00 0.00 0.00

352 0.00 0.00 0.00

353 0.00 0.00 0.00

354 0.00 0.00 0.00

355 0.00 0.00 0.00

356 0.00 0.00 0.00

357 0.00 0.00 0.00


358 0.00 0.00 0.00

359 0.00 0.00 0.00

360 0.00 0.00 0.00

TO CONFORM THE DATE OF UPDATING ,THEREFORE


LEFT OUT
ete M30 Boiler , Unit No.5
gth at age of 28 days
Average of
Average compressive Standard CCS in N/mm Coefficient Result and remarks
strength of the sample deviation 2 of variation
in Kg/cm 2

476.21

467.50

466.04

512.50

477.66

323.76

432.65

344.09

344.09

The SD and CoV are on


7.44 42.76 17.40 higher side
345.54
The SD and CoV are on
7.44 42.76 17.40 higher side

315.05

342.64

394.90

362.96

328.12

384.74

384.74

383.29

392.00

397.81
Degree of Quality control
3.21 37.61 8.52 is good
397.81
Degree of Quality control
3.21 37.61 8.52 is good

328.12

344.09

326.67

342.64

335.38

326.67

357.16

331.02

360.06

303.44
Degree of Quality control
2.26 34.24 6.61 is good

352.80
352.80

352.80

344.09

333.93

389.10

349.90

351.35

317.96

358.61

344.09
Degree of Quality control
2.61 35.66 7.31 is good

329.57
320.86

355.70

342.64

342.64

349.90

354.25

355.70

344.09

348.44
Degree of Quality control
1.43 35.14 4.08 is good

354.25

351.35
351.35

341.19

351.35

352.80

357.16

348.44

349.90

344.09

355.70
Degree of Quality control
0.79 35.78 2.21 is good

338.28

344.09

348.44
348.44

296.18

355.70

349.90

346.99

362.96

364.41

346.99
Degree of Quality control
2.56 35.24 7.26 is good

346.99

335.38

342.64
354.25

354.25

360.06

377.48

362.96

345.54

351.35
Degree of Quality control
1.41 36.03 3.93 is good

360.06

357.16

361.51

352.80
352.80

357.16

352.80

355.70

358.61

362.96

383.29
Degree of Quality control
1.37 36.76 3.73 is good .

365.87

367.32

376.03

345.54

378.93
378.93

377.48

370.22

362.96

367.32

351.35
Degree of Quality control
1.32 37.38 3.54 is good .

358.61

365.87

355.70

348.44

339.73
346.99

371.67

358.61

374.58

354.25
Degree of Quality control
1.34 36.47 3.66 is good .

352.80

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

10.99 3.60 305.25

OF UPDATING ,THEREFORE
UPDATED 29.12.2008
Grade of concrete M30 A Row, Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 890.00 39.56 387.64

2 28-May-08 A Row Raft A- 9 1030.00 45.78 448.62

3 940.00 41.78 409.42

4 780.00 34.67 339.73


A Row Raft, A- 4, 5 and
5 30-May-08 720.00 32.00 313.60
6 Combined raft
6 750.00 33.33 326.67

7 710.00 31.56 309.24


A Row Raft, A- 4, 5 and
8 30-May-08 780.00 34.67 339.73
6 Combined raft
9 770.00 34.22 335.38

10 790.00 35.11 344.09


A Row Raft, A- 4, 5 and
11 30-May-08 740.00 32.89 322.31
6 Combined raft
12 770.00 34.22 335.38

13 770.00 34.22 335.38


A Row Raft, A- 4, 5 and
14 30-May-08 720.00 32.00 313.60
6 Combined raft
15 760.00 33.78 331.02

16 710.00 31.56 309.24

17 2-Jun-08 A Row A -1 Raft 760.00 33.78 331.02

18 740.00 32.89 322.31

19 810.00 36.00 352.80

20 21-Jun-08 A Row Raft A 7,8 800.00 35.56 348.44

21 760.00 33.78 331.02

22 820.00 36.44 357.16

23 21-Jun-08 A Row Raft A 7,8 830.00 36.89 361.51

24 780.00 34.67 339.73

25 810.00 36.00 352.80

26 21-Jun-08 A Row Raft A 7,8 830.00 36.89 361.51

27 800.00 35.56 348.44


28 900.00 40.00 392.00

29 27-Jun-08 A Row Raft A 2-3 870.00 38.67 378.93

30 900.00 40.00 392.00

31 900.00 40.00 392.00

32 27-Jun-08 A Row Raft A 2-3 900.00 40.00 392.00

33 890.00 39.56 387.64

34 920.00 40.89 400.71

35 27-Jun-08 A Row Raft A 2-3 880.00 39.11 383.29

36 900.00 40.00 392.00

37 900.00 40.00 392.00


38 27-Jun-08 A Row Raft A 2-3 910.00 40.44 396.36

39 910.00 40.44 396.36

40 790.00 35.11 344.09

41 23-Aug-08 A B Row Raft J-5 810.00 36.00 352.80

42 780.00 34.67 339.73

43 840.00 37.33 365.87

44 23-Aug-08 A B Row Raft J-5 840.00 37.33 365.87

45 810.00 36.00 352.80

46 830.00 36.89 361.51

47 23-Aug-08 A B Row Raft J-5 850.00 37.78 370.22

48 850.00 37.78 370.22

49 770.00 34.22 335.38

50 26-Aug-08 A B Row Raft J-5 790.00 35.11 344.09

51 800.00 35.56 348.44

52 810.00 36.00 352.80

53 26-Aug-08 A B Row Raft J-5 830.00 36.89 361.51

54 800.00 35.56 348.44

55 820.00 36.44 357.16

56 26-Aug-08 A B Row Raft J-5 820.00 36.44 357.16

57 800.00 35.56 348.44

58 820.00 36.44 357.16

59 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87


6-Sep-08 A B Row Raft J-4

60 880.00 39.11 383.29

61 840.00 37.33 365.87

62 6-Sep-08 A B Row Raft J-4 810.00 36.00 352.80

63 830.00 36.89 361.51

64 800.00 35.56 348.44

65 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87

66 860.00 38.22 374.58

67 790.00 35.11 344.09

68 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87

69 820.00 36.44 357.16


70 800.00 35.56 348.44

71 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87

72 820.00 36.44 357.16

73 840.00 37.33 365.87

74 23-Aug-08 A B Row Raft J-5 840.00 37.33 365.87

75 810.00 36.00 352.80

76 830.00 36.89 361.51

77 23-Aug-08 A B Row Raft J-5 850.00 37.78 370.22

78 850.00 37.78 370.22

79 770.00 34.22 335.38

80 26-Aug-08 A B Row Raft J-5 790.00 35.11 344.09

81 800.00 35.56 348.44

82 810.00 36.00 352.80

83 26-Aug-08 A B Row Raft J-5 830.00 36.89 361.51

84 800.00 35.56 348.44

85 820.00 36.44 357.16

86 26-Aug-08 A B Row Raft J-5 820.00 36.44 357.16

87 800.00 35.56 348.44

88 820.00 36.44 357.16

89 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87

90 880.00 39.11 383.29

91 840.00 37.33 365.87

6-Sep-08 A B Row Raft J-4


92 6-Sep-08 A B Row Raft J-4 810.00 36.00 352.80

93 830.00 36.89 361.51

94 800.00 35.56 348.44

95 6-Sep-08 A B Row Raft J-4 840.00 37.33 365.87

96 860.00 38.22 374.58

97 790.00 35.11 344.09

98 6-Sep-08 A B Row Raft, J - 4 840.00 37.33 365.87

99 820.00 36.44 357.16

100 800.00 35.56 348.44

101 6-Sep-08 A B Row Raft, J - 4 840.00 37.33 365.87


102 820.00 36.44 357.16

103 830.00 36.89 361.51

104 13-Sep-08 A B Row Raft , J - 2 850.00 37.78 370.22

105 970.00 43.11 422.49

106 860.00 38.22 374.58

107 13-Sep-08 A B Row Raft, J - 2 880.00 39.11 383.29

108 1000.00 44.44 435.56

109 860.00 38.22 374.58

110 14-Sep-08 A B Row Raft, J - 2 850.00 37.78 370.22

111 890.00 39.56 387.64

112 870.00 38.67 378.93

113 14-Sep-08 A B Row Raft , J - 2 850.00 37.78 370.22

114 840.00 37.33 365.87

115 810.00 36.00 352.80

116 20-Sep-08 Auxiliary , J - 3 850.00 37.78 370.22

117 830.00 36.89 361.51

118 850.00 37.78 370.22

119 21-Sep-08 Auxiliary , J - 3 880.00 39.11 383.29

120 860.00 38.22 374.58

121 870.00 38.67 378.93


Auxiliary , J - 3
122 30-Sep-08 860.00 38.22 374.58
Between BCRow
123 850.00 37.78 370.22
124 890.00 39.56 387.64
Auxiliary , J - 3
125 30-Sep-08 890.00 39.56 387.64
Between BCRow
126 880.00 39.11 383.29

127 0.00 0.00 0.00

128 10-Nov-08 0.00 0.00 0.00

129 0.00 0.00 0.00

130 0.00 0.00 0.00

131 0.00 0.00 0.00

132 0.00 0.00 0.00

133 0.00 0.00 0.00


134 0.00 0.00 0.00

135 0.00 0.00 0.00

136 0.00 0.00 0.00

137 0.00 0.00 0.00

138 0.00 0.00 0.00

139 0.00 0.00 0.00

140 0.00 0.00 0.00

141 0.00 0.00 0.00

142 0.00 0.00 0.00

143 0.00 0.00 0.00

144 0.00 0.00 0.00

145 0.00 0.00 0.00

146 0.00 0.00 0.00

147 0.00 0.00 0.00

148 0.00 0.00 0.00

149 0.00 0.00 0.00

150 0.00 0.00 0.00

TO CONFORM THE DATE OF UPDATING ,THEREFORE

LEFT OUT
M30 A Row, Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

415.23

326.67

328.12

333.93

326.67

320.86

344.09

352.80

354.25

Degree of Quality control


3.25 35.61 9.13 is good
387.64
Degree of Quality control
3.25 35.61 9.13 is good

390.55

392.00

394.90

345.54

361.51

367.32

342.64

354.25

354.25

368.77
Degree of Quality control
2.00 37.47 5.33 is good
368.77
Degree of Quality control
2.00 37.47 5.33 is good

360.06

362.96

355.70

357.16

361.51

367.32

342.64

354.25

354.25

368.77
Degree of Quality control
1.06 36.58 2.89 is good

360.06
360.06

362.96

355.70

357.16

384.74

397.81

377.48

371.67

361.51

376.03
Degree of Quality control
1.96 37.81 5.18 is good

374.58
386.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Degree of Quality control
15.79 7.76 203.46 is good

OF UPDATING ,THEREFORE
UPDATED 29.12.2008
Grade of concrete M30 , B Row, Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 750.00 33.33 326.67

2 18-Jun-08 B 8 J4,J5 760.00 33.78 331.02

3 740.00 32.89 322.31

4 750.00 33.33 326.67

5 18-Jun-08 B 8J4,J5 740.00 32.89 322.31

6 770.00 34.22 335.38

7 770.00 34.22 335.38

8 18-Jun-08 B 8J4,J5 780.00 34.67 339.73

9 770.00 34.22 335.38

10 740.00 32.89 322.31

11 19-Jun-08 B 9 J4 760.00 33.78 331.02

12 740.00 32.89 322.31

13 710.00 31.56 309.24

14 20-Jun-08 B 10 J4 730.00 32.44 317.96

15 740.00 32.89 322.31

16 930.00 41.33 405.07

17 2-Jul-08 B Row Raft 880.00 39.11 383.29

18 900.00 40.00 392.00

19 900.00 40.00 392.00

20 2-Jul-08 B Row Raft 920.00 40.89 400.71

21 910.00 40.44 396.36

22 870.00 38.67 378.93

23 2-Jul-08 B Row Raft 890.00 39.56 387.64

24 910.00 40.44 396.36

25 910.00 40.44 396.36

26 2-Jul-08 B Row Raft 900.00 40.00 392.00

27 890.00 39.56 387.64


28 880.00 39.11 383.29

29 3-Jul-08 B Row Raft B 1-2 ,J-5 840.00 37.33 365.87

30 870.00 38.67 378.93

31 860.00 38.22 374.58

32 3-Jul-08 B Row Raft B 1-2,J-5 890.00 39.56 387.64

33 860.00 38.22 374.58

34 890.00 39.56 387.64

35 3-Jul-08 B Row Raft B 1-2,J-5 910.00 40.44 396.36

36 900.00 40.00 392.00

37 890.00 39.56 387.64


38 3-Jul-08 B Row Raft B 1-2,J-5 870.00 38.67 378.93

39 880.00 39.11 383.29

40 910.00 40.44 396.36

41 4-Aug-08 B Row Raft B 1-2,J-5 880.00 39.11 383.29

42 900.00 40.00 392.00

43 790.00 35.11 344.09

44 4-Aug-08 B Row Raft J-5 790.00 35.11 344.09

45 780.00 34.67 339.73

46 780.00 34.67 339.73

47 4-Aug-08 B Row Raft J-5 770.00 34.22 335.38

48 790.00 35.11 344.09

49 800.00 35.56 348.44

50 4-Aug-08 B Row Raft J-5 780.00 34.67 339.73

51 790.00 35.11 344.09

52 750.00 33.33 326.67

53 4-Aug-08 B Row Raft J-5 760.00 33.78 331.02

54 720.00 32.00 313.60

55 770.00 34.22 335.38

56 4-Aug-08 B Row Raft J-5 790.00 35.11 344.09

57 720.00 32.00 313.60

58 820.00 36.44 357.16

59 4-Aug-08 B Row Raft J-5 790.00 35.11 344.09


4-Aug-08 B Row Raft J-5

60 800.00 35.56 348.44

61 0.00 0.00 0.00

62 0.00 0.00 0.00

63 0.00 0.00 0.00

64 0.00 0.00 0.00

65 0.00 0.00 0.00

66 0.00 0.00 0.00

67 0.00 0.00 0.00

68 0.00 0.00 0.00

69 0.00 0.00 0.00

70 0.00 0.00 0.00

71 0.00 0.00 0.00

72 0.00 0.00 0.00

73 0.00 0.00 0.00

74 0.00 0.00 0.00

75 0.00 0.00 0.00

76 0.00 0.00 0.00

77 0.00 0.00 0.00

78 0.00 0.00 0.00

79 0.00 0.00 0.00

80 0.00 0.00 0.00

81 0.00 0.00 0.00

82 0.00 0.00 0.00

83 0.00 0.00 0.00

84 0.00 0.00 0.00

85 0.00 0.00 0.00

86 0.00 0.00 0.00

87 0.00 0.00 0.00

88 0.00 0.00 0.00

89 0.00 0.00 0.00

90 0.00 0.00 0.00


TO CONFORM THE DATE OF UPDATING ,THEREFORE
LEFT OUT
M30 , B Row, Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

326.67

328.12

336.83

325.21

316.50

393.45

396.36

387.64

392.00

Degree of Quality control


3.36 36.52 9.21 is good
376.03
Degree of Quality control
3.36 36.52 9.21 is good

378.93

392.00

383.29

390.55

342.64

339.73

344.09

323.76

331.02

349.90
Degree of Quality control
2.62 36.49 7.19 is good
349.90
Degree of Quality control
2.62 36.49 7.19 is good

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Degree of Quality control
0.00 0.00 #DIV/0! is good
OF UPDATING ,THEREFORE
UPDATED 29.12.2008
Grade of concrete M30 C Row Unit No
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 850.00 37.78 370.22

2 26-Jul-08 C-D Row Raft ,J-13 840.00 37.33 365.87

3 830.00 36.89 361.51

4 810.00 36.00 352.80

5 26-Jul-08 C-D Row Raft ,J-13 790.00 35.11 344.09

6 860.00 38.22 374.58

7 820.00 36.44 357.16

8 26-Jul-08 C-D Row Raft ,J-13 770.00 34.22 335.38

9 750.00 33.33 326.67

10 860.00 38.22 374.58

11 26-Jul-08 C-D Row Raft ,J-13 830.00 36.89 361.51

12 840.00 37.33 365.87

13 770.00 34.22 335.38

14 26-Jul-08 C-D Row Raft ,J-13 800.00 35.56 348.44

15 780.00 34.67 339.73

16 810.00 36.00 352.80

17 26-Jul-08 C-D Row Raft ,J-13 830.00 36.89 361.51

18 810.00 36.00 352.80

19 760.00 33.78 331.02

20 6-Aug-08 C-D Row Raft ,J-12 780.00 34.67 339.73

21 770.00 34.22 335.38

22 810.00 36.00 352.80

23 6-Aug-08 C-D Row Raft ,J-12 760.00 33.78 331.02

24 790.00 35.11 344.09

25 770.00 34.22 335.38

26 6-Aug-08 C-D Row Raft ,J-12 780.00 34.67 339.73

27 750.00 33.33 326.67


28 750.00 33.33 326.67

29 6-Aug-08 C-D Row Raft ,J-12 770.00 34.22 335.38

30 780.00 34.67 339.73

31 810.00 36.00 352.80

32 6-Aug-08 C-D Row Raft ,J-12 770.00 34.22 335.38

33 790.00 35.11 344.09

34 770.00 34.22 335.38

35 6-Aug-08 C-D Row Raft ,J-12 750.00 33.33 326.67

36 790.00 35.11 344.09

37 800.00 35.56 348.44

38 7-Aug-08 C-D Row Raft ,J-12 790.00 35.11 344.09

39 780.00 34.67 339.73

40 760.00 33.78 331.02

41 7-Aug-08 C-D Row Raft ,J-12 800.00 35.56 348.44

42 770.00 34.22 335.38

43 780.00 34.67 339.73

44 10-Sep-08 C- 6,7,8,J-8 850.00 37.78 370.22

45 790.00 35.11 344.09

46 750.00 33.33 326.67

47 10-Sep-08 C- 6,7,8,J-8 780.00 34.67 339.73

48 780.00 34.67 339.73

49 800.00 35.56 348.44

50 10-Sep-08 C- 6,7,8,J-8 790.00 35.11 344.09

51 780.00 34.67 339.73

52 790.00 35.11 344.09

53 11-Sep-08 C- 6,7,8,J-8 770.00 34.22 335.38

54 750.00 33.33 326.67

55 780.00 34.67 339.73

56 11-Sep-08 C- 6,7,8,J-8 800.00 35.56 348.44

57 850.00 37.78 370.22

58 790.00 35.11 344.09

59 11-Sep-08 C- 6,7,8,J-8 800.00 35.56 348.44


11-Sep-08 C- 6,7,8,J-8

60 830.00 36.89 361.51

61 800.00 35.56 348.44

62 11-Sep-08 C- 6,7,8,J-8 830.00 36.89 361.51

63 820.00 36.44 357.16

64 780.00 34.67 339.73

65 19-Sep-08 C- 2,3,4, J-9 820.00 36.44 357.16

66 770.00 34.22 335.38

67 830.00 36.89 361.51

68 19-Sep-08 C- 2,3,4, J-9 830.00 36.89 361.51

69 850.00 37.78 370.22

70 780.00 34.67 339.73

71 19-Sep-08 C- 2,3,4, J-9 840.00 37.33 365.87

72 870.00 38.67 378.93

73 850.00 37.78 370.22

74 20-Sep-08 C- 2,3,4, J-9 850.00 37.78 370.22

75 760.00 33.78 331.02

76 830.00 36.89 361.51

77 20-Sep-08 C- 2,3,4, J-9 810.00 36.00 352.80

78 830.00 36.89 361.51

79 780.00 34.67 339.73

80 20-Sep-08 C- 2,3,4, J-9 820.00 36.44 357.16

81 840.00 37.33 365.87

82 800.00 35.56 348.44

83 20-Sep-08 C- 2,3,4, J-9 820.00 36.44 357.16

84 860.00 38.22 374.58

85 870.00 38.67 378.93

86 11-Oct-08 Beam C-D / 5,6,7 850.00 37.78 370.22

87 880.00 39.11 383.29

88 0.00 0.00 0.00

89 0.00 0.00 0.00

90 0.00 0.00 0.00

91 0.00 0.00 0.00


92 0.00 0.00 0.00

93 0.00 0.00 0.00

94 0.00 0.00 0.00

95 0.00 0.00 0.00

96 0.00 0.00 0.00

97 0.00 0.00 0.00

98 0.00 0.00 0.00

99 0.00 0.00 0.00

100 0.00 0.00 0.00

101 0.00 0.00 0.00

102 0.00 0.00 0.00

103 0.00 0.00 0.00

104 0.00 0.00 0.00

105 0.00 0.00 0.00

106 0.00 0.00 0.00

107 0.00 0.00 0.00

108 0.00 0.00 0.00

109 0.00 0.00 0.00

110 0.00 0.00 0.00

111 0.00 0.00 0.00

112 0.00 0.00 0.00

113 0.00 0.00 0.00

114 0.00 0.00 0.00

115 0.00 0.00 0.00

116 0.00 0.00 0.00

117 0.00 0.00 0.00

118 0.00 0.00 0.00

119 0.00 0.00 0.00

120 0.00 0.00 0.00

TO CONFORM THE DATE OF UPDATING ,THEREFORE

LEFT OUT
M30 C Row Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

365.87

357.16

339.73

367.32

341.19

355.70

335.38

342.64

333.93

Degree of Quality control


1.50 35.44 4.24 is good
333.93
Degree of Quality control
1.50 35.44 4.24 is good

344.09

335.38

344.09

338.28

351.35

335.38

344.09

335.38

352.80

351.35
Degree of Quality control
1.09 35.02 3.12 is good
351.35
Degree of Quality control
1.09 35.02 3.12 is good

355.70

344.09

364.41

361.51

357.16

358.61

354.25

360.06

377.48

0.00
Degree of Quality control
11.27 32.99 34.14 is good

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Degree of Quality control
0.00 0.00 #DIV/0! is good

OF UPDATING ,THEREFORE
UPDATED 29.12.2008
Grade of concrete M30 , D Row Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 830.00 36.89 361.51

2 4-Sep-08 D Row Raft J 11 800.00 35.56 348.44

3 810.00 36.00 352.80

4 830.00 36.89 361.51

5 4-Sep-08 D Row Raft J 11 810.00 36.00 352.80

6 850.00 37.78 370.22

7 750.00 33.33 326.67

8 5-Sep-08 D Row Raft J 11 780.00 34.67 339.73

9 790.00 35.11 344.09

10 810.00 36.00 352.80

11 5-Sep-08 D Row Raft J 11 830.00 36.89 361.51

12 850.00 37.78 370.22

13 820.00 36.44 357.16

14 5-Sep-08 D Row Raft J 11 790.00 35.11 344.09

15 840.00 37.33 365.87

16 810.00 36.00 352.80

17 810.00 36.00 352.80

18 810.00 36.00 352.80

19 810.00 36.00 352.80

20 810.00 36.00 352.80

21 810.00 36.00 352.80

22 810.00 36.00 352.80

23 810.00 36.00 352.80

24 810.00 36.00 352.80

25 810.00 36.00 352.80

26 810.00 36.00 352.80

27 810.00 36.00 352.80


28 810.00 36.00 352.80

29 810.00 36.00 352.80

30 810.00 36.00 352.80

TO CONFORM THE DATE OF UPDATING ,THEREFORE


LEFT OUT
M30 , D Row Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

354.25

361.51

336.83

361.51

355.70

352.80

352.80

352.80

Degree of Quality control


is good Based on
352.80
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 15
observations therefore 15
observations are
0.86 36.06 2.37 presumed as an average.
Degree of Quality control
is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 15
352.80 observations therefore 15
observations are
0.86 36.06 2.37 presumed as an average.

OF UPDATING ,THEREFORE
UPDATED 29.12.2008
Grade of concrete M30 , N Row Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 800.00 35.56 348.44

2 28-Aug-08 N Row Raft J 12 820.00 36.44 357.16

3 850.00 37.78 370.22

4 860.00 38.22 374.58

5 28-Aug-08 N Row Raft J 12 830.00 36.89 361.51

6 820.00 36.44 357.16

7 850.00 37.78 370.22

8 28-Aug-08 N Row Raft J 12 830.00 36.89 361.51

9 810.00 36.00 352.80

10 870.00 38.67 378.93

11 28-Aug-08 N Row Raft J 12 850.00 37.78 370.22

12 830.00 36.89 361.51

13 850.00 37.78 370.22

14 28-Aug-08 N Row Raft J 12 810.00 36.00 352.80

15 840.00 37.33 365.87

16 830.00 36.89 361.51

17 5-Sep-08 N Row Beam 880.00 39.11 383.29

18 800.00 35.56 348.44

19 800.00 35.56 348.44

20 13-Oct-08 ID Fan Raft 830.00 36.89 361.51

21 840.00 37.33 365.87

22 850.00 37.78 370.22

23 13-Oct-08 ID Fan Raft 870.00 38.67 378.93

24 890.00 39.56 387.64

25 810.00 36.00 352.80

26 810.00 36.00 352.80

27 810.00 36.00 352.80


28 810.00 36.00 352.80

29 810.00 36.00 352.80

30 810.00 36.00 352.80

TO CONFORM THE DATE OF UPDATING ,THEREFORE


LEFT OUT
M30 , N Row Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

358.61

364.41

361.51

370.22

362.96

364.41

358.61

378.93

Degree of Quality control


is good Based on
352.80
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 15
observations therefore 15
observations are
1.12 36.99 3.02 presumed as an average.
Degree of Quality control
is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 15
352.80 observations therefore 15
observations are
1.12 36.99 3.02 presumed as an average.

OF UPDATING ,THEREFORE
Updated 22.01.2009
Grade of concrete M40 ,Crusher House , Unit N
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 1050.00 46.67 457.33

2 8-Nov-08 Crusher House Raft 1070.00 47.56 466.04

3 1040.00 46.22 452.98

4 1060.00 47.11 461.69

5 8-Nov-08 Crusher House Raft 1080.00 48.00 470.40

6 1040.00 46.22 452.98

7 1070.00 47.56 466.04

8 8-Nov-08 Crusher House Raft 1080.00 48.00 470.40

9 1080.00 48.00 470.40

10 1050.00 46.67 457.33

11 8-Nov-08 Crusher House Raft 1090.00 48.44 474.76

12 1070.00 47.56 466.04

13 1100.00 48.89 479.11

14 9-Nov-08 Crusher House Raft 1080.00 48.00 470.40

15 1060.00 47.11 461.69

16 1060.00 47.11 461.69

17 9-Nov-08 Crusher House Raft 1070.00 47.56 466.04

18 1020.00 45.33 444.27

19 1040.00 46.22 452.98

20 9-Nov-08 Crusher House Raft 1070.00 47.56 466.04

21 1080.00 48.00 470.40


22 1060.00 47.11 461.69

23 9-Nov-08 Crusher House Raft 1040.00 46.22 452.98

24 1080.00 48.00 470.40

25 1100.00 48.89 479.11

26 10-Nov-08 Crusher House Raft 1140.00 50.67 496.53

27 1120.00 49.78 487.82

28 1050.00 46.67 457.33

29 16-Dec-08 Crusher House Raft 1070.00 47.56 466.04

30 1020.00 45.33 444.27

31 1070.00 47.56 466.04

32 16-Dec-08 Crusher House Raft 1050.00 46.67 457.33

33 1040.00 46.22 452.98

34 1060.00 47.11 461.69

35 17-Dec-08 Crusher House Raft 1040.00 46.22 452.98

36 1040.00 46.22 452.98

37 1090.00 48.44 474.76

38 17-Dec-08 Crusher House Raft 1050.00 46.67 457.33

39 1020.00 45.33 444.27

40 1050.00 46.67 457.33

41 17-Dec-08 Crusher House Raft 1040.00 46.22 452.98

42 1030.00 45.78 448.62

43 1090.00 48.44 474.76

44 17-Dec-08 Crusher House Raft 1070.00 47.56 466.04

45 1090.00 48.44 474.76

46 1070.00 47.56 466.04

47 17-Dec-08 Crusher House Raft 1020.00 45.33 444.27


17-Dec-08 Crusher House Raft

48 1030.00 45.78 448.62

49 1070.00 47.56 466.04

50 17-Dec-08 Crusher House Raft 1040.00 46.22 452.98

51 1030.00 45.78 448.62

52 1080.00 48.00 470.40

53 17-Dec-08 Crusher House Raft 1070.00 47.56 466.04

54 1040.00 46.22 452.98

55 1050.00 46.67 457.33

56 1050.00 46.67 457.33

57 1050.00 46.67 457.33

58 1050.00 46.67 457.33

59 1050.00 46.67 457.33

60 1050.00 46.67 457.33


,Crusher House , Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

458.79

461.69

468.95

466.04

470.40

457.33

463.14
461.69

487.82

455.88
Degree of Quality control
1.18 47.47 2.48 is good

458.79

455.88

458.79

452.98

471.85

452.98
452.98

455.88

463.14

457.33 Degree of Quality control


is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
457.33 In actual there are 24
observations therefore 06
observations are
0.87 46.79 1.87 presumed as an average.
Updated 22.01.2009
Grade of concrete M30 ,TG Raft ,Unit No.5
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 770.00 34.22 335.38

2 28-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

3 840.00 37.33 365.87

4 820.00 36.44 357.16

5 28-Jul-08 TG Raft Unit 5 800.00 35.56 348.44

6 780.00 34.67 339.73

7 860.00 38.22 374.58

8 28-Jul-08 TG Raft Unit 5 830.00 36.89 361.51

9 850.00 37.78 370.22

10 870.00 38.67 378.93

11 28-Jul-08 TG Raft Unit 5 850.00 37.78 370.22

12 860.00 38.22 374.58

13 780.00 34.67 339.73

14 28-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

15 840.00 37.33 365.87

16 820.00 36.44 357.16

17 29-Jul-08 TG Raft Unit 5 780.00 34.67 339.73

18 820.00 36.44 357.16

19 820.00 36.44 357.16

20 29-Jul-08 TG Raft Unit 5 780.00 34.67 339.73

21 750.00 33.33 326.67

22 830.00 36.89 361.51

23 29-Jul-08 TG Raft Unit 5 820.00 36.44 357.16

24 800.00 35.56 348.44

25 850.00 37.78 370.22

26 29-Jul-08 TG Raft Unit 5 870.00 38.67 378.93

27 840.00 37.33 365.87


28 810.00 36.00 352.80

29 29-Jul-08 TG Raft Unit 5 820.00 36.44 357.16

30 830.00 36.89 361.51

31 790.00 35.11 344.09

32 29-Jul-08 TG Raft Unit 5 780.00 34.67 339.73

33 840.00 37.33 365.87

34 880.00 39.11 383.29

35 29-Jul-08 TG Raft Unit 5 860.00 38.22 374.58

36 750.00 33.33 326.67

37 790.00 35.11 344.09


38 30-Jul-08 TG Raft Unit 5 810.00 36.00 352.80

39 840.00 37.33 365.87

40 790.00 35.11 344.09

41 30-Jul-08 TG Raft Unit 5 800.00 35.56 348.44

42 820.00 36.44 357.16

43 800.00 35.56 348.44

44 30-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

45 800.00 35.56 348.44

46 820.00 36.44 357.16

47 30-Jul-08 TG Raft Unit 5 800.00 35.56 348.44

48 790.00 35.11 344.09

49 790.00 35.11 344.09

50 30-Jul-08 TG Raft Unit 5 800.00 35.56 348.44

51 780.00 34.67 339.73

52 800.00 35.56 348.44

53 30-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

54 800.00 35.56 348.44

55 810.00 36.00 352.80

56 30-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

57 810.00 36.00 352.80

58 800.00 35.56 348.44

59 30-Jul-08 TG Raft Unit 5 790.00 35.11 344.09


30-Jul-08 TG Raft Unit 5

60 780.00 34.67 339.73

61 830.00 36.89 361.51

62 30-Jul-08 TG Raft Unit 5 780.00 34.67 339.73

63 790.00 35.11 344.09

64 770.00 34.22 335.38

65 30-Jul-08 TG Raft Unit 5 790.00 35.11 344.09

66 800.00 35.56 348.44

67 790.00 35.11 344.09

68 30-Jul-08 TG Raft Unit 5 800.00 35.56 348.44

69 830.00 36.89 361.51


M30 ,TG Raft ,Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

348.44

348.44

368.77

374.58

349.90

351.35

341.19

355.70

371.67

Degree of Quality control


1.40 36.40 3.85 is good
357.16
Degree of Quality control
1.40 36.40 3.85 is good

349.90

361.51

354.25

349.90

346.99

349.90

344.09

346.99

349.90

344.09
Degree of Quality control
1.13 35.69 3.16 is good
344.09
Degree of Quality control
1.13 35.69 3.16 is good

348.44

342.64

SD and CoV are


calculated for 9
351.35 observations .
Degree of Quality control
0.91 35.46 2.57 is good
UPDATED 29.12.2008
Grade of concrete M30 , Fan , Mill & Silo Foundations
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 800.00 35.56 348.44

2 13-Oct-08 ID Fan Raft 830.00 36.89 361.51

3 840.00 37.33 365.87

4 850.00 37.78 370.22

5 13-Oct-08 ID Fan Raft 870.00 38.67 378.93

6 890.00 39.56 387.64

7 790.00 35.11 344.09

8 18-Oct-08 FD Fan Raft F/2 7/F 820.00 36.44 357.16

9 840.00 37.33 365.87

10 860.00 38.22 374.58

11 21-Oct-08 FD Fan Raft 6/F 850.00 37.78 370.22

12 840.00 37.33 365.87

13 780.00 34.67 339.73

14 23-Oct-08 FD Fan Raft 5/F 810.00 36.00 352.80

15 830.00 36.89 361.51

16 840.00 37.33 365.87

17 30-Oct-08 FD Fan Raft J4 810.00 36.00 352.80

18 860.00 38.22 374.58

19 780.00 34.67 339.73

20 4-Nov-08 CE Pit raft 800.00 35.56 348.44

21 810.00 36.00 352.80

22 780.00 34.67 339.73

23 5-Nov-08 Mill Raft C D 7-8 770.00 34.22 335.38

24 780.00 34.67 339.73

25 800.00 35.56 348.44

26 5-Nov-08 Mill Raft C D 7-8 780.00 34.67 339.73

27 810.00 36.00 352.80


28 790.00 35.11 344.09

29 5-Nov-08 ID Fan Raft F2 800.00 35.56 348.44

30 790.00 35.11 344.09

31 800.00 35.56 348.44

32 5-Nov-08 ID Fan Raft F2 790.00 35.11 344.09

33 810.00 36.00 352.80

34 790.00 35.11 344.09

35 8-Nov-08 FD Fan Raft J2 1/F 810.00 36.00 352.80

36 820.00 36.44 357.16

37 800.00 35.56 348.44

38 14-Nov-08 Mill Raft B C 5-6 780.00 34.67 339.73

39 830.00 36.89 361.51

40 790.00 35.11 344.09

41 14-Nov-08 Mill Raft B C 5-6 830.00 36.89 361.51

42 840.00 37.33 365.87

43 790.00 35.11 344.09

44 17-Nov-08 FD Fan Raft J1 3/F 820.00 36.44 357.16

45 800.00 35.56 348.44

46 810.00 36.00 352.80

47 17-Nov-08 Mill Raft C D 6-7 830.00 36.89 361.51

48 800.00 35.56 348.44

49 800.00 35.56 348.44

50 17-Nov-08 Mill Raft C D 6-7 780.00 34.67 339.73

51 830.00 36.89 361.51

52 830.00 36.89 361.51

53 21-Nov-08 CW PIT 790.00 35.11 344.09

54 800.00 35.56 348.44

55 840.00 37.33 365.87

56 21-Nov-08 CW PIT 800.00 35.56 348.44

57 770.00 34.22 335.38

58 790.00 35.11 344.09

59 21-Nov-08 Silo 0/2 840.00 37.33 365.87


21-Nov-08 Silo 0/2

60 810.00 36.00 352.80

61 830.00 36.89 361.51

62 22-Nov-08 Mill Raft C B 2-3 780.00 34.67 339.73

63 800.00 35.56 348.44

64 800.00 35.56 348.44

65 22-Nov-08 Mill Raft C B 2-3 840.00 37.33 365.87

66 850.00 37.78 370.22

67 800.00 35.56 348.44

68 24-Nov-08 FD Fan Raft 770.00 34.22 335.38

69 830.00 36.89 361.51

70 830.00 36.89 361.51

71 24-Nov-08 FD Fan Raft 770.00 34.22 335.38

72 790.00 35.11 344.09

73 790.00 35.11 344.09

74 24-Nov-08 Mill Foundation 850.00 37.78 370.22

75 820.00 36.44 357.16

76 780.00 34.67 339.73

77 24-Nov-08 Mill Foundation 840.00 37.33 365.87

78 800.00 35.56 348.44

79 780.00 34.67 339.73

80 3-Dec-08 FD Fan Raft 810.00 36.00 352.80

81 830.00 36.89 361.51

82 810.00 36.00 352.80

83 810.00 36.00 352.80

84 810.00 36.00 352.80

85 810.00 36.00 352.80

86 810.00 36.00 352.80

87 810.00 36.00 352.80

88 810.00 36.00 352.80

89 810.00 36.00 352.80

90 810.00 36.00 352.80

TO CONFORM THE DATE OF UPDATING ,THEREFORE


LEFT OUT
, Mill & Silo Foundations Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

358.61

378.93

355.70

370.22

351.35

364.41

346.99

338.28

346.99

Degree of Quality control


1.41 36.30 3.88 is good
345.54
Degree of Quality control
1.41 36.30 3.88 is good

348.44

351.35

349.90

357.16

349.90

354.25

349.90

351.35

349.90

354.25
Degree of Quality control
0.87 35.88 2.43 is good .
354.25
Degree of Quality control
0.87 35.88 2.43 is good .

349.90

361.51

348.44

346.99

357.16

351.35

351.35

352.80

Degree of Quality control


is good Based on
352.80
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 18
352.80 observations therefore 12
observations are
0.97 35.97 2.69 presumed as an average.

OF UPDATING ,THEREFORE
Updated 22.01.2009
Grade of concrete M40 ,TG Pedestal, Unit No
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 1090.00 48.44 474.76

2 9-Aug-08 TG Pedestal 1100.00 48.89 479.11

3 1120.00 49.78 487.82

4 1070.00 47.56 466.04


TG Pedestal, A 2 , 1st
5 29-Aug-08 1050.00 46.67 457.33
lift
6 1130.00 50.22 492.18

7 1150.00 51.11 500.89

8 30-Aug-08 TG Pedestal 1110.00 49.33 483.47

9 1130.00 50.22 492.18

10 1050.00 46.67 457.33

11 1-Sep-08 TG Pedestal 1070.00 47.56 466.04

12 1140.00 50.67 496.53

13 1160.00 51.56 505.24

14 4-Sep-08 TG Pedestal 1120.00 49.78 487.82

15 1100.00 48.89 479.11

16 1160.00 51.56 505.24


TG Pedestal , B 1, 1 st
17 6-Sep-08 1080.00 48.00 470.40
lift
18 1120.00 49.78 487.82

19 980.00 43.56 426.84


TG Pedestal , C 1, 1 st
20 13-Sep-08 990.00 44.00 431.20
lift
21 1070.00 47.56 466.04
22 1030.00 45.78 448.62
TG Pedestal , B 1, 1 st
23 19-Sep-08 1080.00 48.00 470.40
lift
24 1120.00 49.78 487.82

25 1120.00 49.78 487.82

26 20-Sep-08 TG Pedestal 1080.00 48.00 470.40

27 1100.00 48.89 479.11

28 1050.00 46.67 457.33


TG Pedestal , E 2, 1 st
29 24-Sep-08 1130.00 50.22 492.18
lift
30 1030.00 45.78 448.62

31 1120.00 49.78 487.82


TG Pedestal , E 1, 1 st
32 26-Sep-08 1150.00 51.11 500.89
lift
33 1170.00 52.00 509.60

34 1120.00 49.78 487.82

35 1-Oct-08 TG Pedestal , B 6 B 7 1060.00 47.11 461.69

36 1090.00 48.44 474.76

37 1030.00 45.78 448.62


TG Pedestal , D 1, 1 st
38 2-Oct-08 1030.00 45.78 448.62
lift
39 1050.00 46.67 457.33

40 1050.00 46.67 457.33

41 13-Oct-08 TG Pedestal , PTZ / 2 1090.00 48.44 474.76

42 1020.00 45.33 444.27

43 948.00 42.13 412.91

44 15-Oct-08 TG Pedestal , P1 / P5 770.00 34.22 335.38

45 970.00 43.11 422.49

46 1100.00 48.89 479.11


TG Pedestal , A 1, 2 nd
47 18-Oct-08 1130.00 50.22 492.18
lift
TG Pedestal , A 1, 2 nd
18-Oct-08
lift
48 1070.00 47.56 466.04

49 1050.00 46.67 457.33

50 20-Oct-08 TG Pedestal , P5 1040.00 46.22 452.98

51 1070.00 47.56 466.04

52 1050.00 46.67 457.33

53 21-Oct-08 TG Pedestal , P2 1070.00 47.56 466.04

54 1080.00 48.00 470.40

55 1070.00 47.56 466.04


TG Pedestal , A 2, 2 nd
56 22-Oct-08 1020.00 45.33 444.27
lift
57 1000.00 44.44 435.56

58 1080.00 48.00 470.40

59 24-Oct-08 TG Pedestal , P 2 1050.00 46.67 457.33

60 1020.00 45.33 444.27

61 1000.00 44.44 435.56


TG Pedestal , B 2,
62 25-Oct-08 2 nd lift, 1080.00 48.00 470.40
A7
63 1040.00 46.22 452.98

64 1110.00 49.33 483.47


TG Pedestal , P 2,
65 30-Oct-08 1080.00 48.00 470.40

66 1090.00 48.44 474.76

67 1080.00 48.00 470.40


TG Pedestal , B 4,
68 6-Nov-08 2 nd lift, 1060.00 47.11 461.69
A 5, PTZ / 2,T1
69 1050.00 46.67 457.33

70 1040.00 46.22 452.98


TG Pedestal E2, 2 nd
71 20-Nov-08 lift 1030.00 45.78 448.62

72 1060.00 47.11 461.69

73 980.00 43.56 426.84


TG Pedestal E1, 2 nd
21-Nov-08 lift
TG Pedestal E1, 2 nd
74 21-Nov-08 lift 1020.00 45.33 444.27

75 1040.00 46.22 452.98

76 1000.00 44.44 435.56


TG Pedestal ,
77 24-Nov-08 1 st lift, 1080.00 48.00 470.40
PTZ / 2
78 990.00 44.00 431.20

79 1040.00 46.22 452.98


TG Pedestal A 10
80 27-Nov-08 1000.00 44.44 435.56

81 990.00 44.00 431.20

82 1050.00 46.67 457.33


TG Pedestal C 11
83 29-Nov-08 1000.00 44.44 435.56

84 1020.00 45.33 444.27

85 1040.00 46.22 452.98


TG Pedestal D / 1
86 9-Dec-08 1070.00 47.56 466.04

87 1050.00 46.67 457.33

88 1040.00 46.22 452.98


TG Pedestal C 10
89 11-Dec-08 1060.00 47.11 461.69

90 1070.00 47.56 466.04

91 1050.00 46.67 457.33


TG Pedestal , C 1, C 8
92 23-Dec-08 2 nd lift, 1070.00 47.56 466.04

93 1040.00 46.22 452.98

94 1050.00 46.67 457.33

95 1050.00 46.67 457.33

96 1050.00 46.67 457.33

97 1050.00 46.67 457.33

98 1050.00 46.67 457.33

99 1050.00 46.67 457.33


100 1050.00 46.67 457.33

101 1050.00 46.67 457.33

102 1050.00 46.67 457.33

103 1050.00 46.67 457.33

104 1050.00 46.67 457.33

105 1050.00 46.67 457.33

106 1050.00 46.67 457.33

107 1050.00 46.67 457.33

108 1050.00 46.67 457.33

109 1050.00 46.67 457.33

110 1050.00 46.67 457.33

111 1050.00 46.67 457.33

112 1050.00 46.67 457.33

113 1050.00 46.67 457.33

114 1050.00 46.67 457.33

115 1050.00 46.67 457.33

116 1050.00 46.67 457.33

117 1050.00 46.67 457.33

118 1050.00 46.67 457.33

119 1050.00 46.67 457.33

120 1050.00 46.67 457.33


0 ,TG Pedestal, Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

480.56

471.85

492.18

473.30

490.73

487.82

441.36
468.95

479.11

466.04
Degree of Quality control
2.05 48.49 4.22 is good

499.44

474.76

451.53

458.79

390.26

479.11
479.11

458.79

464.59

448.62

457.33
Degree of Quality control
3.21 46.77 6.86 is good .

452.98

476.21

463.14

454.43

441.36
441.36

445.72

439.91

445.72

Degree of Quality control


458.79 is good . Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 24
0.00 observations therefore
06 observations are
presumed as an
1.50 46.31 3.23 average.

458.79

457.33

457.33
457.33

457.33

457.33

457.33

457.33

Degree of Quality control


457.33 is good . Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 03
0.00 observations therefore
27 observations are
presumed as an
0.18 46.68 0.39 average.
Updated 29.12.2008
Grade of concrete M40 , Boiler Pedestal ,Unit N
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 1180.00 52.44 513.96

2 3-Jul-08 Boiler -Pedestal 1180.00 52.44 513.96

3 1160.00 51.56 505.24

4 1130.00 50.22 492.18

5 4-Jul-08 Boiler -Pedestal 1150.00 51.11 500.89

6 1160.00 51.56 505.24

7 1140.00 50.67 496.53

8 7-Jul-08 Boiler -Pedestal 1130.00 50.22 492.18

9 1160.00 51.56 505.24

10 1160.00 51.56 505.24

11 8-Jul-08 Boiler -Pedestal 1140.00 50.67 496.53

12 1160.00 51.56 505.24

13 1130.00 50.22 492.18

14 9-Jul-08 Boiler -Pedestal 1190.00 52.89 518.31

15 1160.00 51.56 505.24

16 1160.00 51.56 505.24

17 11-Jul-08 Boiler -Pedestal 1140.00 50.67 496.53

18 1160.00 51.56 505.24

19 1120.00 49.78 487.82

20 12-Jul-08 Boiler -Pedestal 1140.00 50.67 496.53

21 1160.00 51.56 505.24


22 1000.00 44.44 435.56

23 19-Jul-08 Boiler -Pedestal 1100.00 48.89 479.11

24 1060.00 47.11 461.69

25 800.00 35.56 348.44

26 23-Jul-08 Boiler -Pedestal 880.00 39.11 383.29

27 1080.00 48.00 470.40

28 1100.00 48.89 479.11

29 5-Aug-08 Boiler -Pedestal 1110.00 49.33 483.47

30 1120.00 49.78 487.82

31 1080.00 48.00 470.40

32 11-Aug-08 Boiler -Pedestal 1160.00 51.56 505.24

33 1130.00 50.22 492.18

34 1120.00 49.78 487.82

35 25-Aug-08 Boiler -Pedestal 850.00 37.78 370.22

36 1150.00 51.11 500.89

37 1130.00 50.22 492.18

38 5-Sep-08 Boiler -Pedestal, B 8-9 1080.00 48.00 470.40

39 1050.00 46.67 457.33

40 1120.00 49.78 487.82


Boiler -Pedestal, A - 5, A-
41 9-Sep-08 1070.00 47.56 466.04
6,
42 1160.00 51.56 505.24

43 1050.00 46.67 457.33


Boiler -Pedestal,N-B/9.5
44 10-Sep-08 1100.00 48.89 479.11
J11,K-B/19.5,K-B/28.5/J8
45 1090.00 48.44 474.76

46 1070.00 47.56 466.04

47 12-Sep-08 Boiler -Pedestal,L-B/48 1110.00 49.33 483.47


12-Sep-08 Boiler -Pedestal,L-B/48

48 1050.00 46.67 457.33

49 1140.00 50.67 496.53


Boiler -Pedestal J
50 22-Sep-08 1080.00 48.00 470.40
B/9.5,KB/9.5
51 1120.00 49.78 487.82

52 1120.00 49.78 487.82


Boiler -Pedestal
53 23-Sep-08 1150.00 51.11 500.89
HB/28.5,JB/0
54 1080.00 48.00 470.40

55 1040.00 46.22 452.98

56 25-Sep-08 Boiler -Pedestal,KB/38.5 1050.00 46.67 457.33

57 1070.00 47.56 466.04

58 1080.00 48.00 470.40


Boiler -Pedestal,NB-
59 27-Sep-08 1110.00 49.33 483.47
24,MB-0
60 1140.00 50.67 496.53

61 1050.00 46.67 457.33

62 29-Sep-08 Boiler -Pedestal,LB-0 1040.00 46.22 452.98

63 1020.00 45.33 444.27

64 1050.00 46.67 457.33


Boiler -Pedestal,
65 30-Sep-08 1040.00 46.22 452.98
NB/9.5,KB/0,NB/38.5
66 1090.00 48.44 474.76

67 990.00 44.00 431.20

68 3-Oct-08 Boiler -Pedestal,C 3,4,5,6 1130.00 50.22 492.18

69 1050.00 46.67 457.33

70 1050.00 46.67 457.33


Boiler -Pedestal,D 3,4
71 4-Oct-08 1100.00 48.89 479.11
NB/O,NB/48
72 1080.00 48.00 470.40

73 880.00 39.11 383.29

6-Oct-08 Boiler -Pedestal,D row


74 6-Oct-08 Boiler -Pedestal,D row 720.00 32.00 313.60

75 690.00 30.67 300.53

76 1110.00 49.33 483.47

77 11-Oct-08 Boiler Pedestal A-10 890.00 39.56 387.64

78 1050.00 46.67 457.33

79 1030.00 45.78 448.62

80 23-Oct-08 Boiler Pedestal A-2 , A-1 1080.00 48.00 470.40

81 1040.00 46.22 452.98

82 1080.00 48.00 470.40

83 27-Oct-08 Boiler Pedestal A-9 1060.00 47.11 461.69

84 1080.00 48.00 470.40

85 1030.00 45.78 448.62

86 31-Oct-08 Boiler Pedestal A-3 1070.00 47.56 466.04

87 1040.00 46.22 452.98

88 1090.00 48.44 474.76

89 1-Nov-08 Boiler Pedestal B-1 1060.00 47.11 461.69

90 1070.00 47.56 466.04

91 1020.00 45.33 444.27

92 3-Nov-08 Boiler Pedestal D-3 ,D-4 1050.00 46.67 457.33

93 1030.00 45.78 448.62

94 1030.00 45.78 448.62

95 4-Nov-08 Boiler Pedestal A-6 ,B-2 1010.00 44.89 439.91

96 980.00 43.56 426.84

97 1090.00 48.44 474.76

98 7-Nov-08 Boiler Pedestal D-5 1100.00 48.89 479.11

99 1080.00 48.00 470.40


100 1020.00 45.33 444.27

101 10-Nov-08 Boiler Pedestal A-2 , A-1 1040.00 46.22 452.98

102 990.00 44.00 431.20

103 1010.00 44.89 439.91

104 11-Nov-08 Boiler Pedestal A-10 1040.00 46.22 452.98

105 1070.00 47.56 466.04

106 1010.00 44.89 439.91

107 12-Nov-08 Boiler Pedestal A -11 1030.00 45.78 448.62

108 1040.00 46.22 452.98

109 990.00 44.00 431.20

110 13-Nov-08 Boiler Pedestal B -11 1070.00 47.56 466.04

111 1040.00 46.22 452.98

112 980.00 43.56 426.84

113 14-Nov-08 Boiler Pedestal B -5 1060.00 47.11 461.69

114 1020.00 45.33 444.27

115 1040.00 46.22 452.98

116 15-Nov-08 Boiler Pedestal B -6 990.00 44.00 431.20

117 1050.00 46.67 457.33

118 1030.00 45.78 448.62

119 18-Nov-08 Boiler Pedestal C -6 1060.00 47.11 461.69

120 1040.00 46.22 452.98

121 1060.00 47.11 461.69

122 19-Nov-08 Boiler Pedestal D-6,B-7 1030.00 45.78 448.62

123 1080.00 48.00 470.40

124 980.00 43.56 426.84

125 22-Nov-08 Boiler Pedestal D-8 ,B-9 1060.00 47.11 461.69


22-Nov-08 Boiler Pedestal D-8 ,B-9

126 1010.00 44.89 439.91

127 1030.00 45.78 448.62

128 1030.00 45.78 448.62

129 1030.00 45.78 448.62

130 1030.00 45.78 448.62

131 1030.00 45.78 448.62

132 1030.00 45.78 448.62

133 1030.00 45.78 448.62

134 1030.00 45.78 448.62

135 1030.00 45.78 448.62

136 1030.00 45.78 448.62

137 1030.00 45.78 448.62

138 1030.00 45.78 448.62

139 1030.00 45.78 448.62

140 1030.00 45.78 448.62

141 1030.00 45.78 448.62

142 1030.00 45.78 448.62

143 1030.00 45.78 448.62

144 1030.00 45.78 448.62

145 1030.00 45.78 448.62

146 1030.00 45.78 448.62

147 1030.00 45.78 448.62

148 1030.00 45.78 448.62

149 1030.00 45.78 448.62

150 1030.00 45.78 448.62


Boiler Pedestal ,Unit No.5
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

511.05

499.44

497.99

502.34

505.24

502.34

496.53
458.79

400.71

483.47
Degree of Quality control
3.77 49.57 7.61 is good

489.27

452.98

473.30

486.37

470.40

468.95
468.95

484.92

486.37

458.79

483.47
Degree of Quality control
2.58 48.52 5.32 is good

451.53

461.69

460.24

468.95

332.47
332.47

442.81

457.33

467.50

455.88

467.50
Degree of Quality control
4.53 45.57 9.93 is good

450.07

438.46

474.76
442.81

452.98

447.17

450.07

444.27

447.17

454.43
Degree of Quality control
1.39 45.94 3.02 is good

460.24

442.81
442.81

448.62

448.62

448.62

448.62

448.62

448.62

448.62 Degree of Quality control


is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
448.62 In actual there are 06
observations therefore
24 observations are
0.70 45.84 1.52 presumed as an average
Updated 22.01.2009
Grade of concrete M25 ,ESP Unit N
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Load in KN strength in
N /mm2

1 800.00 35.56

2 6-Dec-08 770.00 34.22

3 760.00 33.78

4 750.00 33.33

5 8-Dec-08 770.00 34.22

6 740.00 32.89

7 720.00 32.00

8 15-Dec-08 P3,Q3,R3,S3,T3 Footing 740.00 32.89

9 710.00 31.56

10 710.00 31.56

11 15-Dec-08 P3,Q3,R3,S3,T3 Footing 730.00 32.44

12 730.00 32.44

13 740.00 32.89

14 740.00 32.89

15 740.00 32.89

16 740.00 32.89

17 740.00 32.89

18 740.00 32.89

19 740.00 32.89

20 740.00 32.89

21 740.00 32.89
22 740.00 32.89

23 740.00 32.89

24 740.00 32.89

25 740.00 32.89

26 740.00 32.89

27 740.00 32.89

28 740.00 32.89

29 740.00 32.89

30 740.00 32.89
e of concrete M25 ,ESP Unit No 7
ve strength at age of 28 days
Average
Compressive Average compressive Standard of CCS in Coefficient Result and remarks
strength in strength of the sample deviation N/mm 2 of variation
kg/cm2 in Kg/cm2

348.44

335.38 338.28

331.02

326.67

335.38 328.12

322.31

313.60

322.31 315.05

309.24

309.24

317.96 315.05

317.96

322.31

322.31 322.31

322.31

322.31

322.31 322.31

322.31

322.31

322.31 322.31

322.31
322.31

322.31 322.31

322.31

322.31

322.31 322.31
Quality control is good
322.31 .Based on calculation with
figures appearing in Bold
322.31 Red which are presumtive
figures.
322.31 322.31 In actual there are 12
observations therefore 18
observations are presumed
322.31
0.75 32.96 2.27 as an average
UPDATED 22.01.2009
Grade of concrete M30 Boiler , Unit No.7
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 840.00 37.33 365.87

2 26-Sep-08 Bolier -Raft J-5,B9.5/K 860.00 38.22 374.58

3 880.00 39.11 383.29

4 800.00 35.56 348.44

5 26-Sep-08 Bolier -Raft J-5,B9.5/K 810.00 36.00 352.80

6 830.00 36.89 361.51

7 860.00 38.22 374.58

8 27-Sep-08 Bolier -Raft J-5,B38.5/J 840.00 37.33 365.87

9 820.00 36.44 357.16

10 850.00 37.78 370.22

11 27-Sep-08 Bolier -Raft J-5,B38.5/J 870.00 38.67 378.93

12 840.00 37.33 365.87

13 890.00 39.56 387.64

14 30-Sep-08 Bolier -Raft J-5,B38.5/K 870.00 38.67 378.93

15 890.00 39.56 387.64

16 840.00 37.33 365.87

17 30-Sep-08 Bolier -Raft J-5,B38.5/K 810.00 36.00 352.80

18 870.00 38.67 378.93

19 860.00 38.22 374.58


Bolier -Raft J-
20 2-Oct-08 880.00 39.11 383.29
4,B48/J.B0/J
21 880.00 39.11 383.29
22 840.00 37.33 365.87

23 6-Oct-08 Bolier -Raft J-5,B9.5/J 920.00 40.89 400.71

24 760.00 33.78 331.02

25 870.00 38.67 378.93

26 6-Oct-08 Bolier -Raft J-5,B9.5/J 830.00 36.89 361.51

27 1090.00 48.44 474.76

28 880.00 39.11 383.29

29 8-Oct-08 Bolier -Raft J-11,B9.5/N 860.00 38.22 374.58

30 850.00 37.78 370.22

31 830.00 36.89 361.51

32 8-Oct-08 Bolier -Raft J-11,B9.5/N 810.00 36.00 352.80

33 780.00 34.67 339.73

34 870.00 38.67 378.93

35 8-Oct-08 Bolier -Raft J-11,B9.5/N 890.00 39.56 387.64

36 890.00 39.56 387.64

37 850.00 37.78 370.22

38 13-Oct-08 Bolier -Raft J-7,B48/L 830.00 36.89 361.51

39 810.00 36.00 352.80

40 860.00 38.22 374.58

41 13-Oct-08 Bolier -Raft J-7,B48/L 830.00 36.89 361.51

42 820.00 36.44 357.16

43 830.00 36.89 361.51


Bolier -Raft J-9
44 14-Oct-08 800.00 35.56 348.44
B48/M,J-3 B41/M
45 820.00 36.44 357.16

46 850.00 37.78 370.22

47 17-Oct-08 Bolier -Raft J-1 B 24-48 850.00 37.78 370.22


17-Oct-08 Bolier -Raft J-1 B 24-48

48 870.00 38.67 378.93

49 820.00 36.44 357.16

50 17-Oct-08 Bolier -Raft J-1 B 24-48 840.00 37.33 365.87

51 770.00 34.22 335.38

52 850.00 37.78 370.22

53 17-Oct-08 Bolier -Raft J-1 B 24-48 820.00 36.44 357.16

54 860.00 38.22 374.58

55 800.00 35.56 348.44

56 17-Oct-08 Bolier -Raft J-1 B 24-48 830.00 36.89 361.51

57 720.00 32.00 313.60

58 820.00 36.44 357.16

59 17-Oct-08 Bolier -Raft J-1 B 24-48 850.00 37.78 370.22

60 870.00 38.67 378.93

61 840.00 37.33 365.87

62 18-Oct-08 Bolier -Raft J-1 B 24-48 850.00 37.78 370.22

63 880.00 39.11 383.29

64 800.00 35.56 348.44

65 18-Oct-08 Bolier -Raft J-1 B 24-48 790.00 35.11 344.09

66 810.00 36.00 352.80

67 790.00 35.11 344.09

68 18-Oct-08 Bolier -Raft J-1 B 24-48 800.00 35.56 348.44

69 800.00 35.56 348.44

70 850.00 37.78 370.22


Bolier -Raft J-6 B0 / K
71 22-Oct-08 810.00 36.00 352.80
J - 7 B0 / L
72 840.00 37.33 365.87

73 840.00 37.33 365.87


Bolier -Raft J-6 B0 / K
22-Oct-08
J - 7 B0 / L
Bolier -Raft J-6 B0 / K
74 22-Oct-08 810.00 36.00 352.80
J - 7 B0 / L
75 780.00 34.67 339.73

76 810.00 36.00 352.80

77 11-Nov-08 Bolier -Raft J-8 800.00 35.56 348.44

78 830.00 36.89 361.51

79 840.00 37.33 365.87

80 11-Nov-08 Bolier -Raft J-8 820.00 36.44 357.16

81 810.00 36.00 352.80

82 810.00 36.00 352.80

83 11-Nov-08 Bolier -Raft J-8 780.00 34.67 339.73

84 810.00 36.00 352.80

85 840.00 37.33 365.87

86 11-Nov-08 Bolier -Raft J-8 800.00 35.56 348.44

87 820.00 36.44 357.16

88 830.00 36.89 361.51

89 11-Nov-08 Bolier -Raft J-8 810.00 36.00 352.80

90 840.00 37.33 365.87

91 810.00 36.00 352.80

92 12-Nov-08 Bolier -Raft J-8 830.00 36.89 361.51

93 840.00 37.33 365.87

94 810.00 36.00 352.80

95 12-Nov-08 Bolier -Raft J-8 800.00 35.56 348.44

96 850.00 37.78 370.22

97 840.00 37.33 365.87

98 12-Nov-08 Bolier -Raft J-8 820.00 36.44 357.16

99 810.00 36.00 352.80


100 800.00 35.56 348.44

101 12-Nov-08 Bolier -Raft J-8 830.00 36.89 361.51

102 850.00 37.78 370.22

103 850.00 37.78 370.22

104 12-Nov-08 Bolier -Raft J-8 840.00 37.33 365.87

105 860.00 38.22 374.58

106 850.00 37.78 370.22

107 12-Nov-08 Bolier -Raft J-8 830.00 36.89 361.51

108 820.00 36.44 357.16

109 810.00 36.00 352.80

110 12-Nov-08 Bolier -Raft J-8 830.00 36.89 361.51

111 840.00 37.33 365.87

112 800.00 35.56 348.44

113 12-Nov-08 Bolier -Raft J-8 790.00 35.11 344.09

114 800.00 35.56 348.44

115 800.00 35.56 348.44

116 12-Nov-08 Bolier -Raft J-8 830.00 36.89 361.51

117 820.00 36.44 357.16

118 810.00 36.00 352.80

119 12-Nov-08 Bolier -Raft J-8 820.00 36.44 357.16

120 830.00 36.89 361.51

121 840.00 37.33 365.87

122 12-Nov-08 Bolier -Raft J-8 810.00 36.00 352.80

123 820.00 36.44 357.16

124 800.00 35.56 348.44

125 13-Nov-08 Bolier -Raft J-8 840.00 37.33 365.87


13-Nov-08 Bolier -Raft J-8

126 810.00 36.00 352.80

127 780.00 34.67 339.73

128 17-Nov-08 Bolier -Raft J-6 K/B48 800.00 35.56 348.44

129 770.00 34.22 335.38

130 830.00 36.89 361.51

131 19-Nov-08 Bolier -Raft J-12 N/B48 800.00 35.56 348.44

132 780.00 34.67 339.73

133 810.00 36.00 352.80

134 19-Nov-08 Bolier -Raft J-12 N/B48 790.00 35.11 344.09

135 830.00 36.89 361.51

136 780.00 34.67 339.73

137 20-Nov-08 Bolier -Raft J-12 N/B48 810.00 36.00 352.80

138 800.00 35.56 348.44

139 790.00 35.11 344.09

140 20-Nov-08 Bolier -Raft J-12 N/B48 800.00 35.56 348.44

141 830.00 36.89 361.51

142 840.00 37.33 365.87

143 20-Nov-08 Bolier -Raft J-12 N/B48 800.00 35.56 348.44

144 780.00 34.67 339.73

145 780.00 34.67 339.73

146 5-Dec-08 Bolier -Raft J2,J 3 800.00 35.56 348.44

147 820.00 36.44 357.16

148 820.00 36.44 357.16

149 10-Dec-08 Bolier -Raft J11 800.00 35.56 348.44

150 830.00 36.89 361.51

151 670.00 29.78 291.82

10-Dec-08 Bolier -Raft J11


152 10-Dec-08 Bolier -Raft J11 820.00 36.44 357.16

153 860.00 38.22 374.58

154 870.00 38.67 378.93

155 10-Dec-08 Bolier -Raft J11 710.00 31.56 309.24

156 860.00 38.22 374.58

157 810.00 36.00 352.80

158 24-Dec-08 Bolier -Raft J12 830.00 36.89 361.51

159 790.00 35.11 344.09

160 800.00 35.56 348.44

161 800.00 35.56 348.44

162 800.00 35.56 348.44

163 800.00 35.56 348.44

164 800.00 35.56 348.44

165 800.00 35.56 348.44

166 800.00 35.56 348.44

167 800.00 35.56 348.44

168 800.00 35.56 348.44

169 800.00 35.56 348.44

170 800.00 35.56 348.44

171 800.00 35.56 348.44

172 800.00 35.56 348.44

173 800.00 35.56 348.44

174 800.00 35.56 348.44

175 800.00 35.56 348.44

176 800.00 35.56 348.44

177 800.00 35.56 348.44


178 800.00 35.56 348.44

179 800.00 35.56 348.44

180 800.00 35.56 348.44


ete M30 Boiler , Unit No.7
gth at age of 28 days
Average of
Average compressive Standard CCS in
Coefficient
Result and remarks
strength of the sample deviation N/mm 2
of variation
in Kg/cm2

374.58

354.25

365.87

371.67

384.74

365.87

380.39
365.87

405.07

376.03
Degree of Quality control
2.40 38.21 6.28 is good

351.35

384.74

361.51

364.41

355.70

373.13
373.13

352.80

367.32

341.19

368.77
Degree of Quality control
1.59 36.95 4.31 is good

373.13

348.44

346.99

362.96

352.80
352.80

354.25

358.61

348.44

357.16

360.06
Degree of Quality control
1.03 36.36 2.84 is good

360.06

357.16

358.61
360.06

370.22

362.96

360.06

346.99

355.70

357.16
Degree of Quality control
0.84 36.62 2.29 is good

358.61

355.70
355.70

341.19

349.90

352.80

346.99

351.35

351.35

348.44 Degree of Quality control


is good,Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
355.70 In actual there are 24
observations therefore 06
observations are
0.90 35.84 2.51 presumed as an average

341.19
341.19

354.25

352.80

348.44

348.44

348.44

348.44

348.44

348.44 Degree of Quality control


is good,Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
In actual there are 09
observations therefore 21
observations are
1.62 35.59 4.56 presumed as an average
Degree of Quality control
is good,Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
348.44 In actual there are 09
observations therefore 21
observations are
1.62 35.59 4.56 presumed as an average
UPDATED 22.01.2009
Grade of concrete M30 A B C D N Row and Auxilliary Fo
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

770.00 34.22 335.38


1
C-D Row Raft ,J-13
15-Nov-08 840.00 37.33 365.87
2 1/01
800.00 35.56 348.44
3
790.00 35.11 344.09
4
C-D Row Raft ,J-13
15-Nov-08 840.00 37.33 365.87
5 1/01
800.00 35.56 348.44
6
780.00 34.67 339.73
7
C-D Row Raft ,J-13
15-Nov-08 830.00 36.89 361.51
8 1/01
800.00 35.56 348.44
9
810.00 36.00 352.80
10
C-D Row Raft ,J-13
15-Nov-08 840.00 37.33 365.87
11 1/01
800.00 35.56 348.44
12
780.00 34.67 339.73
13
C-D Row Raft ,J-13
16-Nov-08 790.00 35.11 344.09
14 1/01
820.00 36.44 357.16
15
800.00 35.56 348.44
16
C-D Row Raft ,J-13
16-Nov-08 820.00 36.44 357.16
17 1/01
790.00 35.11 344.09
18
820.00 36.44 357.16
19
19-Nov-08 A Row Raft J1 A/1 800.00 35.56 348.44
20
840.00 37.33 365.87
21
780.00 34.67 339.73
22
2-Dec-08 Raft J9 J10 830.00 36.89 361.51
23
810.00 36.00 352.80
24
810.00 36.00 352.80
25
C-D Row Raft ,J-9
5-Dec-08 790.00 35.11 344.09
26
780.00 34.67 339.73
27
800.00 35.56 348.44
28
C-D Row Raft ,J-9
5-Dec-08 780.00 34.67 339.73
29
820.00 36.44 357.16
30
820.00 36.44 357.16
31
C-D Row Raft ,J-9
6-Dec-08 790.00 35.11 344.09
32
840.00 37.33 365.87
33
780.00 34.67 339.73
34
C-D Row Raft ,J-9
6-Dec-08 830.00 36.89 361.51
35
810.00 36.00 352.80
36
800.00 35.56 348.44
37
C-D Row Raft ,J-9
6-Dec-08 840.00 37.33 365.87
38
830.00 36.89 361.51
39
820.00 36.44 357.16
40
C-D Row Raft ,J-9
6-Dec-08 790.00 35.11 344.09
41
840.00 37.33 365.87
42
830.00 36.89 361.51
43
C-D Row Raft ,J-9
6-Dec-08 770.00 34.22 335.38
44
810.00 36.00 352.80
45
790.00 35.11 344.09
46
Raft , J-7
11-Dec-08 810.00 36.00 352.80
47
Raft , J-7
11-Dec-08

780.00 34.67 339.73


48
800.00 35.56 348.44
49
Raft , J-6
12-Dec-08 780.00 34.67 339.73
50
780.00 34.67 339.73
51
830.00 36.89 361.51
52
Raft , J-6
12-Dec-08 850.00 37.78 370.22
53
820.00 36.44 357.16
54
850.00 37.78 370.22
55
Raft , J-6
13-Dec-08 870.00 38.67 378.93
56
850.00 37.78 370.22
57
830.00 36.89 361.51
58
Raft , J-6
13-Dec-08 850.00 37.78 370.22
59
860.00 38.22 374.58
60
780.00 34.67 339.73
61
Raft , J-8
19-Dec-08 810.00 36.00 352.80
62
820.00 36.44 357.16
63
780.00 34.67 339.73
64
Raft , J-8
19-Dec-08 830.00 36.89 361.51
65
850.00 37.78 370.22
66
810.00 36.00 352.80
67
Raft , J-8
19-Dec-08 830.00 36.89 361.51
68
870.00 38.67 378.93
69
790.00 35.11 344.09
70
Raft , J-8
20-Dec-08 800.00 35.56 348.44
71
790.00 35.11 344.09
72
830.00 36.89 361.51
73
Raft , J-8
20-Dec-08
Raft , J-8
20-Dec-08 850.00 37.78 370.22
74
800.00 35.56 348.44
75
800.00 35.56 348.44
76
Raft , J-8
20-Dec-08 820.00 36.44 357.16
77
800.00 35.56 348.44
78
810.00 36.00 352.80
79
Raft , J-8
20-Dec-08 830.00 36.89 361.51
80
840.00 37.33 365.87
81
810.00 36.00 352.80
82
810.00 36.00 352.80
83
810.00 36.00 352.80
84
810.00 36.00 352.80
85
810.00 36.00 352.80
86
810.00 36.00 352.80
87
810.00 36.00 352.80
88
810.00 36.00 352.80
89
810.00 36.00 352.80
90
ow and Auxilliary Foundations, Unit No.7
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

349.90

352.80

349.90

355.70

346.99

349.90

357.16
351.35

345.54

348.44
Degree of Quality control
0.92 35.79 2.58 is good

355.70

351.35

358.61

355.70

349.90

345.54
345.54

342.64

362.96

373.13

368.77
Degree of Quality control
1.22 36.37 3.37 is good

349.90

357.16

364.41

345.54

360.06
360.06

351.35

360.06

352.80

352.80 Degree of Quality control


is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
352.80 In actual there are 21
observations therefore 09
observations are
0.90 36.19 2.49 presumed as an average
Updated 29.12.2008
Grade of concrete M30 ,TG Raft ,Unit No.7
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 820.00 36.44 357.16

2 26-Nov-08 TG Raft 780.00 34.67 339.73

3 840.00 37.33 365.87

4 790.00 35.11 344.09

5 26-Nov-08 TG Raft 840.00 37.33 365.87

6 810.00 36.00 352.80

7 830.00 36.89 361.51

8 26-Nov-08 TG Raft 780.00 34.67 339.73

9 800.00 35.56 348.44

10 800.00 35.56 348.44

11 27-Nov-08 TG Raft 860.00 38.22 374.58

12 790.00 35.11 344.09

13 780.00 34.67 339.73

14 27-Nov-08 TG Raft 840.00 37.33 365.87

15 810.00 36.00 352.80

16 840.00 37.33 365.87

17 27-Nov-08 TG Raft 870.00 38.67 378.93

18 810.00 36.00 352.80

19 830.00 36.89 361.51

20 27-Nov-08 TG Raft 790.00 35.11 344.09

21 860.00 38.22 374.58

22 810.00 36.00 352.80

23 27-Nov-08 TG Raft 770.00 34.22 335.38

24 840.00 37.33 365.87

25 780.00 34.67 339.73

26 27-Nov-08 TG Raft 850.00 37.78 370.22

27 820.00 36.44 357.16


28 800.00 35.56 348.44

29 27-Nov-08 TG Raft 840.00 37.33 365.87

30 820.00 36.44 357.16

31 820.00 36.44 357.16

32 27-Nov-08 TG Raft 860.00 38.22 374.58

33 800.00 35.56 348.44

34 770.00 34.22 335.38

35 27-Nov-08 TG Raft 830.00 36.89 361.51

36 810.00 36.00 352.80

37 830.00 36.89 361.51


38 27-Nov-08 TG Raft 860.00 38.22 374.58

39 820.00 36.44 357.16

40 820.00 36.44 357.16

41 28-Nov-08 TG Raft 840.00 37.33 365.87

42 790.00 35.11 344.09

43 830.00 36.89 361.51

44 28-Nov-08 TG Raft 780.00 34.67 339.73

45 810.00 36.00 352.80

46 800.00 35.56 348.44

47 28-Nov-08 TG Raft 860.00 38.22 374.58

48 850.00 37.78 370.22

49 840.00 37.33 365.87

50 28-Nov-08 TG Raft 800.00 35.56 348.44

51 820.00 36.44 357.16

52 840.00 37.33 365.87

53 28-Nov-08 TG Raft 860.00 38.22 374.58

54 800.00 35.56 348.44

55 800.00 35.56 348.44

56 28-Nov-08 TG Raft 840.00 37.33 365.87

57 790.00 35.11 344.09

58 790.00 35.11 344.09

59 28-Nov-08 TG Raft 850.00 37.78 370.22


28-Nov-08 TG Raft

60 820.00 36.44 357.16

61 840.00 37.33 365.87

62 28-Nov-08 TG Raft 800.00 35.56 348.44

63 820.00 36.44 357.16

64 790.00 35.11 344.09

65 28-Nov-08 TG Raft 840.00 37.33 365.87

66 830.00 36.89 361.51

67 830.00 36.89 361.51

68 28-Nov-08 TG Raft 850.00 37.78 370.22

69 800.00 35.56 348.44


70 840.00 37.33 365.87

71 28-Nov-08 TG Raft 800.00 35.56 348.44

72 820.00 36.44 357.16


M30 ,TG Raft ,Unit No.7
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

354.25

354.25

349.90

355.70

352.80

365.87

360.06

351.35

355.70

Degree of Quality control


1.23 36.30 3.38 is good
357.16
Degree of Quality control
1.23 36.30 3.38 is good

360.06

349.90

364.41

355.70

351.35

364.41

357.16

362.96

352.80

357.16
Degree of Quality control
1.14 36.49 3.12 is good
357.16
Degree of Quality control
1.14 36.49 3.12 is good

357.16

357.16

360.06

SD and CoV are


calculated for12
357.16 observations .
Degree of Quality control
0.89 36.52 2.42 is good
Updated 22.01.2009
Grade of concrete M40 , Boiler Pedestal ,Unit N
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 1040.00 46.22 452.98

2 1-Dec-08 Boiler -Pedestal J4 J5 990.00 44.00 431.20

3 1020.00 45.33 444.27

4 1090.00 48.44 474.76

5 16-Dec-08 Boiler -Pedestal J10 J8 1050.00 46.67 457.33

6 1010.00 44.89 439.91

7 1050.00 46.67 457.33

8 19-Dec-08 Boiler -Pedestal J2 J11 1070.00 47.56 466.04

9 1020.00 45.33 444.27

10 1030.00 45.78 448.62

11 1030.00 45.78 448.62

12 1030.00 45.78 448.62

13 1030.00 45.78 448.62

14 1030.00 45.78 448.62

15 1030.00 45.78 448.62

16 1030.00 45.78 448.62

17 1030.00 45.78 448.62

18 1030.00 45.78 448.62

19 1030.00 45.78 448.62

20 1030.00 45.78 448.62

21 1030.00 45.78 448.62


22 1030.00 45.78 448.62

23 1030.00 45.78 448.62

24 1030.00 45.78 448.62

25 1030.00 45.78 448.62

26 1030.00 45.78 448.62

27 1030.00 45.78 448.62

28 1030.00 45.78 448.62

29 1030.00 45.78 448.62

30 1030.00 45.78 448.62


Boiler Pedestal ,Unit No.7
gth at age of 28 days
Average
Average compressive Standard of CCS in Coefficient Result and remarks
strength of the sample deviation N/mm 2 of variation
in Kg/cm2

442.81

457.33

455.88

448.62

448.62

448.62

448.62
448.62

448.62 Degree of Quality control


is good Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
448.62 In actual there are 09
observations therefore
21 observations are
0.74 45.88 1.62 presumed as an average
UPDATED 22.01.2009
Grade of concrete M30 Boiler , Unit No.9
Cube compressive strength at age of 28 days

Sr.No. Date of Casting Location of concrete Compressive


Compressive
Load in KN strength in
strength in kg/cm2
N /mm2

1 820.00 36.44 357.16

2 15-Oct-08 Bolier -Raft J-7,L/B0 690.00 30.67 300.53

3 770.00 34.22 335.38

4 700.00 31.11 304.89

5 15-Oct-08 Bolier -Raft J-7,L/B0 780.00 34.67 339.73

6 870.00 38.67 378.93

7 790.00 35.11 344.09


Bolier -Raft J-9,M/B0
8 18-Oct-08 820.00 36.44 357.16
with beam
9 830.00 36.89 361.51

10 860.00 38.22 374.58


Bolier -Raft J-4,J/B48.5
11 20-Oct-08 840.00 37.33 365.87

12 840.00 37.33 365.87

13 800.00 35.56 348.44


Bolier -Raft J-
14 21-Oct-08 9,M/B48.5 840.00 37.33 365.87

15 860.00 38.22 374.58

16 840.00 37.33 365.87


Bolier -Raft J-2,N/B24
17 22-Oct-08 870.00 38.67 378.93

18 840.00 37.33 365.87

19 830.00 36.89 361.51


Bolier -Raft J-12,N/B0
20 22-Oct-08 810.00 36.00 352.80

21 820.00 36.44 357.16


22 840.00 37.33 365.87
Bolier -Raft J-12,N/B0
23 22-Oct-08 860.00 38.22 374.58

24 810.00 36.00 352.80

25 810.00 36.00 352.80


Bolier -Raft J-12,N/B0
26 23-Oct-08 780.00 34.67 339.73

27 760.00 33.78 331.02

28 800.00 35.56 348.44


Bolier -Raft J-12,N/B0
29 23-Oct-08 820.00 36.44 357.16

30 780.00 34.67 339.73

31 830.00 36.89 361.51


Bolier -Raft J-12,N/B0
32 23-Oct-08 780.00 34.67 339.73

33 850.00 37.78 370.22

34 810.00 36.00 352.80


Bolier -Raft J-10,M/B24
35 8-Nov-08 800.00 35.56 348.44
J-7,L/B48
36 820.00 36.44 357.16

37 820.00 36.44 357.16


Bolier -Raft J-10,M/B24
38 8-Nov-08 800.00 35.56 348.44
J-7,L/B48
39 840.00 37.33 365.87

40 840.00 37.33 365.87


Bolier -Raft J-4,L /B0,
41 21-Nov-08 810.00 36.00 352.80
J 6 M/B0
42 830.00 36.89 361.51

43 850.00 37.78 370.22


Bolier -Raft J-12,N /
44 22-Nov-08 B48, 810.00 36.00 352.80

45 780.00 34.67 339.73

46 820.00 36.44 357.16


Bolier -Raft J-12,N /
47 22-Nov-08 B48, 870.00 38.67 378.93
Bolier -Raft J-12,N /
22-Nov-08 B48,

48 840.00 37.33 365.87

49 800.00 35.56 348.44


Bolier -Raft J-12,N /
50 22-Nov-08 B48, 790.00 35.11 344.09

51 840.00 37.33 365.87

52 840.00 37.33 365.87


Bolier -Raft J-12,N /
53 23-Nov-08 B48, 800.00 35.56 348.44

54 790.00 35.11 344.09

55 810.00 36.00 352.80


Bolier -Raft J-12,N /
56 23-Nov-08 B48, 840.00 37.33 365.87

57 790.00 35.11 344.09

58 780.00 34.67 339.73


Bolier -Raft J-3 ,6
59 29-Nov-08 N / B38.5,K/B48 830.00 36.89 361.51

60 850.00 37.78 370.22

61 790.00 35.11 344.09


Bolier -Raft J-11,N/B9.5
62 2-Dec-08 840.00 37.33 365.87

63 810.00 36.00 352.80

64 820.00 36.44 357.16


Bolier -Raft J-11,N/B9.5
65 2-Dec-08 770.00 34.22 335.38

66 840.00 37.33 365.87

67 800.00 35.56 348.44


Bolier -Raft J-11,N/B9.5
68 2-Dec-08 840.00 37.33 365.87

69 810.00 36.00 352.80

70 790.00 35.11 344.09


Bolier -Raft J-5,B9.5
71 4-Dec-08 820.00 36.44 357.16

72 800.00 35.56 348.44

73 830.00 36.89 361.51


Bolier -Raft J-5,B9.5
4-Dec-08
Bolier -Raft J-5,B9.5
74 4-Dec-08 810.00 36.00 352.80

75 840.00 37.33 365.87

76 800.00 35.56 348.44


Bolier -Raft J-5,K/B9.5
77 11-Dec-08 830.00 36.89 361.51

78 850.00 37.78 370.22

79 830.00 36.89 361.51


Bolier -Raft J-5,K/B9.5
80 11-Dec-08 850.00 37.78 370.22

81 830.00 36.89 361.51

82 830.00 36.89 361.51


Bolier -Raft J-
83 22-Dec-08 1,H4/B38.5 810.00 36.00 352.80

84 850.00 37.78 370.22

85 840.00 37.33 365.87


Bolier -Raft J-
86 22-Dec-08 1,H4/B38.5 820.00 36.44 357.16

87 830.00 36.89 361.51

88 830.00 36.89 361.51


Bolier -Raft J-
89 22-Dec-08 1,H4/B38.5 850.00 37.78 370.22

90 860.00 38.22 374.58

91 800.00 35.56 348.44


Bolier -Raft J-
92 23-Dec-08 830.00 36.89 361.51
1,H4/B38.5
93 810.00 36.00 352.80

94 830.00 36.89 361.51


Bolier -Raft J-
95 23-Dec-08 800.00 35.56 348.44
1,H4/B38.5
96 810.00 36.00 352.80

97 790.00 35.11 344.09


Bolier -Raft J-
98 23-Dec-08 800.00 35.56 348.44
1,H4/B38.5
99 820.00 36.44 357.16
100 810.00 36.00 352.80
Bolier -Raft J-
101 23-Dec-08 780.00 34.67 339.73
1,H4/B38.5
102 820.00 36.44 357.16

103 800.00 35.56 348.44


Bolier -Raft J-
104 23-Dec-08 820.00 36.44 357.16
1,H4/B38.5
105 810.00 36.00 352.80

106 830.00 36.89 361.51


Bolier -Raft J-
107 23-Dec-08 850.00 37.78 370.22
1,H4/B38.5
108 830.00 36.89 361.51

109 810.00 36.00 352.80

110 810.00 36.00 352.80

111 810.00 36.00 352.80

112 810.00 36.00 352.80

113 810.00 36.00 352.80

114 810.00 36.00 352.80

115 810.00 36.00 352.80

116 810.00 36.00 352.80

117 810.00 36.00 352.80

118 810.00 36.00 352.80

119 810.00 36.00 352.80

120 810.00 36.00 352.80


ete M30 Boiler , Unit No.9
gth at age of 28 days
Average of
Average compressive Standard CCS in N/mm Coefficient Result and remarks
strength of the sample deviation 2 of variation
in Kg/cm 2

331.02

341.19

354.25

368.77

362.96

370.22

357.16
364.41

341.19

348.44
Degree of Quality control
1.94 36.12 5.36 is good

357.16

352.80

357.16

360.06

354.25

367.32
367.32

352.80

352.80

354.25

357.16
Degree of Quality control
1.09 36.39 2.99 is good

354.25

352.80

355.70

349.90

360.06
360.06

360.06

364.41

361.51

361.51

368.77
Degree of Quality control
0.95 36.62 2.60 is good

354.25

354.25

349.90
349.90

352.80

364.41

352.80

352.80

352.80 Degree of Quality control


is good.Based on
calculation with figures
appearing in Bold Red
which are presumtive
figures.
352.80 In actual there are 18
observations therefore 12
observations are
0.59 36.09 1.63 presumed as an average