Punch Points list - Unit 1


Area / System Clarifier Reservoir MCC romm Equipment General room Layout Sl. No. 1 2 3 4 5 FWD CUM PTP PMCC - WPPC03 1 2 3 4 5 6 7 1 2 3 4 5 1 1 2 3 4 Cable vault room 1 2 3 1 2 3 4

Pre Treatment Plant MCC

Outdoor Ac Panel LDB Transformer Dry Type (2MVA)- 2 Nos

Clarifier Reservoir pump house

General Room structure

5 CT Make Up pump motor 1 1 2 3 1 2 3 4 1 2 3 4 1 1 2 DM Plant MCC- WPMC02 1 2 3 4 5 1 2 3 4 1 2 3 4 5 UF- A UF-B UF CIP 1 1 1

CT Make Up pump motor 2

CT Make Up pump motor 3

Miscellaneous pump motor DM Plant MCC Room General

MLDB

DM Pant pump house

General

Pre Treatment plant

General

1 2

Department - Electrical Punch Points list - Unit 1 Date: 10-01-13


Defect description No House keeping work done Bus ducts are left on the floor as such and no erection work in progress temporary cable all over the floor Loose foreign material all over the place ex- wooden planks, cable trays, tarpoline sheet, angle , loose bolts. Termination for exaust fan not done and cables left loose. Dust on panel and no house keeping work done. No proper tightning of bolts and few nos of bolts missing. No earthing work done. Air cicuit breaker damaged of panel 2F2 . Tripping relay cover(Vaj) of panel 19F1 not mounted properly. Danger board on few panels missing. MCCB operating handle of panel 11R4 missing. No cleaning and housekeeping done. No earthing work done. Panels with loose bolts found, few were missing. MCCB operating handle of panel 10F1 missing. MCCB operating handle of panel 1R3 missing. Tightning work of doors not done. chipping work in progress and loose cocrete dust all around the transformer. No sign of electrical connection. Connecting busduct tightning work is not proper and its covers are in loose open position. No Eye catching work for eathing in progress. No house keeping. loose cables all around the place. foreign materials staggered all over the place. Strainers all over the floor. No house keeping and cleaning work. Foreign materials like wooden plank, scaffolds, tarpolene alln over the place. No earthing connection for any of the LCS provided.

L.T.PANELS
Identification date 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013

General arrangement of the pump house is not proper. No mechanical support for power cable. Lots of foreign material in the cable trench. No cable work for actuators. No motor installed No Earthing work seen. No cable layout. loose cable and material all around the pump. No motor installed No Earthing work seen. No cable layout. loose cable and material all around the pump. No earthing work done Base chekker plates not in positon. Foreign material like GI pipe, elbow , nipple , hose pipe bundles are kept. Earthing done but not proper Loose bolts and open panels found Master Relay Display of panel no 15F1 broken. dust on panel. MCCB operating handel of panel 7R3 not working properly. No Earthing done Dent mark on the panel door. Few bolts are loose and missing Panel door is open and bolts found loose on the floor Loose cables all over the floor along with temporary connection. Earthing of no LCS is done No house keeping. Conduit pipe for power cables not being used and found in damaged condition in which it is in place. No proper mounting of motor covers. Earthing connection not done. Earthing connection not done. Earthing connection not done.

10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013 10.01.2013

No cabling and Earthing for any electrical equipment Loose cable and foreign material all over the place.

10.01.2013 10.01.2013

Identified by Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh

Updated on: Compliance Vendor / Contractor date

Compilance certified by

Manindra Singh Manindra Singh Manindra Singh Manindra Singh

Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh

Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh

Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh Manindra Singh

Manindra Singh Manindra Singh