What was the test methodology followed for ETL & BI Testing

What kind of metrics were collected

What were the main risk & challenges you faced and how did MindTree or project team overcome them

Test cases

FAS91 Upgrade (Financial accounting standards-US) The test execution was in line with the SDLC process on the project. The different areas of testing included application testing, warehouse(DART) to downstream application(FAS91) testing(Dart staging to application staging),Outbound testing-(FAS91 to PSGL-Data validation) Some of the DW standards that we have tested includes: Slowly changing dimensions Fact tables testing Transactional tables with aggregations Data cleansing with the reject handling process in place Exceptions validations of ETL. The tools used are SQL developer (PL/SQL) Most of the metrics were collected from QC for tracking the testing progress. On completion of testing the main reports were "Test coverage", "Test Plan report" and "Test Execution report". These report give the test cases created for the project, the final status of the test cases of these test cases executed and the coverage w.r.t these test cases. The complexity here was incorporating the constant design changes because of instable vendor product(Prematics) where we have come up with generic queries which have been packaged(Automation using PL/SQL scripts) where any change in furthur change in ETL were easily handled. The Mock up data has been updated in the staging table as per the scenarios which was a tedious task as the data provided by the client was in adequate. 850 test cases have been created out of which 425 have been automated.

Project Name

What was the test methodology followed for ETL & BI Testing

What kind of metrics were collected

What were the main risk & challenges you faced and how did MindTree or project team overcome them Test cases

DW Platform upgrade(Database migration) The test execution was in line with the SDLC process on the project. The different areas of testing included Source(Dart 9i) and Target (Dart 11g)mapping and Transformation validations(objects are like Tables, Views, Stored procedure, Permission , Grants, Supplement logs and Partition are checked between 9i - 11g) Some of the DW standards that we have tested includes: Transactional tables with aggregations Data cleansing with the reject handling process in place Exceptions validations of ETL. The tools used are Sql data examiner Most of the metrics were collected from QC for tracking the testing progress. On completion of testing the main reports were "Test coverage", "Test Plan report" and "Test Execution report". These report give the test cases created for the project, the final status of the test cases of these test cases executed and the coverage w.r.t these test cases. There were around 40 generic test cases created apart from that the test cases covered buy the tool were 9000(Total number of tables to be tested in DART = 3000 ( assumption 50 tables per Schema)>Total number of check points needs to tested in each table = Schema, Objects , Data (A-B) and (B-C)>Total manual cases to be executed = 3000* 3 (Minimum Check points) = 9000 units

No clarity on the requirements only the Migration from 9i to 11 g was quoted. We had examined lot of options where huge effort was put to arrive at the test strategy and finally decided on the Sql data examiner which was provided great values to client in terms of Effort & Cost. 20 generic test cases(QC) and 9000 using the tool.

UBS

Project Name

What was the test methodology followed for ETL & BI Testing

What kind of metrics were collected

What were the main risk & challenges you faced and how did MindTree or project team overcome them

UBS(Universal banking system which is FLEXCUBE) The test execution was in line with the SDLC process on the project. The different areas of testing included Upstream application testing, upstream to warehouse interfaces, warehouse to downstream interfaces and downstream application testing. Apart from this, business reports created form the universes and warehouse were also tested. [BIF team in SVB]. Some of the DW standards that we have tested includes: Slowly changing dimensions Fact tables testing Transactional tables with aggregations Data cleansing with the reject handling process in place Exceptions validations of ETL. The tools used are SQL developer and Toad for Oracle and Beyond compare and MS excel for data validation. A lot of complex SQL queries were created for validating the data. Most of the metrics were collected from QC for tracking the testing progress. On completion of testing the main reports were "Test coverage", "Test Plan report" and "Test Execution report". These report give the test cases created for the project, the final status of the test cases of these test cases executed and the coverage w.r.t these test cases. Non QC reports included the data extracts of validations. Downstream testing was the main challenge and we overcame this with the help of the application support engineers as that team was also from MindTree