Client BOQ

Estimate: Egyptian Construction Project


Currency: EGP-Egypt-Pound

Item

11100

12010
12020
12030
12040
12050
12060
12070
12080
12090
12100
12110
12120
12130
12140
12150
12160
12170
12180
12190

Description

Unit

Dam & Reservoir


Reservoir
Reservoir clearing

58,130.00

69,756,000.00

Sub Total: Ha

1,200.00

58,130.00

69,756,000.00

12,500.00
61,100.00
100.00
1.00
9.00
63,000.00
21,000.00
34,000.00
1,600.00
1,320.00
800.00
1.00
1.00
1.00
40.00
800,000.00
100.00
9,000.00
1,300.00

33.00
74.00
4,760.00
6,766,950.00
90,570.00
74.00
247.00
13.00
1,360.00
1,360.00
1,360.00
1,323,150.00
6,321,720.00
3,234,370.00
4,760.00
0.60
73.00
5.00
383.00

412,500.00
4,521,400.00
476,000.00
6,766,950.00
815,130.00
4,662,000.00
5,187,000.00
442,000.00
2,176,000.00
1,795,200.00
1,088,000.00
1,323,150.00
6,321,720.00
3,234,370.00
190,400.00
480,000.00
7,300.00
45,000.00
497,900.00

1.00

40,442,020.00

40,442,020.00

2,125,000.00
385,000.00
1,250,000.00
1.00
2,195,000.00
15,000.00
400.00
1.00
8,250.00
684,000.00
28,000.00
2,912.00
17,580,000.00
35,000.00
1.00
20,000.00
3,000.00
1.00
5,500.00
1,500.00

29.00
83.00
56.00
4,128,110.00
56.00
84.00
4,760.00
367,540.00
73.00
5.00
1,040.00
4,760.00
0.60
1,320.00
1,837,710.00
88.00
706.00
1,209,950.00
42.00
361.00

61,625,000.00
31,955,000.00
70,000,000.00
4,128,110.00
122,920,000.00
1,260,000.00
1,904,000.00
367,540.00
602,250.00
3,420,000.00
29,120,000.00
13,861,120.00
10,548,000.00
46,200,000.00
1,837,710.00
1,760,000.00
2,118,000.00
1,209,950.00
231,000.00
541,500.00

2,273,000.00

178.45

405,609,180.00

1.00

515,807,200.00

515,807,200.00

m3
m3
tonne
ls
ea
m3
m3
kg
m3
m3
m3
LS
ls
ls
tonne
kg
m
kg
m

m3
m3
m3
ls
m3
m3
tonne
ls
m
kg
m3
tonne
kg
m3
ls
m
m3
LS
m2
m
Sub Total: m3

Sub Total: ls

09/07/2007 9:55:09 AM

Amount

1,200.00

Diversion
Cofferdam Common Excavation
Cofferdam Shell
Cofferdam Face Reinforcement
Water Handling
Flood Flows Over Cofferdam
Tunnel Portal Excavation (assume rock)
Tunnel Excavation
Tunnel Rib Support
Concrete Inlet Structure
Concrete Low level outlet
Concrete Invert
Intake gates and guides ( Upper Diversion )
Inlet Trash Racks
Low Level Valve and Piping
Concrete Reinforcement
Portland Cement
Grouting - Drilling
Grouting - Grout
Rock Bolts and Dowels

Dam & Spillway


Common Excavation
Rock Excavation
Dam Borrow
Foundation Treatment
Dam Embankment
Impervious Core
Dam Reinforcing Steel
Instrumentation
Drilling
Grouting
Concrete - Mass
Concrete Reinforcing Steel
Portland cement
Concrete
Spillway Bridge
Concrete Anchoring
Gabions
Dam Electrical & Lighting
Roadway on Top of Dam
Fencing

Rate

Ha

Sub Total: ls

13010
13020
13030
13040
13050
13060
13070
13080
13090
13100
13110
13120
13130
13140
13150
13160
13170
13180
13190
13200

Quantity

Page No 1 of 6

Client BOQ
Estimate: Egyptian Construction Project
Currency: EGP-Egypt-Pound

Item

21010
21020
21030
21040
21050
21060
21070
21080
21090
21100
21110
21120
21130

Description
Power Tunnel & Surge Shaft
Power Tunnel
Reinforcing Steel
Grouting - drilling
Grouting - grout
Portland Cement
Inspection portal adit
Excavation - underground
Rock bolts and dowels
Tunnel support
Shotcrete
Tunnel invert concrete
Tunnel lining concrete
Drill feeler holes
Inspection door

Unit

tonne
m
kg
kg
ls
m
m
kg
m3
m3
m3
m
ls

24010
24020
24030
24040
24050
24060

Amount

4,760.00
73.00
5.00
0.60
3,235,250.00
4,980.00
383.00
13.00
1,900.00
1,180.00
1,120.00
103.00
82,330.00

1,428,000.00
485,450.00
750,000.00
1,500,000.00
3,235,250.00
29,631,000.00
11,030,400.00
3,588,000.00
950,000.00
4,366,000.00
2,464,000.00
92,700.00
82,330.00

5,950.00

10,017.33

59,603,130.00

1,650,000.00
60,000.00
800.00
50.00
320,000.00
675.00
45,500.00
1.00
1.00
500.00
1.00
1.00
3,115.00

29.00
74.00
1,360.00
4,760.00
0.60
73.00
5.00
6,974,480.00
1,868,580.00
21.00
220,530.00
1,212,890.00
383.00

47,850,000.00
4,440,000.00
1,088,000.00
238,000.00
192,000.00
49,275.00
227,500.00
6,974,480.00
1,868,580.00
10,500.00
220,530.00
1,212,890.00
1,193,045.00

800.00

81,956.00

65,564,800.00

3,000.00
9,300.00
150.00
2,000.00
4,000.00
3,500.00
40,000.00
483.00
27,200.00
20.00
860,000.00

39.00
320.00
1,360.00
1,900.00
22.00
383.00
13.00
73.00
5.00
4,760.00
0.60

117,000.00
2,976,000.00
204,000.00
3,800,000.00
88,000.00
1,340,500.00
520,000.00
35,259.00
136,000.00
95,200.00
516,000.00

Sub Total: m3

9,300.00

1,056.77

9,827,959.00

Penstocks
Excavation underground, steel lined section
m3
Excavation underground, 50 concrete lined section m3
Excavation underground, horizontal concrete lined sem3
Tunnel support
kg
Construction adit
ls
Concrete, steel lined section
m

4,373.69
9,463.07
7,554.55
50,000.00
1.00
3,129.62

247.00
247.00
247.00
13.00
2,430,390.00
2,020.00

1,080,300.45
2,337,377.33
1,865,973.50
650,000.00
2,430,390.00
6,321,822.97

Power Tunnel Intake


Excavation including quarry
Excavation - rock
Concrete
Reinforcing steel
Portland Cement
Grouting - drilling
Grouting - grout
Intake gates and guides
Intake gate hoist
Misc metal
Intake gate electrical
Intake trashrack
Rock bolts

m3
m3
m3
tonne
kg
m
kg
ls
ls
kg
ls
ls
m
Sub Total: m3

23010
23020
23030
23040
23050
23060
23070
23080
23090
23100
23110

Rate

300.00
6,650.00
150,000.00
2,500,000.00
1.00
5,950.00
28,800.00
276,000.00
500.00
3,700.00
2,200.00
900.00
1.00

Sub Total: m

22010
22020
22030
22040
22050
22060
22070
22080
22090
22100
22110
22120
22130

Quantity

Surge Shaft
Excavation - common
Excavation- underground
Concrete
Shotcrete
Grill
Rock bolts and dowels
Support steel
Grouting - drilling
Grouting - grout
Reinforcing steel
Portland Cement

09/07/2007 9:55:09 AM

m3
m3
m3
m3
kg
m
kg
m
kg
tonne
kg

Page No 2 of 6

Client BOQ
Estimate: Egyptian Construction Project
Currency: EGP-Egypt-Pound

Item
24070
24080
24090
24100
24110
24120
24130

Description

Unit

Concrete, 50 concrete lined section


Concrete, horizontal concrete lined section
Portland Cement
Steel liner
Reinforcing steel
Grouting - drilling
Grouting - grout

m
m
kg
tonne
tonne
m
kg

31,689,915.83
25,136,501.32
1,200,000.00
26,351,888.00
476,000.00
35,259.00
200,000.00

21,391.30

4,664.30

99,775,428.40

1.00

234,771,317.40

234,771,317.40

48,000.00
7,000.00
1,630.00
80,000.00
8,770.00
1,000.00
50.00
70.00
600.00
1.00
670,000.00
800.00
80,000.00

33.00
89.00
4,980.00
13.00
383.00
1,180.00
4,760.00
1,360.00
1,120.00
328,160.00
0.60
73.00
5.00

1,584,000.00
623,000.00
8,117,400.00
1,040,000.00
3,358,910.00
1,180,000.00
238,000.00
95,200.00
672,000.00
328,160.00
402,000.00
58,400.00
400,000.00

1,630.00

11,102.50

18,097,070.00

1,000.00
670.00
137.80
270,000.00
1,750.00
500.00
40,000.00
50,000.00

320.00
674.00
15,280.00
0.60
383.00
73.00
5.00
13.00

320,000.00
451,580.00
2,105,584.00
162,000.00
670,250.00
36,500.00
200,000.00
650,000.00

Sub Total: m3

1,000.00

4,595.91

4,595,914.00

ls
m3
m3
m3
m
kg
kg
kg

1.00
2,000.00
3,200.00
475.00
2,630.00
20,000.00
77,900.00
190,000.00

255,700.00
39.00
74.00
1,900.00
383.00
13.00
21.00
0.60

255,700.00
78,000.00
236,800.00
902,500.00
1,007,290.00
260,000.00
1,635,900.00
114,000.00

Sub Total: m3

3,200.00

1,403.18

4,490,190.00

m3
m3
m
kg
m
m3
tonne
m3
m3
ls
kg
m
kg
Sub Total: m

32010
32020
32030
32040
32050
32060
32070
32080

33010
33020
33030
33040
33050
33060
33070
33080

Manifold Tunnels
Excavation - underground
Concrete, steel lined section
Steel liner
Portland Cement
Rock bolts & dowels
Grouting - drilling
Grouting - grout
Tunnel support

Cable Shaft
Building
Excavation - common
Excavation - underground
Shotcrete
Rock bolts & dowels
Support steel
Misc metal
Portland Cement

09/07/2007 9:55:09 AM

Amount

4,680.00
4,650.00
0.60
15,280.00
4,760.00
73.00
5.00

Sub Total: ls

31010
31020
31030
31040
31050
31060
31070
31080
31090
31100
31110
31120
31130

Rate

6,771.35
5,405.70
2,000,000.00
1,724.60
100.00
483.00
40,000.00

Sub Total: m3

Powerhouse Complex
Access Tunnel
Excavation - common
Excavation - portal rock
Excavation - underground
Tunnel support
Rock bolts & dowels
Tunnel invert concrete
Reinforcing steel
Portal structural concrete
Tunnel lining
Entrance Portal
Portland Cement
Grouting - drilling
Grouting - grout

Quantity

m3
m3
tonne
kg
m
m
kg
kg

Page No 3 of 6

Client BOQ
Estimate: Egyptian Construction Project
Currency: EGP-Egypt-Pound

Item

34010
34020
34030
34040
34050
34060
34070
34080
34090
34100
34110
34120
34130
34140
34150
34160
34170
34180
34190

Description

Unit

Powerhouse Civil
Excavation - underground
Concrete - mats
Concrete - substructure to el 245
Concrete - pedestals
Concrete - superstructure above el 245
Tendon support on upstream wall
Plugs
Reinforcing steel
Portland Cement
Rock bolts & dowels
Powerhouse bypass adit
Drain holes
Grouting - drilling
Grouting - grout
Architectural
Suspended ceiling along full length of cavern
Ceramic floor tiles
Shotcrete
Misc metals & embedded piping

m3
m3
m3
m3
m3
ls
m3
tonne
kg
m
ls
m
m
kg
ls
ls
m2
m3
kg

12,300,600.00
1,545,800.00
4,760,000.00
272,000.00
2,483,360.00
12,664,820.00
156,400.00
2,332,400.00
2,100,000.00
2,343,960.00
3,763,110.00
7,600.00
146,000.00
4,051,500.00
984,490.00
656,330.00
66,000.00
1,377,500.00
2,175,600.00

49,800.00

1,088.10

54,187,470.00

3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

35,284,040.00
61,747,070.00
27,198,110.00
2,396,370.00
15,092,000.00
6,974,480.00
7,368,480.00
30,383,970.00
2,720,070.00
7,350,840.00
6,027,690.00
15,257,410.00
35,775,080.00

105,852,120.00
61,747,070.00
27,198,110.00
2,396,370.00
15,092,000.00
6,974,480.00
7,368,480.00
30,383,970.00
2,720,070.00
7,350,840.00
6,027,690.00
15,257,410.00
35,775,080.00

1.00

324,143,690.00

324,143,690.00

8,180.00
5,500.00
3,000.00
350,000.00
45,000.00
200.00
3,000,000.00
900.00
230,000.00

4,980.00
1,360.00
516.00
13.00
383.00
4,760.00
0.60
73.00
5.00

40,736,400.00
7,480,000.00
1,548,000.00
4,550,000.00
17,235,000.00
952,000.00
1,800,000.00
65,700.00
1,150,000.00

Sub Total: m

8,180.00

9,231.92

75,517,100.00

Sub Total: ls

1.00

481,031,434.00

481,031,434.00

Powerhouse Equipment
Turbine & Governor & Inlet Valve ( 3 Units )
Generator & Excitation
Main transformers
Draft tube gates & guides
Aux Electrical equipment
Aux mechanical equipment
Powerhouse crane
Switchyard
Transmission line to intake
High voltage cables to switchyard
CM&P equipment & cabling
Mechanical installation
Electrical installation

Tailrace Tunnel
Excavation - underground
Tunnel invert concrete
Tunnel lining
Tunnel support
Rock bolts & dowels
Reinforcing steel
Portland Cement
Grouting - drilling
Grouting - grout

09/07/2007 9:55:09 AM

Amount

247.00
1,180.00
1,360.00
1,360.00
1,360.00
12,664,820.00
1,360.00
4,760.00
0.60
383.00
3,763,110.00
19.00
73.00
5.00
984,490.00
656,330.00
88.00
1,900.00
21.00

ea
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls
ls

Sub Total: ls

36010
36020
36030
36040
36050
36060
36070
36080
36090

Rate

49,800.00
1,310.00
3,500.00
200.00
1,826.00
1.00
115.00
490.00
3,500,000.00
6,120.00
1.00
400.00
2,000.00
810,300.00
1.00
1.00
750.00
725.00
103,600.00

Sub Total: m3

35010
35020
35030
35040
35050
35060
35070
35080
35090
35100
35110
35120
35130

Quantity

m
m3
m3
kg
m
tonne
kg
m
kg

Page No 4 of 6

Client BOQ
Estimate: Egyptian Construction Project
Currency: EGP-Egypt-Pound

Item

41010
41020
41030
41040
41050
41060
41070

Description
Project Access
Roads in Project Area
Excavation - common
Excavation - rock
Embankment
Base coarse material
Gravel base coarse material
Guard rail
Drainage

Unit

m3
m3
m3
m3
m3
m
ls

50010
50020
50030
50040
50050

10
20
30
40

Access Roads
Access road to tailrace portal
Construction road to inspection adit
Access road to powerhouse
Access road to dam site
Maintenance of roads during construction

Miscellaneous Buildings
Workshop including equipment
Warehouse
Office
Control office
Cairo office

Camp Cost
Supply, Install and Commission Camp
Site Preparation
Supply Camp
Supply Water & Sewage Treatment
Demobe Camp

Camp Services
Camp Management
Camp Maintenance
Camp Power
Supply Water
Catering (per man-day occupancy)

4,950,000.00
222,500.00
420,000.00
342,900.00
342,400.00
205,800.00
803,340.00

1.00

7,286,940.00

7,286,940.00

1.00
2,300.00
1.00
14,000.00
1,600.00

11,468,080.00
6,390.00
35,600,000.00
2,490.00
3,560.00

11,468,080.00
14,697,000.00
35,600,000.00
34,860,000.00
5,696,000.00

Sub Total: ls

1.00

102,321,080.00

102,321,080.00

Sub Total: ls

1.00

109,608,020.00

109,608,020.00

m2
m2
m2
m2
m2

814.00
1,261.00
1,222.00
1,375.00
265.00

2,940.00
2,210.00
2,650.00
2,350.00
3,230.00

2,393,160.00
2,786,810.00
3,238,300.00
3,231,250.00
855,950.00

Sub Total: m2

5,872.00

2,129.68

12,505,470.00

120,000.00
1,100.00
1.00
1.00

26.00
18,380.00
3,060,000.00
7,862,660.00

3,120,000.00
20,218,000.00
3,060,000.00
7,862,660.00

1,096.15

31,255.50

34,260,660.00

60.00
60.00
52,000.00
2,300.00
1,027,392.00

28,190.00
24,610.00
332.00
743.00
19.00

1,691,400.00
1,476,600.00
17,264,000.00
1,708,900.00
19,520,448.00

1,265,312.34

32.93

41,661,348.00

305,000.00
8,710.00

6.00
147.00

1,830,000.00
1,280,370.00

8,300,000.00

0.37

3,110,370.00

ls
m
ls
km
km-mos

m2
man
LS
LS

month
MO
Man-Month
day
mday
Sub Total: mday

10
20

Travel Expense
Daily Travel Time
Travel Turnaround Time

hours
man-trips
Sub Total: man-hours

09/07/2007 9:55:09 AM

Amount

33.00
89.00
56.00
127.00
107.00
294.00
803,340.00

Sub Total: Person

10
20
30
40
50

Rate

150,000.00
2,500.00
7,500.00
2,700.00
3,200.00
700.00
1.00

Sub Total: ls

42010
42020
42030
42040
42050

Quantity

Page No 5 of 6

Client BOQ
Estimate: Egyptian Construction Project
Currency: EGP-Egypt-Pound

Item

Description

Unit

Sub Total: man-hours

Grand Total: LS

09/07/2007 9:55:09 AM

Quantity

9,400,000.00

Rate

Amount

8.41

79,032,378.00

1.00 1,432,755,819.40

1,432,755,819.40

Page No 6 of 6