ANNEXURE IV ELECTRICAL SCHEDULE Rs. A.

1 ENGINE ROOM MAIN PANEL INCLUDING METERING PANEL:THE MAIN PANEL IS DESIGNED CONSIDERING 200 KVA AND 83 KVA DG SETS AS POWER SOURCE AND ANY ONE OF THE TWO DG SETS COULD BE SWITCHED 'ON' AT A TIME. THE MAIN PANEL SHALL BE CUBICLE, FLOOR MOUNTING TYPE ETC 250 KVAR Capacitor Panel complete with incoming F.S. Unit Contactors push button etc. complete with Capacitors. Domestic Panel for Factory lighting, stores, workshop and auxiliaries Earthing for the Engine Room with G.I. Flat, G.I. Pipe, Wire etc. as required PVC Insulated and Armoured Aluminium Cable of various sizes for connection of Generator, Capacitor Panel etc. as required Engine Termination of all cables with Gland Socket, Tapes etc. as required 575000

2 3 4 5 6

125000 55000 35000 65000 22000 877000

B. 1 2

C.T.C. ROOM ELECTRIC Supply of Main Cable from Main Board to CTC, FDB, CTC, FDB to Fermenting Motor connection to various FDB equipments. Supply of earthing Station with 3 Mtrs. Long 40mm dia G.I. Pipe continuous earthing with 8 SWG G.I. Wire as required in CTC Areas. Termination of all cables, including supply of necessary termination materials. DRYING ROOM Supply of main Cable from Main Switch Board to FDB & Motor connection cables of various sizes LOT Rs. 15000 2 Supply of Termination materials for above cables, including supply of cable glands, sockets tapes etc. as required LOT Rs. 8000 Supply of Earthing Station with 3 Mtrs. Long 40mm dia G.I. Pipe with continuous G.I. Wire 8 SWG WITHERING TROUGH ELECTRIC 1 Supply of Main Cable from Main Switch Board to FDB & Motor connection cables of various sizes as required. 68000 18000 75000 15000

15000 105000

C. 1

45000

25000 88000

D.

Supply of Termination materials for above cables including supply of cable glands, sockets tapes etc. as Required. SORTING ROOM ELECTRIC

26000 94000

E. 1 2 3

Supply of Main Cable from Main Switch Board to FDB & Motor connection cables of various sizes as required Supply of Termination materials for above cables including supply of cable glands, sockets, tapes etc. as required. Supply of Earthing Station 3 Mtrs. Long 40mm dia G.I. Pipe & continuous earthing wire 8 SWG. CONVEYOR, AND PACKING

45000 15000 25000 85000

F. 1 2

Supply of Termination materials for above cables including supply of cable glands, sockets, tapes etc. as required. Supply of Earthing Station 3 Mtrs. Long 40mm dia G.I. Pipe & continuous earthing wire 8 SWG. LIGHT SCHEDULE

36000 17500 53500

G. 1 2 3 4 5 6 7 8 9 H. 1

Main Lighting Distrubution Board at Factory Building Group Sub-Lighting Boards for Factory Building Group Sub-Lighting Boards for Trough House 1 x 40 Watt Industrial Fluorescent Tube Light fitting for Withering Trough 1 x 40 Watt Industrial Fluorescent Tube Light fitting for Factory Building 20 Amps Receptacles (TPN) Factory and Trough House Point wiring with rigid PVC Conduit Aluminium Wires for Light & Plug Lighting Arrestor complete with G.I. Flat, Clamp & Rod Main Lighting cable from Main Board to lighting D.B. at Factory
1 2

35000 18000 12000 14000 14000 16000 42500 16000 13020 180520

INSTALLATION CHARGES Installation, Testing, Commissioning of all equipments as quoted for power distribution system Lumpsum Installation, Testing & Commissioning of all equipments and accessories as quoted under lighting head. Lumpsum 45000 245000 200000

S U M M A R Y A. B. C. D. E. F. G. H. Engine Room C.T.C. Room Drying Room Withering Trough Sorting Room Conveyors, Gapping & Packing Lighting Installation & Commissioning 877000 105000 88000 94000 85000 53500 180520 245000 1728020 Generator 200 KVA - 1 NO 83 KVA - 1 NO TOTAL COST RS 3778020 Approx. 2050000