Sie sind auf Seite 1von 5

MOHAMMAD.

SHARIF
D.NO: 38-19-22/1, JYOTHI NAGAR, VISAKHAPATNAM -530007, AP-INDIA Contact Nos.: 9030160073(M) E-mail: sharifmd78@yahoo.co.uk sharifmd78@rediff.com

OBJECTIVE Looking for a challenging and demanding position in a growth oriented

Engineering, procurement, construction organization to render professional skills and add value to organizational growth and objective.
SUMMARY I have over 12 years of experience in oil & gas industries out of which 9 years of experience the field of construction, design and installation of offshore /Refinery piping and related facilities covering variety of transportation and product handling systems including platform/terminals and intermediate facilities and design and engineering of pipelines. Experiences cover offshore and refinery pip (oil & gas) Involving concept select, feasibility studies, integrity study, Front End Engineering Design (FEED)/conceptual design, detailed engineering, installation and pre-commissioning/commissioning including tendering and procurement services Review of piping and instrumentation diagram (P&ID),development of equipment layout , material requisitions and technical evaluation of line pipes, LR bends, scraper traps, flow tees /barred tees insulating joints , valves, fitting & flanges ;construction tender preparation and evaluation ,preparation of piping general arrangement layouts design and engineering of all support. Carry out line check list, inspection test plan(ITP) , Punch list ,NCR , AFI, hydrotest package and pneumatic test and also inspection at site to check progress and report it to client. Pipeline route selection, preparation of route maps /field layouts ,alignment sheets, platform approach/riser, arrangement drawing ,construction /installation tender documents for onshore and offshore pipelines, wall thickness calculation ,stress and stability analysis, riser stress analysis, span analysis ,beach pull calculation, review and approval of installation procedures for offshore pipelines including shore pull , HDD river crossing Monitoring QC reporting of the project activities in order to maintain the quality check of project requirement and in order to facilitate the construction activates. To handle procurement activities relating to the projects in accordance with clients and company requirement and contract obligation. Co-ordination and effective implementation of companies and clients standards for the safe execution of project.
TECHNICAL SKILLS

Proficient in preparation of hydrotest and pneumatic test package Mechanical completion and integrity inspection Pre-commissioning and operation testing , start up and initial operation Inspection of vessels and columns Coordinated performance and acceptance testing Coordinated post commissioning operation Proficient in preparation of inspection test plan (ITP) ,RFI, NCR and punch list Proficient in preparation of MTO Proficient in developing plot plans , pipe rack calculation

Page 1 of 5

Knowledge of ASME codes and standards Familiar with P&ID , PFD ETC

CERTIFICATION

Fire prevention and Fire Fighting Personal Survival Techniques Personal Safety and Social responsibility Elementary First Aid Helicopter Underwater Escape Training

PROFESSIONAL EXPERIENCE Company : Mohammad-Almojil Group (MMG) Duration : August 2010- January 2013 Position : Commissioning Engineer -1, Current project : Manifa, jubail, Saudi Arabia Period : 2007- Running Project phase : Construction Responsibilities : Turnover PMCC ( Partial Mechanical completion certificate) Preparing work package and reporting to client on weekly basis Responsible for Mechanical completion and integrity inspection of vessels , columns and pipe work, heat exchangers, condenser , coolers e.t.c Involved in Pre-commisiong and operational testing of facilities, commissioning of utilities and coordinated line check list to ensure items specified in provided documents are as appropriate Coordinate installations activities of static equipment such as steam boilers, feed water tank and heat exchanger for condense recovery Cost estimation of work order Prepare and approve method statement Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary actions to maintain satisfactory standards Prepare field change notice (FCN) for revised isometric pipe supports to suit actual site condition based on the P& ID Procurement of pipes, fitting, valves, strainers and other site related equipments.

Company : J S I W, INFRASTRUCTURE, PVT. LTD , AHMADABAD, GUJARAT Duration : FEB10 Position : Senior Mechanical Engineer Current project : Cairn India refinery, Barmer , Rajasthan Period : 2010- Running Project phase : Construction Responsibilities : Conduct of in house front-end engineering design, preparation of scopes, design bases and specification Mechanical completion and integrity inspection of vessels , columns and pipe work, heat exchangers, condenser , coolers e.t.c

Page 2 of 5

Witnessing pressure testing operation of tanks , reactors and piping for mechanical strength and tightness of joint and certify the tests; and also verify that all necessary safety precautions have been taken; Involved in Pre-commisiong and operational testing of facilities, commissioning of utilities and coordinated line check list to ensure items specified in provided documents are as appropriate Coordinate installations activities of static equipment such as steam boilers, feed water tank and heat exchanger for condense recovery Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary actions to maintain satisfactory standards Fabrication , erection , testing of A/G & U/G piping works which includes to 30 inch of various material . i.e, cs, ss, cs-Ltc,& ss and responsible for monitoring the daily work activities subcontractor and third party Prepare field change notice (FCN) for revised isometric pipe supports to suit actual site condition based on the P& ID Procurement of pipes, fitting, valves, strainers and other site related equipments. Fabrication and erection of structural work i.e, pipe rack, technical structure, equipment structure etc Supervising of spool pre-fabrication in workshop and on site erection according to ISO Drawing sketches and piping layout arrangements Technical & Engineering support to field supervisors, liaise and coordinate with subcontractors Carry out inspections, site surveys and dimensional check to ensure piping installations are as per design drawing and specification and comply with project specification Tie in connection for all kind of services Preparation of weekly progress report Coordination with and attending regular meeting with clients & subcontractor FRAMCO ENGINEERING, Aberdeen, United Kingdom DEC 04 -OCT 09 BP oil Grangemouth Refinary Ltd, Stirlingshire, Scotland Lindsey oil refinery (TOTAL U.K), south Humberside (North Sea), Scotland operation engineer

Company : Duration : Major project handled:

Position : Project : Responsibilities : Conduct of in house front-end engineering design, preparation of scopes, design bases and specification Ensuring that pipe systems are designed are installed, tested, and commissioned in accordance with company codes , specification , drawing and design document Erection of pipe hangers , supports insulation and painting for critical and BOP piping system Co-ordinate installation activities of static equipment as steam boilers , feed water tank and heat exchanger for condense recovery Inspecting on site if the following items has been provided and done ; venting gas and vapour pocket in piping and equipment , low point in piping , pumps and equipment for drawing - Accessibility of valves and instruments including thermocouple , pressure gauge etc - Pipe straight length upstream/ Downstream orifice meter are in accordance with code requirement - Steam traps are provided at low points of piping in accordance with typical assembly for manifold Supervising cleaning of piping system using water flushing and air blowing and inspecting if procedure requirements have been done; items like safety valves, control valves , expansion joints, filters , strainer have been excluded and clean valves are in flushing position, equipment are properly protected from flushing debris and pressure blinds have been installed

Page 3 of 5

Mechanical completion and integrity inspection of vessels , columns and pipe work, heat exchangers, condenser , coolers e.t.c Witnessing pressure testing operation of tanks , reactors and piping for mechanical strength and tightness of joint and certify the tests; and also verify that all necessary safety precautions have been taken; Involved in Pre-commisiong and operational testing of facilities, commissioning of utilities and coordinated line check list to ensure items specified in provided documents are as appropriate Conduct line checking to ensure the construction is in accordance with drawing and specification Responsibility for monitoring piping construction and fabrication activities insuring quality and taking necessary action to maintain satisfactory standards Preparing work packages with all design documentations and method statement for work permits approval Witnessing all field tests including hydro tests (HT) , Dyne penetrate (pt), ultrasonic test(UT) : : : : MC GINLEY SUPPORT SERVICES OCT02 - DEC04 Field Engineer Victor to Viking pipeline project comprising 16 gas line, 3 piggy backed methanol and associated riser. A new 60km 12 GAS injection pipeline is routed from victor field to WHP1/WHP9 to increase the productivity capacity

Company Duration Position Project

Responsibilities: Conduct of in house front-end engineering design ,preparation of scopes, design bases and specification Engaged in construction and installation includes trenching , pipe lay , tie-in spool piece, riser , flow lines, Umbilicals, manifold, and jumpers Studies into rigid pipeline reeling / welding mechanics and deep water buckle propagation Pipeline mechanics in house evaluation of pipeline response under combined stress and external pressure during deep water installation Reeled pipeline installation inter4ield flow lines and trunk lines for shell & BP development Support subsea engineer , barrage engineer& contractor Involvement in HAZOP studies & risk analysis IT SKILLS MS OFFICE PDMS EDUCATION B.E mechanical engineering (1997-2001) Kakatiya University, Warangal, Andhra Pradesh PERSONAL DETAILS Fathers Name Date of Birth Passport Details
DECLARATION

AUTOCAD 2007 PIPEFLEX

SAP-PM

: : :

M.K. Basha 14th Dec 1978 H9064487; 21-06-2020(DoE)

I here by declare that the above details are true and correct to the best of my knowledge

Page 4 of 5

Place: Vishakhapatnam Date:

(Md.Sharif)

Page 5 of 5

Das könnte Ihnen auch gefallen