SECTION B: CIVIL

B1: EARTHWORKS

PART I : GENERAL A. SCOPE OF WORK 1. Description: a. The Contract shall include for all necessary materials, labor plant equipment and cartage to bring the existing levels on the site to the new reduced levels indicated for the buildings to complete the works shown drawings and/or described in this Specification. b. All major earthworks including building pads shall be carried out by others and forms no part of this contract. c. The Contractor shall check all lines, grades and levels and finish as shown. Report any discrepancies to the Architect prior to commencing work. d. Refer to Section A3: Setting out the Work and Staking, for the set out building lines carried out by Supervisor. Related Section in Other Work: The following works have been specified in other sections of this Specifications: Waterproofing Membranes Section B13.

2.

B. SITE CONDITIONS The area of the site will determine on site visit. C. NATURE OF EXCAVATION Make due allowance for excavation in materials of whatever nature may be encountered, providing that in the opinion of the Architect, the material is capable of being excavated by hand, machine or ripping, without the use of jackhammers or blasting. When the opinion of the Architect the nature of the materials to be excavated and the type of excavation is such that the only practicable means of excavation is by jackhammers or blasting, an instruction will be issued by the Architect for this method to be employed. D. WORK SPECIFIED IN OTHER SECTIONS Some associated work specified in other sections is listed but not limited to the following: 1. Preliminaries for survey of adjoining properties and for setting out the works. 2. Concrete for paving and deck. 3. Plumbing for underground services below sub grade. E. CONTINGENT WORK

Should any unforeseen conditions, obstructions or services be encountered inform the Architect and obtain his instructions before proceeding. F. SETTING OUT

Setting out of the building and establishment of datums and the like shall be carried out by the Architect, Refer to Section Preliminaries. G. DISPOSAL OF SURPLUS MATERIAL The Contractor shall dispose of excess soil and surplus materials resulting from excavation and clearing.

PT. WIETASHA PUTRINDO WISATA

B1 - 1

ALAM KULKUL RESORT PROJECT

H. OBJECTS OF INTEREST OR VALUE The Proprietor claims ownership of any objects of interest, fossils, and coins, antiquity or other objects or value that may be found on the site. PART II : MATERIALS Fill material shall be clean well-graded sand, free from weeds, roots, stones, vegetable matter and excessive clay or silt. PART III : WORKMANSHIP A. SAFETY Carry out the works in a thoroughly safe manner. Conform to all relevant Acts or Statutes, Regulations, By-laws or Orders relating to the safety of persons and property on or about the site. A. CLEARING Remove all trees, top soil, stumps, disused services, roots or rubbish encountered to the extent as necessary for construction and as directed by the Architect. B. GRADING Cut and fill the area of the site to correspond with levels shown on drawings. Accurately machine grades to final levels and finish to a true, even and smooth surface. From embankments to gradients and levels shown on drawings and as directed by the Architects. B. EXCAVATION GENERALLY Excavate forming bottoms of excavations smooth and level, or graded as shown. If excavations interfere with existing services notify the Architect immediately for direction. Step excavations for footings, services or other causes arising, ensure depth shown from floor level to bottom of excavation is maintained. Steps in footings shall suit masonry coursing. Excavate for underground services. Dress bottoms of trenches accurately to falls and to support barrels of pipes. C. SPECIFIC EXCAVATIONS Excavate to depths, widths and lengths for all structures as shown the drawings and as required for the completion of the works, allowing for step-downs where necessary. Carry out any sheet piling, planking, strutting or timbering necessary to maintain and keep all excavations free from debris, cave-ins, etc. The Architect prior to pouring concrete or back filling with stone, etc must inspect excavations. D. EXCESS EXCAVATION Excavation that exceeds the depth specified or shown on drawings shall be back filled to the correct depth with filling material previously specified in layers not more than 200mm thick. Compact each layer to the degree specified for the area concerned.

PT. WIETASHA PUTRINDO WISATA

B1 - 2

ALAM KULKUL RESORT PROJECT

E.

MAINTAINING EXCAVATION

Provide shoring, planking and strutting necessary to retain the sides of the excavation, and to ensure safe working. Provide safety covers holes. Provide any necessary needing, shoring, and strutting to adjacent buildings on adjoining properties. If in the opinion of the Architect any support is considered insufficient he may order the Contractor to provide additional support. No instruction shall relieve the Contractor of sole responsibility for the sufficient support on the excavation. Guard against the formation of voids outside sheeting or sheet pilling if used, and should any voids form, fill and consolidate them to the satisfaction of the Architect. Remove shoring and timbering progressively as the work proceeds unless otherwise instructed. F. DEWATERING

Maintain excavations, leveled and filled areas free of water by temporary catch drains, sumps, pumping, baling or whatever means are suitable and effective. Immediately prior to placing concrete or masonry on ground, remove free water and foreign matter. Comply with the requirements of the Local Authority for disposal of ground water. G. COMPACTION Refer Structural Engineering Drawings for the levels of compaction required. H. INSPECTION AND TESTING Refer to Structural Engineering instruction for inspection and testing. I. EXCAVATION AND BACKFILLING FOR SERVICES

Excavate for all services etc. as shown specified and required. All trenches are to be kept to a minimum size with true and even grades. Do not excavate for service trenches when they are close to foundations or retaining walls without approval from the Architect. Place and tamp by hand the first 300mm of fill around and above pipes to achieve compaction while not damaging pipes. Place the remaining backfill in 150mm layers and compact to a density at least equal to the density of adjacent undisturbed material. PART IV : APPLY TERMITE CONTROL ON EARTHWORK A. GENERAL Provide termite control, complete, as shown and specified per Contract Documents. B. QUALITY ASSURANCE 1. 2. Qualification: Applicator: Licensed by Pesticides chemical manufacturer in possession of valid operating license from Department of Agriculture (Pesticides Commission); Member of IPPHAMI. Testing Quality Control: a. Test: Checking of environmental conditions prior to application and after work completed to be done preferably by IPB (Bogor Institute of Agriculture) or as selected by Owner: paid for by Contractor. b. Certification: By IPB, or as selected by Owner; paid for by Contractor.

PT. WIETASHA PUTRINDO WISATA

B1 - 3

ALAM KULKUL RESORT PROJECT

C. SUBMITTALS 1. 2. 3. Samples Following listed samples; others, if specifically requested. Chemicals and Other Additives: One half litter each. Product Data. Manufacturers specifications, data, installation instructions, and original bill of sales. Certificates a. Applicator. Before starting work, submit written statement that Contract Documents were reviewed with Termicide chemical manufacturers representative and it was jointly agreed that materials are proper, compatible and adequate for purposes intended. b. Manufacturer: Upon completion of treatments, submit statement that technical support to applicator and field supervision was sufficient to assure proper application of materials and that installation is acceptable. Warranty

4.

General: 5 years; prepared and signed by Termicide Manufacturer and Applicator. Warrant Treatment against defective materials and application workmanship and that the treatment will be effective and ecologically safe. PART V : PRODUCT HANDLING A. DELIVERY General: Deliver materials in original unopened containers bearing manufacturers labels intact and with seals unbroken, proper warning should also be assured to guard against contamination to the environment B. STORAGE General: Store chemicals per manufacturers recommendations in dry locations as directed by manufacturer in manner to prevent damage and instruction of foreign matter C. PRODUCT CONDITIONS Environmental Requirements Applicator must assure himself that soil is not subject to erosion, water table is lower than 0.50 meters, below surface work is away from sources of water such as open well, soil will not crack in dry conditions, and there is good natural drainage system D. MATERIALS Type of termicide shall be registered under government Decree No. 7 1973, Pesticide Commission Indonesia. Termicide in original containers, in sealed form with proper label and identification from manufacturer. Appoint testing agency at the cost of Applicator if materials are not properly labeled and identified E. CHEMICALS

Use the following products (do not mix), or approved equal Wazari 10 FW F. EQUIPMENT

Equipment, including injectors, high powered compressors, and protective clothing, must not be allowed to contaminate environment prior or after completion of work G. INSPECTION Examine soil to receive termite control treatment, give written notification of deficiencies, state of water table, moisture test of soil, water sources drainage pattern, and other detrimental imperfections. Do not proceed until unsatisfactory conditions are corrected

PT. WIETASHA PUTRINDO WISATA

B1 - 4

ALAM KULKUL RESORT PROJECT

PART VI : EXECUTION A. SITE PREPARATION Clearing and preparation per termicide Manufacturers recommendations. B. PROTECTION Protect environment, including water sources, from ground water contamination and air borne chemical particles C. MIXING Supervisor must be present during mixing. Use of exact formula is critical, mix per Manufacturers recommendations. Do not re-use mixing container Mixture: Depends on type on type of chemical used, see indication by manufacturer Wazari 10FW 12.5 ml per 1 litter (5 litters per 1 m2) D. APPLICATION Use only genuine chemicals from original containers, sealed and properly labeled. Comply with general specification indicated by manufacturer Usage. 1. Apply termite control treatment to following: a. Exposed ground surfaces at every level of building, including imported soils to be used in planted interior areas. b. Alongside of sidewalls, piers, pipes, etc. 2. Rates of Application a. Earthworks: Exposed Ground Surfaces: Apply 5 litters of over 1 square meter of exposed ground surfaces on every level of Building. b. Walls, Piers & Pipes: Apply 5 litters of solution per 20 meter length along side walls, piers and around pipes. c. Perimeter of Building: Apply solution to perimeter of Building. d. Carpentry: Apply to all timber framing and structure with brush after completion of all cutting working and fabrication (note-including joinery). E. FIELD QUALITY CONTROL

Applicator monitored by termicides manufacturer to assure proper and safe application of treatment at every phase of work F. 1. TESTING AGENCY

General: Perform following. Testing agencys performance does not relieve Contractor, applicator, or termicides manufacturer from their respective responsibilities. 2. Product Handling: Verify products are properly identified, store and protected. 3. Project Conditions: Verify that environmental requirements are proper for proper for and during product application. 4. Termicides: a. General: Inspect as required to assure products are applied as specified and per manufacturers recommendations. Coordinate inspection with product manufacturers requirements. b. Chemicals: If for some reason chemicals submitted is doubted; analysis of chemicals can be done by third party at applicator expense. Testing agency can be one of the following: BATAN, SUCOFINDO, and IPB. c. Final Inspection: Take soil samples, select location within an area random. At testing Agencys option: Samples taken after 7 to 12 days of treatment, at depth of 15 or 20 cm, samples to be analyzed by acceptable Laboratory to indicate Termicide content in soil. The expense of testing will be borne by applicator. 5. Reports: Submit as directed G. CLEANING Upon completion, dispose mixing utensils, protective gear and excess materials off site. Leave areas clean, safe and undamaged. ===============
PT. WIETASHA PUTRINDO WISATA B1 - 5 ALAM KULKUL RESORT PROJECT