Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE:

AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Sl. No. Description BILL NO. 1 PRELIMINARY & GENERAL Procure (Purchase) and Supply brand new vehicles for Employer Site staff. including Registration, Full Comprehensive Insurance (1st year) Number plate, Road Tax , etc. As per Tech. Spec. Cl.124 a) Mahindra Scorpio SLX Turbo 2.6 7 seater option 4 x 4 wheel drive CRDE EURO II or "Equivalent approved" Supply of digital colour record photographs fixed in albums and copied on to a CD as per Tech. Spec. Cl. 125 (on an avg. 75photographs / month) Supply of video cassette: Taking video film of important activities for playing time of 180 minutes each as per Tech.Spec. Cl. 126 a) Start of the Contract b) During execution of Works c) End of the Contract Maintenance of Earthern shoulders by filling with new gravelly soil by making up loss of material/irregularities on shoulder to design level by adding new soil and compacting with plate compactor to the desired field density with all lead and lift as per Tech Spec. Cl. 3003.1 Filling and Patching of Potholes as per Technical Specification Cl. 3004.2 Depth upto 100mm More than 100mm Prepare, submit and obtain approval of Engineer for Construction Safety Management Plan 14 days prior to commencement of Construction Work at Site. Total Carried to Summary Unit Rate Amount

Annexure-3.1(b)

1.01

No

822289.4

822289.3875 0

1.02

No

219.8133 0

329719.95 0 0 1096.38585 2192.7717 1096.38585 0 809620.6356 0 0 2207341.033 3354350.958 0 21927.717 7549635.224 0 0

1.03

0 Sets. Sets. Sets. 1096.386 1096.386 1096.386 0 16.97745 0 0 165.3068 219.8133 0

1.04

Sqm

1.05 a) b)

Sqm Sqm

1.06

Lumpsum 21927.72 0 0 0

Sl. No.

Description

Unit 0 0 ha 27409.65 0 0 0 0 Cum Sqm Cum Cum Cum Sqm 142.968 274.3199 494.1332 603.1463 0 142.968 0 0 0 0 55.4001 0 0 0 4056627.645 0 0 0 0 822780.84 61721.96625 1236321.141 250305.6938 0 6071565.024 0 0 0 0 237832.6293 0 October 2011

2.01 2.02

BILL NO. 2 SITE CLEARANCE Clearing and grubbing for road land, embankment, drain, cross drainage structures complete as per Technical Specification clause 201. (Item No.2.02, Not Used) Dismantling structures and pavements including disposal of dismantled material and / or salvaging useful material complete as per Technical Specification clause 202 and section 2800. Brick Masonry/Stone Masonary Stone Slab in Structure Plain cement concrete Reinforced cement concrete including straightening and cutting of bars and separating them completely. Pavement Structure i) Bituminous Pavement/Granular Pavement Courses. ii) (Item No.2.03.e.ii, Not Used) (Item No.2.03.f, Not Used) (Item No.2.03.g, Not Used) (Item No.2.03.h, Not Used) Wearing Coat (Item No.2.03.j, Not Used) 1 of 18

2.03 a) b) c) d) e)

f) g) h) i) j) FINANCIAL BID EVALUATION

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) SH-76 k) Dismantling Hume Pipe/GI Pipes over 300of mm dia. Lm 2.04 Scarification existing Bituminous Surface as per Technical Specification. Cl 305.4.3. Total Carried to Summary Sqm

Annexure-3.1(b)

548.6397 0 27.70005 0 0 0

630935.655 0 5807010.782 0 19175101.38 0

Sl. No.

Description

Unit 0 0 0 0

BILL NO.3 - EARTHWORKS Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification clause 301. and disposal of all cut material including necessary stacking of suitable material with all lead and lift . In all types of Soil Ordinary Rock (not requiring blasting) Hard Rock (controlled blasting) Construction of embankment with approved material from borrow areas complete as per drawing and Technical Specification clause 305 with all leads and lifts complete Construction of embankment with available material obtained from Road way excavation complete as per drawing and Technical Specification clause 305 with all leads and lifts complete Construction of subgrade with approved material from approved borrow areas as per Technical Specification clause 305 including all leads and lifts complete. Construction of earthen shoulder with approved material from approved borrow areas as per drawing and Technical Specification clause 305 and 407 including all leads & lifts complete. (Item No.3.06. Not Used) Construction of Subgrade with approved available material obtained from Road way excavation complete as per drawing and Technical Specification clause 305 including leads and lifts complete Construction of Embankment using Fly ash/Pond ash available form coal or lignite burring Thermal plants as waste material admixtured with granular soil, free from organic matter/deleterious material or clayey silts content not less than 10%(fly ash) as per Technical specification Cl. 315, including all leads and lifts complete., Total Carried to Summary Cum Cum Cum

3.01

a) b) c)

62.5485 107.226 189.4326 0 98.2905 0

97851498.89 838727.1333 1481751.269 0 43078072.31 0 8857532.401 0 75549479.23 0 23331429.28 0 0 0 5490198.476

3.02

Cum

3.03

Cum

66.1227 0

3.04

Cum

108.1196 0

3.05

Cum

98.2905 0 0 0 72.37755

3.06

3.07

Cum

3.08

Cum

165.3068

3306135

0 0 0

0 259784824 0

Sl. No.

Description

Unit 0 0 Cum 608.5076 0 0 0 157662480.7 0 October 2011

4.01

BILL NO.4 SUB-BASE COURSE & BASE COURSE (Non Bituminous) Construction of Granular sub-base (GSB) with approved materials conforming to Grading-I (Table 400-2), as per Technical Specification Clause 401 and as per drawings.

FINANCIAL BID EVALUATION

2 of 18

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Construction of Wet Mix Macadam (WMM) base with approved material 4.02 Cum complete as per drawing and Technical Specification clause 406. Total Carried to Summary

Annexure-3.1(b)

759.5175 0 0 0

183988526.9 0 341651007.6 0

Sl. No.

Description

Unit 0 0 Sqm 17.871 0 0 0 16820395.18 0 0 6728158.074 0 311069640.9 0 248209715.9 0 0 0 0 0 582827910.1 0 0

BILL NO.5 BASE AND SURFACE COURSES (Bituminous) 5.01 Providing and laying bituminous prime coat over granular surface with bituminous emulsion complete as per Technical Specification clause 502 . Providing and laying bituminous tack coat with bituminous emulsion complete as per Technical Specification clause 503 Over bituminous surface. Providing and laying Dense graded Bituminous Macadam (DBM) course Grading 2 of Table 500-10 using paving bitumen complying to IS specification IS : 73-2006 of Viscosity grade bitumen VG-30 complete as per Technical Specification Clause 507 Providing and laying Bituminous concrete using paving bitumen complying to IS specification IS : 73-2006 of Viscosity grade bitumen VG-30 complete as per Technical Specification Clause 509 (Item No.5.05, Not Used) (Item No.5.06, Not Used) Total Carried to page 2

5.02 a)

0 Sqm 7.1484 0 5444.4 0

5.03

Cum

5.04

Cum

6825.828 0 0 0 0 0 0 0 0

5.05 5.06

Sl. No.

Description

Unit 0 0 0 Cum 1192.889 0 0 582827910.1 0 2097099.302 0

5.07

BILL NO.5 BASE AND SURFACE COURSES (Bituminous) Contd.. Brought forward from page 1 Prividing and laying sand bed below dry lean concrete as per drawing compacting deposited material by plate compactor after duly watering to achieve the desired degree of compaction, as per specifiction and direction of engineer Incharge with all lead and left etc,.complete Dry Lean Cement Concrete Sub- base Providing and Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate 25 mm& 12.5 mm Gramte/Basalt/Trap metal & clean seived approved sand, after blending to be as pertable600-1, cernent content atl50kg/cum optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpaat7days, loading materials to batch mix plant by F.E. Loader, mixed in a batching plant at 75 Cum/hr transported to site in tipper to paver, laid with paver finisher with electronic sensor, to the required grade, level and alignment, compacting with 8-10 tonnes vibratory roller, finishing and curing including cost of all materials, labour, lead and lift, hire charges of machineries etc., complete. (Compacted thickness) MORT&H Technical Specification Clause 601

5.08

Cum

2625.25

5768986.655

0 FINANCIAL BID EVALUATION 3 of 18

0 October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) ofConstruction SH-76 Cement Concrete Pavement Providing and of un-reinforced, dowel jointed, plain cement concrete pavement over aprepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, coarse aggregate 25 mm & 12.5 mm Granite/Basalt/Trap metal & clean seived approved sand,, loading materials to : batch mix plant by EE. Loader, mixed in a cement conrete batch mix plant 175 Cum/hour as per approved mix design, transported to site in transit truck agitator 5 Cum capacity, laid with a slip form paver with electronic sensor, compacted and 5.09 Cum finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures curing compound as approved, finishing to the required grade, level and alignment, textured with texturing machine, finishing and curing including cost of all materials, labour, lead and lift, hire charges of machineries etc., complete (Compacted thickness) MORT&H Technical Specification Clause 602 Total Carried to Summary

Annexure-3.1(b)

5032.474

27477305.86

0 0 0

0 618171301.9 0

Sl. No.

Description

Unit 0 0 0 Cum 69.6969 0 329.72 0 0 0 0 1229732.104 0 5383667.344 0 406634.9469 0 0 11417017.02 0

6.01 a)

BILL NO. 6 CULVERTS Earth work in excavation of foundation for structure complete including all leads and lifts as per drawing and Technical Specification clauses 304 and 2903. In all types of Soil Providing backfilling behind abutment, wing wall, return wall or any other area with selected granular materials of approved quality complete as per drawing and Technical Specification clauses 305, 2907 and IRC 78 Providing and laying filter media behind abutment, wing wall and return wall complete as per drawing and Technical Specification clauses 309 and 2504..

6.02

Cum

6.03

Cum

679.9916 0

6.04 a)

Providing and laying cement concrete flooring/ leveling in foundation complete as per drawing and Technical Specification 1500, 1700, 2100 & 2200. M-15 Grade Cum

0 3141.722 0

FINANCIAL BID EVALUATION

4 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Providing and laying Plain/Reinforced cement concrete in foundation/sub 6.05 a) b) structure etc. excluding reinforcement complete as per drawing and Technical Specification 1500, 1700, 2100 & 2200. M- 20 Grade M- 30 Grade Providing and laying reinforced cement concrete in superstructure complete etc.. excluding reinforcement as per drawing and Technical Specification section 1500, 1700 & 2300. M- 25 Grade M- 30 Grade Providing, cutting & fixing in position TMT bar reinforcement complete as per drawing & Technical Specification section 1600. Providing and fixing in Position 20mm thick compressible fiber board in expansion joint including sealing with a joint sealing compound as per drawing and Technical Specification section 2600 and direction of the Engineer. Total Carried to page 2 0 Cum Cum 3890.517 4069.227 0 0 Cum Cum T 5098.596 5220.119 0 52232.47 0 6.08 Sqm 822.9596 0 0 0 Description BILL NO. 6 CULVERTS, Contd., Brought forward from page 1 Providing and fixing Tar paper bearings complete reinforced with bitumen laminated Kraft paper conforming to IS-1398 and as per drawing and Technical Specification section 2000 & IRC SP 13. Providing and fixing galvanized drainage spouts complete as per drawing and Technical Specification clause 2705. Providing & laying reinforced cement concrete (grade M-25) in approach slab including reinforcement & bituminous joint filler between approach slab & dirt wall complete as per drawing and Technical Specification section 1500,1600, 1700 & 2704. Providing, laying and jointing RCC NP-4 pipes (as per IS: 458-1988) Hume pipes for culverts complete as per drawing and Technical Specification section 2900 and IRC : SP : 13-1973. Diameter 900 mm Diameter 1000 mm Diameter 1200 mm Providing and fixing PVC pipe of 100mm dia. for weep holes in abutment, wing wall and return wall complete as per Technical Specification clause 2200 & 2706. Providing and laying stone pitching in slope and apron (300 mm thick) for earth protection complete as per drawing and Technical Specification clause 2504 Providing and fixing Marker Post for buried culvert as per drawing, IRC:71971 and directions of the Engineer including painting the necessary details with synthetic enamel as per directions of the Engineer. Painting of culvert no. and span arrangement as per Technical Specification section 800. Total Carried to page 3 Unit 0 0 0 Sqm 88.46145 0 6.10 No 1316.199 0 0 96550929.71 15392.2923 0 115825.5252 0 27128572.95 8952298.74 0 0 469070.8596 12914574.65 0 27683206.58 0 966154.5117 0 96550929.71 0

Annexure-3.1(b)

6.06 a) b) 6.07

Sl. No.

6.09

6.11

Cum

7202.907 0

1671074.32 0 0 1938646.08 5882536.309 3373712.399 0 702743.1201 0 3445475.187 0 55342.9128 0 31245.6564 0 113782923.5

6.12 a) b) c)

0 Lm Lm Lm 4846.615 5416.7 6413.902 0 219.8133 0

6.13

No

6.14

Cum

921.2501 0

6.15

No

494.1332 0

6.16

No

55.4001 0 0

FINANCIAL BID EVALUATION

5 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76

Annexure-3.1(b)

0 0

0 0

Sl. No.

Description BILL NO. 6 CULVERTS, Contd., Brought forward from page 2 Painting with water proof cement paint of approved brand and shade in two coat on all exposed surfaces, including cost of materials, labour complete as per specification Cl.800. Painting with two coats of new concrete surface after filling the surface with Synthetic enamel paint in all shades on new plastered concrete surface complete as per Technical specification Cl.803. Providing, laying and jointing RCC NP-3 pipes (as per IS: 458-1988) Hume pipes for culverts complete as per drawing and Technical Specification section 2900 and IRC : SP : 13-1973. Diameter 900 mm (Item No.6.20, Not Used) Filling in foundation with sand and granite boulders of 100 to 150mm size in foundation including watering, tamping with all leads and lifts, etc., complete as per drawing. Total Carried to Summary

Unit 0 0 0 Sqm 165.3068 0 0 0 113782923.5 1458336.149 0 84480.68475 0 0 7569083.34 0 0 0 1455292.181 124350115.9 0

6.17

6.18

Sqm

88.46145 0

6.19 a) 6.20

0 Lm 4205.046 0 0 0 873.8919 0 0 Unit 0 0 0 Cum Cum Cum 85.7808 107.226 189.4326 0 329.72 0

6.21

Cum

Sl. No.

Description BILL NO. 7 BRIDGES Earth work in excavation of foundation for structure complete including all leads and lifts as per drawing and Technical Specification clause 304 In all types of Soil Ordinary Rock (not requiring blasting) Hard Rock (controlled blasting) Backfilling behind abutment, wing wall and return wall or any other area with selected granular materials of approved quality complete as per drawing and Technical Specification clause 305, 2900 & IRC 78. Providing and laying filter media behind abutment, wing wall and return wall complete as per drawing and Technical Specification clauses 309 and 2504. Providing and laying Cement Concrete flooring / leveling complete as per drawing and Technical Specification 1400, 1500, 1700, 2100 & 2500. M-15 Grade Providing and laying cement concrete / reinforced cement concrete for foundation and sub-structure excluding cost of reinforcement with all leads and lifts as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. and as directed by Engineer (Item No.7.05.a,Not Used) M-25 Grade M-30 Grade Total Carried to page 2

0 0 0 1893439.598 89640.936 15912.3384 0 1326793.079 0 1031547.181 0 7527565.433 0 0 0 7698022.605 20203710.57 0 39786631.74 0

7.01 a) b) c)

7.02

Cum

7.03 7.04 a)

Cum

679.9916 0

Cum

3141.722 0 0

7.05 a) b) c)

Cum Cum

0 3947.704 4069.227 0 0 0

FINANCIAL BID EVALUATION

6 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Sl. No. Description BILL NO. 7 BRIDGES, Contd., Brought forward from page 1 Providing and laying reinforced cement concrete in superstructure complete etc.. excluding reinforcement as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. Grade M-25 Grade M-30 Grade M-35 Providing and laying reinforced cement concrete in superstructure complete etc.. excluding reinforcement as per drawing and Technical Specification section 1500, 1700 2100, 2200 & 2300. Grade M40 RCC/PSC Providing, cutting and fixing in position TMT bar reinforcement complete as per drawing and Technical Specification section 1600. Providing, cutting and fixing in position 19K13 type HTS strands along with HDPE Corrugated sheathing, Anchorages and other accessories including stressing, grouting etc complete as per drawing and Technical Specification sections Cl 1800 Providing and fixing tar paper bearing complete reinforced with bitumen laminated Kraft paper conforming to IS-1398 and as per drawing and Technical Specification section 2000 & IRC SP13 Supplying, fitting & fixing in position true to line and level Elastomeric Bearing conforming to IRC:83(part II) section IX and Technical Specification Cl 2000,2005 & 2200. Total Carried to page 3 Unit 0 0 0 0 Cum Cum Cum 5098.596 5220.119 5279.987 0 0 Cum T 5632.939 0 52232.47 0 7.09 T 91571 0 7.10 Sqm 88.46145 0 0 39786631.74 0 729099.2709 9323132.713 8537738.898 0 0 4573946.63 0 54530693.72 0 2289275.1 0 27599.9724

Annexure-3.1(b)

7.06 a) b) c)

7.07 a) 7.08

a)

cu.cm

0.89355 0 0 0

694352.6856 0 120492470.7 0

Sl. No.

Description BILL NO. 7 BRIDGES, Contd., Brought forward from page 2 Providing and fixing the following type expansion joints complete as per drawing and Technical Specification section 2600. Providing & fixing in Position 20mm thick compressible fiber board in expansion joint including Sealing with a joint sealing compound as per drawing and Technical Specification clause 2605 and direction of the Engineer. Providing asphaltic plug joint as per drawing and Technical Specifications section 2600 Compression Seal Joint and Technical Specifications section 2600 Strip Seal joint for 40mm moment and Technical Specifications section 2607 Provinding filling joint sealing compound as per drawing with coarse sand with 6% bitumen by weight as per Technical Specification clause 2605 Providing and fixing galvanized drainage spouts complete as per drawing and Technical Specification clause 2705. Providing, laying and erecting cement concrete grade M-40 in Crash Barrier excluding the cost of reinforcement complete as per drawing and Technical Specification clause 809 and sections 1500,1600 and 1700. 7 of 18

Unit 0 0 0 0 0 0 120492470.7 0

7.11

a)

Sqm

822.9596

1777592.628

b) c) d)

Lm Lm Lm

329.72 1316.199 8771.087 0

631743.4242 568598.0328 421012.1664 0 373114.3122 0 189532.6776 0 4490813.419

7.12

Lm

1480.612 0

7.13

No

1316.199 0

7.14

Lm

3483.951

FINANCIAL BID EVALUATION

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Providing & laying reinforced cement concrete (grade M-30) in approach slab including reinforcement & bituminous joint filler between approach slab & dirt wall complete as per drawing and Technical Specification section 1500,1600, 1700 & 2704. Total Carried to page 4

Annexure-3.1(b)

0 7202.907 0 0 0

0 3219699.228 0 132164576.6 0

7.15

Cum

Sl. No.

Description BILL NO. 7 BRIDGES, Contd., Brought forward from page 3 Providing and fixing PVC pipe 100mm dia. for weep holes in abutment, wing wall and return wall complete as per Technical Specification clause 2706 & 2200. Providing and fixing in position 150mm dia PVC pipe 2.5kg /Sqcm pressure of approved make for utility ducts in foot path as directed by Engineer. Painting of bridge no and span arrangement as per IRC-7: 1971 drawings and direction of the engineer. Tech Spec Cl. 800 Providing Wearing Coat (56mm) consisting of 50mm thick Asphaltic concrete and 6mm thick Mastic Asphalt including prime coat as per Tech. Spec. Cl.2700 Construction of Gabion wall with segments of wire crates as per Tech Spec Cl. 2503 Construction of Gabion mattress 170 mm thick as per Tech Spec. 2503 Construction of Gabion mattress 230 mm thick as per Tech Spec. 2503 Providing Geotextile over filter material under Gabion Mattress as per specification 2503 & 2504. Painting with water proof cement paint of approved brand and shade in two coat on all exposed surfaces, including cost of materials, labour complete as per specification Cl-800. Painting with two coats of new concrete suface after filling the surface with Synthetic enamal paint in all shades on new plastered concrete surface, as per specification Cl.803. Provide and maintain temporary diversion of road at site of bridge reconstruction location including structure if needed and dismantling after completion as per Tech. Spec. 112 and as directed by Engineer. Total Carried to page 5

Unit 0 0 0 No 235.8972 0 0 0 132164576.6 345353.5008 0 846551.0571 0 3988.8072 0 4293798.154 0 394859.745 0 1479563.322 0 850117.2152 0 1624800.046 0 1623101.407 0 284845.869 0 3141998.801 0 147053554.5 0

7.16

7.17

Lm

274.3199 0

7.18

No

55.4001 0

7.19

Sqm

506.6429 0

7.20 7.21 7.22 7.23

Cum Sqm Sqm Sqm

1316.199 0 219.8133 0 274.3199 0 165.3068 0

7.24

Sqm

219.8133 0

7.25

Sqm

88.46145 0

7.26

Lm

1645.026 0 0 0 0.89355 0 0 0

Sl. No.

Description

Unit

BILL NO. 7 BRIDGES, Contd., Brought forward from page 4

0 0 147053554.5

FINANCIAL BID EVALUATION

8 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Granite Stone masonry work in (1:3) CM in substructure complete excluding 7.27 pointing and plastering as per drawing & Technical Specification Section 1400. (Item No.7.28, Not Used) Pointing with CM (1:3) on stone work in superstructure / substructure as per Tech. Spec Cl.1405.6 Providing plastering 12mm thk, with cement mortor 1:3 as per Tech, Spec 1300. Providing and laying stone pitching on slopes (300 mm thick) for earth protection and aprons complete as per drawing and Technical Specification clause 2504 Providing and laying filter media below stone pitching as per drawing and Technical Specification clause 309 and 2504. Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the proportion as per technical Clause 2807.1., sand and coarse aggregates conforming to IS :383 and gunite not less then 2000kg/cum, strength not less then 25Mpa and workmanship conforming to Technical Specifications Clause 2807.6 Total Carried to page 6 Cum 1957.768 0 0 0 165.3068 0 7.30 Sqm 142.968 0 7.31 Cum 921.2501 0 7.32 Cum 679.9916 0 5090196.93 0 0 0 357723.807 0 50324.736 0 458782.5249 0 410442.8996 0

Annexure-3.1(b)

7.28 7.29

Sqm

7.33

Sqm

1096.386

385927.8192

0 0 0 0 0 0 0 Sqm 2358.078 0

0 0 0

Sl. No.

Description

Unit

7.34

BILL NO. 7 BRIDGES, Contd., Brought forward from page 5 Epoxy bonding of new concrete to old concrete, including cost of all materials, labour, lead lifts as per Technical Specification Clause 2805 Carrying out repair of RCC m30 railing to bring it to the original shape, by cutting and trimming the damaged portion to a regular shape, cleaning the area to be repaired thoroughly, applying cement concrete after erection of proposed form work, reinforcements and disposing of dismantled material, including cost of materials, labour, hire charges of machinery, lead, lifts, loading, unloading etc., complete as per direction of Engineer. (Item No.7.36, Not Used) Filling in foundation with sand and granite boulders of 100 to 150mm size in foundation including watering, tamping with all leads and lifts, etc., complete as directed by Engineer.

0 0 0 830043.6144 0

7.35

Lm

1645.026

164502.555

7.36

0 0 0 940.0146 0

0 0 0 1535043.842 0

7.37

Cum

Providing and constructing Temporary Island 14m diameter for construction of Well foundation by using crane with grab, compacting earth, placing sand bags for protection of earth on slopes including cost of all materials, hire 7.38 charge of machineries, labour, lead, lift, loading, unloading etc., complete. the diameter of the island shall be in the conformity with clause 1203.2 a) for depth of water 3.0m and height of island 3.40m Total Carried to page 7 No

109638.6 0 0 0

219277.17 0 156555820.4 0 October 2011

FINANCIAL BID EVALUATION

9 of 18

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Sl. No. Description Unit 0

Annexure-3.1(b)

Brought forward from page 6 Providing and constructing one span service road to each island location from one pier location to another pier location of span length 30m, width of service road 10m. Depth of water 3m and height of road 3.25m using front end loader, 7.39 transporting the materials by tipper, compacting earth, placing sand bag for protection of earthen slopes, including cost of all materials, labour, lead, lift, loading, unloading, transporting, hire charge of machineries etc., complete as per technical specification 1200. Providing and laying cutting edge of mild steel weighing not less than 40 kg/m 7.40 for well foundation complete as per technical specification 1200 & 1900. Providing and laying plain / Reinforced Cement Concrete Grade M30 in well 7.41 foundation complete as per technical specification 1200, 1500, 1700. a) Well curb b) Well Steining a) Well Cap 7.42 Plain Cement Concrete M25 grade in top and bottom plug,complete as per technical specification 1200, 1500 & 1700. a) Top plug b) Bottom plug Providing Sand filling in wells complete as per drawing and technical specifications 1207. Providing HYSD bar reinforcement confirming to IS-1786 complete as per drawing and technical specifications 1600. a) Well curb, stening, cap, dowels Providing and Sinking of 6m external diameter well complete as per technical specification 1200 in Clayey soil (a)Depth below bed level upto 3.0m (b)Depth from 3.0m to 7.0m (c)in Soft Rock Providing and Sinking of 10m external diameter well complete as per technical specification 1200 in Clayey soil (a) Depth below bed level upto 3.0m (b) Depth from 3.0m to 7.0m (c)in Soft Rock Drilling of 65mm dia holes 1.50m in rock for dowels including Grouting of holes in cement mortar 1 : 1 1/2 Total Carried to Summary

0 0 0

0 0 156555820.4

Lm

54819.29

1644578.775

0 T 60301.22 0 0 Cum Cum Cum 3740.4 3740.4 4069.227 0 0 Cum Cum Cum 3618.878 3618.878 0 1225.951 0 7.44 0 T 52232.47 0 0 Lm Lm Lm 0 27409.65 31521.76 34262.28 0 0 Lm Lm Lm No 0 54819.29 63042.63 68524.56 0 3180.144 0 0

0 482409.774 0 0 497473.2399 3740400.3 1627690.68 0 0 231608.16 1523547.428 0 1485852.127 0 0 4700921.873 0 0 0 164457.8775 504348.2136 205573.6872 0 0 0 328915.755 1008682.13 411147.3744 0 318014.445 175431442.3

7.43

7.45

7.46

7.47

Sl. No.

Description

Unit 0 0 0 0

BILL NO. 8 DRAINAGE AND PROTECTION WORK

FINANCIAL BID EVALUATION

10 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur 105.630) of slopes, SH-76 verges, earthen Providing and laying turfing (Km on embankment 8.01 shoulders and other locations with green sods as per drawing and Technical Specification clause 307. Providing and installing Single Metal Beam Crash Barrier system comprising of "W" profile beams, posts, spacer channels, terminal pieces, reflectors and requisite number of fasteners including Foundation complete as per the Drawing no U/T/09 and technical specification Cl.810 Construction of lined drains and footpath, Toe walls as per drawings Cement Concrete grade M15 including form work for levelling coarse as per Tech Spec. 1500 & 1700.drawing no.U/T/04 Cement Concrete grade M20 including form work for sub-structure as per Tech Spec. 1500 & 1700. drawing no.U/T/04 Providing, casting and fixing in position Kerb Type II with cement concrete M30 grade per Tech Spec. 1500 & 1700. drawing no.U/T/04 Providing, casting and fixing in position RCC cover slab with cement concrete M25 grade per Tech Spec. 1500 & 1700. (excluding reinforcement) drawing no.U/T/04 TMT steel reinforcement bars complete as per bending schedule drawing Tech Spec. 1600, 1800 & 2300. Providing and fixing in position MS gratings of size 1500 x 300 mm made out of MS Flats 25 x 80 mm as per drawing no.U/T/04 Providing and fixing 100 mm dia PVC pipes as per Technical specification claue 2706 & 2200 and as per drawing no.U/T/04 Total Carried to page 2 Sqm 27.70005 0 1732970.528 0

Annexure-3.1(b)

8.02

Lm

1606.603

10622858.37

8.03 a)

0 0 Cum 3141.722 0

0 0 17024990.43 0 70792156.4 0 912576.3602 0 9446474.78 0 72341964.37 0 5874435.384 0 547115.3037 189295541.9 0

b)

Cum

3561.69 0

c)

Lm

268.9586 0

d)

Cum

3727.891 0

e)

52232.47 0

f)

No

3289.158 0

g)

Lm

219.8133 0 0

Sl. No.

Description BILL NO. 8 DRAINAGE AND PROTECTION WORK, Contd., Brought forward from page1 Providing and laying in position interlocking paver blocks 75 mm thick using cement and coarse sand for manufacturing of blocks of approved size, shape and colour with a minimum compressive strength of 281 kgs/sqm over 50 mm thick sand bed and compacting with plate vibrator having 3 ton compacting force. as per drawing no.U/T/04 and Technical Specification clause A5. (Item No.8.03.i, Not Used) (Item No.8.03.j, Not Used) Providing and laying 300mm thick stone pitching in slopes complete as per Technical Specifications Clause No. 2504. Providing and laying filter material below stone pitching complete as per Technical Specifications clause 2504.

Unit 0 0 0 0 0 189295541.9

h)

Sqm

548.6397

8749705.936

i) j) 8.04

Cum

0 0 0 0 0 921.2501 0

0 0 0 0 0 5093591.526 0 1267232.253 0

8.05

Cum

679.9916 0

FINANCIAL BID EVALUATION

11 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Providing and fixing heavy duty interlocking Paver blocks 75 mm thick interlock cement pavers for Raised Pedestrain Crossing, using cement and coarse sand for Paver blocks of approved size, shape and colour with a maximum compressive strength of 281 Kg/Sqm over 50 mm thick sand bed (average thickness) over prepared surface and compacting with plate vibrator Sqm 8.06 3 tons compaction force there by forcing part of sand underneath to come up in between joints and providing M-30 grade Precast Concrete blocks for lateral support of size(400X100X150)mm with Bituminous Concrete on either side of carriageway to form ramp as per drawing no.U/T/17 and Technical Specification Clause A-5A. Providing and fixing over head sign near Pedestrian Crossing including Cement Concrete foundation, base plate with nut and bolt of 25mm dia, 100mm square MS pole of 5mm thick including painting of approved quality, colour and 150 Watts Metal Hallide Luminaire with 2 nos of Cautionary warning signs (Triangular 900mm. sides) for each pole including lighting and other electical installation as per drawingno. U/T/17, as per technical specification clause A-5B & as approved by Engineer. Total Carried to Summary

Annexure-3.1(b)

713.0529

94122.9828

8.07

No

49337.36

197349.453

0 0

204697544.1 0

Sl. No.

Description

Unit 0 0 3141.722 0 0 0 5153366.269 0 6363021.376 0

9.01

BILL NO.9 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES Providing and laying plain cement concrete ( M-15 grade ) in foundations for Cum Kerb complete as per drawing and Technical Specification clauses 408 sections 1500, 1700 and 400 as per drawing no.U/T/04 Providing and laying plain cement concrete Kerb (M-30 Grade) complete, as per technical specificatiion clause 808 sections 1500, 1700 & 400, as per drawing no.U/T/04 Supplying and fixing sign boards including the cost of posts, fixtures, foundation, fitting and fixing. Sheeting will be made of encapsulated lens type of Retro-reflective type and messages/ borders will be screen printed complete as per Technical Specification clause 801 and as directed by Engineer. and as per drawings no.U/T/03 Mandatory/Regulatory Traffic Signs Type IX Octagonal 900x 900 mm Circular 600mm dia (a) Informatory Signs, Facility Signs, Direction Signs, Advance Direction/ Destination Signs, Route Marker Signs etc. Type IX Cautionary warning signs (Triangular 900mm sides) Type IX Chevrons Object Marker Providing and laying pavement marking with hot applied thermoplastic paints conforming to ASTM D-36/ BS 3262 (Part-I) complete as per drawing and Technical Specification clause 803 and drawings no.U/T/11 Lane/ centerline / edge marking / transverse and any other marking. Directional arrows, lettering etc. as per drawing No. U/T/11 and Tech. Spec. Cl. 803. Stop Line Major/Minor Junctions Stop Letters Diagonal/Chevron Marking Total Carried to page 2

9.02

Lm

268.9586 0

9.03

a) i) ii) b) c) d) e)

No No Sqm No No No

0 9176.759 5702.636 9038.258 6452.325 5317.516 3727.891 0 0

0 697433.646 536047.7934 1620378.939 4361771.396 1829225.521 134204.0616 0 0 13177686.44 49180.992 45338.727 3268.6059 18777.0597 33989700.82 0

9.04 i) ii) iii) iv) v)

Sqm No No No No

329.72 384.2265 384.2265 27.70005 494.1332 0 0

Sl. No. FINANCIAL BID EVALUATION

Description 12 of 18

Unit October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS Sl. No. Description CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Unit Birur (Km 105.630) of SH-76 BILL NO.9 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES , Contd., Brought forward from page1 Providing and Fixing single granite stone with all exposed faces three line dressing , of Standard dimension/size as per IRC:8-1980 and IRC:26, excavation and fixing in position in M15 grade concrete, curing, painting and printing letters, etc. complete including the cost of all materials, labour, loading, unloading, lead ,lift, transporting etc., complete as per Technical specification clause 804 and as per drawing no.U/T/13 Hectometer stone (Granite stone) Ordinary kilometre Stone (Granite stone) 5th kilometre Stone (Granite stone) Providing and fixing Road Delineators complete as per drawing and Technical Specification clause 805 and direction of the Engineer and as per drawing no. U/T/10 For Curves-Type1 Providing and erecting RCC. boundary stone/ pillars including cost of reinforcement and two coats of painting with ready mix oil bound paint complete as per Technical Specification clause 806. and as per drawing no.U/T/13 Providing and laying of a reinforced cement concrete NP-3 pipe duct , 450mm dia across the road, extending from drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as pre IRC:98-1997, bedded on a 0.3m thick layer of granular material free of rock pieces, outer to outer distance of pipeat least half dia of pipe subject to minimum 450mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt as per approved drawings including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete. as directed by Engineer. Total Carried to page 3 No No No

Annexure-3.1(b)

0 0 0

0 0 33989700.82

9.05

a) b) c)

822.9596 1096.386 1370.706 0 0

330829.7391 93192.79725 31526.2311 0 0 5948351.627 0 581558.082 0

9.06 i)

No

822.9596 0 548.6397 0

9.07

No

9.08

Lm

2245.491

6280638.747

0 0 0 Description Unit

0 47255798.05 0

Sl. No.

9.09

9.10 9.11 9.12 9.13 9.14

0 BILL NO.9 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES , Contd., 0 0 Brought forward from page2 Supplying and fixing of Road Studs (Raised Pavement Markers) Conforming to ASTM D4280 type "H" in position as indicated in the drawings and as No 214.452 directed by Engineer as per Technical Specification clause 812. and as per drawing no.U/T/08 0 Provide Bus bays as per drawing no.U/T/05 including lane/ line marking and No 49337.36 painting & as per direction of Engineer. 0 0 (Item No.9.11, Not Used) 0 0 (Item No. 9.12, Not Used) 0 Providing and laying Island fill/Median Fill with available earth materials Cum 66.1227 complete as per Technical Specification clause 407. 0 0 (Item No.9.14, Not Used) 0

0 47255798.05 0 2300426.604 0 2762892.342 0 0 0 0 0 156922.3916 0 0 0

FINANCIAL BID EVALUATION

13 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Kmas 105.630) of SH-76 Providing and fixing guard post directed by Engineer and as per drawings 9.15 No no.U/T/10 Providing and Fixing Footpath Barrier as per drawing and Technical Specification clause 808 and as directed by Engineer and as per drawings no.U/T/15 Providing and Fixing Median Barrier as per drawing and Technical Specification clause 808 and as directed by Engineer and as per drawings no.U/T/15 Providing and Constructing traffic calming measures as per Technical Specifications and as per direction of the Engineer and as per drawing no.U/T/12 Road Humps and as per drawings no.U/T/12 a) Tack Coat as per Technical Specifications clause 503 b) Dense Bituminous Macadam as per Technical Specifications clause 507 c) Road Marking as per Technical Specifications clause 803

Annexure-3.1(b)

384.2265 0

1349787.695 0 25591554.36 0 9857286.18 0 0 0 1745.63928 68926.1059 119325.3818 0 0 78961.2264 0 180022.625 89723648.6 0

9.16

Lm

1699.532 0

9.17

Lm

1699.532 0

9.18 i)

0 0 7.1484 5444.4 384.2265 0 0 1645.026 0 2686.905 0 0 Unit 0 0

Sqm Cum Sqm

ii) 9.19

Rumble Strips as per drawing no.U/T/12 Providing Solar Studs complete as per Technical Specifications Clause 814 and conforming to IRC:SP:55:2001. As per Drawing no U/T/18 Total Carried to Summary

No No

Sl. No.

Description BILL NO.10 - SAFETY IN ROAD CONSTRUCTION ZONE Supplying and fixing sign boards including the cost of posts, fixtures, foundation, fitting and fixing. Sheeting will be made of encapsulated lens type of Retro-reflective type and messages/ borders will be screen printed complete as per Technical Specification clause 112 & 801 and as directed by Engineer. Octagonal 900x 900 mm type IX Circular 600mm dia type IX Informatory as per drawing type IX Cautionary warning signs (Triangular 900mm sides) TypeIX Providing of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene(LDPE) material with a square base of 390x390x35mm and a height of 770mm, 4Kg in weight, placed at 1.5m interval, all as per BS 873 including cost of all materials, labour, loading, unloading, lead, lift, transporting etc complete Technical Specification clause/section 112 & 801 & IRC SP 55-2001. Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5m in length fitted on a "A" frame made with 45X45X5 mm angle iron section, 1.5m in height, horizontal rail painted(2coat) with yellow and white strips, 150mm in width at angle of 45degree, "A" frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading, lead, lift, transporting etc complete. as per Technical Specifiction Cl. 112 Provision of metal drum/empty bitumen drum delineator, 300mm in diameter, 800mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100mm wide 2 coats fitted with reflectors 3 Nos of 7.5cm dia, all as per IRC:SP:55-2001 including cost of all materials, labour, loading, unloading, lead lift, transporting etc., complete as per Technical Specifiction Cl. 112 14 of 18

0 0

10.01

i) ii) iii) iv)

No No Sqm No

9176.759 5702.636 9038.258 6452.325 0

367070.34 171079.083 542295.495 193569.7365 0

10.02

No

630.8463

189253.89

10.03

No

5481.929

548192.925

10.04

No

329.72

98915.985

FINANCIAL BID EVALUATION

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 10.05 Providing plastic crash barrier as per drawing and per the directions of the Engineer(1000X490X780MM size)(LxWxH) as per Technical Specification Clause 112 Providing Barricading/Caution Tapes of High quality PVC tape tube type to Enclose construction area as per Technical Specification Clause 112 Total Carried to Summary No

Annexure-3.1(b)

0 5208.503 0

0 781275.4425 0 1648599.75 0 4540252.647 0 0 0 0

10.06

Lm

329.72 0 0 0 0 0 0

Sl. No.

Description

Unit

0 0 Bill. No. 11. Implementation of Environmental Management Action Plan to be executed under Civil Works 0 0 Contract 0 0 11.01 A. Carting away the unserviceable materials from work site to the nearest disposal site (up to a lead of 10km) and disposing the same in disposal pits or borrow areas including depositing unserviceable materials in layers and manual compaction as per Technical Specification Clause 111.14 B. The 30 cm top layer of disposal pit shall be provided with good earth, suitable for development of vegetation/plantation. All work shall be carried out as per specifications and approval of the Engineer in Charge as per Technical Specification Clause 111 11.02 Turfing at ground level at disposal pits for un-serviceable material as per specifications and approval of the Engineer in Charge as per Technical Specification Clause 111 Regular water sprinkling (at least 4 times) per day at all construction sites for suppression of visible dust levels as per Technical Specification Clause 111 Note: This item is to be operated after the completion of earthwork to suppress the visible dust levels. Cost of watering during compaction of earth work is deem to be cover under civil work Construction of Recharge pits within the selected water bodies along the project road as per approved design and drawing as developed by Central Ground Water Board as per Technical Specification Clause 111 and as per drawing no. U/T/19 Construction of silt traps at the discharge points of channels in to fresh water bodies across the project road as per the Standard Details provided as per Technical Specification Clause. 111 and as per Drawing No. U/T/19 Providing informatory sign boards (informatory /caution messages) for road users for providing information about ecologically sensitive areas, wild life crossing points (if any), important tourist locations, etc as applicable. The specifications of sign boards shall conform to relevent IRC specifications. using type- IX sheeting the locations for Informatory sign boards are given in as per Technical Specification Clause. 111 Total Carried to page 2

Cum

93.82275

3984464.547

0 Sqm 50.0388 0 Sqm 22.33875 0 11.03

0 11805854.24 0 5270470.643 0

Km

2192.772

231596.1614

0 11.04 No 32891.58 0 11.05 Lm 5481.929 0 11.06

0 986747.265 0 164457.8775 0

Sqm

9038.258

36153.033

0 0 0

0 22479743.77 0

FINANCIAL BID EVALUATION

15 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 Sl. No. Description Unit

Annexure-3.1(b)

0 0 Bill. No. 11. Implementation of Environmental Management Action Plan to be executed under Civil Works 0 0 Contract Brought Forward From Page 1 0 22479743.77 11.07 Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal of scarified bitumen including carriage (up to a lead of 10km), depositing bitumen in layers of 15 cms with manual compaction and covering the pit with 20cm thick good earth as top layer all complete as per Typical Drawing as per Technical Specification Clause. 111 and as per drawing Turfing at ground level at disposal pits for scarified bitumen as per specification clause 307 and approval of the Engineer in Charge. Item No. 11.09 Not used Item No. 11.10 Not Used Periodic air quality monitoring during construction stage at construction camp sites, bitumen hot mix plants, crusher plants (if specifically established for Project), at major settlement areas along project road. The parameters to be monitored are SPM, RPM, SO2, NOx and CO, Lead. Each monitoring schedule shall be over a duration of 24 hours (in 8 hour shifts), once in four month for 2 Years. The tests are to conducted in accordance CPCB norms and As per Technical Specification Clause-111 Total Carried to page 3

No

9867.47 0 Sqm 22.33875 0 0 0 0 0

283620.3876 0
217020.9563 0 0 0 0 0

11.08

11.09 11.10 11.11

No

10963.86

723614.661

0 0 Description Unit

23703999.77 0

Sl. No.

11.12

11.13

11.14

11.15

0 0 Bill. No. 11. Implementation of Environmental Management Action Plan to be executed under Civil Works 0 0 Contract Brought Forward From Page 2 0 23703999.77 Water quality monitoring during construction phase at locations given in Appendix . The sampling shall be carried out once in four month for 2 years 10963.86 526265.208 No and cover all parameters as per IS10500 including heavy metals As per Technical Specification Clause-111 0 0 Noise quality monitoring at specified silent receptors along Project Road, at construction camp sites, bitumen hot mix plants, crusher plants(if specifically established for Project), and at major settlement areas along project road. No 10963.86 723614.661 Each monitoring schedule shall be over a duration of 12hours (6Am to 6PM), once in four month for 2 Years). The monitoring shall be carried out in accordance with CPCB norms at locations. As per Technical Specification Clause-111 0 0 Soil quality monitoring at Construction camp /plant sites, Labour camps, Batching plants and productive agricultural lands abutting traffic detours and traffic diversions and major intersections along Project Road. Parameters No 10963.86 570120.642 shall include pH, Nitrogen, Phosphorus, Potassium, Sodium, Chloride, Organic Carbon and Lead and carried out twice in a year (Pre and Post Monsoon) at all locations for 2 years. As per Technical Specification Clause111 0 0 Providing Oil Interceptors at the fuel/oil storage camps or Construction camps No 21927.72 43855.434 as per Typical Drawing and as per Technical Specification Clause 111 and as per Drawing No. U/T/20 0 0 16 of 18 October 2011

FINANCIAL BID EVALUATION

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 11.16 cost/ Providing Personal Protective Equipment to labours during construction person/ construction Phase of the project as per Technical Specification Clause 111 annum

Annexure-3.1(b)

2192.772

438554.34 0

11.17

11.18

Sl. No. 1 2 3 4 5 6 7 8 9

0 Provision for two health check ups for the carcinogens from bituminous fumes, which may inhaled during road paving works. The first health check up cost/ person 2192.772 prior to induction of the personnel into the construction works and the last health check up prior to the discharge of tech personal from the construction works as per Technical Specification Clause 111 0 Utilistion of unserviceable material obtained from Road way excavation for Cum 66.1227 widening and construction of cross roads as per Technical Specification Cl. 111.14.4 and as Direted by Engineer. 0 0 Total Carried to Summary 0 0 0 Description Unit Day 285.936 Mazdoor Day 428.904 Mason Day 428.904 Carpenter Day 428.904 Fabricator/Blacksmith/Welder Day 428.904 Operator for Tractor Day 428.904 Electrician Day 428.904 Operator for Dozer Day 428.904 Operator for Roller Day 357.42 Driver LMV

438554.34

0 156181.8174 0 26601146.21 0 0 8578.08 6433.56 2573.424 2573.424 2573.424 1286.712 1286.712 1286.712 32167.8

FINANCIAL BID EVALUATION

17 of 18

October 2011

Karnataka State Highways IMprovement Project - II: Stage -2 COMPARATIVE STATEMENT OF RATES AS FILLED BY THE BIDDERS CONTRACT PACKAGE: AEP-6 :Upgradation of Road from Davangere (Km 0+000) to Birur (Km 105.630) of SH-76 10 Day Driver HMV 11 Day Operator for Excavator/Crane 12 Day Computer Operator 13 Day Watchman Sub total Allow_________% Contracotor's Overhead and Profits etc. Total For Day works: Labour

Annexure-3.1(b)

SCHEDULE OF DAY WORKS RATES MATERIALS Description Bitumen 60/70 grade (bulk ) Cement M 15 Concrete M 20 Concrete M 25 Concrete TMT Bars Sand Aggregate 40 mm down size Aggregate 20 mm down size Aggregate 10 mm down size Granite Stone of size 15 to 20 mm solid concrete block size 400 x 200 mm size Hume pipe (NP 4) 900 mm dia 2.5 m long. Boulders Selected Earth Sub total Allow_________% Contracotor's Overhead and Profits etc. Total For Day works: Materials

357.42 428.904 223.3875 178.71 0 0 0 0 0 0 0 0 28593.6 4396.266 2470.666 2768.218 2814.683 42568.72 956.0985 312.7425 335.0813 352.9523 580.8075 357.42 5003.88 223.3875 53.613 0 0 0 0 0 0 0 0 0 0 1340.325 1340.325 2233.875 1787.1 670.1625 1340.325 1787.1 2233.875 893.55 893.55 2233.875 446.775 1340.325

1072.26 1286.712 107226 85780.8 254125.62 50825.124 304950.744 0 0 0 0 0 28593.6 13188.798 17294.66025 19377.5253 8444.0475 127706.166 6692.6895 2189.1975 2345.56875 2470.66575 580807.5 357420 75058.2 20104.875 12330.99 1274024.484 254804.8967 1528829.202 0 0 0 0 0 0 40209.75 40209.75 26806.5 21445.2 8041.95 13403.25 5361.3 6701.625 26806.5 13403.25 33508.125 1340.325 4020.975 241258.5 48251.7 289510.2

Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Unit T T Cu.m Cu.m Cu.m T Cu.m Cu.m Cu.m Cu.m No. No. Rm Cu.m Cu.m

SCHEDULE OF DAY WORKS RATES CONSTRUCTION PLANT Description Bull Dozer Size up to 200KW Front End Loader bach hoe Motor Grader Pneumatic Tyred Roller (20 tonne) Tractor with trailor Bull dozer (D7 or equivalent) Roller Static (8-10 tonne) Roller Vibratory (8-10 tonne static) Truck (10/12 tonne) Truck mounted water tanker (10 tonne) DG set (125 KVA) Concrete Mixer (mobile) Drilling equipment with compressor Sub total Allow_________% Contracotor's Overhead and Profits etc. Total For Day works:Construction Plant

Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13

Unit Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour

Total Amount

1873799310

FINANCIAL BID EVALUATION