Report No.: REC-PDCL/MSEDCL/HINGOLI/Ist/62 LOCATION Name of Village Census Code No. Name of Block Name of District Tender No. REC Scheme Code : : : : : :
Date: 15/07/2011.
CONTENT
Sr. No. 1. 2. Project Summary Verification of Bill of Material BPL Connection 3. 4. 5. Observation Construction Summary Report on discrepancies &defects observed Supporting Documents Attached: (a) Photographs Showing Deviations (Link/Reference to photograph Number to be Mentioned in Remark Column) (b) Duly Approved Survey Report (c) Field Inspection Report 8 9-11 7 6 of Monitoring Team on Quality of Description Page No. 3 4 5
PROJECT SUMMARY
Sr. No. 1. 2. 3. 4. 5. 6.
Project Details Name of the village : Census Code No. : Name of Block : Name of District : Name of Implementing agency : Name of Turnkey contractor : MATHA 2094400 AUNDHA
HINGOLI
MSEDCL M/S. PEC ELECTRICAL PVT LTD. KUKATPALLY HYDRABAD. REC-Power Distribution Company Limited, New Delhi Mr. ASIM PANIWALE Mr. Md. IRFAN Mr. AMIT KUMAR Mr. BHAGESH D -Mr. BALKRISHNA
7. 8.
Name of Third Party Monitoring Agency : Name of Inspecting Engineer/Site Engineer: Name of representative of MSEDCL, if any : Name of representative of contractor, if any:
9. 10.
Date: 15/07/2011.
CONSUMER NAME
CONNECTION NO.
G I Coupling
Meter board
D P Switch
Meter No.
G I Bend
P 1 2 3 4 5 6 7 8 VILAS KUTE GANGUBAI BANGAR NARAYAN GUGE BABASAHEB JANABAI RAMRAO SAHEBRAO GANPATHRAO 832980 832972 832976 832974 832977 832971 832975 832973 25 25 25 25 25 25 25 25
E 1 2 9 7 1 4 1 8 1 1 1 7 1 3
P 2 2 2 2 2 2 2 2
E 9 6 04 11 15 08 14 10
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
P 3 3 3 3 3 3 3 3
E 2 2 2 2 2 2 2 2
P 20 20 20 20 20 20 20 20
E 5 3 4 5 3 6 4 5
P 3 3 3 3 3 3 3 3
E 2 2 2 2 2 2 2 2
P 2 2 2 2 2 2 2 2
E 2 2 2 2 2 2 2 2
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
P 1 1 1 1 1 1 1 1
E 0 0 0 0 0 0 0 0
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
P 1 1 1 1 1 1 1 1
E 1 1 1 1 1 1 1 1
NOTE;P-PROVISION,E-EXISTING
Remark
8 JANABAI CONSUMER NAME RAMRAO BPL Card No. 832980 832971 P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 832977 832974 832976 832972 Meter No. W.P. wire (1/1.8) 2.5 sq. mm twin core (30 meter. /connection) G.I Wire 10 SWG(30mtr = 2 Kg) LT MCB with enclosure 10A/250V(1 no./connection) P P G.I pipe 20 mm(3 meter /connection) Reel insulators(20 no./connection) SAHEBRAO 832975 P P VILAS KUTE BABASAHEB GANPATHRAO 832973 P P NARAYAN GUGE GANGUBAI BANGAR
CONNECTION NO.
G I Coupling
G I Bend
1 Ph. Static meter, with Box (1 Set/ connection) PVC flexible pipe 20 mm (2mtr/ connection)
D P Switch
G.I Wire, Earthing nut bolts, G.I. plate of size 4"X4" (1Set)
FITTING board
Date: 15/07/2011.
5 Amp. Switch with PVC holder both having ISI mark (1Set)
Remark
S.No.
Photograph Reference 1 2
Location
1 2
Note: Earth resistance and the I.R. value of the DT is not measured moreover line is charged.
5 6 7
Name of the Inspection Officer Name of the Project Implementing Agency (PIA) Name of the Trunkey Contractor Details of Accompanying officials, if any, in respect of Project Implementing Agency (PIA), Third Party Inspection Agency (TPIA), Turnkey Contractor etc Total No. of Households coverage (Including BPL Households) Total No. of BPL Households coverage
9 10
351 51
Report No.: REC-PDCL/MSEDCL/HINGOLI/Ist/62 Date: 15/07/2011. 11 Details of Physical Quantity of executed work Provision as per Award/ approved by REC
Name of the material/ equipment as per scheme coverage in the inspection area
Unit
I. Major physical quantities 1 2 3 4 5 BPL Households Distribution Transformer 33 KV circuit Length 11 KV circuit Length LT circuit Length No. No./ each KVA Km. Km. Km. 51 8 -
II. All materials in the scheme area 1 Refer page no 4 (Verification of bill of material)
12
Unit
Quantity
Report No.: REC-PDCL/MSEDCL/HINGOLI/Ist/62 Date: 15/07/2011. 13 Cover age in the village AS PER BOQ 8 BPL households No. of BPL households charged out of the inspected BPL households 8 8-12 HRS BPL connections have been charged through existing networks. NA YES NO HAPPY WITH RGGVY SCHEME No. of BPL households yet to be charged out of the inspected BPL households and reasons thereof 0
Nos. Inspected
154630 14
No. of Hours of power supply in the village whether the newly developed system has been charged/commissioned Whether the newly developed infrastructure handed over to state authorized authorities Whether certificate from Gram Panchayat furnished Whether Franchisee appointed? If yes, details of Franchises Feedback from Public
15
16 17 18 19 20
Details of discrepancies, if any, observed on executed works (including BPL households) Sl. No 1 Job description Discrepancy/Deviation Suggestion for corrective action
21
BPL Discrepancy/Deviation Listed on Refer page no.6 Connections page No.6 should be rectified Remarks on compliance of construction standards and field quality manual of the executed work with reference to REC Quality Control manual REC construction standards followed except some deviations as listed on page. 6 Signature A Name of the inspecting officer Name of the organization Whether RQM/TPIA/PIA Date : Place : 15/07/2011 HINGOLI :
Mr. ASIM PANIWALE Mr. Md. IRFAN Mr. BHAGESH D
Sign
:RECPDCL :TPIA