ULSAB-AVC Assembly
Version 08/21/01
Exhaust to Engine
2800 Headliner Install Support 2900 C Pillar Molding LH Install B Pillar Molding Lower LH Install 3000 1 B Pillar Molding Upper LH Install 3100 Rocker Molding 2 Install LH A Pillar Molding Lower LH Install 3200 A Pillar Molding Upper LH Install Sunvisor Install LH
Headliner Install
Hook-up of
Water Electric Air Heating/Air Conditioning
Quality Verification 2
Body to Line
100
200
300
400
500
600
700
800
900
1000 1
1100 Installation of Front End Module Hose Hook-up Water, Oil, Intercooler 1 Drysump Tank to Subframe
1200
1300
1400
1500
1600
Shock to Body Quality Verification Front Cat. Conv. 1 Muffler Filler Neck Installation 1 1 man per side of line Quality Verification Coil Springs Quality Verification 990 980 970 960 950 940 930 2 1 2 920 910 1 905 1 1
Rear Fascia
Wheels / Tires 4x
1
Tests
Plastic Pan Heating and Air Conditioning Air Filter 4300 Fusebox
1700
Exhaust System
Assembly Module to Body Structure 4000 4100 4150 4200 5000 5100 5200 5300 5400 5500 5600 5700 5800 5900 6000 6100 6150 6200 6300 6400
1800
1900
2000
2100
2200
2400
2500
2600
3400
3500
3600 3650
3700
3800
3900
Drive Off
3rd Brake Light 1 Bumper Lights 1 Quality Verification 1 1 4 Glazing Electrics Gas Struts Lock 3 1 From Paintshop 1 1 1
Subframe with Suspension + Brakes + Driveshaft + Engine Mounts from Systems Supplier
mechanical Lifter
Engine + Gearbox from Systems Supplier Incl. Engine Electric Wiring Harness
mechanical Lifter 1
Filling
Water Oil Washer Fluid
Fenders RH
Rear Lights
2 Final Inspection
2 load assist
Instrument Panel Complete Installation Incl. Air Bar Ducting + Heat Exchanger
100
200
300
400
500
600
700
800
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2400
2500
2600
2700 - 3300
3400
3500
3600
3700
3800
3900
4000
4100
4150
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
5400
5500
5600
5700
5800
5900
6000
6100
6150
6200
6300
6400
6500 - 6900
7000
7100
1 1 1
2 2
3 2
13
4 1
3 1
6 / 12 2/4
3 1 3
1 1