Clarification

V-410 / V-430 / V-431 / V-510 / V-511 No ITEM Key Word 1 Common Material Description Please confirm that the material of the type 304 is suitable for the fablication. Information issue schedule (1) Agitator's size, number of impeller blade (2) baffle (3) Assembly sequences of agitator impeller blade and shaft (4) Nozzle load (Static load, Torque, Vertical down, Bending moment) for N4 to be provided from Agitator Supplier (5) Tolerance of nozzles for vertically mounted agitator (6) Informaiton for the vibration check as below. - Motor Frequency - Rotating speed of blade - Q'ty of baffles Vendor confirmation results

2 Common

Baffles

Knuckle radius: Vendor to confimr whether the current knucle radius shown in data sheet is suitable or not.

3 Common

Knuckle

4 Common

Knuckle

Please confirm the knuckle part fabrication procedure. - Press machine capacity - Availability of Dye of pressing (Newly fabricate for each item? ) - Whose scope of forming? By sub-vendor or By vessel vendor? - Experience of pressing (or forming)

5 Common

Shell / Conical

Even though it's non-code vessel, shell and conical thickness shall be designed and calcuated as per ASME VIII Div1 Appendix-9. Due to pressurizing inside steam coil, shell and conical will be stressed from external. Please confirm and follow the above requirement.

Following requirement to consider: The Jacket coil shall be welded with full penetration after V-bevel edge preparation. Further, all welding seam shall be NDE examined by PT or MT.

6 Common

Jacket Coil

7 Common

Vessel fabrication procedure shall be finalized in consideration of the imppeller blade size, baffle size and agitator assembly sequence. The points of procedure are: - Blade installation method - Tolerance for shaft verticality Fabrication - Timing of installation - Who will install - How to take the agitator parts in vessel, and from where - Required inspection after agitator installation - Temporary support for transportation (if required) - Vendor to verify whether a RIB supports and additional rainforcing around Agitator Mount nozzle is reuired or not - Vendor to recommended how much nozzle projection will be required.. (We guess 150mm nozzle projection is too short) Agitator Mount Nozzle

8 Common

Please confimr if the Motor of Agitator can be located on top roof. 9 Common Motor Type

1/2

141252711.xls.ms_office

Clarification
V-410 / V-430 / V-431 / V-510 / V-511 No ITEM Key Word Description Please incorporate the scope of design and analysis of Vibration and reinforcement design of top Stiffener roof. Beam The vibration would caused by agitator due to resonance. And also need confirm whose scope of top below the roof design to avoid vibration. top roof Stiffener beam shall be designed in consideration of not only the loading data from Agitator Supplier (1) but also the sympathetic vibration between tank and agitator. To avoid vibration and to reinforce support beams, the additional ribs inside STEEL channel are required. (As per Taganito PJ Lesson Learned) Vendor confirmation results

10 Common

11 Common

Stiffener Beam below the top roof (2)

12 Common

Nozzle Projection

The following nozzle projection to be recommended by vendor. N2 , N7 A/B/C, N8 A/B/C (those are attached on the jacket coil)

Please confirm the fabrication procedure and sequence of coil jacket with vessel vendor. The attachment is one of typical fabrication sequence. Fabrication of Coil Jacket(2)

13 Common

Attachment-1 (Fab sequence).pd

14 Common

Bolt Circle Diameter of setting bolt

When vendor follow the above typical sequence, please confirm the following points; - Experience - Coil bending procedure and sub-vendor - Scope of shell and Lugs location. Vendor to temporary advice the B.C.D.

Loading data shall be calculated by vendor. 15 Common Loading Data Vendor to cofirm whether a lug support is sufficient for V-430, V-410.