Sample Reports

for
HAP v4.50 Example Problem

February, 2010
Carrier Software Systems
Copyright 2010 Carrier Corporation, All Rights Reserved

Air System Sizing Summary for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

02/26/2010
04:54PM

Air System Information


Air System Name ................. Packaged Rooftop AHU
Equipment Class ...................................... PKG ROOF
Air System Type .................................................. VAV

Number of zones ........................................................... 9


Floor Area ............................................................ 9559.0 ft
Location ........................................ Chicago IAP, Illinois

Sizing Calculation Information


Zone and Space Sizing Method:
Zone CFM .......................... Peak zone sensible load
Space CFM .................. Individual peak space loads

Calculation Months ...................................... May to Nov


Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data


Total coil load ...................................................... 29.8
Total coil load ..................................................... 357.5
Sensible coil load ................................................ 242.3
Coil CFM at Aug 1600 ......................................... 6569
Max block CFM at Jun 1700 ................................ 7131
Sum of peak zone CFM ....................................... 7180
Sensible heat ratio .............................................. 0.678
ft/Ton ................................................................. 320.9
BTU/(hr-ft) .......................................................... 37.4
Water flow @ 10.0 F rise ..................................... N/A

Tons
MBH
MBH
CFM
CFM
CFM

Load occurs at ................................................ Aug 1600


OA DB / WB ................................................... 91.0 / 74.0
Entering DB / WB ........................................... 88.1 / 70.4
Leaving DB / WB ............................................ 53.1 / 52.6
Coil ADP .................................................................. 51.7
Bypass Factor ........................................................ 0.038
Resulting RH ............................................................... 48
Design supply temp. ................................................. 55.0
Zone T-stat Check ................................................. 9 of 9
Max zone temperature deviation ................................ 0.0

F
F
F
F
%
F
OK
F

Preheat Coil Sizing Data


Max coil load ...................................................... 221.5 MBH
Coil CFM at Des Htg ............................................ 3653 CFM
Max coil CFM ...................................................... 7131 CFM
Water flow @ 20.0 F drop ................................... N/A

Load occurs at .................................................. Des Htg


Ent. DB / Lvg DB ............................................. -5.5 / 52.0 F

Supply Fan Sizing Data


Actual max CFM at Jun 1700 ............................... 7131 CFM
Standard CFM ..................................................... 6959 CFM
Actual max CFM/ft .............................................. 0.75 CFM/ft

Fan motor BHP ........................................................ 6.23 BHP


Fan motor kW .......................................................... 4.65 kW
Fan static ................................................................. 3.00 in wg

Outdoor Ventilation Air Data


Design airflow CFM ............................................. 3630 CFM
CFM/ft ................................................................ 0.38 CFM/ft

Hourly Analysis Program v4.50

CFM/person ........................................................... 17.97 CFM/person

Page 1 of 1

Zone Sizing Summary for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

02/26/2010
04:54PM

Air System Information


Air System Name ................. Packaged Rooftop AHU
Equipment Class ...................................... PKG ROOF
Air System Type .................................................. VAV

Number of zones ........................................................... 9


Floor Area ............................................................ 9559.0 ft
Location ........................................ Chicago IAP, Illinois

Sizing Calculation Information


Zone and Space Sizing Method:
Zone CFM .......................... Peak zone sensible load
Space CFM .................. Individual peak space loads

Calculation Months ...................................... May to Nov


Sizing Data ................................................... Calculated

Zone Sizing Data

Zone Name
D101 - Classroom
D102 - Classroom
D103 - Classroom
D104 - Classroom
D106 - Classroom
D107 - Classroom
D108 - Music Room
D113 - West Corridor
D114 - South Corridor

Maximum
Cooling
Sensible
(MBH)
15.4
15.4
15.4
15.7
18.0
17.5
31.0
8.3
7.2

Design
Air
Flow
(CFM)
768
768
768
782
897
873
1548
414
361

Minimum
Air
Flow
(CFM)
449
449
449
449
449
449
813
79
69

Time
of
Peak
Load
Jun 1600
Jun 1600
Jun 1600
Jun 1600
Jun 1700
Jun 1700
Aug 1700
Jun 1600
Jun 1600

Maximum
Heating
Load
(MBH)
10.4
10.4
10.4
13.4
14.4
10.4
19.6
4.6
4.0

Reheat
Coil
Load
(MBH)
18.4
18.4
18.4
21.5
22.4
18.4
34.2
6.0
5.2

Reheat
Coil
Water
gpm
@ 20.0 F
-

Zone
Htg
Coil
Load
(MBH)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Zone
Htg
Water
gpm
@ 20.0 F
-

Mixing
Box Fan
Airflow
(CFM)
197
197
197
255
273
197
373
87
76

Zone
Floor
Area
(ft)
907.5
907.5
907.5
907.5
907.5
907.5
2140.0
1054.0
920.0

Zone
CFM/ft
0.85
0.85
0.85
0.86
0.99
0.96
0.72
0.39
0.39

Zone Terminal Sizing Data

Zone Name
D101 - Classroom
D102 - Classroom
D103 - Classroom
D104 - Classroom
D106 - Classroom
D107 - Classroom
D108 - Music Room
D113 - West Corridor
D114 - South Corridor

Space Loads and Airflows

Zone Name /
Space Name
D101 - Classroom
D101 - Typical Classroom
D102 - Classroom
D101 - Typical Classroom
D103 - Classroom
D101 - Typical Classroom
D104 - Classroom
D104 - Classroom
D106 - Classroom
D106 - Classroom
D107 - Classroom
D107 - Classroom
D108 - Music Room
D108 - Music Room
Hourly Analysis Program v4.50

Mult.

Cooling
Sensible
(MBH)

Time
of
Load

Air
Flow
(CFM)

Heating
Load
(MBH)

Floor
Area
(ft)

Space
CFM/ft

15.4

Jun 1600

768

10.4

907.5

0.85

15.4

Jun 1600

768

10.4

907.5

0.85

15.4

Jun 1600

768

10.4

907.5

0.85

15.7

Jun 1600

782

13.4

907.5

0.86

18.0

Jun 1700

897

14.4

907.5

0.99

17.5

Jun 1700

873

10.4

907.5

0.96

25.7

Sep 1500

1284

13.1

1781.0

0.72
Page 1 of 1

Zone Sizing Summary for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

Zone Name /
Space Name
D109 - Practice Room
D110 - Storage
D111 - Office
D113 - West Corridor
D113 - West Corridor
D114 - South Corridor
D114 - South Corridor

Hourly Analysis Program v4.50

02/26/2010
04:54PM

Mult.
1
1
1

Cooling
Sensible
(MBH)
0.9
1.0
3.6

Time
of
Load
Aug 1700
Jun 1700
Jun 1700

Air
Flow
(CFM)
45
52
179

Heating
Load
(MBH)
1.7
1.7
3.2

Floor
Area
(ft)
65.0
120.0
174.0

Space
CFM/ft
0.69
0.43
1.03

8.3

Jun 1600

414

4.6

1054.0

0.39

7.2

Jun 1600

361

4.0

920.0

0.39

Page 2 of 2

Ventilation Sizing Summary for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

02/26/2010
04:54PM

1. Summary
Ventilation Sizing Method .......................................... ASHRAE Std 62.1-2004
Design Condition ..................................................... Minimum flow (heating)
Occupant Diversity ................................................................................. 1.000
Uncorrected Ventilation Airflow Rate ........................................................ 2922 CFM
System Ventilation Efficiency .................................................................. 0.805
Design Ventilation Airflow Rate ................................................................ 3630 CFM

2. Space Ventilation Analysis Table

Zone Name / Space Name


D101 - Classroom
D101 - Typical Classroom
D102 - Classroom
D101 - Typical Classroom
D103 - Classroom
D101 - Typical Classroom
D104 - Classroom
D104 - Classroom
D106 - Classroom
D106 - Classroom
D107 - Classroom
D107 - Classroom
D108 - Music Room
D108 - Music Room
D109 - Practice Room
D110 - Storage
D111 - Office
D113 - West Corridor
D113 - West Corridor
D114 - South Corridor
D114 - South Corridor
Totals (incl. Space Multipliers)

Hourly Analysis Program v4.50

Minimum
Supply
Air
Mult.
(CFM)

Floor

Required

Area

Outdoor Air

(ft)

(CFM/ft)

Time

Required

Air

Required

Uncorrected

Space

Averaged

Outdoor Air

Distribution

Outdoor Air

Outdoor Air

Ventilation

Occupancy (CFM/person) Effectiveness

(CFM)

(CFM)

Efficiency

449

907.5

0.12

25.0

10.00

0.80

449

359

0.805

449

907.5

0.12

25.0

10.00

0.80

449

359

0.805

449

907.5

0.12

25.0

10.00

0.80

449

359

0.805

449

907.5

0.12

25.0

10.00

0.80

449

359

0.881

449

907.5

0.12

25.0

10.00

0.80

449

359

0.902

449

907.5

0.12

25.0

10.00

0.80

449

359

0.805

1
1
1
1

759
17
18
19

1781.0
65.0
120.0
174.0

0.06
0.06
0.12
0.06

50.0
1.0
0.0
1.0

10.00
10.00
0.00
5.00

0.80
0.80
0.80
0.80

759
17
18
19

607
14
14
15

0.817
0.817
0.817
0.817

79

1054.0

0.06

0.0

0.00

0.80

79

63

1.086

69
3653

920.0

0.06

0.0

0.00

0.80

69

55
2922

1.086
0.805

Page 1 of 1

Air System Design Load Summary for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

ZONE LOADS
Window & Skylight Solar Loads
Wall Transmission
Roof Transmission
Window Transmission
Skylight Transmission
Door Loads
Floor Transmission
Partitions
Ceiling
Overhead Lighting
Task Lighting
Electric Equipment
People
Infiltration
Miscellaneous
Safety Factor
>> Total Zone Loads
Zone Conditioning
Plenum Wall Load
Plenum Roof Load
Plenum Lighting Load
Return Fan Load
Ventilation Load
Supply Fan Load
Space Fan Coil Fans
Duct Heat Gain / Loss
>> Total System Loads
Central Cooling Coil
Preheat Coil
Terminal Reheat Coils
>> Total Conditioning
Key:

Hourly Analysis Program v4.50

02/26/2010
04:54PM

DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Aug 1600
HEATING DATA AT DES HTG
COOLING OA DB / WB 91.0 F / 74.0 F
HEATING OA DB / WB -6.0 F / -7.2 F
Sensible
Latent
Sensible
Latent
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
504 ft
24736
504 ft
2576 ft
3306
2576 ft
16905
9559 ft
10253
9559 ft
41562
504 ft
4412
504 ft
25513
0 ft
0
0 ft
0
0 ft
0
0 ft
0
7585 ft
0
7585 ft
13614
0 ft
0
0 ft
0
0 ft
0
0 ft
0
30971 W
61736
0
0
0W
0
0
0
0W
0
0
0
202
36734
28660
0
0
0
0
0
0
0
0
0
0
0
0% / 0%
0
0
0%
0
0
141177
28660
97594
0
148105
28660
94306
0
20%
1045
0
0
70%
23923
0
0
30%
31702
0
0
6569 CFM
0
3653 CFM
0
3630 CFM
24573
86498
3630 CFM
287464
0
6569 CFM
12982
3653 CFM
-4159
0
-741
0%
0
0%
0
242331
115158
376869
0
242331
115158
0
0
0
221493
0
155278
242331
115158
376772
0
Positive values are clg loads
Positive values are htg loads
Negative values are htg loads
Negative values are clg loads

Page 1 of 1

Monthly Simulation Results for Packaged Rooftop AHU


Project Name: HAP45 Example
Prepared by: Carrier Corp

02/26/2010
04:55PM

Air System Simulation Results (Table 1) :


Preheat Coil
Load
(kBTU)
28339

Preheat Eqpt
Load
(kBTU)
28339

Preheat Coil
Input
(kBTU)
34560

Preheat
Heating Misc.
Electric
(kWh)
0

Central
Cooling Coil
Load
(kBTU)
1

Central
Cooling Eqpt
Load
(kBTU)
1

Central Unit
Clg Input
(kWh)
0

February

21146

21146

25787

March

Month
January

14472

14472

17649

419

419

28

April

2659

2659

3242

2987

2987

201

May

192

192

235

24701

24701

1851

June

38907

38907

3059

July

8444

8444

756

August

52066

52066

3979

September
October

28

28

34

34206

34206

2579

1959

1959

2389

11463

11463

829

November

9842

9842

12003

399

399

26

December

14111

14111

17209

92748

92748

113107

173593

173593

13308

Air System Simulation Results (Table 2) :


Terminal
Terminal
Heating Coil
Heating Coil
Load
Input
Month
(kBTU)
(kWh)
January
17941
5258

Supply Fan
(kWh)
474

Terminal Fan
(kWh)
65

Lighting
(kWh)
8407

Electric
Equipment
(kWh)
0

Total

February

10930

3203

439

53

7641

March

6791

1990

467

46

8035

April

1509

442

416

17

6542

May

80

23

708

8407

June

641

5800

July

103

238

623

5807

33

10

662

7656

August
September
October

1408

413

566

18

8778

November

6012

1762

426

43

7285

December
Total

16049

4703

328

51

5807

60752

17805

5853

298

80403

Hourly Analysis Program v4.50

Page 1 of 1

Annual Component Costs - Base Case Design


HAP45 Example
Carrier Corp

02/26/2010
04:56PM

Air System Fans 5.0%


Cooling 11.6%

Heating 19.7%
63.8% Lights

1. Annual Costs
Annual Cost
($)
742

($/ft)
0.078

Percent of Total
(%)
5.0

Cooling

1,728

0.181

11.6

Heating

2,943

0.308

19.7

Pumps

0.000

0.0

Cooling Tower Fans

0.000

0.0

Component
Air System Fans

HVAC Sub-Total

5,412

0.566

36.2

9,530

0.997

63.8

Electric Equipment

0.000

0.0

Misc. Electric

0.000

0.0

0.000

0.0

9,530

0.997

63.8

Grand Total
14,943
1.563
Note: Cost per unit floor area is based on the gross building floor area.

100.0

Lights

Misc. Fuel Use


Non-HVAC Sub-Total

Gross Floor Area ........................................ 9559.0 ft


Conditioned Floor Area ............................... 9559.0 ft

Hourly Analysis Program v4.50

Page 1 of 1

Monthly Energy Use by Component - Base Case Design


HAP45 Example
Carrier Corp

02/26/2010
04:56PM

1. Monthly Energy Use by System Component


Component
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Air System Fans (kWh)

539

492

513

433

711

641

103

623

664

584

469

379

28

201

1851

3059

756

3979

2579

829

26

Natural Gas (Therm)

Fuel Oil (na)

Propane (na)

Remote HW (na)

Remote Steam (na)

Remote CW (na)

5258

3203

1990

442

23

10

413

1762

4703

346

258

176

32

24

120

172

Fuel Oil (na)

Propane (na)

Remote HW (na)

Remote Steam (na)

Pumps (kWh)

Clg. Tower Fans (kWh)

Cooling
Electric (kWh)

Heating
Electric (kWh)
Natural Gas (Therm)

Lighting (kWh)

8407

7641

8035

6542

8407

5800

238

5807

7656

8778

7285

5807

Electric Eqpt. (kWh)

Misc. Electric (kWh)

Natural Gas (Therm)

Propane (na)

Remote HW (na)

Remote Steam (na)

Misc. Fuel

Hourly Analysis Program v4.50

Page 1 of 1

Billing Details - Electric - Base Case Design


HAP45 Example
Carrier Corp

02/26/2010
04:56PM

1. Component Charges
Billing
Period
Jan

Energy Charges Demand Charges


($)
($)
603
871

Customer
Charges
($)
40

Taxes
($)
0

Total Charge
($)
1,514

Feb

481

818

40

1,340

Mar

449

709

40

1,198

Apr

324

662

40

1,026

May

467

659

40

1,166

Jun

403

974

40

1,417

Jul

47

72

40

159

Aug

442

904

40

1,386

Sep

463

841

40

1,344

Oct

450

596

40

1,086

Nov

405

642

40

1,087

Dec

462

815

40

1,317

4,997

8,562

480

14,039

Total Charges
($)
1,514

Total
Consumption
(kWh)
14,204

Avg Price
($/kWh)
0.1066

1,340

11,337

0.1182

Mar

1,198

10,566

0.1134

Apr

1,026

7,618

0.1346

May

1,166

10,992

0.1061

Jun

1,417

9,499

0.1492

Totals
2. Totals
Billing
Period
Jan
Feb

Jul

159

1,097

0.1445

Aug

1,386

10,410

0.1331

Sep

1,344

10,909

0.1232

Oct

1,086

10,604

0.1025

Nov

1,087

9,542

0.1139

Dec

1,317

10,890

0.1210

14,039

117,667

0.1193

3. Consumption Totals
Billing
Peak
Period
(kWh)
Jan
0

Mid-Peak
(kWh)
0

Normal Peak
(kWh)
0

Off-Peak
(kWh)
0

Overall
(kWh)
14,204

Totals

Feb

11,337

Mar

10,566

Apr

7,618

May

10,992

Jun

9,499

Jul

1,097

Aug

10,410

Sep

10,909

Oct

10,604

Nov

9,542

Dec

10,890

Totals

117,667

Hourly Analysis Program v4.50

Page 1 of 1

Billing Details - Electric - Base Case Design


HAP45 Example
Carrier Corp

4. Billing Demands
Billing
Period
Jan

02/26/2010
04:56PM

Peak
(kW)
0.0

Mid-Peak
(kW)
0.0

Normal Peak
(kW)
0.0

Off-Peak
(kW)
0.0

Overall
(kW)
77.4

Feb

0.0

0.0

0.0

0.0

72.7

Mar

0.0

0.0

0.0

0.0

63.1

Apr

0.0

0.0

0.0

0.0

58.9

May

0.0

0.0

0.0

0.0

58.6

Jun

0.0

0.0

0.0

0.0

67.1

Jul

0.0

0.0

0.0

0.0

5.0

Aug

0.0

0.0

0.0

0.0

62.3

Sep

0.0

0.0

0.0

0.0

58.0

Oct

0.0

0.0

0.0

0.0

53.0

Nov

0.0

0.0

0.0

0.0

57.0

Dec

0.0

0.0

0.0

0.0

72.4

Peak
(kW)
0.0

Mid-Peak
(kW)
0.0

Normal Peak
(kW)
0.0

Off-Peak
(kW)
0.0

Overall
(kW)
77.4

Feb

0.0

0.0

0.0

0.0

72.7

Mar

0.0

0.0

0.0

0.0

63.1

Apr

0.0

0.0

0.0

0.0

58.9

May

0.0

0.0

0.0

0.0

58.6

Jun

0.0

0.0

0.0

0.0

67.1

Jul

0.0

0.0

0.0

0.0

5.0

Aug

0.0

0.0

0.0

0.0

62.3

Sep

0.0

0.0

0.0

0.0

58.0

Oct

0.0

0.0

0.0

0.0

53.0

Nov

0.0

0.0

0.0

0.0

57.0

Dec

0.0

0.0

0.0

0.0

72.4

Mid-Peak
(m/d/h)
n/a

Normal Peak
(m/d/h)
n/a

Off-Peak
(m/d/h)
n/a

Overall
(m/d/h)
1/2/0700
2/4/0700

5. Maximum Demands
Billing
Period
Jan

6. Time Of Maximum Demands


Billing
Peak
Period
(m/d/h)
Jan
n/a
Feb

n/a

n/a

n/a

n/a

Mar

n/a

n/a

n/a

n/a

3/4/0700

Apr

n/a

n/a

n/a

n/a

4/22/0700

May

n/a

n/a

n/a

n/a

5/30/1700

Jun

n/a

n/a

n/a

n/a

6/20/1500

Jul

n/a

n/a

n/a

n/a

7/9/1600

Aug

n/a

n/a

n/a

n/a

8/22/1700

Sep

n/a

n/a

n/a

n/a

9/6/1200

Oct

n/a

n/a

n/a

n/a

10/21/0700

Nov

n/a

n/a

n/a

n/a

11/18/0700

Dec

n/a

n/a

n/a

n/a

12/16/0700

Hourly Analysis Program v4.50

Page 2 of 2