Project Details
Project Building Project Eq 1 From Eq 1 Eq 2 From Eq 2 Eq 3 Assumption Building Space (squre -foot) Site area (acers) 53792 (5000 m2) 1.5

Development Density (sf/acre)= Gross Building Area(sf)/Site Area (acres) Development Density (sf/acre) 35861.3

Density radius (ft) = 3 * (Site area* development density)(1/2) Density radius (ft) 695.8

Average Property Density within density Boundry= sum of square footage/sum of site area In the density radius total site area = 20 acers (out of 35 acers) In the density radius total building space = 10 acers Average property density ( m2) 8093.7 >1500 m2/acre net (Satisfied Credit 2.2 requirements)

From Eq 3

Alternative Transportation Map


Reduced Site Disturbance Eq 4 From Eq 4 50% of Site (excluding building footprint) = (Total site area-building foot print area)*0.5 50% of site (excluding building footprint) ( m2) <2500 m2 of the site will comprise of native 2035 and adapted vegitation (Satisfied Credit 2.5.1 requirement)

Eq 5 From Eq 5 Eq 6

Local zoninig's open space requirement = 0.35* total site area Local zoninig requrement ( m2) 2124.5

From Eq 6

25% of Local authority open space requirement = 0.25 * local zoning requirement + Local zoning requirement <4000 m2 open space 2655.625 (Satisfied Credit 2.5.2 requirement)

Stromwater Design, Quantity Control Volume of captured runoff = (P*Rv*A)/1000 P= average rainfall (mm) Rv= 0.05+0.009 (I) , I = percentage impervious of collection surface A= area of collection surface (m2) assume roof area = 2000 m2, ground area = 2500 m2

Eq 7

Eq 8

Minimum draw down rate (Qr) = Tank Capacity (m3)/Rainfall even interval (s)

Table 1: Monthly Rain Details And Discharge Rates

From Eq 7 From Eq 8

Month Average Precipitation (mm) Qv from roof Qv from ground Captured total runoff Qr Actual Qr due to rain

Jan
89 169 111.25 280 0.007 0.003

Feb
69 131 86.25 217 0.007 0.003

March
147 279 183.75 463 0.007 0.005

April
231 439 288.75 728 0.007 0.008

May
371 705 463.75 1169 0.007 0.014

Jun

Jul

Aug
109 207 136.25 343 0.007 0.004

Sep
160 304 200 504 0.007 0.006

Oct

Nov

Dec

224 135 426 257 280 168.75 706 425 0.007 0.007 0.008 0.005

348 315 147 661 599 279 435 393.75 183.75 1096 992 463 0.007 0.007 0.007 0.013 0.011 0.005

Actual Qr < Qr Maximum (Therefor it is adequate 40*20*1.4 m3 pond to collect strom water within one day) Satisfied Credit 2.6 requirement

Quality Control of Stromwater Technology use Vegitated Filter strips Pond Impervious pavement Average removal of suspendad solids 65% 50% 70% Considarable Factors runoff volume, slope and infiltration rater of soil pool volume and pond shape storage volume and percolation rate Credit 2.7 requirement

Heat Island Effect, Non-roof


Eq 9 Q = S+E+A+R+O S= area shaded area by trees or other landscape feature E= area shaded by solar energy pannels A= area shaded by architectural devices R= all the hardscape surfaces that have an SRI of at least 29 O= all hardscape surfaces that have and open-grid paving Description Total non-roof hardscapes Shaded area Areas of hardscapes with minimum SRI-29 Total qulifing surfaces (Q) Q >T/2 T = total non roof area T/2 ( m2 ) = 1250 < Q Satisfied Credit 2.8 requirement Area (m2) 2500 750 800 1550

From Eq 9 Eq 10 From Eq 10

Heat Island effect -Roof Eq 11 (Area of Roof meeting Minimum SRI / Total roof area) + (SRI of Installed roof / Required SRI ) >= 0.75 From Eq 11 2000/2000 + 29/29 = 2 > 0.75 Satisfied the Credit 2.9 requirement

Lighting Pollution Reduction


Actual LPD (From Site Lighting table) 2.00 1.50 2.20 1.20

Identification

Code of Practice for energy efficient Building in Sri Lanka LPD (W/m2)

Actual LPD Reduction (%) 38% 25% 27% 60%

Required LPD Reduction (%)

Complies

Parking Walkways Courtyard Building Faade

3.20 2.00 3.00 3.00

20% 20% 20% 50%

yes yes yes yes

(Credit 2.10 requirement)

Without Shilding waste of light

With shilding reduce the polution (Credit 2.10 requirement)