Models
I.D. 12.7
Gas pipe
I.D12.7 I.D. 15.88 I.D9.52
Liquid pipe
I.D6.35 I.D9.52
2 3
ARBLN01621
I.D. 15.88 I.D19.05 O.D15.88 I.D22.2 I.D19.05 I.D12.7 I.D. 15.88 I.D19.05 I.D9.52 I.D9.52 I.D25.4 I.D12.7 I.D28.58 O.D25.4 I.D12.7 I.D15.88 I.D19.05 O.D19.05 I.D22.2 I.D19.05 I.D22.2 I.D15.88 I.D12.7 I.D31.8 I.D19.05 I.D19.05 I.D15.88 O.D22.2 I.D31.8 I.D28.58 O.D19.05 O.D31.8 I.D22.2 O.D12.7 I.D6.35 I.D9.52 I.D28.58 I.D9.52 O.D12.7 I.D15.88 I.D12.7 I.D15.88 I.D12.7 I.D9.52 O.D19.05 I.D22.2 I.D25.4 I.D12.7 I.D6.35 I.D12.7 I.D6.35 I.D6.35 I.D9.52 I.D6.35
I.D12.7 O.D9.52
Liquid pipe [mm(inch)] 6.35(1/4) 9.52(3/8) 9.52(3/8) 9.52(3/8) 12.7(1/2) 15.88(5/8) 19.05(3/4) 19.05(3/4)
Gas pipe [mm(inch)] 12.7(1/2) 15.88(5/8) 19.05(3/4) 22.2(7/8) 28.58(9/8) 28.58(9/8) 34.9(13/8) 41.3(15/8)
I.D15.88
ARBLN03321
I.D28.58
ARBLN07121
I.D19.05
104 (354,900)
I.D34.9
I.D15.88
I.D19.05
ARBLN14521
For example. Indicated 9.52 is the outer diameter(O.D..) of field jointed piping
10m or less
10m or less
L50m
L50m
L150m 40m
L150m 40m
h15m
h15m
h15m
h15m
A : Outdoor Unit B : 1st branch (Y branch) C : Indoor Units D : Downward Indoor Unit
A : Outdoor Unit B : 1st branch (Y branch) C : Indoor Units D : Downward Indoor Unit
A B C D E
: Outdoor Unit : 1st branch (Y branch) : Indoor Units : Downward Indoor Unit : Connection branch pipe between Outdoor Units: ARCNN20
A B C D E F
: Outdoor Unit : 1st branch (Y branch) : Indoor Units : Downward Indoor Unit : Connection branch pipe between Outdoor Units: ARCNN20 : Connection branch pipe between Outdoor Units: ARCNN30
Fig. 3 Example
Pipe cover Insulation material (field spply)
Mount Liquid pipe 1 to pipe cover 2 in matching. Seal the joing section of pipe cover with inslated sealing tape(field supply). (Refer to Fig. 2) Apply the same procedures to the gas pipe also.
Lapped space of taping Tape (field spply)
Note 1. Apply insulation to all refrigerant piping (field supply). When using the insulation materials being marketed, employ heat resistant insulation material (heat resistant temperature: 120C or more) Note 2. As the pipe cover contracts slightly conduct taping in the field securely by providing lapped parts as shown in so that no gap will exit on the piping cover and field supply insulation material.
P/No.: 3850A25001K