Sie sind auf Seite 1von 1

2 Existing

Ground Line

1
Step

{ Post

(Where Reqd) 4"

B
{ Post & Caisson 1-0" min. Soil Cover
3-0" Dia. Caisson

{ Post

Proposed Grade

6"

(See Note 8)

Finished Ground

Line (1:2) Max.

6" Min.

6" min. Soil Cover

1-0" min. Soil Cover

Proposed Grade

A
2-0"

A
10"

10"

3"

Min.

6"

(5-0" Min.) Roughen


Surface of Post) Post Embedment

#16 Spiral Bar


w/ 3" Pitch

(5-0" Min., Roughen

Varies (Step in Precast

Surface of Post)

Post Embedment

4"

Neoprene Bearing Pad (Typ.)

B
12 - #25 Eq. Sp.

" x 4" x 6"

Type A, KA & D Posts


15 - #32 Eq. Sp.

#16 Spiral Bar w/ 3" Pitch

Length Of Caisson

Class B Concrete

3"

Panel Elevation)

Length Of Caisson

Limits of Payment
For Foundation Excavation

FOUNDATION EXCAVATION
E, F & LA Posts

PLAN

Type B, C, KB, KC,

ELEVATION

Constr. Jt.

Class B Concrete

#16 Spiral Bar w/

SPREAD FOOTING TABLE


3" cl.

Constr. Jt.

BAR SCHEDULE FOUND. TYPE NO.OF BAR NO.OF BAR NO.OF BAR SIZE BARS SIZE

DIMENSION SCHEDULE

3" cl.

BARS SIZE BARS


"W"

WIDTH LENGTH THICK.


"L" "T"

HEIGHT "H"
6" Minimum

"A"
"E"
Pedestal

"B"

"C"

"D"
"F"

I
II III IV

Coarse Aggregate

6" Minimum 3"

Coarse Aggregate Post

Footing

V VI VII
6" (Typ.)

SECTION: A-A

#16 spiral bar @ 3" pitch full height plus 1 turns each end

SECTION: B-B

VIII
IX X

TYPICAL CAISSON DETAILS

(FOR MAXIMUM POST HEIGHT OF 26-3")

{ Post Neoprene Bearing Pad (Typ.)

" x 4" x 6"


{ Post, Pedestal

3"

3" Pitch

6" Min. Soil Cover Step 4"

and Footing #16 Spiral Bar w/

Constr. Jt.

Proposed Grade

PLAN
3" Pitch
Temporary Sheeting

(Where Reqd)

{ Post

C - #D Bars @ Eq Sp.

6" min. Soil Cover


Longit. ReinforceMent

3-0" Dia. Pedestal

Limit as required 6"

Varies (Step in Precast Footing Width


Constr. Jt. (See Note 8)

Proposed Grade

Panel Elevation)

"W"

Post Embedment

Ground Line

#16 Spiral Bar w/

Surface of Post)

C
10"

(5-0" min., Roughen

Existing

10"

3" Cl.

W/2

180^ Std. (5-0" min., Roughen

Hook #16 Spiral Bar w/

Footing Height

Level

Finished Ground Line

#B Bars

A - #B Bars
Eq. Sp.

D
L/2

Eq. Sp.

3" Pitch

(1:2)max.

Thickness

E - #F Bars @ Eq. Sp. Footing

"H"

#B Bars "T" "L"


Footing Length Eq. Sp. 1-0"

Level

6"

Transverse ReinforceMent

Min.

3" Cl.

3" Cl. Min.

(Typ.)

W/2

#16 spiral bar @ 3" pitch full height plus 1 turns each end

"W"

See Note 1

Footing Width

6"

PLAN
NOTES: 1. When temporary sheeting is required, maintain a 3-0" distance adjacent to pedestrian or vehicular traffic and 1-0" when

Min.

3" Cl. (Typ.)


"L"

L/2

#16 spiral bar @ 3" pitch full height plus 1 turns each end

3" Cl.

SECTION: D-D

(Typ.) Footing Length

TEMPORARY SHEETING ELEVATION

minimum for all others.

STANDARD DRAWING PLATE 2.4-2


SECTION: C-C
2. If temporary sheeting is left in place, the upper portion

NEW JERSEY DEPARTMENT OF TRANSPORTATION


shall be removed to 3-0" minimum below finished ground.

BUREAU OF STRUCTURAL ENGINEERING

TYPICAL SPREAD FOOTING DETAILS


3. Payment for temporary sheetings upper limit shall be
from the finished grade if grading is required and from (FOR MAXIMUM POST HEIGHT OF 26-3")

NOISE WALL BARRIERS


the existing ground line if grading is not required and
lower limit shall be bottom of excavation.

CONTROL SECTION
DES. BY DWN.
BY

FOUNDATION DETAILS

JOB NO.

ROUTE
CHK.
BY

SECTION

EST.

CHK. BY

MUNICIPALITY

COUNTY

BDC04MB-01

BY SPECS.
BY

Footing

Min. 4"

Thickness

3" Cl.

Class B Concrete

6"

Surface of Post)

Post Embedment

IN CHARGE OF

REVISION

BY

CKD

SHEET NO.

Class B Concrete

"T"

Footing Height 6"

3" Pitch

"H"

OF

DATE

Das könnte Ihnen auch gefallen