Sie sind auf Seite 1von 2

SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder-1 ABB 17.02.2013

Page 1 2

1.
CT Details

Transformer HV REF from NCT protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (mA)

Secondary Current [mA] Monitored at:


E03+R1, TB XA= 132kV Relay Panel 11 498.4 12 501.0 Test plug X64HV (RTXP18) 9A 507.2 10A 507.4 Stabilizing Resistor RSHV A82 498.0 A83 498.0 Metrosil RMHV A82 0 A85 0

CT2 Tr. HV REF

Injection from Trafo (201) MK box N(222,223) 499.6 F64HV Display Io (A) 154.4

Secondary Current [mA]


F64HV (RET615) (TB X120) 13 14 502.4 502.3

2.
CT Details

Transformer HV NCT for SBEF protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (mA)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel S1 S2 6 7 497 498 Test plug X51NHV (RTXP18) 9A 503 10A 499 +F51NHV (REF615) (TB X120) 13 497 14 498 +F51NHV Display A Io 154.9

CT1 Tr. HV SBEF

Injection from Trafo (201) MK box N(220,221) 499.4

3.
CT Details

Transformer Tertiary Wdg CT for SBEF protection Core:- CT Ratio 300/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel S1 S2 13 14 509.1 515.9 Test plug X51NT (RTXP18) 9A 510.4 10A 516.4 +F51NT (REF615) (TB X120) 13 516.1 14 518.1 +F51NT Display A Io 158.6

CT9 Tr. Tertiary SBEF

Injection from Trafo (201) MK box N(228,229) 507.3

Tested by ABB Transmission & Distribution Signature Name Date Ganesan K 17.02.2013

Witnessed by ENERGO

Approved by

Mohammad Rasheed 17.02.2013

SITE TEST REPORT

Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399) Consultant Main Contractor

ENERGO

Name of the Equipment Name of the Feeder Manufacturer Date

40MVA Power Transformer-T201 E03 Transformer Feeder-1 ABB 17.02.2013

Page 2 2

4.
CT Details

Transformer MV REF from NCT protection Core:- CT Ratio 2500/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XA= 132kV Relay Panel 18 501.5 19 503.0 Test plug X64MV (RTXP18) 9A 505.4 10A 505.5 Stabilizing Resistor RSMV A182 507.9 A183 507.9 Metrosil RMMV A182 0 A185 0

CT5 MV REF 2500/1A

Injection from Tr(201) MK box N(226,227) 499.4

Secondary Current [mA]


F64MV (RET615) (TB X120) 13 14 500.2 504.3 F64MV Display Iob-A 1293.9

5.
CT Details

Transformer MV NCT for SBEF protection Core:- CT Ratio 2500/1A


Phase Injected Sec Current (A)

Secondary Current [mA] Monitored at:


E03+R1, TB XC= 132kV Relay Panel 10 510.6 11 510.2 Test plug X51NMV (RTXP18) 9A 506.8 10A 508.0 +F51NMV (REF615) (TB X120) 13 506.2 14 506.7 +F51NMV Display Io 1303.4

CT4 Tr. MV SBEF

Injection from Tr(201) MK box N(224,225) 504.9

Remarks:- Single point Earthing confirmed before start of secondary injection. Single point Earthing is done at E03+R01 panel side for the above cores.

Tested by ABB Transmission & Distribution Signature Name Date Ganesan K 17.02.2013

Witnessed by ENERGO

Approved by

Mohammad Rasheed 17.02.2013