COMPUTATION OF LOAD DUE TO VARIOUS TYPES OF PIER SUBSTRUCTURES :NOTE: ALL HIGHLIGHTED CELLS ARE TO BE TREATED AS INPUT DATA

2.90 RL 13.906 Pier cap top Level 1.50 RL 1.50 12.406

H.F.L. 12.600

12.806

RL -0.400 Top Level of foundation

SECTIONAL ELEVATION 0.75 3.40 0.75

1.50

0.75

5.00 SECTIONAL PLAN PIER

0.75

2.90

10.00 PLAN OF PIER CAP

LOAD CALCULATIONS
1 FORMATION LEVEL 2 BEARING LEVEL 3 BEARING HEIGHT 4 PIER CAP TOP LEVEL 5 WELL CAP/ FOUNDATION TOP TOP 6 FOUNDING LEVEL 7 SCOUR LEVEL MAX. 8 HIGHEST WATER LEVEL(HFL) 9 MAX. VELOCITY OF FLOW 10 PIER CAP THICKNESS 11 PIER CAP WIDTH 12 PIER CAP LENGTH 13 PIER WALL THICKNESS 14(a) PIER WALL LENGTH AT TOP 14(b) PIER WALL LENGTH AT BASE 15(a) PIER WALL HAS SEMI CIRCULAR ENDS -STRAIGHT PORTION OF PIER WALL AT TOP 15(b) PIER WALL HAS SEMI CIRCULAR ENDS -STRAIGHT PORTION OF PIER WALL AT TOP 16(a) PLAN AREA OF PIER WALL AT BOTTOM,A1 16(b) PLAN AREA OF PIER WALL AT TOP,A2 16(c) Volume of pier shaft, V1 ((A1+A2+(A1*A2)0.5)*H/3 17.410 m 14.385 m 0.185 m 13.950 m -0.400 m -31.00 m -20.105 m 12.600 m 3.00 m/sec 1.50 m 2.90 m 10.00 m 1.50 m 6.50 m 4.90 m

3.40 m

5.00 m
2 6.87 m 2 9.27 m 3 102.92 m

17 WEIGHT OF SUB STRUCTURE UPTO FOOTING TOP - PIER CAP - RL of cg of pier cap - Height of cg of pier cap w.r.t. pier base - PIER WALL - RL of cg of pier wall w.r.t to pier wall top - Height of cg of pier wall w.r.t pier base - 15% PORE PRESSURE UPLIFT - PEDESTALS 18 TOTAL WEIGHT OF SUBSTRUCTURE - UNDER DRY CONDITION - UNDER SUBMERGED CONDITION - HEIGHT OF COMBINED CG OF SUBSTRUCTURE - RL OF COMBINED CG OF SUBSTRUCTURE 331.29 t 319.40 t 8.499 m 8.099 m 82.77 t 13.406 m 13.806 m 247.02 t 6.32 m 6.720 m 13.39 t 1.50 t

SUBSTRUCTURE LOAD CALCULATIONS FOR PIER SUBSTRUCTURE

3.40m 1.00m 0.50m 1.00m 700 mm wide inspection platform,depth varying from 250mm to 200mm Pier cap top Level RL 95.950

pier centre line

H= 14.25m

2.00m RL 80.200 Top of well cap / open foundation

SECTIONAL ELEVATION ALONG L-L AXIS

11.00m Pier cap top Level RL 95.950 1.00m 0.50m 5.00m 2500mm wide inspection platform,depth varying from 250mm to 200mm

pier centre line 14.25m

6.00m

RL 80.200 Top of well cap / open foundation

CROSS - SECTION ALONG T-T AXIS

2.00m

1.00m

1.00m 0.50m

6.00m

A2

A1

5.00m

SECTIONAL PLAN AT BASE LEVEL LOAD CALCULATIONS: 1 FORMATION LEVEL 2 BEARING LEVEL 3 PIER CAP TOP LEVEL 4 TOP OF WELL CAP 5 FOUNDING LEVEL

SECTIONAL PLAN AT CAP LEVEL

100.300 m 96.450 m 95.950 m 80.200 m 51.500 m

6 WEIGHT OF SUB STRUCTURE UPTO WELL CAP TOP a) Weight of varying portion of pier shaft :Height of varying portion (m) Area of section at top of pier, A1 Area of section at bottom of pier, A2 Area of section at HFL, A3 Volume of pier shaft, V ((A1+A2+(A1*A2)0.5)*H/3 b) Weight of the Pier cap :Height of uniform portion (m) C/S Area of the uniform portion Volume of the uniform portion Height of varying portion (m) Volume of the varying portion = = = = = = = 1.00 m
2 37.40 m

= = = = =

14.25 m
2 4.79 m 2 11.14 m 2 10.68 m 3 110.32 m

37.4*1.0 = 0.50 m

3 37.4 m

37.4+(1.2*5.2)+((37.4*(1.2*5.2))^0.5))*0.5/3 3 9.82 m
3 47.22 m

Volume of pier cap, ((A1+A2+(A1*A2)0.5)*H/3 c) Weight of the Inspection platform :Total surface area of the platform

= =

(2*(2.5*(3.4+2*0.7))+2*(11.0*0.7)) 39.40 0.225 39.4*0.225 = m2 m


3 8.865 m

Average depth of the platform Total volume of the inspection platform

= =

Weight of railing on the inspection platform @ 0.3t/m = [2*(4.8+16.0)]*0.3 = TOTAL WEIGHT OF PIER SHAFT WEIGHT DUE TO PEDESTALS TOTAL WEIGHT OF SUBSTRUCTURE = = = 399.38 t 1.50 t 413.36 t

12.48 t

COMPUTATION OF COMBINED C.G. OF PIER SHAFT FROM PIER CAP LEVEL FOR SEISMIC ANALYSIS: Horizontal C.G. of varying portion of pier shaft Horizontal C.G. of uniform portion of pier cap Horizontal C.G. of varying portion of pier cap Horizontal C.G. of inspection platform = = = = 8.073 m 0.500 m 0.187 m 0.125 m 6.721 m

Height of Combined C.G. of substructure from pier cap top level = Therefore RL of combined C.G. of substructure w.r.t. top of pier cap level Height of combined C.G. wrt well cap top

= =

89.229 m 9.029 m

SUBSTRUCTURE LOAD CALCULATIONS FOR PIER SUBSTRUCTURE

1.60m Pier cap top Level RL 28.390

pier centre line

H= 3.75m

RL 24.640 1.10m ` 1.34m

RL 23.300 ###

###

RL 22.500 5.00m SECTIONAL ELEVATION

Founding level

2.00m

2.75m

1.00m

1.375m

5.15m

3.15m

A2

A1

3.15m

5.90m

1.00m 1.375m SECTIONAL PLAN AT BASE LEVEL LOAD CALCULATIONS: 1 FORMATION LEVEL 2 BEARING LEVEL 3 PIER CAP TOP LEVEL 4 FOOTING TOP 5 FOUNDING LEVEL SECTIONAL PLAN AT CAP LEVEL

30.640 m 30.305 m 28.390 m 23.300 m 22.500 m

6 WEIGHT OF SUB STRUCTURE UPTO FOOTING TOP a) Weight of varying portion of pier shaft :Height of varying portion (m) Area of section at top of pier, A1 Area of section at bottom of pier, A2 Volume of pier shaft, V1 ((A1+A2+(A1*A2) )*H/3
0.5

= = = =

3.75 m
2 14.60 m 2 9.44 m 3 44.73 m

b) Weight of constant bottom portion of pier shaft :Height of varying portion (m) Area of pier section Volume of pier shaft, V Therefore total volume of pier shaft TOTAL WEIGHT OF PIER SHAFT WEIGHT DUE TO PEDESTALS 7 TOTAL WEIGHT OF SUBSTRUCTURE = = = = = = = 1.34 m
2 9.44 m 3 12.65 m 3 57.38 m

137.72 t 1.50 t 139.22 t

COMPUTATION OF COMBINED C.G. OF PIER SHAFT FROM PIER CAP LEVEL FOR SEISMIC ANALYSIS: Horizontal C.G. of varying portion of pier shaft Horizontal C.G. of constant portion of pier shaft Combined C.G. of pier shaft from pier cap top level Therefore RL of combined C.G. of pier shaft w.r.t. top of pier cap level = = = 1.741 m 0.670 m 2.332 m

26.058 m

5.90m Pier cap top Level RL 28.390

pier centre line

3.75m

3.15m

RL 24.640

0.50m 1.34m

3.15m

0.50m

Foundation depth

RL 22.500 Founding Level Foundation width CROSS - SECTION