5 " Hole
Operator : Report For : Well Name : Contractor : Report For : BP / PHPC Haytham / Brian West Akhen-7 ST2 Transocean Steve / Chris / Sal Field/Area : Description : Location : Water Depth : Rig Name : Ras El Barr/Med. Sea Development Egypt 82 m Constellation II
MUD VOLUME (bbl) Total Circulating Volume 1528 Hole Volume OH Volume 1177 2 Active Pits Base Oil Stock 538 380 Reserve Volume Premix Volume 406 OH Capacity 0.29 bbl/m

OIL-BASE MUD REPORT No. 203


Depth/TVD : Date : Spud Date : Mud Type : Activity/ Bit Depth : 5486 m / 4356 m
27/05/2012 11/09/2011

RHELIANT RIH / 4565 m

DRILLING ASSEMBLY 4213 m, 5.875-in DP m, 5.08-in DP 352 m, 3.5-in HWDP m, 4.75-in DC m, -in m, -in Nozzles 20x3 1/32" Bit 9.5-in Tricone

CASING (TVD) 13.375-in @2914 m (2914 TVD) 11.75-in L @4103 m (3482 TVD) 9.875-in L @5240 m (4196 TVD) 7.625-in L @5480 m (4352 TVD)

2 523 HOLE VOLUME DETAILS Open Hole Length (m) Drill String (bbl) 7 Annulus (bbl) Drilled Hole Last 24 hr (m) Daily Drilled Volume (Cutting) (bbl) Below Bit (bbl) Average Annulus Cuttings Load (m) Tubing Displacement (bbl) Average Surface Losses (bbl/m) Average Annulus Cuttings Load (bbl) REMARKS AND TREATMENT Transfer remainging dead volume from Traps to slop pit and then to TWMA skips. Filter brine as per program prior to clean up. Clean dead volume from Pit #1 prior to filtering remaining brine.

Sample From FlowLine Temp Depth/TVD Mud Weight Funnel Viscosity Rheology Temp R600/R300 R200/R100 R6/R3 PV YP 10s/10m/30m Gel Yz HTHP Fluid Loss Cake APT/HT Unc Ret Solids Correct Solids Oil Uncorr Water Oil/Water Ratio Alkal Mud (Pom) Cl- Whole Mud Salt Lime Emul Stability Cl water phase LCM+barite+LGS (Sand Content) Sand Skips Last 24hr PPT Disk Size PPT Calc. Spurt PPT total Calib Scale Sag Index Dynamic Sag Test Daily Stop Card Total Stop Card

MUD PROPERTIES Pit 0:00 F m lb/gal s/qt F 5478/4350 15.15@88 64 120 98/60 46/32 17/16 38 22 30/43/45 15 2.0@250 /2 30 30 53 17 76/24 4.2 24000 18.1 5.46 386 132418 Tr

CIRCULATION DATA Pump Make NATIONAL 14P-220 NATIONAL 14P-220 Pump Liner x Stk 6x14 in 6x14 in Pump Capacity gal/stk 4.986 4.986 Pump stk/min 34@97% 0@97% Flow Rate / Riser Pump gal/min 170 Pump Pressure psi Bottoms Up 156.4 min 5318 stk Total Circulation 377.6 min 12838 stk Stks to Bit / Total Stks (Cycle) 3016 stks 8348 stks PRODUCTS USED Last 24 hr Products Size Amount Recovered Base Oil f/TWMA 1. BL BK 50

cP lb/100ft lb/100ft lb/100ft cc/30min 1/32" %Vol %Vol %Vol %Vol ml mg/L %Wt lb/bbl volts mg/l % % Micron ml ml/24hr Yes/No lb/gal

SOLIDS CONTROL EQUIPMENT Last 24 hr Model/Size Type Hrs Used 120/120/120 Derrick Shaker 1 120/120/165 Derrick Shaker 2 120/165/165 Derrick Shaker 3 21 84/84/84 Derrick Shaker 4 120/165/165/ Derrick Shaker 5 21 Scalper 1 Scalper 2 Scalper 3 Desander Mud Gas Separator Degasser SURVEY DATA & LITHOLOGY 49.95 Deg , 98.73 Azm @ 5334m Last Survey Sidi Salem (Mud stone , Sand Stone) FM & LTH. 248 F @ 5486 m 358 Max. Circ. BHT. 633 MUD PROPERTY SPECS Actual 187 Weight 15.15 15.15 119.6 Yz >13 15 HTHP Filtrate 2 2.0 REMARKS POOH with USIT-CCL-GR to Surface Hold PJSM with crew for L/D wire line logging tools and R/D wire line equipment. L/D wire line logging tools and R/D wire line surface equipment. Clean and clear Rig floor before P/U EZSV packer assembly. Hold PJSM with crew for P/U EZSV packer assembly. C/O handling equipment before P/U EZSV packer assembly. P/U and TIH with EZSV packer assembly to 353m at a controlled rate. C/O handling equipment before RIH with 5 7/8" DP. TIH with 5 7/8" DP to 611m at a controlled rate. Hold PJSM for installing PS-30 power slips. Install PS-30 power slips. TIH with 5 7/8" DP to 1208m at a controlled rate. Empty trip tank before continue RIH. TIH with 5 7/8" DP to 1493m at a controlled rate. Carry out trip drill as per T.O. procedures while TIH with 5 7/8" DP. Install FOSV, simulate closing Annular and opening lower choke HCR in 1 min 30 secs. Discuss with the crew roles and responsibilities during this and the kill operation. TIH with 5 7/8" DP to 1949m at a controlled rate. Hold PJSM for tripping EZSV on 5 7/8 without retract system. RIH with EZSV on 5 7/8 DP to 3033m. Install FOSV in 50 seconds and conduct trip drill discussing crew action, roles and responsibilities. Continue to RIH with EZSV on 5 7/8 DP to 4226m. Flow check well on trip tank due to gain in trip tank. Flow check static. Continue to RIH with EZSV on 5 7/8 DP to 4509m. Flow check well on trip tank due to a gain. Static flow check. Pipe appears to be only partially filling through ported sub. Decision made to Run a couple more stands to investigate. Continue to RIH with EZSV on 5 7/8 DP to 4566m. Still getting gains due to pipe partially filling. Fill pipe due to string not self filling. Update RMS and open items in action tracker and service lube and maintain housekeeping standards around rig.

TIME DISTRIBUTION Last 24 hrs Rig Up/Service Drilling 20.75 Tripping 0.75 Non-Productive Time 2.25 Wireline Logs 0.25 Condition Mud BOP Testing

DRILLING PARAMETERS WOB (Klbs) Rotary (RPM) Average ROP (m/hr) M-I ENGR / PHONE Waleed Mansour Dave Benton

65

MUD VOL ACCTG (bbl) Oil Added Water Added 31 Mud Received Mud Returned Shakers Evaporation Formation TWMA Skips Tripping / Shrinkage LCM / SC Stripping Hole Fill Chemical Added Start Volume 2091 Final Volume 2122 RIG PHONE 20227557005

SOLIDS ANALYSIS Salt Wt% Salt Conc Adjusted Solids Oil/Water Ratio Average SG Solids Low Gravity % Low Gravity Wt. High Gravity % High Gravity Wt.

18.10 13.15 29.12 76/24 4.10 2.40 21.80 26.7 392.63

RHEOLOGY & HYDRAULICS np/na 0.708/0.198 Kp/Ka 0.775/12.367 Bit Pressure Loss/% 48 / 1. Bit HHP/HSI 5 / 1. Jet Velocity 59 Va Pipe 107 Va Collars 68 Cva Pipe 353 Cva Collars 156 ECD at TD ECD at Shoe/TD (VH) ECD at Shoe/TD (PWD) Total Flow Area (TFA) 0.920 CUMULATIVE COST $2,067,385.04

WAREHOUSE PHONE

DAILY COST

9.5 " Hole


Operator : BP / PHPC Report For : Well Name : Contractor : Report For :
Sample From Rheology Temp (F) 600 rpm 300 rpm 200 rpm 100 rpm 6 rpm 3 rpm PV (cP) YP (lb/100ft2) 10 sec Gels (lb/100ft2) 10 min Gels (lb/100ft2) Yz (lb/100ft2) 80 134 79 65 42 15 15 55 24 30 43 15

OIL-BASE MUD REPORT No. 203


Depth/TVD : Date : Spud Date : Mud Type : Activity/ Bit Depth :
0:00 Depth/TVD /

Field/Area : Ras El Barr/Med. Sea Description : Location : Water Depth : Rig Name : Development Egypt 82 m Constellation II
Temperature Rheology Pit 0:00 Depth/TVD 5478/4350 100 109 65 53 36 16 15 44 21 31 45 14 120 98 60 46 32 17 16 38 22 30 43 15 150 83 52 42 32 17 16 31 21 29 39 15

5486 m / 4356 m
27/05/2012 11/09/2011

Haytham / Brian West Akhen-7 ST2 Transocean Steve / Chris / Sal

RHELIANT RIH / 4565 m

Sample From Rheology Temp (F) 600 rpm 300 rpm 200 rpm 100 rpm 6 rpm 3 rpm PV (cP) YP (lb/100ft2) 10 sec Gels (lb/100ft2) 10 min Gels (lb/100ft2) Yz (lb/100ft2)

0:00 Depth/TVD /

0:00 Depth/TVD /

RHELIANT Rheology Sample From Rheology Temp (F) 6 rpm YP (lb/100ft2) 10 min Gels (lb/100ft2) 80 15 24 43 16 21 45 Pit 0:00 Depth/TVD 5478/4350 100 120 17 22 43 150 17 21 39 0:00 Depth/TVD /

RHELIANT Rheology
50 40 30 20 10 0 6 rpm YP (lb/100ft2)

Temp. oF
80 100 120 150 10 min Gels (lb/100ft2)

RHELIANT Rheology
1 1 1 0 0 0 6 rpm YP (lb/100ft2) 0:00 Depth/TVD /

Temp. oF
0 0 0 0 10 min Gels (lb/100ft2)

Sample From Rheology Temp (F) 6 rpm YP (lb/100ft2) 10 min Gels (lb/100ft2)

0:00 Depth/TVD /

RHELIANT Rheology
1 1 1 0 0 0 6 rpm M-I ENGR / PHONE Waleed Mansour Dave Benton YP (lb/100ft2) 10 min Gels (lb/100ft2) RIG PHONE 20227557005 WAREHOUSE PHONE 0

RHELIANT Rheology

Temp. oF
0 0 0 0

Temp. oF
0 0 0

1 1 1 0 0 0 6 rpm YP (lb/100ft2) DAILY COST 10 min Gels (lb/100ft2) CUMULATIVE COST $2,067,385.04

MUD VOLUME ACCOUNTING


Daily Report

9.5 " Hole


Operator : BP / PHPC Well Name : West Akhen-7 ST2 Date : 27/05/2012 Report No. : 203

PIT DESCRIPTION
Pit # 1 Pit # 2 Pit # 3 Pit # 4 Pit # 5 Pit # 6 Pit # 7 Pit # 8 Slug Pit Sand Traps Trip Tank 1 Trip Tank 2 Base Oil Tank SB Africa - Fluid 2 Pathfinder Brine Tank SB Africa - Fluid 1 Cement Unit SB Africa - Fluid 3 TWMA Vac Unit Explorer - Fluid 1 Irresistible-Fluid 1

CAPACITY bbl
598 600 600 598 606 557 557 606 101 350 31 31 1350 2000 2000 1000 2000 200 2000 20 3000 2000

WEIGHT lb/gal

VOLUME bbl
15 523 202 329 538 340 493 34 23 20 380 614 2100 500 450 350 1595

REMARKS
Brine Standard Brine Standard Brine Standard Base Oil In-Flo -tst Active Screened Mud Brine Standard Brine Standard Brine Standard Brine/OBM/Slops ROBM Screened ROBM Screened ROBM Screened Escaid 110 Screened ROBM Brine (Not Charged) Brine (Not Charged) TK#3ps

PIT TYPE
Brine Brine Brine Reserve Active Brine Brine Brine Reserve Active Reserve Reserve Base Oil Boats Brine Brine Boats Reserve Boats Reserve Brine Brine

SUM PIT VOLUMES


MUD VOLUME Active Reserve Premix OTHER VOLUME Drill Water Breaker Spike Boats A/Q Base Base Oil Slops Brine 80% Silicate Sildril Boats + A/Q Spacer Mud Sea Water bbl 538 407 bbls

14.80 15.15

15.15 15.15 15.15 15.15 6.80 15.50 10.10 10.00 12.90 15.8 10.1

1414 380 5768

Brine (Not Charged)

MUD IN HOLE (bbls)


Total Hole Volume Volume Not Mud Mud Volume
IN/TO:

ANNULUS 633 633


ACTIVE

PIPE 358 358

BELOW BIT 187 187


RESERVE PREMIX TOTAL

TOTAL 1178 1178

VOLUME BALANCE (bbls)


Start Volume Oil Added Water Added Vol Chem Added Chem Not For Mud Total Volume Built Received Return From Active To From Reserve To From Premix To Daily Loss

LOSS BREAKDOWN (bbls) 2091 31


Shakers Evaporation Formation TWMA Skips Tripping / Shrinkage LCM / SC Stripping Hole Fill

1711

380 31

31

31

37 41

Final Volume

1715

407

2122

Total Loss

WELLSITE CHEMICAL INVENTORY Daily Report 9.5 " Hole


Operator : BP / PHPC Well Name : West Akhen-7 ST2 Total Daily Cost : Date : 27/05/2012 Report No : 203 Cumulative Cost : $2,067,385.04

Category

Product ESCAID 110 M-I BARITE M-I GEL Mud In Hole f/WA-7 ST1 Recovered Base Oil f/TWMA RHELIANT @ 12 ppg (70/30 OWR) RHELIANT @ 12.9 ppg (75/25 OWR) RHELIANT @ 14.9 ppg (75/25 OWR) RHELIANT @ 15.5 ppg (75/25 OWR) RHELIANT @ 16 ppg (70/30 OWR) RHELIANT @ 16.3 ppg (75/25 OWR) DRISPAC R DRISPAC SL DUO-VIS FLO-TROL FLO-VIS PLUS GUAR GUM HEC KCL (BIG BAG) M-I GEL SUPREME (UNTREATED) M-I PAC R M-I PAC UL NACL (SALT) SILDRIL L SODA ASH SODIUM BICARBONATE SPERSENE CF XCD POLYMER CALCIUM CHLORIDE (98%) ECOTROL RD EMI-1050 EMI-943 LIME RHEBUILD RHEDUCE RHEFLAT RHETHIK SOLTEX SUREMUL SUREWET VERSA GEL HT VG-PLUS VG-SUPREME EZ-SQUEEZE FORM-A-BLOK FORM-A-SQUEEZE G-SEAL G-SEAL PLUS Local Safe Carb M-I-X II (COARSE) M-I-X II (FINE) M-I-X II (MEDIUM) Marble Coarse MARBLE MEDIUM MI SEAL COARSE MI SEAL FINE MI SEAL MEDIUM MICA (COARSE) MICA (FINE) MICA (MEDIUM) NUT PLUG (COARSE) NUT PLUG (FINE) NUT PLUG (MEDIUM) SAFE CARB 250 SAFE CARB 40 SAFE CARB 500 SAFE CARB 750 SAFE CARB SIZED SAFE-CARB 10 SAFE-CARB 1000 SAFE-CARB 2 SAFE-CARB 20 ALPINE DRILL BEADS BIOZAN CAUSTIC SODA CITRIC ACID CONQOR 303A D-D DEFOAM A DESCO DEUTERIUM OXIDE GLYDRIL MC LUBE 167 M-I CIDE MAGNESIUM OXIDE MEG (GLYCOL) OS-1L PIPE LAX W PTS-200 SAFE-CIDE SAFE-SCAV CA SAFE-SCAV NA SAFE-SOLV OM SAFE-SURF E SAFE-SURF O SAFE-SURF W SODIUM BROMIDE SUPER SWEEP ZINC OXIDE

Unit Size 1. BL BK 1. MT BK 1. MT BK 1. BL BK 1. BL BK 1. BL BK 1. BL BK 1. BL BK 1. BL BK 1. BL BK 1. BL BK 50. LB BG 50. LB BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 1. MT BG 100. LB BG 25. KG BG 25. KG BG 1. MT BG 294. KG DM 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 50. LB BG 25. KG BG 25. KG BG 55. GA DM 55. GA DM 55. GA DM 55. GA DM 25. KG BG 55. GA DM 55. GA DM 25. KG BG 25. KG BG 50. LB BG 25. LB BG 20. LB BG 40. LB BG 25. KG BG 25. KG BG 55. LB BG 25. LB BG 25. LB BG 25. LB BG 25. KG BG 25. KG BG 40. LB BG 40. LB BG 40. LB BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 50. LB BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 50. LB BG 50. LB BG 25. KG CN 25. KG BG 55. GA DM 55. GA DM 55. GA DM 25. LB BG 1. LT CN 55. GA DM 55. GA DM 5. GA CN 50. KG BG 55. GA DM 55. GA DM 55. GA DM 55. GA DM 5. GA CN 15. LB BG 55. GA DM 55. GA DM 55. GA DM 55. GA DM 55. GA DM 25. KG BG 15. LB CN 25. KG BG

Start Amount 118

Daily Used

Cum Used 5004 1537 950 140 546 251 491 -2801 648 -519

Daily Rec'd

Cum Rec'd 3713 1219

Daily Return

Cum. Return

Final Stock 118

Bulk

380

50

470 452

330

193

70 126 7

70 101

70 126

WBM Chemicals

1 19

1 19

10 15 1

10

10 15

826 89

689 96

75 24

OBM Chemicals

5 4 14 5 8 3 16

635

440 4 52 92 240 88 36 200 100 320 160

160

5 4 14 5 8 3 16

31 82 160 95 43 219 100 100

8 4 80 4 4

220 160

48

997

1120

150

48

Loss Circulation Chemicals

47 5

393

640 160

200 155

47 5

66

123 338 573

240 570 750 80

117 240 240 80

66

405 2 48 122 60 8 79 1166 624 1007 2298

480 150 1138 672 1392 2280

80 190 90 347

2 48 122 60 8 79

1201 35 46 263 4

1360

40 80

427 24 40

164 28 40

28

4 3

4 74

65

4 3

Other Chemicals

3 16

29 24

4 31 16

3 16

Other Chemicals

2 39 29 4 800 21 21 12 60 40 4 800 102 39 29 4 800 21

4 24

57

MUD ENGINEER'S DAILY HTHP CHECK LIST


Date: 27/05/2012

Verify That Mud Balances Are Reading Correctly Calculate Slug Requirements To Drop The Pipe Level 240ft Calculate The Theoretical Gain From The Slug GAIN WEIGHT 6.19 35 BBLS

0 BBLS @ 17.83 PPG

Daily Information: Bulk / Liquids on Boats / Plant Boat / Base SB Africa - Fluid 2 Type Boats Volume (bbl) 614 Mud Weight (ppg) 15.50 Comments Screened ROBM

SB Africa - Fluid 1 SB Africa - Fluid 3

Boats Boats

450 350

12.90 15.80

TK#3ps 0

Bulks on board Barite Base Oil 117.5 mt 380 bbls

Note: Build potential is based on the total available Barite to weigh up 1000 Bbls to Drilling Specifications Pit # 1 Pit # 2 Pit # 3 Pit # 4 Pit # 5 Pit # 6 Pit # 7 Pit # 8 Slug Pit Sand Traps Brine Brine Brine Reserve Active Brine Brine Brine Reserve Active 15.15 ppg 15.15 ppg Total Surface Volume : Sand Traps : Materials for Barite Plug accessible LCM Material accessible Total Circulating System (Active Surface + Hole) Present Active Mud Weight EMW / LOT Present Mud Weight increased to FIT / LOT Barite required to reach FIT / LOT Volume increase from Barite addition to FIT / LOT Yes Yes 1715 15.15 17.00 1.85 118 176 2474 0 340 bbls 493 bbls 34 bbls 14.8 ppg 15.15 ppg 15 bbls 523 bbls 202 bbls 329 bbls 538 bbls Brine Standard Brine Standard Brine Standard Base Oil In-Flo -tst Active Screened Mud Brine Standard Brine Standard Brine Standard Brine/OBM/Slops ROBM Screened bbls bbls Yes Yes Yes/No Yes/No

Yes/No Pill Pit clean and empty Yes/No Barite lines been tested bbls ppg ppg ppg mt bbls Barite required to raise Active System (+2 ppg) Amount Barite onboard Amount of Barite onboard after weight up Volume increase from Barite addition (+2 ppg) Total Volume of Active System after Weight Up Active + Volume from Weight Up to LOT

128 mt 118 mt mt 0 192 bbls 1907 bbls 1891 bbls