Overview. . . .
2 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Basic system:-
Mechanical drive for downhole pumps
Produced water Fuel gas filter and drier Produced water
Gas and water lines and fittings
API 3000# Gas flow meter (orifice or proprietary) 150# HDPE
Safety relief valves on gas & water lines
Control panel including flow computer
Produced gas Possible extra items (if justified):-
Gas (throttling) control valve? Produced gas
Remotely operated gas shutdown valve? HDPE
API 3000#
Separator for de-gassing water? 150#
Separator for de-watering gas?
Separator for co-mingled water and gas?
Above ground Below ground
3 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
4 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
5 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
6 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
7 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
8 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
9 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Gathering Systems
New concept . . . . .
Install nodal separation stations to eliminate wellhead separators
VERTICAL SEPARATON TANK (MADE FROM LARGE DIAMETER HDPE GAS PIPE)
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
New concept . . . .
Use of PCPump power for boosting gas pressure of weak wells
WELLHEAD
HIGH PRESSURE WATER EJECTOR
(FROM DOWNHOLE PC PUMP
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Gathering Systems & Central Gas Processing Facilities
New concept . . . . .
Eliminate inlet & oily water handling at central compression plant
“DRY” PIPELINE TO
HEAT CENTRAL PLANT
EXCHANGER
NODAL (INFIELD) SKID
COMPRESSION STATION
DX CHILLER
PACKAGE*
* IF ELECTRICAL POWER NOT READILY AVAILABLE, USE NH3 ABSORPTION CHILLER POWERED BY COMPRESSOR ENGINE WASTE HEAT
1 Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
Thank you for listening!