Beruflich Dokumente
Kultur Dokumente
Acceptance test procedure for F5 comprises of the following test tracks. 1. Network Diagram 2. System LEDs Status Verifying 3. System Information Verifying 4. Network Connectivity Verifying 5. HA setup Verifying 6. F5 Failover redundancy Testing
1. Network Diagram
External Zone
stack
Server Zone
1|Page
2|Page
b. License Information
Web Configuration System >License
3|Page
c.
Memory Information
Check Memory by use b memory command
[admin@iisvlrsd0401:Active] ~ # b memory MEMORY STATISTICS -| (Host) Total = 371.7MB Used = 350.3MB | (TMM) Total = 3.636GB Used = 25.05MB
e. SNMP Information
Check SNMP server by Web management System > SNMP
4|Page
f.
NTP Information
Check NTP server by b ntp list all command
[admin@iisvlrsd0401:Active] ~ # b ntp list all ntp { partition Common include none servers 10.20.1.33 192.168.1.25 timezone "Asia/Bangkok" }
5|Page
6|Page
5. HA setup Verifying
Access Web Management System > High availability > Redundancy
Check device status by b failover show command Active device [admin@iisvlrsd0401:Active] ~ # b failover show FAILOVER active for 443d 09:30:16
Standby device [admin@iisvlrsd0402:Standby] ~ # b failover show FAILOVER standby for 443d 09:16:08
7|Page
NO. 6.1
Remark
Expected results
Expected results Standby device is promoted to Active and takes over the traffic processing Pass Fail
8|Page
NO. 6.2
Remark
Expected results
Expected results Standby device is promoted to Active and takes over the traffic processing Pass Fail
NO.
DTAC F5 PAT Test
Remark 9|Page
6.3
Expected results
Expected results Standby device is promoted to Active and takes over the traffic processing Pass Fail
10 | P a g e
Pass
Fail
Pass
Fail
Expected results 3.1 Software Information : Version. 3.2 License : Production 3.3 Memory Information 3.4 Syslog Information : Syslog Server IP.. 3.5 SNMP 3.6 NTP
Pass
Fail
Pass
Fail
11 | P a g e
5. HA setup Verifying
Pass
Fail
Expected results
Standby device is promoted to Active and takes over the traffic processing Standby device is promoted to Active and takes over the traffic processing Standby device is promoted to Active and takes over the traffic processing
Pass
Fail
F0/1
6.3
12 | P a g e