Document No. Job Number Project Location Item Number Item Name

172-YER-PE-V10-0003

KBRJ6491 Yanbu Export Refinery Project Saudi Arabia 172-D-0009 Benzene Export Storage Tank

EQUIPMENT DATA Equipment TypelConfiguration

I Field Fabricated API Storage Tank (Internal Floater) with Dome Roof
Shell - Carbon Steel External Roof - Carbon Steel Floating Roof - Carbon Steel Structural Steel - Galvanized

External Material of Construction

Operating Temperature ("C) Cyclic or Intermittent Conditions ("C) Note:

1 43

Any changes to the equipment data above may result in a corresponding change to the data below. Information on this data sheet shall be verified during detailed design.
PROJECT SPECIFICATIONS
I I

Specification No.

Document No.

Document Title

Specifications Apply To: S (Fabricator's Shop), M (Module Yard), F (FieldlSite)

YERP-09-SAMSS-Y200 YERP-SAES-H-I 00 YERP-SAES-H-I01 YERP-SAES-H-1OIV YERP-SAES-H-102 YERP-12-SAMSS-007 YERP-09-SAMSS-107

I 100-YER-PE-YSS-0538 I Proiect Coating Summary

I
I

Coating Materials & Application Requirements for lndustrial Facilities Approved Protective Coating Systems for 100-YER-PE-YSS-0080 Industrial Plants & ECi~itIment , , Approved Saudi Aramco Data Sheets - Paints 100-YER-PE-YSS-0081 and 100-YER-PE-YSS-0079

I
I

I
I

S, F

s, F S, F S S

I 100-YER-PE-YSS-0082 I Safety Requirements for Coating Applications I I 100-YER-PE-YSS-0328 I Fabrication of Structural and Miscellaneous Steel I
100-KBR-PE-YSS-0324 Application of Composite Fluoropolymer/Ceramic Coatings to Fasteners WORK SCOPE AND LOCATION

I I

I
Surface Description

Painting

Insulation

Support Fireproofing

External srfaces of shell and roof Tank bottoms (soil side) Internal shell surfaces between the 2 roofs including the underside of the fixed roof, the topside of the floating roof, and the sides of the floating roof pontoons. All internal surfaces of tank bottom, lower shell, and internals up to a minimum of 300 mm above the max. water level (minimum of 0.6 m above the tank bottom) Structural steel including stairs, handrails, ladders, grating, etc Flange Bolting

1
1

APCS-1C
APCS-3

I
I

S1,FI
S or F2

1 Galvanized (
1
s3

S2, F3

s
INDEX

This document contains confidential information that is only to be used for the Yanbu Export Refinery Project (YERP) and it IS not intended for any other use or any disclosure to third parties or publication without the express written permission of the YERP Project Management Team (PMT). Any reproductionis restricted to those portions and copies strictly necessary in order for recipients to make the intended and permitted use and all such copies shall be returned to YERP PMT for appropriate disposal after completion of such use.

General Confidential

COATING, INSULATION, FIREPROOFING DATA SHEET


Number Date By Chk Appd Client FF 11Mar08 RWN RR RR WAB/AAD Quality Purpose IFD Document No. Job Number Project Location Item Number Item Name 172-YER-PE-V10-0003 KBR-J6491 Yanbu Export Refinery Project Saudi Arabia 172-D-0009 Benzene Export Storage Tank

Page 2 of 2

Revisions

WORK SCOPE AND LOCATION

* Work areas are:


(S) Notes Fabricators Shop: S1

S in Fabricators Shop, M in Module Yard, F in Field/Site. Suffix indicates notes

S2

S3

External surfaces of carbon steel plates shall be abrasive blast cleaned in accordance with Sa 2.5 and primed with an inorganic zinc preconstruction primer. Shop primer shall comply with either APCS-17A or APCS-17B. Preconstruction primer shall not be applied to surfaces which require an internal lining. All structural steel including platform steel, handrails, ladders, cages, grating, and fasteners shall be hot-dip galvanized per YERP-12-SAMSS-007. Walking surfaces (except grating) that could be exposed to a slippery fluid, such as water or oil, shall have a non-skid coating applied per APCS-12. Flange bolting shall be coated with fluoropolymer/ceramic coating in accordance with YERP-09-SAMSS-107.

(F) Notes Field (Site): F1 All field painting shall be in accordance with referenced project coating specifications. After erection of tank, all external surfaces shall be abrasive blast cleaned and coated as follows: a. Surfaces without a shop applied primer and all field welds, shall be abrasive blast cleaned per Sa 2.5. b. Surfaces with a shop applied primer showing signs of rust shall be abrasive blast cleaned in accordance with Sa 2.5. c. The remaining surfaces with a shop primer shall be thoroughly sweep blast cleaned in accordance with Sa 1. d. Apply primer, intermediate and finish coats of coating system APCS-1C over shop applied preconstruction primer. Damaged coal tar epoxy on underside of tank bottom plates due to welding does not require repair. Repairs to hot dip galvanizing shall be in accordance with YERP-12-SAMSS-007. Detailed Engineering contractor shall obtain from the lining manufacturer his confirmation that the selected lining material is suitable for this service and maximum operating temperature.

F2 F3 F4

This document contains confidential information that is only to be used for the Yanbu Export Refinery Project (YERP) and it is not intended for any other use or any disclosure to third parties or publication without the express written permission of the YERP Project Management Team (PMT). Any reproduction is restricted to those portions and copies strictly necessary in order for recipients to make the intended and permitted use and all such copies shall be returned to YERP PMT for appropriate disposal after completion of such use.