Sie sind auf Seite 1von 12

JODHPUR VIDHYUT VITRAN NIGAM LIMITED

Daily Progress Report


Reporting Month:_______

Date of Visit Visited Site Purpose of Visit Problem Observed

Work carried out / Action taken at site

Feeder Manager (M&P) Jodhpur Discom :____________

Remark (status of problem)

&P)

_______

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF ROUTINE VISIT OF 33/11 KV SUB-STATION Progress for the Month:_____________ Reporting Month:_____________ Name of the Circle:__________________ No. of Sub-Stations Added No. of Sub-Stations Cheched

S.No.

Name of SubDivision

Total SubStations as on 31.03.13 Up to last Month 3 4

Total No. of Sub-Stations at the end of month(3+4+5 During ) the Month 5 6 0 0 0 0

Total checked (sum of Up to last During the col.7 to 8) month month 7 8 9 0 0 0 0 0 0 0

1 1 2 3 4

Total

Note:-The details of new S/s added during the month and details of the same must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

No. of S/s where Log Sheet is being maintained and verified 10 0 0 0 0 0

master database.

der Manager (M&P) Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF POWER TRANSFORMERS Progress for the Month:_____________ Reporting Month:_____________ Name of the Circle:__________________ No. of Power Transformers Added Upto last Month 4 During the Month 5 Total No. of Power Transfoermers at the end of month (3+4+5) 6 0 0 0 0 No. of Power Transformers checked Up to last month 7 No. of Power Transformers where maintenance done Total checked During the (sum of col.7 During the Up to last month & 8) month month 8 9 0 0 0 0 0 0 0 0 0 10 11

S.No.

Name of SubDivision

Total No. of Power Transformers as on 31.03.13 3

Total maintenance done (sum of col.10 & 11) 12 0 0 0 0 0

1 1 2 3 4

Total

Note:-The details of new Power T/F added during the month and details of the same must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF CAPACITOR BANK Progress for the Month:_____________ Reporting Month:_____________ Name of the Circle:__________________ No. of Capacitor Bank No. of Capacitor Added Bank checked Total Total No. of No.of Capacitor Capacitor Bank at the During Bank as on Upto last During end of month Up to last the 31.03.13 (3+4+5) Month the Month month month 3 4 5 6 0 0 0 0 7 8 No. of defective Capacitor Bank put in circuit after maintenance Status of Capacitor Bank at the end of month

S.No.

Name of SubDivision

Up to end of last month 9

During the month 10

Working

Defective

2.0 MVAR 1.2 MVAR 2.0 MVAR 1.2 MVAR

1 1 2 3 4

11

12

13

14

Total

Note:-The details of new Capacitor Bank added during the month and details of the same must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF 33 KV CIRCUIT BREAKERS Progress for the Month:_____________ Reporting Month:_____________ Name of the Circle:__________________ No. of defective 33 KV No. of 33 KV Circuit Total No. No. of 33 KV Circuit Circuit Breakers put in Total No. of 33 KV Breakers Breakers checked circuit after maintenance of 33 KV Circuit Circuit Breakers at Added the end of Breakers as Added Up to last During the Up to end of During the During on 31.03.13 Upto last month month month last month month Month the Month (3+5+7) 3 4 5 6 0 0 0 0 7 8 9 10 Status of Capacitor Bank at the end of month

S.No.

Name of SubDivision

Working 11

Defective 12

1 1 2 3 4

Total

#REF!

#REF!

#REF!

#REF!

Note:-The details of new Circuit Breaker added during the month and details of the same must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF ROUTINE TESTING / CHECKING & PREVENTIVE MAINTENANCE OF 11 KV CIRCUIT BREAKERS Progress for the Month:_____________ Reporting Month:_____________ Name of the Circle:__________________ No. of defective 11 KV No. of 11 KV Circuit Total No. No. of 11 KV Circuit Circuit Breakers put in Total No. of 11 KV Breakers Breakers checked circuit after maintenance of 11 KV Circuit Circuit Breakers at Added the end of Breakers as Added Up to last During the Up to end of During the During on 31.03.13 Upto last month month month last month month Month the Month (3+5+7) 3 4 5 6 0 0 0 0 7 8 9 10 Status of Circuit Breakers at the end of month

S.No.

Name of SubDivision

Working 11

Defective 12

1 1 2 3 4

Total

#REF!

#REF!

#REF!

#REF!

Note:-The details of new Circuit Breaker added during the month and details of the same must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

Jodhpur Vidyut Vitran Nigam Limited


Progress of 11kV Feeder Metering
Progress for the Month:_____________ Name of the Circle:__________________ Reporting Month:_____________

Total No. of New Total Total No of 11 kV No. of Metering Metering Balance for No of Feeders Added 11 kV Metering Equipments Equipments Installation Name of Sub11 kV Feeders Equipments Installed S No Installed at of metering Division Feeders at the Installed as Upto During end of on 31.03.2013 Upto During the end of equipments as on the month (6-10) the last the 31.03.13 last month (7+8+9) month month (3+4+5) month month

10

11

1 2 3 Total 0 0 0

0 0 0 0 0 0 0

0 0 0 0

0 0 0 0

Status of 11kV Feeder Metering


No. of Defective Feeder Metering Maintained by Replacement of Replacement of Repairing / CTPTs Meters Replacement of VCB Upto During Upto During last the last the month month month month Upto last month Attending Other Problems During the month No. of Defective Feeder Metering (out of col. 10) due to No. of Healthy Feeder Metering (out of col.10) During the month

S No

Name of SubDivision

During Upto the last month month

CTPTs

Both Meters CTPT & Meter

VCB

Upto last month

12

13

14

15

16

17

18

19

20

21

22

23

24

25

1 2 3 Total 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

Note:-The details of new feeders added during the month and details of metering equipments installed during the month must be updated in the master database. Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


No. of DLMS Protocol HTTVM Installed in R-APDRP town Progress for the Month:____________ Reporting Month:_____________ Name of the Circle:______________ No. of DLMS HTTVM pending Reason for Meter available for replacement pendency at the end of Up to the last During the month month month 4 5 6 7 8 No. of Meter replaced by DLMS Protocol Meter

Name of Circle

Name of town

Total No. of Feeder

Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


DETAILS OF BURNT POWER TRANSFORMERS Progress for the Month:____________ Reporting Month:_____________ Name of the Circle:______________ Total No. of Power Transfoermers at the end of this month 3 No. of Power Transformers Burnt Up to last month 4 Total (sum of During the col. 4 & 5) month 5 6 0 0 0 0 Failure Rate (6/3)*100

S.No.

Name of SubDivision

1 1 2 3 4

12 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Total

Feeder Manager (M&P) Jodhpur Discom :____________

JODHPUR VIDHYUT VITRAN NIGAM LIMITED


Power Control Details Progress for the Month:____________ Name of the Circle:______________ Reporting Month:_____________

S. No.

Name of SubDivision

Name of SubStation

Name of Feeder

Load Survey Period

1-phase Supply Hrs.

3-phase Supply Hrs.

Feeder Manager (M&P) Jodhpur Discom :____________