OUTPUT
Record
PROCEDURE 1. Make JSA 2. Take the Work Permit 3. Cleaning the Equipment 4. If oil lubricated ,then drain the oil 5. Dismantle all the parts like De couple the motor and pump Motor base bolts Lifting the motor Lifting the motor stool Pump Coupling Lock nut Bearing cover White metal bearing Thrust roller bearing Housing Pump base Dis. Flange Lift the pump base Head shaft Stuffing box Distance pipe Head shaft Column pipe Int. shaft Tapper column pipe Pump shaft
Wartsila India Ltd. PREPARED BY : MECH APPROVED BY : PPM ISSUED BY : PPM DATE :
6. Cleaning the all parts by Diesel or Petrol 7. Change the Recommended parts like Bearing Oil seal Lock washer Lock nut Impeller Wear ring
8. Box-up the Pump as per Quality Bearing box-up by cold/hot Temp.(Up to 55 mm ID-Cold Box-up and above 55mm ID-Hot Box-up),BRG heating by Induction heater or oil bathing(up to110deg.C) Oil seal fitted by Hot water
Take the Pump Shaft Float Take alignment(Reading<0.05) Fitting the Oil indicator Top-up Oil-Level 60% Area should be cleaning Properly Clean the equipment and work area Surrendered the work permit Trial run the equipment Take the Vibration reading of both pump and motor
QUALITY All the parameters, activities are maintained within prescribed limit. Any deviation from the norm is recorded and corrective action is taken accordingly. ENVIRONMENT Not applicable. OHSAS Ensure PPE, Helmet, adequate lighting near the work place. Ensure the lifting tools are in adequate condition. Ensure proper earthing of the equipment / area of work as the case may be.
Wartsila India Ltd. PREPARED BY : MECH APPROVED BY : PPM ISSUED BY : PPM DATE :
Ensure healthiness & safety of the entire activities with respect to electrical system.
RECORDS: WIN/SIL/4/F/05