Beruflich Dokumente
Kultur Dokumente
PDM ID N
Rev.
-
Transportation limitaion
6 x 3.25 x 3.5 m , 40 MT
The dam site is approachable from Guwahati via Tezpur Bhalukpong Bomdila & Nafra
involving a distance of 415 Km.
788.50 m
CL of Runner
Rev.
Index
Page N
Description
Executed
Approved
A
B
C
D
E
Execution OU:
Executed by:
Name
Checked by:
Sign.
Name
Approved by:
Sign.
Name
Date:
Sign.
Issue Date
Date:
VHN
Sandeep
Sandeep
Pratap N
TURBINE
Sl. No.
Description
Dimensions (m)
per Colli
W
total
Weight
total
Volume (m)
FRT
3
1
3.00
1.00
3.00
1.00
1.40
0.60
13.00
0.500
12.60
0.60
39.00
0.50
37.80
0.60
39.00
0.60
2
2
2
1
3.50
0.10
0.15
0.25
1.10
0.40
0.80
0.20
1.10
0.40
0.80
0.20
9.00
1.10
0.50
0.50
4.24
0.02
0.10
0.01
18.00
2.20
1.00
0.50
8.47
0.03
0.19
0.01
18.00
2.20
1.00
0.50
6.00
2.20
3.00
11.00
39.60
22.00
79.20
79.20
6.00
2.40
3.00
10.00
43.20
20.00
86.40
86.40
4
2
2
2
2
8
2
5.00
6.00
5.20
3.50
3.10
4.20
1.00
2.50
2.55
2.60
2.70
3.20
2.80
0.70
1.30
3.00
2.80
2.70
3.20
0.60
0.70
2.25
7.00
5.00
4.50
6.80
1.75
0.50
16.25
45.90
37.86
25.52
31.74
7.06
0.49
9.00
14.00
10.00
9.00
13.60
14.00
1.00
65.00
91.80
75.71
51.03
63.49
56.45
0.98
91.80
75.71
51.03
63.49
56.45
1.00
4
4
1
2
1
1
1
2
3.80
3.80
4.00
3.20
3.00
1.50
1.00
4.00
1.90
1.90
3.00
2.60
1.00
0.25
1.00
2.50
0.71
0.70
1.00
0.50
0.60
0.23
1.00
2.50
7.50
3.00
30.00
2.10
12.00
0.50
3.00
2.10
5.13
5.05
12.00
31.74
7.06
0.09
1.00
25.00
30.00
12.00
30.00
13.60
1.75
0.50
3.00
4.20
20.50
20.22
12.00
63.49
7.06
0.09
1.00
50.00
30.00
20.22
30.00
63.49
7.06
0.50
3.00
50.00
4.00
4.00
1.50
15.00
0.36
15.00
0.36
15.00
2
2
2.60
2.00
2.60
1.00
0.60
1.00
4.30
0.40
4.06
2.00
8.60
0.80
8.11
4.00
8.60
4.00
1.60
1.60
0.40
1.40
1.02
2.80
2.05
2.80
3.00
3.00
3.50
7.20
31.50
14.40
63.00
63.00
2.00
5.00
3.25
2.00
3.25
3.25
2.00
3.50
2.00
0.65
7.50
3.00
8.00
56.88
21.13
1.30
30.00
6.00
16.00
227.50
42.25
16.00
227.50
42.25
No. of colli
total
1 Runner
2
2
7
8
2
2
4
2
Origin
of
Equipment
TURBINE
Sl. No.
Description
Grand Total
Dimensions (m)
per Colli
W
3.30
3.50
3.30
3.50
1.80
2.00
0.90
3.30
1
1
1
2.50
3.30
1.00
2.50
3.30
0.30
2.00
2.00
0.30
5.50
2.80
3.00
1.80
2.00
2.00
1.50
1.40
1.40
0.50
2.20
2.20
3.80
0.50
0.70
0.50
2.20
2.20
No. of colli
total
1
2
4
4
2
2
total
Weight
total
Volume (m)
FRT
19.60
24.50
0.90
6.60
19.60
49.00
19.60
49.00
0.70
2.20
0.40
12.50
21.78
0.09
0.70
2.20
0.40
12.50
21.78
0.09
12.50
21.78
0.40
40.00
1.80
8.00
1.00
6.50
6.00
31.35
1.96
2.94
0.45
9.68
9.68
80.00
5.40
32.00
4.00
13.00
12.00
62.70
5.88
11.76
1.80
19.36
19.36
80.00
5.88
32.00
4.00
19.36
19.36
489.5
1,378.6
1,413.7
Origin
of
Equipment
TURBINE
Number
of
Shipments
estimated
FOB date
Start
TURBINE
Number
of
Shipments
estimated
FOB date
Start