Beruflich Dokumente
Kultur Dokumente
Project Details
Project Building Project Eq 1 From Eq 1 Eq 2 From Eq 2 Eq 3 Assumption Building Space (squre -foot) Site area (acers) 53792 (5000 m2) 1.5
Development Density (sf/acre)= Gross Building Area(sf)/Site Area (acres) Development Density (sf/acre) 35861.3
Density radius (ft) = 3 * (Site area* development density)(1/2) Density radius (ft) 695.8
Average Property Density within density Boundry= sum of square footage/sum of site area In the density radius total site area = 20 acers (out of 35 acers) In the density radius total building space = 10 acers Average property density ( m2) 8093.7 >1500 m2/acre net (Satisfied Credit 2.2 requirements)
From Eq 3
Eq 5 From Eq 5 Eq 6
Local zoninig's open space requirement = 0.35* total site area Local zoninig requrement ( m2) 2124.5
From Eq 6
25% of Local authority open space requirement = 0.25 * local zoning requirement + Local zoning requirement <4000 m2 open space 2655.625 (Satisfied Credit 2.5.2 requirement)
Stromwater Design, Quantity Control Volume of captured runoff = (P*Rv*A)/1000 P= average rainfall (mm) Rv= 0.05+0.009 (I) , I = percentage impervious of collection surface A= area of collection surface (m2) assume roof area = 2000 m2, ground area = 2500 m2
Eq 7
Eq 8
Minimum draw down rate (Qr) = Tank Capacity (m3)/Rainfall even interval (s)
From Eq 7 From Eq 8
Month Average Precipitation (mm) Qv from roof Qv from ground Captured total runoff Qr Actual Qr due to rain
Jan
89 169 111.25 280 0.007 0.003
Feb
69 131 86.25 217 0.007 0.003
March
147 279 183.75 463 0.007 0.005
April
231 439 288.75 728 0.007 0.008
May
371 705 463.75 1169 0.007 0.014
Jun
Jul
Aug
109 207 136.25 343 0.007 0.004
Sep
160 304 200 504 0.007 0.006
Oct
Nov
Dec
224 135 426 257 280 168.75 706 425 0.007 0.007 0.008 0.005
348 315 147 661 599 279 435 393.75 183.75 1096 992 463 0.007 0.007 0.007 0.013 0.011 0.005
Actual Qr < Qr Maximum (Therefor it is adequate 40*20*1.4 m3 pond to collect strom water within one day) Satisfied Credit 2.6 requirement
Quality Control of Stromwater Technology use Vegitated Filter strips Pond Impervious pavement Average removal of suspendad solids 65% 50% 70% Considarable Factors runoff volume, slope and infiltration rater of soil pool volume and pond shape storage volume and percolation rate Credit 2.7 requirement
From Eq 9 Eq 10 From Eq 10
Heat Island effect -Roof Eq 11 (Area of Roof meeting Minimum SRI / Total roof area) + (SRI of Installed roof / Required SRI ) >= 0.75 From Eq 11 2000/2000 + 29/29 = 2 > 0.75 Satisfied the Credit 2.9 requirement
Identification
Code of Practice for energy efficient Building in Sri Lanka LPD (W/m2)
Complies