helmet, safety shoes, plier, test pen, screw drivers all new trainees are asked come together in a special room, a safety lectures are given by supervisors, trainees are given safety devices lectures finish and disperse. I can understand the safety precautions before carrying out tasks in the factory 18/12 repairing old wiring change the all the old wiring to new wiring new cable, spanner, screw drivers, cutters, saws, plier, test pen main switch is closed, remove the old cable with a safe and orderly manner, cut the length of the new cable is required, install the new cable with the safe, make sure the cable seal tightly, open the main switch. I know the colors cable and wiring lights and increase knowledge about wiring lights 19/12 spotlight wiring make wiring spotlight to give a smooth work during the night spotlight, cable, screw driver, spanner, cutter, plier, test pen Closing the control switch, test spotlight.pasang site in the area has been set up, make sure screwed tight at the base, open the control switch can discover the underground wiring and ways to install correctly spotlight
20/12 3 phase motor repairers repair and change the motor controller that is damaged clean the internal parts such as bearing motor, the rotor, the winding.
motor 3 fasa,spanar,skru driver,tukul besi,plier,ellen key dan insulation tester open parts of the motor using a spanner, after opening the motor rotor pull out carefully so as not about winding.change the bearings are damaged to a new one, after the completion of the switch input bearing rotor into the motor, reinstall the motor motor.after completed be sure to take it mounted amp meter reading. I know how to repair motors and can learn how to use the test on the motor amp tester
cover all the main switch and control switch lock the main switch and control switch maintained electrical equipment such as motors, generators and cranes unlock and open the main switch and control switch.
paint brush, paint, soap soapy water mix machine that already cleared the entry into soapy water paint brush used to remove old paint effects on motor after motor cleaned, motor is brought to the dry after cleaning the motor will be new paint
while cleaning the motor and motor paint I could find out about the motor clean and get to know the type of motor.
closing the main switch or switch control open fluorescent lights are damaged make sure there is no supply to the lamp that will be opening open choke using a screw driver or pen test exchange defective choke to the new after completion of the new choke change light bulbs and switch open
I was able to find out the causes of problems when Lapu fluorescent can not be turned on
cable, spotlight, light pole, hoe, skru driver, plier, test pen, spanar
be sure to plant the pole in a safe place use a hoe to dig a hole to plant cables after the hole has been dug ready cable entry size 2.5mm connect the wires on light poles plug in spotlight d itiang lights and on suis Guard.
can figure out how to make the size and street light poles ..
28/12/13 jumaat 2
alternator open after opening mix at soapy water, wash the oily alternator using soapy water, after dry, reinstall the alternator.
able to know and identify the tools in the alternator and alternator function in plants. 31/12 isnin 3
main switch off, remove the wire that is connected to the motor, remove the screws that tie the motor and lift motor and place it on a trolley and taken to the workshop. open the motor and identify the damage done to the motor and replace the defective parts to the new
2/1/13 rabu 3 ready to install the motor in selenggara address the effect on motor
motor is ready to take on selenggara to a need to be installed, the location of the motor in the space provided and skru in tight so that the motor does not move, the installation should be made in a state of the motor is spinning delta.apabila take readings of current flowing using clamp meter
3/1/13 khamis 3 street lighting projects spotlight on the platform loading ramp spotlight, spotlight pole, cable cutter, plier, screw driver
cable installed on light poles and cable plant. connect the cable to the main switch, install the spotlight on the cable has to be connected to the mast
can learn how to installation and connection lights spotlight 4/1/13 jumaat 3 install the motor in the boiler conveyors
bring the finished motor in maintenance to boiler room, put the motor padatempat provided, tightly screw on convenyor mator so the motor does not move and shake,
7/1/13 isnin 4 mains repair replace the main switch to the new
main switch off, check the current flow using a pen test, disconnect and remove the old switch, connect the cable according to the correct connection, for insulation test and test phase to phase multimeter.buka using the main switch.
can understand how conversion mains. 8/1/13 selasa 4 install a spotlight in water treatment
spotlight, screw driver, plier, cable, test pen on the main switch, closing the main switch, connect the cable to the main switch, install the spotlight on a site that has been prepared and tight screws, connect the cables to the spotlight, open the main switch.
clean place to be in the paint, paint stir until smooth, take a brush and start painting, when he finished painting using the paint brush clean petrol
learn about the care workshop 10/1/13 khamis 4 repair damage to the motor digester hammer, spanner, screw driver, plier, ellen key
closing the main switch, remove the motor from digester an bring to the workshop, remove motor parts, clean the motor, identify motor damage, after identifying the cause of the damage was replaced with a new one.
closing the main switch, plug in the spotlight, put the bulb and remove the mains.
11/1/2013 4 jumaat
remove the motor from the digester, remove the motor, clean the motor, replace the damaged motor parts.
replace the damaged motor parts, motor parts paint reinstall the motor to the motor take digester
turn off the main switch, remove the old lamp, unplug Chock and starter, install a new stator and Chock, for induction and grounding test after completing all tests re-supply
16/1/13 rabu 5
closing the main switch spotlight on the base pairs that are drawn tight screw spotlight open the main switch.
Wiring fluorescent light and spotlight in Inclined replace old lights to the new correct defective spotlight
closing the main switch, unplug the lamp and unplug the choke and starter spotlight long, install choke and a new starter, install spotlight on the site is provided, use a multimeter for testing open the main switch
scrape the old paint, torn at the workshop door, clean the workshop door, use a roller and a paint brush to paint completed after clean paint brush and paint roller paint
22/1/13 selasa 6 replacement of the hydraulic switch cable tray hydraulic pump repair
closing the main switch, cut the damaged cable, connect the new cable to replace the old cable was rosak.pasangkan new tray in place long tray, input tray and tie cable, open the main switch.
able to learn the connection tray and connection types. 23/1/13 rabu 6 Wiring fluorescent lights in strelization replace old lights
main switch off, unplug the old fluorescent lighting, clean lighting, install fluorescent lights, choke or starter switch is broken, re-supply
main switch off, identify the faulty lights, seleggara old spotlight and identify the damage done, open the main switch
able to identify the cause of the problem lights 29/1/13 selasa 7 manufacturing spotlight lamp posts
steel cut according to the measurements, connect the two using a set of iron welding, welding steel connected tightly, use sandpaper to smooth the surface, began to paint the entire column.
measurements can learn to make posts and learn to use welding set 1/2/2013 jumaat 7
30/1/13 rabu 7 wiring in conduit in the laboratory make pemansangan and new wiring
punched holes and install conduit clib measure and cut conduit install conduit and attach the clip input 1.5mm cable into the conduit size and make sure all work is done neatly
can learn plumbing conduits and know using punching machine type boach 31/1/13 khamis 7 distribution wiring board
open distribution box, plug contactor, timer, and MCCB, connect the cable to use the equipment. for direct connection on the starter [DOL] make sure the connection is made correctly and neatly
main switch off, remove the motor from the place, fix the motor base had cracked reinstall the motor in place, tightly screw motor.
4/2/13 isnin 8 motor maintenance vacuum pump repair damage to the motor
main switch off, remove the motor, repair and maintenance of damaged motor parts, motor and check motor wipe clean, reinstall the motor has been repaired, go to the main switch
measuring conduit according to size, install the T and L bend at the end of the conduit after completion for wiring
can learn how to measure conduit 6/2/13 rabu MCCB repair damaged
main switch off, disconnect the cable that is connected the MCCB, MCCB remove from site and replace the new ones, check wire connections before switching on
sius delete key, scrape dirt and dust in the vicinity of bunker shell, use a blower to remove dust, paint the motor
can learn to use the blower and blower function 8/2/2013 DB 100A switch fuse pond water
main switch off, disconnect the cable, remove the old fuse, Install new fuse, open the main switch.
13/2/13 cable switch boiler water level alarm switch cables are damaged
main switch off, disconnect the water level of the old cable, be sure to disconnect the cable that the cable does not interfere with long, make sure the cable tie on the cable tray with an update, open the main switch.
learn cable sizes 14/2/13 khamis motor maintenance are fruit elevators repair damage to the motor
main switch off, lower the motor from its place, take the motor to the workshop, remove motor parts, wash thoroughly, kerosakanpada repair and reinstall the motor.
main switch off, open and remove the motor, clean the motor, use a blower to remove dust attached, check the carbon brush make sure it can be used, reinstall the motor.
know how to clean and service carbon brush 18/2/13 A line lighting wiring
open old conduit pipes, make measurements on new conduit for loop using the tool and die spring, install the T and L bend at the end of the conduit was in Loop install new conduit in the installation, pull the lamp cable.
open old conduit pipes, make measurements on new conduit for loop using the tool and die spring, install the T and L bend at the end of the conduit was in Loop install new conduit in the installation, pull the lamp cable.
turn off the main supply, contactor input into DB, place the photo cells in the DB, test the finished photo sell in pairs.
get PTW provide goods equipment turn off the main suplly for motor circuit signboard hanging are working on state board bukacover machine V / S open bolt nut for motor disconnect the wires on the motor using motor lift chainlock motor is brought to the workshop for service motor cover is open and the wash bearing rotor in front and back change IR test done on winding if ok all in pairs complete cover
turn off the main supply to the lamp circuit, use a hoe to mengali hole after hole already dug pull the cable from pole to pole lights to be in pairs, using a connection cable for Tied, after the completion of replanting land already in exploration.
able to learn the continued spotlight 26/2/13 repair welding set cabstam supply wire shot phase to earth
supply off, open wire was burnt, replace the new wires, after the installation is completed using a multimeter to test insulation, re-completion of supply.
turn off the supply, use a ladder to climb and put the spotlight, take the cable to make the connection from the nearest lamp, upon the completion of re-supply.
28/2/13 install lights and conduits in the water lock distoner fan line A and line B
cut conduit according to size, put the L and T bend, make a loop on the conduit, after completion of the pull wire to make wiring lights
1/3/13
alternator service
supply off, open the cover of the alternator to the clean, use soapy water to clean the alternator, once completed open all supplies.