SF Cross-Bar Cooler upgrade

A surprisingly simple upgrade gives your SF cooler increased clinker transport, allowing greater throughput and more control of the clinker bed under heavily loaded conditions all with fewer wear parts.

Increase capacity and more


An advance in technology The key change involves an upgraded transport mechanism. A shuttle drive motion is used, where all cross bars move forward together, and alternative lanes of newly designed 2-wide cross bars move together in the reverse stroke. Because each cross bar covers only 2 grates instead of 4, you achieve more finite control across the width of the cooler. Furthermore, while your existing SF cooler has 6 moving and 6 stationary cross bars, the upgrade has only 6 moving cross bars along the length of a module. In practice, this requires changing the cross bars and dividing the drive frame into 2 separate, independent drive plates. By increasing the clinker transport efficiency with the same hydraulic flow volume and with fewer strokes, you achieve greater throughput without enlarging the grate area. And since the drive now moves more slowly, the lifetime of wear parts is also extended. How its done The upgrade is achieved with the majority of your SF cooler untouched, and essentially only requires a change in cross bars and hydraulic system. Typical steps to the upgrade process include: 1. Replace cross bars with a new design. 2. Mount new grate protection plates. 3. Divide the drive frame into 2 drive plates (dismantle the connections between drive plates and original cylinder bracket). 4. Replace cylinder brackets and intermodular straps. 5. Install hydraulic blocks for flow dividers and directional valves (existing hydraulic cylinders reused). 6. Modify hydraulic piping as required. 7. Install new PLC program and supplementary electrical parts. A project includes a thorough review of all existing SF cooler equipment from both a mechanical and process perspective to ensure a successful upgrade. Fast installation Your installed SF cooler can be upgraded within an estimated 2-3 weeks in other words, during a normal maintenance stop. And, no heavy equipment is needed to carry out the changes. Contact your FLSmidth representative to learn more.
Cross bars removed from SF cooler

Potential benefits
- Greater throughput/capacity with the same grate area - More cooler control under heavily loaded conditions - Fewer cast parts for low, easy, predictable maintenance - Longer lifetime of wear parts - Improvements in thermal efficiency and power consumption - Fast, simple installation - Attractive investment level

Before upgrade

New cross bars installed

Project Centre Denmark FLSmidth A/S Vigerslev All 77 DK-2500 Valby Copenhagen Tel: +45 3618 1000 Fax: +45 3630 1820 E-mail: info@flsmidth.com

Project Centre USA FLSmidth Inc. 2040 Avenue C Bethlehem, PA 18017-2188 Tel: +1 610-264-6011 Fax: +1 610-264-6170 E-mail: info-us@flsmidth.com

Project Centre India FLSmidth Private Limited FLSmidth House 34, Egatoor, Kelambakkam (Rajiv Gandhi Salai, Chennai) Tamil Nadu 603 103 Tel: +91-44-4748 1000 Fax: +91-44-2747 0301 E-mail: indiainfo@flsmidth.com

www.flsmidth.com

Copyright 2010 FLSmidth A/S. ALL RIGHTS RESERVED. FLSmidth is a (registered) trademark of FLSmidth A/S. This brochure makes no offers, representations or warranties (express or implied), and information and data contained in this brochure are for general reference only and may change at any time.

C 01-11 400-2-ENG V2

Das könnte Ihnen auch gefallen