FACULTAD DE INGENIERA
CARRERA DE INGENIERIA CIVIL
PROYECTO DE GRADO
CALCULO Y DISEO ESTRUCTURAL DEL
ESTADIO ATLETICO ALTO IRPAVI
TOMO I
Postulante:
Erik Jos, ESTRADA CALLIZAYA
Tutor:
Ing. Miguel, TRUJILLO MALLEA
LA PAZ - BOLIVIA
RESUMEN
CALCULO Y DISEO ESTRUCTURAL DEL
ESTADIO ATLTICO ALTO IRPAVI
SUMMARY
ALCULATE AND STRUCTURAL DESIGN GIVES THE ONE
ATHLETIC STADIUM HIGH IRPAVI
The project is located in the Department he/she gives The Peace (seat of government), County
Murillo, in the Area gives High Irpavi corresponding to the South area.
This project gives degree it consists on the design and calculation gives a structure with
longitudinal beams he/she gives concrete pretensado and to compare it entirely with another
structure gives armed concrete for an Athletic Stadium; in both solutions a metallic structure is
adopted for the cover. In the project the low calculation the different stock is made, as being a
load he/she gives important exploitation and including the stock gives wind as well as the seismic
action according to characteristic parameters gives the place he/she gives location.
In the analysis, use has been made he/she gives the package he/she gives structural analysis SAP
2000 V.9.0.3.
Fact a study and an evaluation gives the data he/she gives exit emitted by the structural
spectrometric oil analysis, it is determined that the most preponderant horizontal action, and that
it governs in this case, it is the action he/she gives the wind, for the solicitations to that this
subjected one the elements give the structure in study for this condition, one can affirm with
enough certainty that the structure in question, calculated to the certain wind for the city gives
The Peace, it can support a seismic risk he/she gives intensity V, (Merrcalli-modified). This result
confirms the preponderance he/she gives the stock he/she gives the wind against he/she gives
them the earthquake.
Although the sismicidad gives area, in the city he/she gives The Peace it is relatively low and
without ending up imposing rules antissmicas for the constructions, the very executed works,
give good quality and with an appropriate calculation to the actions gives the wind he/she gives
design (V=132 Km/hr), they would not be affected and they could support the seismic risk.
Give the comparison he/she gives both alternatives you can conclude that, in this case, the
solution gives to use longitudinal beams he/she gives concrete pretensado it is 6 % more
economic that the alternative gives armed concrete and that, also, its run-time is smaller in around
10%. he/she explains to It the one for that today in day is particularly every bigger time the
works that are faced by means of concrete pretensado, in the case he/she gives lights and bigger
loads.
PROYECTO DE GRADO
1
1
2
2
3
3
3
3
3
5
5
8
8
9
11
11
12
12
14
14
14
15
15
16
16
16
16
16
17
17
17
17
18
18
18
21
21
22
22
23
23
24
25
26
PROYECTO DE GRADO
3.
4.
5.
6.
ii
PROYECTO DE GRADO
78
6.5.1. CLCULO DE LAS SOLICITACIONES DE VIENTO BLOQUE 1 Y 3 78
6.5.2. CLCULO DE LAS SOLICITACIONES DE VIENTO BLOQUE 2
79
6.6. ANLISIS SSMICO
80
6.6.1. DETERMINACIN DEL MOMENTO POLAR Y CENTRO DE MASA 80
6.6.2. ESPECTRO DE RESPUESTA
81
6.7. DISEO DE LOSA ARMADA EN UNA DIRECCIN
82
6.7.1. ESQUEMA DE DESCARGAS SOBRE LOSAS
83
6.7.2. ESTADOS DE CARGAS EN LOSAS
84
6.8. PRETENSADO
6.8.1. DISEO DE VIGAS PRETENSADAS BLOQUE 1 Y 3
6.8.1.1. UBICACIN DE VIGAS BLOQUE 1 Y 3
6.8.1.2. GEOMETRIA DE VIGA TIPO
6.8.1.3. DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
6.8.1.4. TRAYECTORIA DEL CABLE
6.8.1.5. GRAFICO DIAGRAMA DE TENSIONES CABLE DE ACERO
6.8.1.6. CALCULO DE LAS PERDIDAS SEGN ACI-318-02
6.8.2. DISEO DE VIGAS PRETENSADAS BLOQUE 2
6.8.2.1. UBICACIN DE VIGAS BLOQUE 2
6.8.2.2. GEOMETRIA DE VIGA TIPO
6.8.2.3. DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
6.8.2.4. TRAYECTORIA DEL CABLE
6.8.2.5. GRAFICO DIAGRAMA DE TENSIONES CABLE DE ACERO
6.8.2.6. CALCULO DE LAS PERDIDAS SEGN ACI-318-02
88
89
90
91
92
93
99
100
101
102
103
104
110
111
111
111
111
111
113
114
115
ASPECTOS GENERALES
PROGRAMA DE CALCULO
METODOLOGA DE CLCULO
TABLA DE REACCIONES BLOQUE 1
TABLA DE REACCIONES BLOQUE 2
124
124
124
124
125
126
127
6.10.1.
6.10.2.
6.10.3.
6.10.4.
6.10.5.
iii
127
135
PROYECTO DE GRADO
iv
136
137
138
139
157
161
162
163
164
187
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
respectivo apoyo a nuestra seleccin para los trabajos de entrenamiento y los partidos de
preparacin de la seleccin Boliviana.
Segn opiniones especficas de tcnicos, sealaron que el acortamiento de las dos
primeras filas de gradera en las curvas y el sector de general, podran afectar tambin la
estructura en su totalidad de las graderas, ya que podra ser debilitado el punto de apoyo o
anclaje, sin embargo este aspecto debera ser confirmado por un estudio completo de las
estructuras.
El tema de la curvatura, es decir el radio de la pista, representaba otra dificultad con, menores
posibilidades de ser resuelto, ya que un cambio en la curvatura implicaba un rediseo en su forma
que afectara a la estructura misma del estadio Hernando Siles
El rea de calentamiento, representaba otra gran dificultad por no existir reas libres para su
habilitacin.
El 26 de octubre de 2004 el seor Juan A. Scarpin, emiti su informe al Comit Organizador de
los VIII Juegos ODESUR 2006, en el que hizo sus observaciones sobre las condiciones de la
pista atltica del Estadio Hernando Siles, habiendo concluido que la misma no cumple con las
condiciones mnimas exigidas por la IAAF, recomendndose la construccin de una nueva
instalacin atltica acorde a las normas del organismo internacional de atletismo.
Con estas consideraciones las autoridades de la Prefectura a la Cabeza del Prefecto en consulta
con el Comit Organizador, decidieron que la nica alternativa consista en la construccin de
una pista atltica, que permita mantener la sede de los VIII Juegos ODESUR 2006
1.3. OBJETIVOS
1.3.1. OBJETIVO GENERAL
El objetivo general de este proyecto de grado consiste en la elaboracin de una
estructura de hormign armado y comprala con otra de hormign pretensado para un estadio
deportivo, que complementariamente tendr otras unidades deportivas como: pista sinttica de
atletismo, fosa de obstculos, lanzamiento de jabalina, salto con garrocha, lanzamiento de bala,
salto triple y de longitud, lanzamiento de disco y martillo, y otros. El estadio contar con
facilidad de instalaciones elctricas e hidrosanitarias, graderas, camerinos y un rea
administrativa.
El alcance del proyecto solo abarcar el diseo estructural y no los otros componentes de diseo,
las mismas que estn ms bien involucradas en el rea arquitectnica y de instalaciones.
_____________________________________________________________________________________
- 2 2-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
BOLIVIA
DEPTO. DE
LA PAZ
_____________________________________________________________________________________
- 4 4-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
1.6.1.1.Departamento de La Paz
El proyecto se encuentra ubicado en el departamento de La Paz, este departamento fue creado por
Decreto Supremo de 23 de enero de 1826, durante el gobierno del Mariscal Antonio Jos de
Sucre y esta situado al Oeste de la Repblica de Bolivia. Limita al Norte con el departamento de
Pando, al Sud con el departamento de Oruro, al Este con los departamentos de Cochabamba y
Beni y al Oeste con las repblicas del Per y Chile. (Ver Mapa 1)
Mapa 1: Departamento de La Paz
PROVINCIA
MURILLO
1.6.1.2.Ciudad de La Paz
La ciudad de La Paz, Seccin Capital de la Provincia Murillo, es la sede de Gobierno de la
Republica de Bolivia y una de las principales ciudades del pas. Al Norte limita con la provincia
de Larecaja, al Este limita con la provincia Los Andes y con El Alto (cuarta seccin de la
Provincia Murillo), al Oeste con las Provincias de Caranavi, Nor Yungas, Sud Yungas; al Sur con
Palca, Mecapaca y Achocalla (primera, segunda y tercera seccin de la Provincia Murillo). (Ver
Mapa 2)
_____________________________________________________________________________________
- 5 5-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
CIUDAD DE
LA PAZ
En el rea de influencia directa del proyecto se encuentran las zonas aledaas a Alto Irpavi, que
son las siguientes:
Irpavi
Koani
Calacoto
Obrajes
Zona Central
Dentro de la zona de influencia indirecta del proyecto, se encuentran todas las zonas de las
ciudades de La Paz y El Alto. Adems, se debe mencionar que por ser un escenario deportivo con
caractersticas internacionales, la poblacin deportiva del departamento de La Paz y de Bolivia
pueden resultar como beneficiarios indirectos del proyecto.
_____________________________________________________________________________________
- 6 6-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
ESTADIO
ATLTICO
_____________________________________________________________________________________
- 7 7-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
TIPO DE RED
TOTAL
(Km.)
13
33
15
25
ASFALTO
(km.)
13
33
Fundamental
Complementaria
Vecinal
La Paz
Fundamental
25
Complementaria
Vecinal
62
FUENTE: PDD Altiplano Norte, Valles Interandinos 1997.
RIPIO
(km)
TIERRA
(km)
15
62
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
6) Consideraciones Hidrogeolgicas:
Durante la excavacin de pozos en situ, puede establecerse las manifestaciones de
flujo de aguas subterrneas, las posibles filtraciones que deben ser tomadas en
cuenta para la realizacin de obras de drenaje (sub-drenes).
Los diferentes ensayos de estudio de suelos fue realizado por LABOMAT (ver
anexos).
1.6.5. TOPOGRAFA
El levantamiento topogrfico tiene por finalidad determinar la configuracin de la
superficie del terreno de la zona de proyecto, obtenindose la siguiente informacin:
configuracin del terreno natural, relevamiento, diferencias de nivel, perfiles
longitudinales.
La delimitacin de la zona de levantamiento est en funcin a los requerimientos del
proyecto.
Para el proyecto definitivo, adicionalmente deber realizarse un levantamiento detallado
de toda el rea correspondiente a la zona donde se prev la localizacin de las obras
a realizarse, e indicar las propiedades a ser afectadas as como los servicios como ser agua
potable, alcantarillado, telfonos, etc.
1.6.6. HIDROLOGA E HIDRULICA
Esta parte del estudio tiene por finalidad evaluar las condiciones de escurrimiento
superficial del agua, para el diseo de las obras de drenaje.
Red Hidrogrfica.
La red hidrogrfica muestra un conjunto de torrenteras, canalizaciones, embovedados, en
esta se puede establecer el tipo de cuenca al que pertenece la zona de proyecto.
_____________________________________________________________________________________
- 1111
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Estudios pluviomtricos.
Mediante esta informacin se obtienen los registros de precipitaciones de las estaciones y
puede establecerse los periodos de retorno para el diseo de obras destinadas a evacuar las
aguas superficiales.
1.7. LIMITACIONES
El marco de referencia del proyecto de grado est limitado por el contenido de la Norma
Boliviana del Hormign Armado CBH-87, pero se tomara tambin en cuenta a nivel de consulta
y actualizacin las siguientes normas:
Una de las limitaciones que podramos encontrar en este proyecto es el aspecto econmico, ya
que se debera disear un Estadio de Atletismo que cumpla con todas las condiciones necesarias y
que adems sea relativamente accesible al presupuesto de la prefectura de La Paz.
Otra de las limitaciones la impone el espacio para las curvas Norte y Sur ya que el espacio est
limitado en una parte por la EMI y en la otra por el Cartodromo.
1.8. DATOS DE PROYECTO
Proyecto:
CALCULO Y DISEO ESTRUCTURAL DEL ESTADIO ATLTICO ALTO IRPAVI
Ubicacin:
Alto Irpavi
Zona Sur, ciudad de La Paz Bolivia.
Descripcin Tcnica:
El centro Regional de Desarrollo Asociacin Internacional de Federaciones Atlticas, por
intermedio de su Director Juan A. Acarpin, seal que las caractersticas con que debe contar una
instalacin de atletismo para los Juegos ODESUR 2006 deben estar de acuerdo a las
consideraciones del Manual de la I.A.A.F. Track and Field Facilities Manual, edicin 2003.
_____________________________________________________________________________________
- 1212
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
La categora de construccin requerida segn el tipo de competencia, para los Juegos ODESUR
sera necesaria una instalacin categora II. Que contara con las siguientes instalaciones.
Pista de una longitud estndar 400 m. La pista tendr dos rectas paralelas de 84.39 m y
dos curvas cuyos radios sern igual a 36.80m y con 8 carriles 1.22 m.
Foso de agua para carrera con obstculos (steeplechase)
2 correderas para salto largo y triple (adyacentes y con igual direccin para pruebas
simultneas en similares condiciones)
2 sectores para salto en alto
2 correderas para salto con garrocha (adyacentes y con igual direccin para pruebas
simultneas en similares condiciones)
1 plataforma para lanzamiento de disco y martillo (crculos separados o concntricos)
1 plataforma adicional para disco solamente
2 correderas para lanzamiento de jabalina (con direcciones opuestas)
2 plataformas para lanzamiento de peso (bala)
Instalaciones para el funcionamiento de autoridades, de servicios de competencia (para
atletas, jueces de control, control tcnico, etc.) y para la prensa (escrita, oral y televisiva)
Instalaciones para espectadores
Instalacin para calentamiento previo con piso igual al de competencia, consistente en una
pista de 200 metros con cuatro andariveles ovales y 4 rectos: instalaciones para saltos
(largo triple, en alto y con garrocha); instalaciones para jabalina, disco y martillo con
campo para lanzamientos; 1 instalacin para lanzamiento de peso (bala)
Gimnasio auxiliar para acondicionamiento y fisioterapia con superficie mnima de 200
metros cuadrados.
Estructura:
La estructura estar en base a hormign armado contando adicionalmente con elementos
prefabricados y elementos de hormign pretensado.
_____________________________________________________________________________________
- 1313
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
9 Que las vigas y las columnas estn en el mismo plano y que sus ejes se intersecten,
adems que ningn elemento estructural cambie bruscamente de dimensiones y refuerzos.
9 Aun en los casos de que el proyecto arquitectnico imponga ciertas irregularidades se
deben tomar medidas que mejoren el comportamiento ssmico.
9 Cuando ms hiperesttico sea el sistema estructural mayor ser su posibilidad de que, sin
convertirse en un mecanismo inestable, se formen articulaciones plsticas en l, con alta
capacidad de absorcin de energa, mediante deformaciones inelsticas, con el
consecuente comportamiento adecuado ante los sismos.
9 En la estructura en estudio adems de los prticos o marcos con nudos rgidos, no ser
necesario utilizar pantallas de contraventeo, para resistir cargas laterales ya que la altura
de la estructura no es considerable.
9 Para fundaciones se evitar, combinar el uso de sistemas superficiales y profundos, y que
las cargas verticales se distribuyan simtricamente buscndose que la cimentacin tenga
una accin de conjunto, que limite en lo posible los desplazamientos diferenciales
horizontales y verticales ligando entre s, las zapatas mediante vigas de arriostramiento.
2.3. SISTEMA ESTRUCTURAL
2.3.1. MTODO DE CLCULO
Para evaluar las solicitaciones que el viento y el sismo introducen en la estructura, se utilizara
un programa de cmputo poderoso muy conocido en nuestro medio, como es el SAP 2000
V 9.0.1. Programa que realiza el anlisis tridimensional de la estructura tanto para viento
como para el anlisis ssmico, a base de barras y placas que simulan las vigas, columnas y
losas, con lo cual es posible modelar de manera muy detallada la estructura y obtener una
estimacin muy aproximada de su respuesta.
2.3.2. ESTADOS DE CARGA Y COMBINACIONES DE CARGA
Para el calculo de las solicitaciones en el anlisis tridimensional, la estructura se carga en su
totalidad, con los coeficientes o los factores de carga permitidos por los reglamentos y casi
todos los reglamentos de construccin admiten que al calcular los esfuerzos del sismo no se
sumen a los que provoca el viento, que tambin obra horizontalmente.
2.4. MEMORIA DESCRIPTIVA
2.4.1. DESCRIPCIN
La edificacin consta de planta Baja destinada a camerinos, gimnasio, enfermera, depsito y
salas administrativas, primera planta destinada a sala de conferencia, cafetera y baos, y la
segunda Planta destinada a casetas de periodistas, palco y baos.
_____________________________________________________________________________________
- 1616
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Balcones
Baos
Cocinas
Comedores
Gimnasios
Oficinas
2,5
Rellanos y corredores
7,5
Vestuarios
2,5
Los balcones volados de toda clase de edificios se calcularn con una sobrecarga superficial,
actuando en toda su rea, igual a la de las habitaciones con que comunican, ms una sobrecarga
lineal, actuando en sus bordes frontales, de 2 kN/m.
Esfuerzos horizontales en barandas de escaleras y balcones 1[KN/m2] aplicada a lo largo del
borde superior.
2.4.3. VIENTO
Para la accin global del viento se determinar la fuerza de arrastre correspondiente a la
velocidad en la direccin paralela del viento, dejando de lado la fuerza de deriva o la accin
perpendicular de sta, por considerar que el edificio en cuestin no es una construccin
esbelta y que las oscilaciones laterales pueden ser desestimadas.
La norma francesa define que la fuerza de arrastre viene dada por:
T = Ct*B*D*Q*Li
Donde el factor que determina la variacin de la fuerza es la cota o altura del punto
considerado conjuntamente con la presin debida a la velocidad del viento:
_____________________________________________________________________________________
- 1818
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Q = 2.5*qe*Ks*(z + 18)/(z+60)
Z es la altura o cota del punto considerado y la presin de viento corregido para una altura de la
ciudad de La Paz cuya densidad del aire es = 0.85741 [Kg/m3], y g = 9.775 [m/seg2].
El concepto bsico de la transformacin del viento a presin puede ser obtenida de la ley general
de Bernoulli para un fluido ideal:
v12
v 22
+ p1 = p 2 +
2g
2g
donde:
p1 y p2 = Presiones que actan en las secciones 1 y 2 en una corriente de aire.
v1 y v2 = Son las velocidades del viento en las mismas secciones 1 y 2.
= densidad de la masa de aire seco la cual varia con la ecuacin de Clapeyron, con la
temperatura y la altitud de acuerdo a la ley de Hooke.
Si el flujo de aire de la masa es forzado a pararse por una superficie normal al viento, v2 se hace
cero, y la presin sobre la superficie resulta:
v12
p 2 = p1 +
2g
y la sobrepresin sobre la superficie es (p2 p1), de donde la presin ejercida por el libre flujo
del aire puede ser tomada como:
v12
q=
2g
de donde la presin del viento en La Paz resulta:
q=
* v2
25.92 * g
Ks = funcin de sitio (sitio normal = planicie de gran extensin con desniveles poco importantes
y con pendiente inferior al 10%)
Ct = Depende de la forma de la estructura (estructura de base rectangular)
B = Coeficiente Dinmico que depende del periodo del modo fundamental de oscilacin propio
de la construccin y del nivel considerado:
B = 1 + e*t
e = coeficiente de respuesta que depende del periodo propio de vibracin y del grado de
amortiguamiento del material.
t = Coeficiente de Pulsacin
D = Coeficiente de reduccin que considera el efecto de las dimensiones en funcin de la altura
de la construccin y del nivel considerado, ste coeficiente resulta de la observacin de que la
fuerza del viento actu por sectores localizados de dimensiones relativamente pequeas, en obras
_____________________________________________________________________________________
- 1919
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
de grandes dimensiones existe una menor probabilidad de que el viento golpee en la totalidad de
la rea con la misma presin.
Li = Dimensin o ancho de la superficie considerada perpendicular a la direccin del viento.
Para la determinacin de cada uno de los coeficientes adimensionales: Ks, Ct, e, t, D, se utiliza
grficos del reglamento, Figuras: 1 y 2 (ver anexos)
De esta manera se determina la fuerza de arrastre por unidad de longitud y que multiplicado por
la altura del entrepiso se consigue la fuerza total que acta en cada nivel del edificio.
Para la cubierta segn la American Society of Civil Engineers, para determinar la presin del
viento en superficies planas inclinadas con relacin al viento, se tiene: p = c*q donde c est en
funcin de , el ngulo de inclinacin de la cubierta. Los valores de c pueden obtenerse del
grfico siguiente. Se indican las curvas de los valores A.S.C.E. ajustados, basados en la
existencia de presiones o succiones exteriores y una succin interna de 22.0 [Kg/m2].
Barlovento 1
+1.5
Viento
Sotavento 2
+1.0
+0.5
0.0
-0.28
-0.5
-1.0
10
20
30
40
50
60
70
80
90
Valores de , en grados
_____________________________________________________________________________________
- 2020
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
2.4.4.
SISMO
2.4.4.1.Anlisis dinmico
ESPECTRO DE DISEO
Para determinar la carga dinmica, se recurre al espectro de diseo propuesto por NCh 433.
Donde las ordenadas del espectro de diseo estn dadas por la siguiente expresin:
Sa =
Tn
1 + 4.5
To
=
3
Tn
1+
To
IAo
R*
(1)
(2)
R* = 1 +
T*
T*
0.10To +
Ro
(3)
Para efectos de esta Norma, los perfiles de suelo se clasifican tomando en cuenta las propiedades
mecnicas del suelo, el espesor del estrato, el periodo fundamental de vibracin y la velocidad de
propagacin de las ondas de corte.
Para el caso particular corresponde el perfil tipo S3: Suelos flexibles o con estratos de gran
espesor.
Donde:
Sa = Aceleracin espectral.
Tn = Periodo espectral.
I = 1.2 determinado por el factor de uso e importancia categora B, Edificaciones importantes.
Ao/g = 0.025 Coeficiente de aceleracin, tomado del grafico: Ssmicidad, distribucin de
Aceleraciones correspondiente a la zona ssmica 1.
= Coeficiente de importancia de la estructura, dada por la ecuacin (2).
R* = Factor de reduccin de la aceleracin espectral, dada por ecuacin (3).
Ro = 7 Coeficiente de reduccin para estructuras regulares, prticos de concreto armado.
To = 0.75; p = 1; T* = 0.85, Parmetro relativo al tipo de suelo de fundacin, de acuerdo al
perfil del suelo.
Se adopta, para el presente estudio, El Espectro de Diseo representativo, para este tipo de suelo
coincidente con el de la estructura, utilizando el coeficiente de aceleracin para esta ciudad, y se
grafica en la pgina correspondiente.
Ver hoja de: Espectro de Diseo propuesto.
_____________________________________________________________________________________
- 2121
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
2.4.5.2.Linealidad y no Linealidad
Una estructura tiene un comportamiento lineal si todos sus movimientos y esfuerzos son
funciones lineales de las cargas aplicadas.
Hay tres causas importantes de comportamiento no lineal de una estructura: La primera, es el
comportamiento no lineal del material de que est formada la estructura.
La segunda causa es generalmente conocida con la denominacin de "grandes deformaciones".
En el anlisis lineal es necesario suponer que los movimientos de la estructura son pequeos
comparados con sus dimensiones, de forma que la geometra de la estructura no se altera
significativamente por el proceso de carga. Ms exactamente, se supone vlido expresar las
ecuaciones de equilibrio utilizando longitudes, ngulos, etc., correspondientes a la estructura no
_____________________________________________________________________________________
- 2222
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
calculando una estructura hiperesttica, es necesario utilizar las tres condiciones si se desean
obtener esfuerzos o movimientos.
En un sentido amplio, pueden clasificarse los mtodos de clculo de estructuras de acuerdo con
el orden en el cual se aplican las condiciones de equilibrio y compatibilidad.
Los mtodos en los cuales se utilizan primero las condiciones de compatibilidad dan origen a las
ecuaciones de equilibrio de nudos y se llaman mtodos de equilibrio o de los movimientos
(desplazamientos).
Los mtodos en los cuales las condiciones de equilibrio son primeramente satisfechas conducen
a las ecuaciones de compatibilidad de movimientos y se denominan mtodos de compatibilidad o
de las fuerzas.
Para comparar los mtodos de equilibrio y compatibilidad, lo ms inmediato resulta considerar el
nmero de ecuaciones a resolver. En el anlisis de una estructura por equilibrio, el nmero de
ecuaciones es igual al grado de libertad, mientras que en el anlisis por compatibilidad es igual al
nmero de hiperestticas. Sin embargo, la comparacin en estos trminos hoy es secundaria, por la
facilidad con que pueden ser resueltos grandes sistemas de ecuaciones con las computadoras
modernas. Es ms adecuado basarse en una comparacin de la cantidad de trabajo a efectuar para
establecer las ecuaciones y la facilidad con este trabajo puede ser sistematizado, En este sentido,
las incgnitas bsicas del mtodo de la compatibilidad son un cierto nmero de fuerzas y
momentos que deben escogerse de acuerdo con ciertas reglas. Cualquier programa general de
clculo de estructuras en una computadora, basado en el mtodo de compatibilidad, debe incluir
un proceso sistemtico para determinar el nmero y situacin de estas fuerzas y momentos.
A continuacin se hace una descripcin general del mtodo del equilibrio o de los movimientos
(el mtodo de las fuerzas conceptualmente varia muy poco).
La esencia de los mtodos de equilibrio, relativo a las estructuras reticulares, consiste en
considerar como incgnitas bsicas los movimientos en los nudos.
El primer paso es expresar los esfuerzos de los extremos de las piezas, en funcin de los
correspondientes movimientos de dichos extremos. Si la estructura es lineal, los esfuerzos en los
extremos de las barras sern funciones lineales de los movimientos de los mismos, siendo los
coeficientes de los movimientos funciones de las propiedades del material y dimensiones de la
pieza.
El paso siguiente utiliza las condiciones de compatibilidad para determinar los movimientos de
los extremos de piezas, en trminos de los movimientos de los nudos.As, se obtienen expresiones
de los esfuerzos que actan en los extremos de piezas, en funcin de los movimientos incgnitas
de estos extremos, los cuales satisfacen las ecuaciones de tensin-deformacin 1) y las ecuaciones
de compatibilidad 2).Estas expresiones de los esfuerzos extremos de barras se sustituyen,
_____________________________________________________________________________________
- 2424
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
entonces, en las ecuaciones de equilibrio del nudo. El resultado es un sistema de ecuaciones -las
ecuaciones esfuerzos-movimientos de la estructura- que relacionan los esfuerzos conocidos de los
nudos con los movimientos desconocidos de los mismos. Habr una ecuacin para cada
componente del movimiento del nudo, y el trmino independiente ser la componente de la carga
aplicada.
Resolviendo este sistema se obtienen los valores de los movimientos incgnita de los nudos. Una
vez hecho esto, las expresiones ya utilizadas al establecer las ecuaciones de equilibrio pueden
emplearse para hallar los esfuerzos en los extremos de las barras.
Se observa que en la aplicacin del mtodo del equilibrio son siempre los movimientos los que
primero se deducen. El nmero de ecuaciones a resolver es igual al nmero total de movimientos
independientes desconocidos, el grado de libertad de la estructura, como a menudo se llama
2.4.5.6.Matriz de Rigidez
Las ecuaciones que ligan las fuerzas y los movimientos de los extremes de una barra de una
estructura pueden escribirse de diversas formas. En el mtodo del equilibrio, la forma apropiada
consiste en expresar las fuerzas de extremo p1, p2 en funcin de los movimientos d1, d2. Para
piezas que presentan un comportamiento lineal, estas expresiones tienen la forma general:
P1 = K11d1 + K12d2 (1)
P2 = K21d1 + K22d2 (2)
Donde en general:
x
y
z
d=
x
y
z
px
py
pz
p=
mx
my
mz
Y el orden de las matrices K11, etc., depende del mismo nmero de componentes de los vectores
fuerza y movimiento.
El mtodo del equilibrio, emplea las condiciones de compatibilidad de movimientos y
equilibrio de nudos, para obtener el sistema de ecuaciones cargas-movimientos de una estructura
completa, a partir de las ecuaciones fuerzas-movimientos anteriores de las piezas individuales. Este
sistema de ecuaciones puede escribirse:
P = K d (3)
En el que P indica el conjunto total de cargas aplicadas en los nudos y d el sistema
correspondiente de movimientos desconocidos de dichos nudos.
_____________________________________________________________________________________
- 2525
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
De esta manera es que el mtodo del equilibrio emplea las relaciones esfuerzos-movimientos
para las barras, expresando los esfuerzos de los extremos en funcin de los movimientos de
dichos extremos.
Al tratar el problema elemental de la extensin de un muelle, es conveniente introducir el concepto
de "rigidez" a travs de la ecuacin:
Fuerza = rigidez x movimiento
Es natural emplear este concepto en un sentido ms general cuando se refiere a ecuaciones como las
anteriores. As se llamar a K11, K12, etc., matrices de rigidez de la barra, y a K, matriz rigidez de una
estructura.
2.4.5.7.Vector deformacin
El vector deformacin de una pieza se define como el movimiento relativo del extremo 2 respecto
del 1, es decir, el movimiento que experimentara el extremo 2 suponiendo rgidamente
empotrado el extremo 1. Este vector se designa por e. As, se puede escribir la ecuacin (2)
anterior en la forma:
P2 = K22 e
(4)
Obteniendo p1, de p2 mediante la simple consideracin del equilibrio de la barra. Puesto que esta
definida unvocamente para cualquier valor de P2, se puede invertir (4) obtenindose,
e = F22 p2
(5)
En la que F22 es la inversa de K22. Por analoga con el simple concepto de flexibilidad,
llamaremos a F22 matriz flexibilidad. En este proceso, el movimiento genrico de una pieza se ha
supuesto como la suma de una deformacin, unvocamente definida por la carga y las
propiedades elsticas de la pieza, y un movimiento de conjunto como cuerpo rgido, que resulta
independiente de estas propiedades elsticas.
Aunque las ecuaciones (1) y (2) de una barra son singulares y, por consiguiente, no puede
realizarse su inversin, las ecuaciones cargas-movimientos (3) tendrn una solucin nica, en el
supuesto que las piezas forman una estructura y no un mecanismo. En otras palabras, puede
establecerse en trminos fsicos que la matriz ser siempre no singular, de forma que (3) puede
invertirse, escribindose de la forma
d = K-1 P = FP (6)
Denominando a F matriz flexibilidad de una estructura.
La notacin utilizada para fuerzas y movimientos permite escribir las ecuaciones de equilibrio y
compatibilidad en forma muy sencilla. Por ejemplo, consideremos las condiciones de un nudo
tpico X de una estructura.
_____________________________________________________________________________________
- 2626
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Px
(7)
(8)
Puede parecer a primera vista que no hay ninguna relacin entre estas ecuaciones (7) y (8). Sin
embargo, existe de hecho una relacin extremadamente importante, siempre que las condiciones
de equilibrio y compatibilidad sean satisfechas.
Escribiendo las correspondientes fuerzas y movimientos de extremos de barras en la forma:
P'2a
P'm P'2b
P'
1c
d'2a
d'm d'2b
d'
1c
En el cual el subndice m indica barras. Las ecuaciones (7) y (8) se pueden escribir entonces
Px = [I I I]p`m
I
d'm I dx
I
(9)
( 10)
A partir de las cuales, vemos que la matriz (en este caso simplemente una sola fila de matrices
unidad) que relaciona los vectores carga del nudo con los vectores fuerza de extremos de
barras es la transpuesta de la matriz que liga los correspondientes vectores movimiento.
Se demuestra el resultado de la siguiente manera. Escribimos (9) en la forma
Px = C P`m (11)
_____________________________________________________________________________________
- 2727
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
_____________________________________________________________________________________
- 2828
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
El valor real prctico y la popularidad del mtodo de los elementos finitos no se habra alcanzado
si no fuera por la tecnologa actual de los ordenadores que tienen la capacidad de resolucin de
miles de funciones matemticas en pocos minutos.
En la actualidad los programas de clculo de estructuras utilizan los ms avanzados conceptos de
Anlisis Matricial, Mtodo de los Elementos Finitos, Mtodo de la Dinmica de las Estructuras,
todos ellos asociados a modernas tcnicas de Anlisis Numrico y Mtodos Computacionales.
2.4.5.10. Convencin de signos fuerzas y momentos utilizados en el proyecto
_____________________________________________________________________________________
- 2929
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
(252 MPa)
E = 203400 MPa
2.4.6.2.Coeficientes de seguridad
La capacidad portante del terreno es de 2 Kg/cm2 segn estudio de suelos (ver anexos)
_____________________________________________________________________________________
- 3030
-
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
3. CUBIERTA
3.1. DISEO DE LARGUEROS
3.1.1. DETERMINACIN DE DATOS GEOMTRICOS
Longitud de cubierta: 2.40 [m]
L = 13.37 [m]
donde = 3.91
entonces:
Li = 13.40 [m]
Determinacin del numero de hojas:
13.40/2.40 = 5.58
Li L
0.91
[m]
1.80 [m]
e = 2.20 [m]
e adoptado = 1.10 [m]
3.1.3. DISEO DE LARGUEROS
Cargas verticales:
Lamina asfaltica long. 2.40 [m] =
2
2.80 [Kg/m ]
Largueros C100X50X15X3 =
4.50 [Kg/m ]
10.00 [Kg/m ]
Carga de nieve =
50.00 [Kg/m ]
67.30 [Kg/m2]
_____________________________________________________________________________________
31
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Carga de viento:
Velocidad del viento = 132.00 [Km/h]
q =(0.85741/253.368)*V 2 =
58.96
[Kg/m2]
C1 =
C2 =
-0.5
-0.28
barlovento
sotavento
P = C*q
P1 =
-29.48 [Kg/m2]
2
P2 =
-16.51 [Kg/m ]
P=
2
-29.48 [Kg/m ]
Carga de viento =
succin
2
-29.48 [Kg/m ]
Wgy
5.40
2
maxMy
Wgy l
268.58 [Kg-m]
Eje X:
Wgx
5.40
2
maxMx
Wgx l
8
18.36 [Kg-m]
Factor de conversiin:
1kg-m =
7.23 lb-pie
132.78 lb-pie
0.13 Klb-pie
_____________________________________________________________________________________
32
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
3.1.5. DISEO:
Por Flexin Combinada:
fbx
0.66Fx
fby
0.75 Fy
Fy = 36.00 Ksi
Perfil:
Sx=
C100X50X15X3
1.19 pul
fbx
maxMy
Sx
19.59 [Ksi]
maxMx
4.19 [Ksi]
Sy
0.82
fby
0.75 Fy
0.16
0.98 1
C 100x50x15x3
15mm
100mm
3mm
50mm
_____________________________________________________________________________________
33
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Teniendo en cuenta la separacin entre largueros es igual a 1.10 metros, se tiene las cargas por
metro lineal:
Con estas cargas y con la teora anteriormente expuesta se procede a introducir el modelo en el
programa SAP 2000 con el cual se realiza el diseo de modo de obtener resultados ptimos.
Por razones prcticas y de espacio solo se imprime los resultados de una cercha tipo central, la
cual corresponde a la segunda cercha.
_____________________________________________________________________________________
- 3434
-
SAP2000
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
35
SAP2000
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
36
SAP2000
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
37
SAP2000 v9.0.3 - File:cubierta - Cold-Formed Steel P-M Interaction Ratios (Color Only) (AISI-ASD96) - Kgf, m, C Units
SAP2000
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
38
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
9.0.3
ProgLevel
Text
CurrUnits
Text
SteelCode
Text
Advanced
Kgf, m, C
AISI-ASD96
Load case
Load case
Load case
Load case
Load case
Carga Muerta
Carga Viva
Carga de Viento
Carga Viva en Volado
Carga Viva en Tramo
CaseType
Text
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Linear Static
Response Combo
Response Combo
Response Combo
Response Combo
Response Combo
Response Combo
CaseName
Text
CM
CM
CV
CM
CV
V
CM
CVvolado
CM
CVvolado
CM
CVtramo
COMB 1
COMB 2
COMB 3
COMB 4
COMB 5
COMB 6
ScaleFactor
Unitless
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
ColdDesign
Yes/No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
_____________________________________________________________________________________
39
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
TABLE: Connectivity - Frame
Frame
JointI
JointJ
Length
Text
Text
Text
cm
53
51
52
0.35
54
53
54
0.15
55
55
56
0.39
56
57
58
0.42
57
59
60
0.50
58
61
62
0.54
59
63
64
0.57
60
65
66
0.46
61
67
68
0.61
62
69
70
0.65
63
71
72
0.69
64
73
74
0.72
65
75
76
0.76
66
77
78
0.80
67
79
80
0.75
68
81
82
0.69
69
83
84
0.64
70
85
86
0.58
71
87
88
0.53
72
89
90
0.48
73
91
92
0.42
74
93
94
0.37
75
95
96
0.31
76
97
98
0.26
77
99
100
0.20
78
54
99
0.59
79
99
98
0.59
80
98
95
0.63
81
95
94
0.63
82
94
91
0.69
83
91
90
0.69
84
90
87
0.76
85
87
86
0.76
86
86
83
0.84
87
83
82
0.84
88
82
79
0.93
89
79
78
0.93
90
78
75
0.94
91
75
74
0.94
92
74
71
0.88
93
71
70
0.88
94
70
67
0.82
95
67
64
0.82
96
64
61
0.77
97
61
60
0.77
98
60
65
0.72
99
65
58
0.72
100
58
55
0.62
101
55
51
0.73
102
54
51
13.20
103
53
77
6.63
104
77
52
6.62
CentroidX
cm
6.63
-6.54
6.01
5.53
4.43
3.88
3.33
4.98
2.78
2.23
1.68
1.13
0.58
0.03
-0.52
-1.07
-1.61
-2.16
-2.71
-3.25
-3.80
-4.35
-4.89
-5.44
-5.99
-6.26
-5.71
-5.17
-4.62
-4.08
-3.53
-2.98
-2.43
-1.89
-1.34
-0.79
-0.25
0.30
0.85
1.40
1.95
2.50
3.05
3.60
4.15
4.70
5.25
5.77
6.32
0.05
-3.27
3.31
CentroidY
cm
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
CentroidZ
cm
0.17
1.17
0.20
0.21
0.25
0.27
0.29
0.23
0.31
0.32
0.34
0.36
0.38
0.40
0.46
0.53
0.59
0.66
0.72
0.79
0.85
0.92
0.98
1.04
1.11
1.13
1.09
1.00
0.96
0.87
0.83
0.74
0.70
0.61
0.57
0.48
0.44
0.40
0.36
0.36
0.32
0.32
0.29
0.29
0.25
0.25
0.21
0.21
0.17
0.80
0.55
0.00
SectionType
Text
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
SD Section
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
Cold Formed C
SD Section
SD Section
SD Section
DesignSect
Text
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
2C80x40x15x3
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
C80X40X15X2
2C80x40x15x3
2C80x40x15x3
2C80x40x15x3
R3
Yes/No
No
No
U3
Kgf
1078.63
-999.79
6065.60
2244.47
R1
Kgf-cm
0.00
0.00
0.00
0.00
R2
Kgf-cm
0.00
0.00
0.00
0.00
R3
Kgf-cm
0.00
0.00
0.00
0.00
_____________________________________________________________________________________
40
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
53
0.00
ENVOLVENTE Combination
53
0.17
ENVOLVENTE Combination
53
0.35
ENVOLVENTE Combination
53
0.00
ENVOLVENTE Combination
53
0.17
ENVOLVENTE Combination
53
0.35
ENVOLVENTE Combination
54
0.00
ENVOLVENTE Combination
54
0.08
ENVOLVENTE Combination
54
0.15
ENVOLVENTE Combination
54
0.00
ENVOLVENTE Combination
54
0.08
ENVOLVENTE Combination
54
0.15
ENVOLVENTE Combination
55
0.00
ENVOLVENTE Combination
55
0.20
ENVOLVENTE Combination
55
0.39
ENVOLVENTE Combination
55
0.00
ENVOLVENTE Combination
55
0.20
ENVOLVENTE Combination
55
0.39
ENVOLVENTE Combination
56
0.00
ENVOLVENTE Combination
56
0.21
ENVOLVENTE Combination
56
0.42
ENVOLVENTE Combination
56
0.00
ENVOLVENTE Combination
56
0.21
ENVOLVENTE Combination
56
0.42
ENVOLVENTE Combination
57
0.00
ENVOLVENTE Combination
57
0.25
ENVOLVENTE Combination
57
0.50
ENVOLVENTE Combination
57
0.00
ENVOLVENTE Combination
57
0.25
ENVOLVENTE Combination
57
0.50
ENVOLVENTE Combination
58
0.00
ENVOLVENTE Combination
58
0.27
ENVOLVENTE Combination
58
0.54
ENVOLVENTE Combination
58
0.00
ENVOLVENTE Combination
58
0.27
ENVOLVENTE Combination
58
0.54
ENVOLVENTE Combination
59
0.00
ENVOLVENTE Combination
59
0.29
ENVOLVENTE Combination
59
0.57
ENVOLVENTE Combination
59
0.00
ENVOLVENTE Combination
59
0.29
ENVOLVENTE Combination
59
0.57
ENVOLVENTE Combination
60
0.00
ENVOLVENTE Combination
60
0.23
ENVOLVENTE Combination
60
0.46
ENVOLVENTE Combination
60
0.00
ENVOLVENTE Combination
60
0.23
ENVOLVENTE Combination
60
0.46
ENVOLVENTE Combination
61
0.00
ENVOLVENTE Combination
61
0.31
ENVOLVENTE Combination
61
0.61
ENVOLVENTE Combination
61
0.00
ENVOLVENTE Combination
61
0.31
ENVOLVENTE Combination
61
0.61
ENVOLVENTE Combination
62
0.00
ENVOLVENTE Combination
62
0.32
ENVOLVENTE Combination
62
0.65
ENVOLVENTE Combination
62
0.00
ENVOLVENTE Combination
62
0.32
ENVOLVENTE Combination
62
0.65
ENVOLVENTE Combination
63
0.00
ENVOLVENTE Combination
63
0.34
ENVOLVENTE Combination
63
0.69
ENVOLVENTE Combination
63
0.00
ENVOLVENTE Combination
63
0.34
ENVOLVENTE Combination
63
0.69
ENVOLVENTE Combination
64
0.00
ENVOLVENTE Combination
64
0.36
ENVOLVENTE Combination
64
0.72
ENVOLVENTE Combination
64
0.00
ENVOLVENTE Combination
64
0.36
ENVOLVENTE Combination
64
0.72
ENVOLVENTE Combination
65
0.00
ENVOLVENTE Combination
StepType
Text
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
P
Kgf
23.99
23.51
23.03
-41.19
-41.67
-42.16
-12.60
-12.39
-12.19
-36.22
-36.01
-35.80
-6.89
-6.35
-5.80
-139.85
-139.31
-138.77
-60.25
-59.66
-59.07
-171.21
-170.62
-170.03
-53.82
-53.13
-52.44
-158.48
-157.79
-157.10
-53.19
-52.44
-51.70
-158.62
-157.87
-157.13
-51.96
-51.17
-50.37
-148.20
-147.40
-146.61
-45.83
-45.19
-44.55
-179.18
-178.54
-177.90
-55.99
-55.14
-54.29
-144.47
-143.62
-142.77
-48.43
-47.53
-46.63
-139.00
-138.10
-137.20
-54.28
-53.33
-52.38
-140.00
-139.05
-138.09
-24.51
-23.51
-22.50
-74.08
-73.07
-72.07
14.28
V2
Kgf
-16.61
-16.61
-16.61
-49.49
-49.49
-49.49
6.07
6.07
6.07
1.90
1.90
1.90
-0.74
-0.74
-0.74
-3.43
-3.43
-3.43
-14.44
-14.44
-14.44
-42.47
-42.47
-42.47
-5.31
-5.31
-5.31
-14.34
-14.34
-14.34
1.43
1.43
1.43
0.43
0.43
0.43
-1.34
-1.34
-1.34
-7.84
-7.84
-7.84
0.52
0.52
0.52
-0.49
-0.49
-0.49
1.31
1.31
1.31
0.39
0.39
0.39
-3.40
-3.40
-3.40
-9.13
-9.13
-9.13
1.86
1.86
1.86
0.64
0.64
0.64
-4.26
-4.26
-4.26
-12.43
-12.43
-12.43
0.34
V3
Kgf
21.53
21.50
21.47
1.63
1.59
1.56
113.76
113.75
113.73
42.44
42.42
42.41
13.40
13.37
13.33
-25.24
-25.28
-25.31
23.55
23.51
23.47
-47.40
-47.44
-47.48
-0.29
-0.34
-0.38
-31.11
-31.16
-31.21
-5.79
-5.84
-5.89
-26.80
-26.85
-26.90
-8.85
-8.90
-8.95
-23.91
-23.96
-24.02
9.53
9.49
9.44
-38.63
-38.67
-38.71
-8.84
-8.89
-8.95
-23.91
-23.97
-24.02
-8.63
-8.69
-8.75
-23.44
-23.50
-23.56
-8.46
-8.52
-8.59
-23.03
-23.09
-23.16
-8.02
-8.09
-8.16
-21.89
-21.96
-22.03
-10.06
T
Kgf-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.01
-0.01
-0.01
0.00
M2
Kgf-m
3.68
-0.06
-0.34
0.21
-0.09
-3.83
8.71
0.17
-3.03
3.34
0.15
-8.36
2.58
0.00
4.95
-4.94
-0.03
-2.64
5.03
0.04
9.85
-10.28
-0.22
-4.95
-0.11
-0.03
7.67
-7.90
-0.12
0.06
-1.56
0.07
7.29
-7.14
0.00
1.58
-2.59
-0.04
6.79
-6.98
-0.11
2.52
2.17
0.05
8.98
-8.88
-0.03
-2.22
-2.68
0.09
7.44
-7.23
0.03
2.76
-2.85
-0.04
7.55
-7.72
-0.10
2.79
-2.88
0.11
8.06
-7.81
0.04
2.98
-2.91
0.04
8.00
-7.92
0.00
2.95
-3.94
M3
Kgf-m
-5.87
-2.97
-0.07
-17.42
-8.77
-0.13
-0.50
-0.64
-0.78
-1.89
-2.34
-2.80
3.24
3.85
4.47
1.11
1.31
1.50
-0.36
7.74
16.75
-1.32
2.65
5.72
0.95
4.53
8.12
0.31
1.64
2.96
0.93
0.55
0.16
0.27
0.16
0.04
0.48
2.69
4.94
0.11
0.52
0.90
0.91
0.91
0.91
0.35
0.33
0.32
1.11
0.71
0.31
0.33
0.21
0.09
0.61
3.58
6.55
0.19
1.30
2.40
2.12
1.48
0.84
0.73
0.51
0.30
-0.01
4.46
8.97
-0.37
1.54
3.08
2.60
_____________________________________________________________________________________
41
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
65
0.38
ENVOLVENTE Combination
65
0.76
ENVOLVENTE Combination
65
0.00
ENVOLVENTE Combination
65
0.38
ENVOLVENTE Combination
65
0.76
ENVOLVENTE Combination
66
0.00
ENVOLVENTE Combination
66
0.40
ENVOLVENTE Combination
66
0.80
ENVOLVENTE Combination
66
0.00
ENVOLVENTE Combination
66
0.40
ENVOLVENTE Combination
66
0.80
ENVOLVENTE Combination
67
0.00
ENVOLVENTE Combination
67
0.37
ENVOLVENTE Combination
67
0.75
ENVOLVENTE Combination
67
0.00
ENVOLVENTE Combination
67
0.37
ENVOLVENTE Combination
67
0.75
ENVOLVENTE Combination
68
0.00
ENVOLVENTE Combination
68
0.35
ENVOLVENTE Combination
68
0.69
ENVOLVENTE Combination
68
0.00
ENVOLVENTE Combination
68
0.35
ENVOLVENTE Combination
68
0.69
ENVOLVENTE Combination
69
0.00
ENVOLVENTE Combination
69
0.32
ENVOLVENTE Combination
69
0.64
ENVOLVENTE Combination
69
0.00
ENVOLVENTE Combination
69
0.32
ENVOLVENTE Combination
69
0.64
ENVOLVENTE Combination
70
0.00
ENVOLVENTE Combination
70
0.29
ENVOLVENTE Combination
70
0.58
ENVOLVENTE Combination
70
0.00
ENVOLVENTE Combination
70
0.29
ENVOLVENTE Combination
70
0.58
ENVOLVENTE Combination
71
0.00
ENVOLVENTE Combination
71
0.26
ENVOLVENTE Combination
71
0.53
ENVOLVENTE Combination
71
0.00
ENVOLVENTE Combination
71
0.26
ENVOLVENTE Combination
71
0.53
ENVOLVENTE Combination
72
0.00
ENVOLVENTE Combination
72
0.24
ENVOLVENTE Combination
72
0.48
ENVOLVENTE Combination
72
0.00
ENVOLVENTE Combination
72
0.24
ENVOLVENTE Combination
72
0.48
ENVOLVENTE Combination
73
0.00
ENVOLVENTE Combination
73
0.21
ENVOLVENTE Combination
73
0.42
ENVOLVENTE Combination
73
0.00
ENVOLVENTE Combination
73
0.21
ENVOLVENTE Combination
73
0.42
ENVOLVENTE Combination
74
0.00
ENVOLVENTE Combination
74
0.18
ENVOLVENTE Combination
74
0.37
ENVOLVENTE Combination
74
0.00
ENVOLVENTE Combination
74
0.18
ENVOLVENTE Combination
74
0.37
ENVOLVENTE Combination
75
0.00
ENVOLVENTE Combination
75
0.16
ENVOLVENTE Combination
75
0.31
ENVOLVENTE Combination
75
0.00
ENVOLVENTE Combination
75
0.16
ENVOLVENTE Combination
75
0.31
ENVOLVENTE Combination
76
0.00
ENVOLVENTE Combination
76
0.13
ENVOLVENTE Combination
76
0.26
ENVOLVENTE Combination
76
0.00
ENVOLVENTE Combination
76
0.13
ENVOLVENTE Combination
76
0.26
ENVOLVENTE Combination
77
0.00
ENVOLVENTE Combination
77
0.10
ENVOLVENTE Combination
StepType
Text
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
P
Kgf
15.33
16.39
-33.66
-32.60
-31.55
-1318.30
-1315.15
-1312.01
-3582.81
-3579.66
-3576.52
32.59
33.62
34.65
9.67
10.70
11.74
14.01
14.97
15.93
-7.36
-6.40
-5.44
-22.12
-21.24
-20.36
-55.00
-54.12
-53.24
-14.43
-13.62
-12.81
-49.10
-48.30
-47.49
-20.34
-19.61
-18.88
-50.42
-49.69
-48.96
-14.12
-13.46
-12.81
-48.38
-47.73
-47.07
-19.88
-19.30
-18.72
-49.92
-49.34
-48.76
-13.49
-12.98
-12.47
-48.25
-47.74
-47.23
-20.91
-20.48
-20.05
-53.19
-52.76
-52.33
-15.56
-15.20
-14.85
-54.99
-54.63
-54.28
-16.83
-16.54
V2
Kgf
0.34
0.34
-1.35
-1.35
-1.35
71.02
71.02
71.02
-22.32
-22.32
-22.32
0.44
0.44
0.44
-1.18
-1.18
-1.18
-4.08
-4.08
-4.08
-12.61
-12.61
-12.61
2.43
2.43
2.43
0.80
0.80
0.80
-1.86
-1.86
-1.86
-7.13
-7.13
-7.13
1.27
1.27
1.27
0.47
0.47
0.47
-5.64
-5.64
-5.64
-11.30
-11.30
-11.30
0.86
0.86
0.86
0.33
0.33
0.33
1.37
1.37
1.37
0.45
0.45
0.45
0.07
0.07
0.07
-0.26
-0.26
-0.26
-2.06
-2.06
-2.06
-7.59
-7.59
-7.59
-0.53
-0.53
V3
Kgf
-10.13
-10.21
-27.43
-27.50
-27.57
32.13
31.91
31.70
-24.47
-24.68
-24.90
23.80
23.73
23.66
8.76
8.69
8.62
19.97
19.90
19.84
7.16
7.09
7.02
22.10
22.04
21.98
8.08
8.02
7.96
24.79
24.73
24.68
9.09
9.04
8.98
27.67
27.62
27.57
10.20
10.15
10.10
32.20
32.16
32.11
11.87
11.82
11.78
37.43
37.39
37.35
13.80
13.76
13.72
45.74
45.71
45.67
17.01
16.98
16.94
55.66
55.63
55.60
21.04
21.01
20.98
66.70
66.68
66.65
25.84
25.82
25.79
66.47
66.45
T
Kgf-m
0.00
0.00
0.00
0.00
0.00
0.65
0.65
0.65
-0.77
-0.77
-0.77
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
Kgf-m
-0.09
10.26
-10.71
-0.24
3.79
12.47
-0.18
9.62
-10.13
-0.45
-13.06
9.05
0.19
-3.16
3.32
0.07
-8.65
6.77
-0.06
-2.52
2.39
-0.14
-6.99
6.84
-0.07
-2.62
2.49
-0.20
-7.21
7.20
-0.01
-2.64
2.63
-0.02
-7.22
7.13
-0.07
-2.75
2.62
-0.18
-7.48
7.63
-0.01
-2.81
2.81
-0.01
-7.64
7.72
-0.06
-2.95
2.84
-0.15
-8.01
8.38
0.00
-3.11
3.11
0.00
-8.38
8.59
-0.04
-3.32
3.24
-0.10
-8.79
8.63
0.01
-3.33
3.34
0.00
-8.60
6.73
-0.04
M3
Kgf-m
2.50
2.40
-1.74
-1.22
-0.71
2.52
11.30
20.23
0.77
-25.89
-54.30
2.74
2.58
2.42
-1.25
-0.81
-0.37
-0.02
4.30
8.66
-0.32
1.39
2.80
2.27
1.49
0.72
0.75
0.48
0.22
0.74
2.82
4.90
0.27
0.81
1.35
0.92
0.59
0.25
0.35
0.23
0.10
0.08
2.77
5.45
0.04
1.38
2.72
0.40
0.22
0.04
0.16
0.09
0.02
0.72
0.64
0.55
0.24
-0.01
-0.26
-0.07
-0.08
-0.09
-0.33
-0.29
-0.26
0.04
1.02
2.00
-0.04
0.23
0.49
-0.22
-0.16
_____________________________________________________________________________________
42
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
77
0.20
ENVOLVENTE Combination
77
0.00
ENVOLVENTE Combination
77
0.10
ENVOLVENTE Combination
77
0.20
ENVOLVENTE Combination
78
0.00
ENVOLVENTE Combination
78
0.29
ENVOLVENTE Combination
78
0.59
ENVOLVENTE Combination
78
0.00
ENVOLVENTE Combination
78
0.29
ENVOLVENTE Combination
78
0.59
ENVOLVENTE Combination
79
0.00
ENVOLVENTE Combination
79
0.29
ENVOLVENTE Combination
79
0.59
ENVOLVENTE Combination
79
0.00
ENVOLVENTE Combination
79
0.29
ENVOLVENTE Combination
79
0.59
ENVOLVENTE Combination
80
0.00
ENVOLVENTE Combination
80
0.32
ENVOLVENTE Combination
80
0.63
ENVOLVENTE Combination
80
0.00
ENVOLVENTE Combination
80
0.32
ENVOLVENTE Combination
80
0.63
ENVOLVENTE Combination
81
0.00
ENVOLVENTE Combination
81
0.32
ENVOLVENTE Combination
81
0.63
ENVOLVENTE Combination
81
0.00
ENVOLVENTE Combination
81
0.32
ENVOLVENTE Combination
81
0.63
ENVOLVENTE Combination
82
0.00
ENVOLVENTE Combination
82
0.35
ENVOLVENTE Combination
82
0.69
ENVOLVENTE Combination
82
0.00
ENVOLVENTE Combination
82
0.35
ENVOLVENTE Combination
82
0.69
ENVOLVENTE Combination
83
0.00
ENVOLVENTE Combination
83
0.35
ENVOLVENTE Combination
83
0.69
ENVOLVENTE Combination
83
0.00
ENVOLVENTE Combination
83
0.35
ENVOLVENTE Combination
83
0.69
ENVOLVENTE Combination
84
0.00
ENVOLVENTE Combination
84
0.38
ENVOLVENTE Combination
84
0.76
ENVOLVENTE Combination
84
0.00
ENVOLVENTE Combination
84
0.38
ENVOLVENTE Combination
84
0.76
ENVOLVENTE Combination
85
0.00
ENVOLVENTE Combination
85
0.38
ENVOLVENTE Combination
85
0.76
ENVOLVENTE Combination
85
0.00
ENVOLVENTE Combination
85
0.38
ENVOLVENTE Combination
85
0.76
ENVOLVENTE Combination
86
0.00
ENVOLVENTE Combination
86
0.42
ENVOLVENTE Combination
86
0.84
ENVOLVENTE Combination
86
0.00
ENVOLVENTE Combination
86
0.42
ENVOLVENTE Combination
86
0.84
ENVOLVENTE Combination
87
0.00
ENVOLVENTE Combination
87
0.42
ENVOLVENTE Combination
87
0.84
ENVOLVENTE Combination
87
0.00
ENVOLVENTE Combination
87
0.42
ENVOLVENTE Combination
87
0.84
ENVOLVENTE Combination
88
0.00
ENVOLVENTE Combination
88
0.46
ENVOLVENTE Combination
88
0.93
ENVOLVENTE Combination
88
0.00
ENVOLVENTE Combination
88
0.46
ENVOLVENTE Combination
88
0.93
ENVOLVENTE Combination
89
0.00
ENVOLVENTE Combination
89
0.46
ENVOLVENTE Combination
89
0.93
ENVOLVENTE Combination
StepType
Text
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
P
Kgf
-16.26
-34.21
-33.93
-33.64
-225.69
-226.02
-226.36
-580.35
-580.68
-581.02
479.01
479.24
479.47
199.45
199.68
199.91
-423.66
-424.15
-424.63
-1126.81
-1127.30
-1127.78
983.38
983.76
984.14
374.56
374.94
375.32
-538.29
-538.92
-539.56
-1468.30
-1468.93
-1469.57
1286.27
1286.80
1287.33
477.83
478.36
478.89
-627.78
-628.57
-629.35
-1718.85
-1719.64
-1720.42
1538.04
1538.72
1539.40
568.98
569.66
570.34
-701.50
-702.44
-703.37
-1933.45
-1934.39
-1935.32
1759.69
1760.52
1761.36
645.17
646.00
646.83
-796.40
-797.49
-798.57
-2185.93
-2187.02
-2188.10
1686.73
1687.71
1688.69
V2
Kgf
-0.53
-1.34
-1.34
-1.34
-1.58
-1.58
-1.58
-5.91
-5.91
-5.91
-0.70
-0.70
-0.70
-2.03
-2.03
-2.03
1.55
1.55
1.55
0.73
0.73
0.73
4.83
4.83
4.83
1.89
1.89
1.89
-2.40
-2.40
-2.40
-5.36
-5.36
-5.36
-2.45
-2.45
-2.45
-5.22
-5.22
-5.22
3.27
3.27
3.27
1.78
1.78
1.78
1.08
1.08
1.08
0.70
0.70
0.70
0.11
0.11
0.11
-0.61
-0.61
-0.61
-2.24
-2.24
-2.24
-6.77
-6.77
-6.77
11.91
11.91
11.91
2.96
2.96
2.96
14.52
14.52
14.52
V3
Kgf
66.43
27.42
27.41
27.39
0.10
-0.65
-1.39
-0.38
-1.12
-1.86
1.94
1.16
0.38
1.12
0.34
-0.44
0.80
0.07
-0.66
0.69
-0.04
-0.77
3.98
3.19
2.39
1.92
1.13
0.34
3.32
2.59
1.87
1.70
0.98
0.25
5.65
4.84
4.04
2.55
1.75
0.95
4.98
4.26
3.55
2.28
1.57
0.86
6.89
6.08
5.27
3.02
2.21
1.39
6.13
5.43
4.73
2.69
1.99
1.29
7.93
7.11
6.29
3.41
2.59
1.76
9.55
8.86
8.16
3.95
3.26
2.57
5.96
5.13
4.30
T
Kgf-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
Kgf-m
-2.83
2.76
-0.06
-6.84
-0.21
-0.12
0.24
-0.41
-0.20
0.17
0.36
-0.03
-0.02
0.17
-0.10
-0.32
0.44
0.34
0.47
0.26
0.13
0.22
1.80
0.67
0.01
0.73
0.25
-0.21
1.93
0.91
0.14
0.80
0.33
0.10
2.83
1.01
-0.11
1.11
0.36
-0.53
2.93
1.17
-0.04
1.16
0.42
-0.33
3.63
1.15
-0.28
1.40
0.40
-1.01
3.71
1.28
-0.24
1.44
0.45
-0.86
4.33
1.16
-0.51
1.66
0.40
-1.66
5.16
0.97
-1.05
1.97
0.24
-3.05
5.02
2.56
0.64
M3
Kgf-m
-0.11
-0.71
-0.58
-0.44
-1.33
-0.87
-0.40
-5.18
-3.44
-1.71
3.79
4.39
4.98
1.03
1.24
1.45
-0.40
-0.63
-0.87
-1.79
-2.28
-2.76
3.56
2.08
0.61
1.06
0.41
-0.23
-0.65
0.24
2.10
-1.90
-0.15
0.68
-0.43
0.68
2.40
-1.39
0.08
0.98
6.36
5.11
3.86
2.75
2.07
1.39
-1.17
-1.49
-1.82
-3.25
-3.66
-4.07
8.91
9.16
9.41
3.00
3.19
3.37
-3.57
-2.63
-1.21
-10.05
-7.34
-5.41
15.71
10.79
6.54
5.09
2.99
0.69
-2.86
0.66
5.16
_____________________________________________________________________________________
43
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
89
0.00
ENVOLVENTE Combination
89
0.46
ENVOLVENTE Combination
89
0.93
ENVOLVENTE Combination
90
0.00
ENVOLVENTE Combination
90
0.47
ENVOLVENTE Combination
90
0.94
ENVOLVENTE Combination
90
0.00
ENVOLVENTE Combination
90
0.47
ENVOLVENTE Combination
90
0.94
ENVOLVENTE Combination
91
0.00
ENVOLVENTE Combination
91
0.47
ENVOLVENTE Combination
91
0.94
ENVOLVENTE Combination
91
0.00
ENVOLVENTE Combination
91
0.47
ENVOLVENTE Combination
91
0.94
ENVOLVENTE Combination
92
0.00
ENVOLVENTE Combination
92
0.44
ENVOLVENTE Combination
92
0.88
ENVOLVENTE Combination
92
0.00
ENVOLVENTE Combination
92
0.44
ENVOLVENTE Combination
92
0.88
ENVOLVENTE Combination
93
0.00
ENVOLVENTE Combination
93
0.44
ENVOLVENTE Combination
93
0.88
ENVOLVENTE Combination
93
0.00
ENVOLVENTE Combination
93
0.44
ENVOLVENTE Combination
93
0.88
ENVOLVENTE Combination
94
0.00
ENVOLVENTE Combination
94
0.41
ENVOLVENTE Combination
94
0.82
ENVOLVENTE Combination
94
0.00
ENVOLVENTE Combination
94
0.41
ENVOLVENTE Combination
94
0.82
ENVOLVENTE Combination
95
0.00
ENVOLVENTE Combination
95
0.41
ENVOLVENTE Combination
95
0.82
ENVOLVENTE Combination
95
0.00
ENVOLVENTE Combination
95
0.41
ENVOLVENTE Combination
95
0.82
ENVOLVENTE Combination
96
0.00
ENVOLVENTE Combination
96
0.38
ENVOLVENTE Combination
96
0.77
ENVOLVENTE Combination
96
0.00
ENVOLVENTE Combination
96
0.38
ENVOLVENTE Combination
96
0.77
ENVOLVENTE Combination
97
0.00
ENVOLVENTE Combination
97
0.38
ENVOLVENTE Combination
97
0.77
ENVOLVENTE Combination
97
0.00
ENVOLVENTE Combination
97
0.38
ENVOLVENTE Combination
97
0.77
ENVOLVENTE Combination
98
0.00
ENVOLVENTE Combination
98
0.36
ENVOLVENTE Combination
98
0.72
ENVOLVENTE Combination
98
0.00
ENVOLVENTE Combination
98
0.36
ENVOLVENTE Combination
98
0.72
ENVOLVENTE Combination
99
0.00
ENVOLVENTE Combination
99
0.36
ENVOLVENTE Combination
99
0.72
ENVOLVENTE Combination
99
0.00
ENVOLVENTE Combination
99
0.36
ENVOLVENTE Combination
99
0.72
ENVOLVENTE Combination
100
0.00
ENVOLVENTE Combination
100
0.31
ENVOLVENTE Combination
100
0.62
ENVOLVENTE Combination
100
0.00
ENVOLVENTE Combination
100
0.31
ENVOLVENTE Combination
100
0.62
ENVOLVENTE Combination
101
0.00
ENVOLVENTE Combination
101
0.36
ENVOLVENTE Combination
101
0.73
ENVOLVENTE Combination
101
0.00
ENVOLVENTE Combination
StepType
Text
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
P
Kgf
540.27
541.25
542.23
2027.61
2026.51
2025.40
752.08
750.97
749.86
-885.65
-884.64
-883.64
-2414.12
-2413.11
-2412.11
2161.13
2160.13
2159.12
802.70
801.70
800.70
-746.60
-745.70
-744.80
-2033.04
-2032.14
-2031.24
1847.09
1846.19
1845.29
690.01
689.11
688.21
-612.43
-611.64
-610.84
-1660.95
-1660.15
-1659.36
1650.91
1650.12
1649.32
380.91
380.11
379.31
-264.52
-263.82
-263.13
-1395.56
-1394.87
-1394.18
1756.42
1755.72
1755.03
-306.35
-307.04
-307.73
523.60
524.18
524.77
-1442.06
-1441.48
-1440.89
1674.17
1673.58
1673.00
-965.17
-965.75
-966.34
-156.43
-155.95
-155.46
-401.21
V2
Kgf
-16.48
-16.48
-16.48
15.74
15.74
15.74
-15.04
-15.04
-15.04
-3.20
-3.20
-3.20
-9.46
-9.46
-9.46
6.14
6.14
6.14
2.03
2.03
2.03
-0.68
-0.68
-0.68
-1.53
-1.53
-1.53
1.55
1.55
1.55
0.69
0.69
0.69
0.12
0.12
0.12
-1.23
-1.23
-1.23
0.64
0.64
0.64
-0.36
-0.36
-0.36
-0.07
-0.07
-0.07
-0.69
-0.69
-0.69
-0.35
-0.35
-0.35
-1.39
-1.39
-1.39
-4.66
-4.66
-4.66
-13.89
-13.89
-13.89
36.32
36.32
36.32
12.11
12.11
12.11
-9.31
-9.31
-9.31
-27.40
V3
Kgf
2.30
1.46
0.63
-1.91
-2.60
-3.29
-6.36
-7.05
-7.74
-2.24
-3.08
-3.91
-7.53
-8.37
-9.20
-3.29
-3.99
-4.69
-10.11
-10.81
-11.50
-0.68
-1.51
-2.34
-3.28
-4.10
-4.93
-3.02
-3.73
-4.43
-9.35
-10.06
-10.76
0.03
-0.79
-1.61
-1.32
-2.14
-2.96
-2.03
-2.74
-3.45
-9.30
-10.01
-10.72
1.33
0.52
-0.30
0.67
-0.14
-0.95
0.25
-0.47
-1.19
-10.34
-11.05
-11.77
4.06
3.25
2.45
1.98
1.17
0.37
-0.30
-0.94
-1.57
-9.56
-10.20
-10.83
3.18
2.29
1.40
-1.10
T
Kgf-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
Kgf-m
1.93
0.91
0.14
-0.07
2.52
5.99
-0.69
0.90
2.29
-1.18
0.48
4.42
-3.45
-0.11
1.71
-1.41
0.78
5.51
-4.00
0.02
2.10
-0.03
0.68
2.44
-1.49
-0.09
0.98
-1.29
0.66
4.63
-3.65
-0.21
1.78
0.13
0.46
1.16
-0.88
-0.34
0.51
-1.22
0.41
4.39
-3.45
-0.45
0.74
0.20
0.10
0.31
-0.19
-0.55
-0.59
-0.64
-0.04
4.06
-3.88
-0.60
-0.30
0.68
-0.32
-0.60
0.08
-0.80
-1.82
0.04
0.23
1.76
-4.61
-1.52
0.63
1.56
0.56
0.30
-1.14
M3
Kgf-m
-10.11
-11.00
-17.73
4.48
-0.87
1.02
-13.12
-6.05
-10.31
6.73
11.17
15.62
-0.60
3.67
5.17
-1.10
-1.99
-2.89
-3.76
-6.47
-9.17
8.46
9.14
9.81
2.62
2.92
3.22
-0.12
-0.44
-0.75
-1.46
-1.98
-2.49
2.82
3.33
3.83
0.86
0.82
0.77
3.38
3.14
3.11
0.62
0.72
0.63
-0.50
-0.23
0.03
-2.89
-2.87
-2.84
10.84
11.32
11.82
3.45
3.63
3.76
-4.21
-2.54
-0.87
-13.14
-8.15
-3.16
21.73
10.40
-0.40
7.16
3.38
-0.93
-3.71
-0.24
8.66
-11.29
_____________________________________________________________________________________
44
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
101
0.36
ENVOLVENTE Combination
101
0.73
ENVOLVENTE Combination
102
0.00
ENVOLVENTE Combination
102
0.55
ENVOLVENTE Combination
102
0.55
ENVOLVENTE Combination
102
1.10
ENVOLVENTE Combination
102
1.10
ENVOLVENTE Combination
102
1.65
ENVOLVENTE Combination
102
1.65
ENVOLVENTE Combination
102
2.20
ENVOLVENTE Combination
102
2.20
ENVOLVENTE Combination
102
2.75
ENVOLVENTE Combination
102
2.75
ENVOLVENTE Combination
102
3.30
ENVOLVENTE Combination
102
3.30
ENVOLVENTE Combination
102
3.85
ENVOLVENTE Combination
102
3.85
ENVOLVENTE Combination
102
4.40
ENVOLVENTE Combination
102
4.40
ENVOLVENTE Combination
102
4.95
ENVOLVENTE Combination
102
4.95
ENVOLVENTE Combination
102
5.50
ENVOLVENTE Combination
102
5.50
ENVOLVENTE Combination
102
6.05
ENVOLVENTE Combination
102
6.05
ENVOLVENTE Combination
102
6.60
ENVOLVENTE Combination
102
6.60
ENVOLVENTE Combination
102
7.15
ENVOLVENTE Combination
102
7.15
ENVOLVENTE Combination
102
7.70
ENVOLVENTE Combination
102
7.70
ENVOLVENTE Combination
102
8.25
ENVOLVENTE Combination
102
8.25
ENVOLVENTE Combination
102
8.80
ENVOLVENTE Combination
102
8.80
ENVOLVENTE Combination
102
9.35
ENVOLVENTE Combination
102
9.35
ENVOLVENTE Combination
102
9.90
ENVOLVENTE Combination
102
9.90
ENVOLVENTE Combination
102
10.45 ENVOLVENTE Combination
102
10.45 ENVOLVENTE Combination
102
11.00 ENVOLVENTE Combination
102
11.00 ENVOLVENTE Combination
102
11.55 ENVOLVENTE Combination
102
11.55 ENVOLVENTE Combination
102
12.10 ENVOLVENTE Combination
102
12.10 ENVOLVENTE Combination
102
12.59 ENVOLVENTE Combination
102
12.59 ENVOLVENTE Combination
102
13.20 ENVOLVENTE Combination
102
0.00
ENVOLVENTE Combination
102
0.55
ENVOLVENTE Combination
102
0.55
ENVOLVENTE Combination
102
1.10
ENVOLVENTE Combination
102
1.10
ENVOLVENTE Combination
102
1.65
ENVOLVENTE Combination
102
1.65
ENVOLVENTE Combination
102
2.20
ENVOLVENTE Combination
102
2.20
ENVOLVENTE Combination
102
2.75
ENVOLVENTE Combination
102
2.75
ENVOLVENTE Combination
102
3.30
ENVOLVENTE Combination
102
3.30
ENVOLVENTE Combination
102
3.85
ENVOLVENTE Combination
102
3.85
ENVOLVENTE Combination
102
4.40
ENVOLVENTE Combination
102
4.40
ENVOLVENTE Combination
102
4.95
ENVOLVENTE Combination
102
4.95
ENVOLVENTE Combination
102
5.50
ENVOLVENTE Combination
102
5.50
ENVOLVENTE Combination
102
6.05
ENVOLVENTE Combination
102
6.05
ENVOLVENTE Combination
StepType
Text
Min
Min
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
P
Kgf
-400.72
-400.24
-24.75
-25.05
2.47
2.17
1381.91
1381.61
1437.21
1436.92
3488.24
3487.94
3525.29
3525.00
5804.65
5804.35
5831.92
5831.63
8217.12
8216.82
8238.77
8238.48
10699.98
10699.68
10723.34
10723.05
10898.04
10897.75
10879.75
10879.46
8994.54
8994.24
8977.74
8977.44
6997.06
6996.77
6976.25
6975.96
4833.29
4832.99
4806.09
4805.79
2426.39
2426.10
2387.38
2387.09
277.11
276.85
290.18
289.85
-182.53
-182.83
-116.53
-116.82
557.98
557.68
578.66
578.36
1343.82
1343.52
1357.24
1356.94
2197.50
2197.20
2207.30
2207.01
3083.52
3083.23
3091.22
3090.92
3993.42
3993.12
4001.74
V2
Kgf
-27.40
-27.40
28.19
32.51
-0.16
4.16
48.60
52.92
0.90
5.22
42.42
46.74
-1.04
3.28
40.87
45.20
-1.85
2.47
41.39
45.72
-3.24
1.08
43.37
47.69
82.35
86.67
-33.43
-29.10
-34.48
-30.15
42.13
46.46
-35.73
-31.40
44.51
48.83
-36.57
-32.24
49.00
53.33
-31.60
-27.28
57.32
61.64
-16.04
-11.72
87.44
91.26
15.78
20.61
11.57
15.89
-1.13
3.19
15.72
20.05
-0.28
4.05
13.13
17.46
-2.02
2.30
12.70
17.03
-3.76
0.56
12.79
17.11
-7.52
-3.20
13.54
17.87
29.60
V3
Kgf
-1.98
-2.87
0.64
0.64
-0.51
-0.51
13.11
13.11
12.98
12.98
-4.43
-4.43
-4.10
-4.10
5.38
5.38
6.65
6.65
-5.41
-5.41
-4.58
-4.58
-2.08
-2.08
-1.97
-1.97
19.54
19.54
19.31
19.31
11.21
11.21
12.48
12.48
-0.70
-0.70
0.51
0.51
1.76
1.76
3.00
3.00
-9.09
-9.09
-8.72
-8.72
6.80
6.80
3.37
3.37
-0.13
-0.13
-0.88
-0.88
4.78
4.78
4.77
4.77
-12.53
-12.53
-11.67
-11.67
1.51
1.51
2.12
2.12
-15.22
-15.22
-12.79
-12.79
-28.17
-28.17
-29.35
T
Kgf-m
0.00
0.00
1.97
1.97
1.53
1.53
1.14
1.14
0.89
0.89
0.04
0.04
0.06
0.06
-0.53
-0.53
-0.42
-0.42
-0.91
-0.91
-0.69
-0.69
-0.88
-0.88
0.30
0.30
2.55
2.55
3.28
3.28
1.74
1.74
2.58
2.58
0.48
0.48
0.78
0.78
-0.12
-0.12
-0.03
-0.03
-1.11
-1.11
-0.79
-0.79
-1.24
-1.24
0.68
0.68
0.52
0.52
0.41
0.41
0.33
0.33
0.23
0.23
-0.13
-0.13
-0.09
-0.09
-1.23
-1.23
-0.98
-0.98
-2.62
-2.62
-1.95
-1.95
-3.77
-3.77
-4.14
M2
Kgf-m
-0.58
-0.11
2.42
2.09
2.09
2.57
7.77
0.56
0.56
-2.55
-2.09
0.96
0.96
7.38
4.09
1.18
1.18
-0.74
-4.04
-0.75
-0.75
4.16
-1.36
3.02
3.02
19.16
12.74
2.26
2.27
-2.80
6.40
0.24
0.24
-2.51
-0.35
0.16
0.16
2.86
1.24
0.27
0.27
-0.84
-4.54
2.48
2.47
17.88
0.48
-1.36
-1.36
0.31
0.63
0.70
0.70
0.98
2.60
-0.03
-0.03
-6.71
-5.93
0.34
0.34
2.61
1.26
0.43
0.43
-2.53
-11.23
-3.17
-3.18
1.45
-12.47
-0.22
-0.22
M3
Kgf-m
-1.39
3.07
10.39
-2.69
0.74
-0.02
9.34
-7.10
-3.77
-4.96
-0.77
-9.46
-6.51
-7.01
-2.94
-11.11
-8.37
-8.54
-4.17
-12.40
-9.77
-9.00
-3.86
-12.76
-9.39
-27.09
-26.62
-6.86
-13.21
13.41
0.56
-5.61
-10.90
17.32
5.65
-1.44
-5.28
24.04
12.64
1.48
-0.09
31.04
22.34
1.48
3.70
40.83
33.15
17.70
12.75
4.71
4.86
-6.30
-0.03
-0.84
2.74
-18.58
-9.79
-11.30
-1.05
-25.29
-17.28
-17.36
-6.26
-29.93
-22.44
-21.56
-9.63
-33.58
-26.38
-23.65
-10.04
-34.71
-26.19
_____________________________________________________________________________________
45
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
102
6.60
ENVOLVENTE Combination
102
6.60
ENVOLVENTE Combination
102
7.15
ENVOLVENTE Combination
102
7.15
ENVOLVENTE Combination
102
7.70
ENVOLVENTE Combination
102
7.70
ENVOLVENTE Combination
102
8.25
ENVOLVENTE Combination
102
8.25
ENVOLVENTE Combination
102
8.80
ENVOLVENTE Combination
102
8.80
ENVOLVENTE Combination
102
9.35
ENVOLVENTE Combination
102
9.35
ENVOLVENTE Combination
102
9.90
ENVOLVENTE Combination
102
9.90
ENVOLVENTE Combination
102
10.45 ENVOLVENTE Combination
102
10.45 ENVOLVENTE Combination
102
11.00 ENVOLVENTE Combination
102
11.00 ENVOLVENTE Combination
102
11.55 ENVOLVENTE Combination
102
11.55 ENVOLVENTE Combination
102
12.10 ENVOLVENTE Combination
102
12.10 ENVOLVENTE Combination
102
12.59 ENVOLVENTE Combination
102
12.59 ENVOLVENTE Combination
102
13.20 ENVOLVENTE Combination
103
0.00
ENVOLVENTE Combination
103
0.55
ENVOLVENTE Combination
103
0.55
ENVOLVENTE Combination
103
1.11
ENVOLVENTE Combination
103
1.11
ENVOLVENTE Combination
103
1.66
ENVOLVENTE Combination
103
1.66
ENVOLVENTE Combination
103
2.21
ENVOLVENTE Combination
103
2.21
ENVOLVENTE Combination
103
2.76
ENVOLVENTE Combination
103
2.76
ENVOLVENTE Combination
103
3.32
ENVOLVENTE Combination
103
3.32
ENVOLVENTE Combination
103
3.87
ENVOLVENTE Combination
103
3.87
ENVOLVENTE Combination
103
4.42
ENVOLVENTE Combination
103
4.42
ENVOLVENTE Combination
103
4.97
ENVOLVENTE Combination
103
4.97
ENVOLVENTE Combination
103
5.53
ENVOLVENTE Combination
103
5.53
ENVOLVENTE Combination
103
6.08
ENVOLVENTE Combination
103
6.08
ENVOLVENTE Combination
103
6.63
ENVOLVENTE Combination
103
0.00
ENVOLVENTE Combination
103
0.55
ENVOLVENTE Combination
103
0.55
ENVOLVENTE Combination
103
1.11
ENVOLVENTE Combination
103
1.11
ENVOLVENTE Combination
103
1.66
ENVOLVENTE Combination
103
1.66
ENVOLVENTE Combination
103
2.21
ENVOLVENTE Combination
103
2.21
ENVOLVENTE Combination
103
2.76
ENVOLVENTE Combination
103
2.76
ENVOLVENTE Combination
103
3.32
ENVOLVENTE Combination
103
3.32
ENVOLVENTE Combination
103
3.87
ENVOLVENTE Combination
103
3.87
ENVOLVENTE Combination
103
4.42
ENVOLVENTE Combination
103
4.42
ENVOLVENTE Combination
103
4.97
ENVOLVENTE Combination
103
4.97
ENVOLVENTE Combination
103
5.53
ENVOLVENTE Combination
103
5.53
ENVOLVENTE Combination
103
6.08
ENVOLVENTE Combination
103
6.08
ENVOLVENTE Combination
103
6.63
ENVOLVENTE Combination
StepType
Text
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
P
Kgf
4001.45
3488.85
3488.56
3468.88
3468.59
1507.26
1506.96
1491.72
1491.42
-20.24
-20.53
-32.99
-33.29
-919.49
-919.79
-925.68
-925.97
-894.79
-895.08
-885.64
-885.93
-71.66
-71.92
-97.23
-97.56
-43.47
-44.19
-472.11
-472.83
-500.07
-500.79
-1218.56
-1219.28
-1237.53
-1238.25
-2063.60
-2064.32
-2077.52
-2078.24
-2957.06
-2957.78
-2968.26
-2968.98
-3866.61
-3867.33
-3874.12
-3874.84
-4703.11
-4703.83
-116.76
-117.49
-1178.97
-1179.69
-1251.46
-1252.18
-3148.44
-3149.16
-3199.41
-3200.13
-5436.14
-5436.86
-5473.64
-5474.37
-7863.21
-7863.93
-7893.39
-7894.11
-10343.59
-10344.31
-10363.70
-10364.43
-12717.04
-12717.76
V2
Kgf
33.93
-85.24
-80.91
-91.58
-87.26
9.06
13.38
-94.85
-90.52
10.71
15.04
-96.65
-92.32
15.77
20.10
-103.80
-99.48
19.10
23.42
-121.32
-117.00
17.76
21.58
-47.51
-42.68
24.89
29.19
-0.55
3.74
50.45
54.74
-1.50
2.79
45.08
49.37
-3.01
1.28
43.56
47.86
-3.71
0.59
43.23
47.53
-1.12
3.17
5.79
10.08
191.63
195.93
8.38
12.68
-2.03
2.26
16.69
20.99
-2.75
1.55
14.49
18.79
-5.72
-1.43
14.18
18.47
-7.50
-3.21
14.05
18.35
-3.88
0.42
-11.47
-7.18
69.38
73.68
V3
Kgf
-29.35
6.48
6.48
6.56
6.56
0.65
0.65
1.78
1.78
-5.42
-5.42
-4.91
-4.91
0.50
0.50
1.24
1.24
-27.61
-27.61
-28.02
-28.02
-3.79
-3.79
-4.53
-4.53
-1.90
-1.90
-2.25
-2.25
0.04
0.04
-1.29
-1.29
-2.34
-2.34
-2.72
-2.72
5.69
5.69
6.61
6.61
13.74
13.74
17.47
17.47
30.08
30.08
55.28
55.28
-6.07
-6.07
-8.60
-8.60
-1.22
-1.22
-4.16
-4.16
-4.80
-4.80
-5.82
-5.82
2.70
2.70
3.16
3.16
5.02
5.02
5.99
5.99
10.07
10.07
18.54
18.54
T
Kgf-m
-4.14
0.27
0.27
1.08
1.08
0.53
0.53
0.83
0.83
0.07
0.07
0.16
0.16
-0.81
-0.81
-0.70
-0.70
-3.44
-3.44
-2.53
-2.53
-3.78
-3.78
0.26
0.26
1.88
1.88
1.36
1.36
1.34
1.34
0.74
0.74
0.06
0.06
-0.20
-0.20
-0.24
-0.24
-0.56
-0.56
-0.82
-0.82
-0.98
-0.98
-0.85
-0.85
-0.15
-0.15
0.50
0.50
0.36
0.36
0.38
0.38
0.20
0.20
-0.08
-0.08
-0.59
-0.59
-0.68
-0.68
-1.52
-1.52
-2.26
-2.26
-2.79
-2.79
-2.73
-2.73
-1.63
-1.63
M2
Kgf-m
0.86
4.37
0.71
0.72
-8.35
-2.45
-2.80
-2.80
-7.92
-2.82
0.03
0.03
-0.24
-0.57
-0.84
-0.85
-2.05
-13.71
-0.47
-0.47
4.33
-4.31
-4.03
-4.04
-4.89
-0.05
3.16
-0.34
2.83
2.83
3.46
-0.79
0.42
0.49
3.03
5.87
8.97
8.98
5.84
11.07
7.42
7.50
0.50
12.74
4.66
4.64
-4.63
-1.16
-11.41
-0.19
1.00
-1.97
0.83
0.82
0.87
-2.00
-0.27
-0.24
1.22
2.14
3.77
3.77
2.28
4.16
2.42
2.44
-1.11
4.18
-1.22
-1.24
-13.54
-7.43
-34.26
M3
Kgf-m
-72.55
-71.21
-27.98
-35.78
4.56
-5.10
-29.47
-35.21
6.00
-1.00
-26.67
-33.03
8.55
4.30
-22.55
-29.84
11.12
7.84
-15.72
-24.71
11.33
11.92
-25.62
-22.97
1.58
8.71
-2.48
0.80
0.55
9.17
-7.67
-3.92
-4.25
-1.13
-10.33
-6.50
-6.02
-3.21
-12.23
-8.16
-7.30
-4.66
-13.61
-9.20
-9.25
-6.79
-2.28
4.72
-39.45
3.34
-6.24
0.10
-0.60
2.74
-19.90
-9.97
-9.64
-1.26
-27.36
-16.95
-14.97
-7.34
-32.60
-21.53
-18.57
-11.37
-36.45
-24.43
-24.07
-17.37
-21.03
-4.78
-106.43
_____________________________________________________________________________________
46
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame Station
OutputCase
CaseType
Text
m
Text
Text
104
0.00
ENVOLVENTE Combination
104
0.28
ENVOLVENTE Combination
104
0.55
ENVOLVENTE Combination
104
0.55
ENVOLVENTE Combination
104
0.83
ENVOLVENTE Combination
104
1.10
ENVOLVENTE Combination
104
1.10
ENVOLVENTE Combination
104
1.38
ENVOLVENTE Combination
104
1.65
ENVOLVENTE Combination
104
1.65
ENVOLVENTE Combination
104
1.93
ENVOLVENTE Combination
104
2.21
ENVOLVENTE Combination
104
2.21
ENVOLVENTE Combination
104
2.48
ENVOLVENTE Combination
104
2.76
ENVOLVENTE Combination
104
2.76
ENVOLVENTE Combination
104
3.03
ENVOLVENTE Combination
104
3.31
ENVOLVENTE Combination
104
3.31
ENVOLVENTE Combination
104
3.58
ENVOLVENTE Combination
104
3.86
ENVOLVENTE Combination
104
3.86
ENVOLVENTE Combination
104
4.13
ENVOLVENTE Combination
104
4.41
ENVOLVENTE Combination
104
4.41
ENVOLVENTE Combination
104
4.69
ENVOLVENTE Combination
104
4.96
ENVOLVENTE Combination
104
4.96
ENVOLVENTE Combination
104
5.24
ENVOLVENTE Combination
104
5.51
ENVOLVENTE Combination
104
5.51
ENVOLVENTE Combination
104
6.00
ENVOLVENTE Combination
104
6.00
ENVOLVENTE Combination
104
6.31
ENVOLVENTE Combination
104
6.62
ENVOLVENTE Combination
104
0.00
ENVOLVENTE Combination
104
0.28
ENVOLVENTE Combination
104
0.55
ENVOLVENTE Combination
104
0.55
ENVOLVENTE Combination
104
0.83
ENVOLVENTE Combination
104
1.10
ENVOLVENTE Combination
104
1.10
ENVOLVENTE Combination
104
1.38
ENVOLVENTE Combination
104
1.65
ENVOLVENTE Combination
104
1.65
ENVOLVENTE Combination
104
1.93
ENVOLVENTE Combination
104
2.21
ENVOLVENTE Combination
104
2.21
ENVOLVENTE Combination
104
2.48
ENVOLVENTE Combination
104
2.76
ENVOLVENTE Combination
104
2.76
ENVOLVENTE Combination
104
3.03
ENVOLVENTE Combination
104
3.31
ENVOLVENTE Combination
104
3.31
ENVOLVENTE Combination
104
3.58
ENVOLVENTE Combination
104
3.86
ENVOLVENTE Combination
104
3.86
ENVOLVENTE Combination
104
4.13
ENVOLVENTE Combination
104
4.41
ENVOLVENTE Combination
104
4.41
ENVOLVENTE Combination
104
4.69
ENVOLVENTE Combination
104
4.96
ENVOLVENTE Combination
104
4.96
ENVOLVENTE Combination
104
5.24
ENVOLVENTE Combination
104
5.51
ENVOLVENTE Combination
104
5.51
ENVOLVENTE Combination
104
6.00
ENVOLVENTE Combination
104
6.00
ENVOLVENTE Combination
104
6.31
ENVOLVENTE Combination
104
6.62
ENVOLVENTE Combination
StepType
Text
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
P
Kgf
-2443.01
-2443.01
-2443.01
-1465.83
-1465.83
-1465.83
-1456.15
-1456.15
-1456.15
-68.08
-68.08
-68.08
-49.87
-49.87
-49.87
1174.30
1174.30
1174.30
1188.22
1188.22
1188.22
3110.45
3110.45
3110.45
3143.95
3143.95
3143.95
5136.48
5136.48
5136.48
5192.97
5192.97
0.01
0.01
0.01
-6604.76
-6604.76
-6604.76
-3951.45
-3951.45
-3951.45
-3924.56
-3924.56
-3924.56
-1684.05
-1684.05
-1684.05
-1657.49
-1657.49
-1657.49
369.51
369.51
369.51
401.92
401.92
401.92
1150.93
1150.93
1150.93
1163.21
1163.21
1163.21
1004.99
1004.99
1004.99
988.07
988.07
-24.29
-24.29
-24.29
V2
Kgf
-73.49
-71.32
-69.15
-17.37
-15.20
-13.03
37.59
39.76
41.93
-36.99
-34.81
-32.64
46.60
48.77
50.94
-38.03
-35.85
-33.68
51.37
53.54
55.71
-33.27
-31.10
-28.93
59.11
61.28
63.45
-15.70
-13.53
-11.36
86.48
90.32
18.23
20.65
23.08
-195.67
-193.50
-191.32
-43.59
-41.42
-39.25
6.62
8.79
10.96
-96.70
-94.53
-92.35
13.24
15.41
17.58
-99.20
-97.03
-94.86
17.56
19.73
21.90
-105.74
-103.57
-101.40
20.22
22.39
24.57
-122.30
-120.13
-117.95
13.56
17.40
-45.45
-43.02
-40.60
V3
Kgf
-10.90
-10.90
-10.90
-10.12
-10.12
-10.12
-5.86
-5.86
-5.86
-3.79
-3.79
-3.79
-0.39
-0.39
-0.39
-0.12
-0.12
-0.12
5.73
5.73
5.73
5.19
5.19
5.19
19.53
19.53
19.53
32.04
32.04
32.04
74.51
74.51
-16.61
-16.61
-16.61
-55.59
-55.59
-55.59
-30.65
-30.65
-30.65
-18.22
-18.22
-18.22
-12.41
-12.41
-12.41
-3.27
-3.27
-3.27
-2.10
-2.10
-2.10
1.22
1.22
1.22
0.94
0.94
0.94
6.25
6.25
6.25
10.49
10.49
10.49
24.93
24.93
-49.49
-49.49
-49.49
T
Kgf-m
1.70
1.70
1.70
2.69
2.69
2.69
2.73
2.73
2.73
1.92
1.92
1.92
1.31
1.31
1.31
0.20
0.20
0.20
0.03
0.03
0.03
-0.45
-0.45
-0.45
-0.80
-0.80
-0.80
-1.27
-1.27
-1.27
-0.86
-0.86
0.13
0.13
0.13
-0.56
-0.56
-0.56
0.77
0.77
0.77
0.87
0.87
0.87
0.58
0.58
0.58
0.39
0.39
0.39
0.06
0.06
0.06
-0.33
-0.33
-0.33
-1.65
-1.65
-1.65
-2.57
-2.57
-2.57
-3.94
-3.94
-3.94
-2.67
-2.67
0.07
0.07
0.07
M2
Kgf-m
-11.41
-6.30
-0.94
-4.41
-1.62
5.08
5.08
9.33
13.59
3.75
6.45
9.15
9.11
9.93
10.84
7.20
7.78
8.36
8.33
6.75
5.17
9.03
7.60
6.17
6.11
1.10
-1.29
14.92
6.55
-0.99
-0.96
-13.10
-10.21
-5.10
0.01
-34.31
-18.99
-10.80
-13.60
-5.51
-1.25
-1.23
1.28
3.80
-0.81
1.12
3.01
3.00
3.11
3.21
2.11
2.14
2.17
2.16
1.83
1.49
2.69
2.43
2.17
2.15
0.16
-4.65
4.34
1.02
-3.25
-3.15
-39.45
-30.45
-15.22
0.01
M3
Kgf-m
-38.80
-18.84
9.17
-5.07
1.07
6.61
0.94
-1.19
-3.91
-13.45
-0.18
14.84
7.81
3.86
-0.69
-7.15
4.49
22.29
15.31
7.38
1.57
-0.92
7.95
29.94
24.12
9.00
1.28
4.42
10.47
38.71
33.26
20.89
13.05
7.07
3.83
-104.73
-51.10
-7.55
-20.70
-10.26
-0.42
-5.58
-16.24
-27.50
-37.78
-14.80
5.24
1.70
-11.45
-25.19
-35.79
-10.20
8.03
5.44
-6.23
-21.23
-32.55
-3.70
10.83
8.64
1.30
-14.65
-27.51
3.89
11.88
12.08
-26.16
-22.64
-9.03
0.34
_____________________________________________________________________________________
47
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint
OutputCase
Text
Text
51
ENVOLVENTE
51
ENVOLVENTE
52
ENVOLVENTE
52
ENVOLVENTE
53
ENVOLVENTE
53
ENVOLVENTE
54
ENVOLVENTE
54
ENVOLVENTE
55
ENVOLVENTE
55
ENVOLVENTE
56
ENVOLVENTE
56
ENVOLVENTE
57
ENVOLVENTE
57
ENVOLVENTE
58
ENVOLVENTE
58
ENVOLVENTE
59
ENVOLVENTE
59
ENVOLVENTE
60
ENVOLVENTE
60
ENVOLVENTE
61
ENVOLVENTE
61
ENVOLVENTE
62
ENVOLVENTE
62
ENVOLVENTE
63
ENVOLVENTE
63
ENVOLVENTE
64
ENVOLVENTE
64
ENVOLVENTE
65
ENVOLVENTE
65
ENVOLVENTE
66
ENVOLVENTE
66
ENVOLVENTE
67
ENVOLVENTE
67
ENVOLVENTE
68
ENVOLVENTE
68
ENVOLVENTE
69
ENVOLVENTE
69
ENVOLVENTE
70
ENVOLVENTE
70
ENVOLVENTE
71
ENVOLVENTE
71
ENVOLVENTE
72
ENVOLVENTE
72
ENVOLVENTE
73
ENVOLVENTE
73
ENVOLVENTE
74
ENVOLVENTE
74
ENVOLVENTE
75
ENVOLVENTE
75
ENVOLVENTE
76
ENVOLVENTE
76
ENVOLVENTE
77
ENVOLVENTE
77
ENVOLVENTE
78
ENVOLVENTE
78
ENVOLVENTE
79
ENVOLVENTE
79
ENVOLVENTE
80
ENVOLVENTE
80
ENVOLVENTE
81
ENVOLVENTE
81
ENVOLVENTE
82
ENVOLVENTE
82
ENVOLVENTE
CaseType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
U1
cm
-0.01
-0.02
0.00
0.00
-0.15
-0.51
-0.19
-0.63
0.00
0.00
-0.01
-0.02
0.00
-0.01
-0.01
-0.02
-0.01
-0.03
-0.01
-0.03
-0.01
-0.04
-0.01
-0.03
-0.02
-0.04
-0.01
-0.04
0.00
-0.03
-0.01
-0.03
-0.02
-0.04
-0.02
-0.05
-0.02
-0.04
-0.02
-0.07
-0.01
-0.04
-0.02
-0.09
-0.01
-0.03
-0.02
-0.12
-0.01
-0.02
-0.03
-0.15
0.00
0.00
-0.04
-0.19
0.00
0.00
-0.05
-0.23
0.00
-0.01
-0.07
-0.27
U2
cm
0.03
0.01
0.01
0.00
0.02
0.01
0.00
-0.01
0.00
0.00
0.02
0.01
0.03
0.01
0.02
0.01
0.11
0.03
0.01
0.00
0.13
0.04
0.01
0.00
0.15
0.04
0.01
0.00
0.07
0.02
0.02
0.00
0.15
0.04
0.01
0.00
0.14
0.03
0.00
0.00
0.12
0.02
0.01
0.00
0.08
0.01
0.02
0.01
0.03
-0.01
0.03
0.01
0.00
0.00
0.04
0.01
0.03
0.00
0.03
0.01
0.07
0.01
0.02
0.01
U3
cm
0.03
0.01
0.03
0.01
-1.31
-4.17
-1.31
-4.16
0.00
0.00
0.00
0.00
0.01
-0.04
0.01
-0.04
0.10
-0.10
0.10
-0.10
0.15
-0.10
0.15
-0.10
0.18
-0.10
0.18
-0.10
0.06
-0.07
0.06
-0.07
0.20
-0.09
0.20
-0.09
0.20
-0.07
0.21
-0.07
0.19
-0.05
0.20
-0.05
0.15
-0.03
0.16
-0.03
0.09
-0.01
0.10
-0.01
0.00
0.00
0.00
0.00
-0.05
-0.19
-0.05
-0.17
-0.11
-0.41
-0.11
-0.40
R1
Radians
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
R2
Radians
0.00
0.00
0.00
0.00
0.00
-0.01
0.00
-0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
R3
Radians
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
_____________________________________________________________________________________
48
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
CaseType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
TotalLength
m
243.81
217.98
491.40
211.86
40.82
U1
cm
0.00
-0.02
-0.08
-0.31
0.00
-0.05
-0.09
-0.35
-0.01
-0.09
-0.11
-0.39
-0.03
-0.13
-0.12
-0.43
-0.04
-0.18
-0.13
-0.47
-0.06
-0.24
-0.15
-0.50
-0.08
-0.30
-0.16
-0.54
-0.10
-0.37
-0.17
-0.57
-0.13
-0.44
-0.18
-0.60
U2
cm
0.11
0.03
0.01
0.00
0.13
0.04
0.01
0.00
0.15
0.05
0.01
0.00
0.15
0.05
0.02
0.01
0.13
0.05
0.01
0.00
0.11
0.04
0.01
0.00
0.09
0.03
0.01
0.00
0.07
0.03
0.01
0.00
0.05
0.02
0.01
0.00
U3
cm
-0.19
-0.67
-0.18
-0.65
-0.27
-0.97
-0.27
-0.95
-0.37
-1.29
-0.37
-1.27
-0.49
-1.65
-0.48
-1.63
-0.61
-2.03
-0.60
-2.02
-0.74
-2.44
-0.73
-2.42
-0.88
-2.86
-0.87
-2.85
-1.02
-3.30
-1.02
-3.29
-1.16
-3.73
-1.16
-3.72
R1
Radians
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
R2
Radians
0.00
0.00
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
0.00
-0.01
R3
Radians
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TotalWeight
Kgf
676.87
1717.76
2433.08
188.07
64.41
_____________________________________________________________________________________
49
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
4. ESCALERAS
4.1. DISEO ESCALERA DE HORMIGON ARMADO
Datos Geometricos:
a=
b=
c=
d=
2.70
2.45
0.20
2.35
[m]
[m]
[m]
[m]
Huella X = 0.30
Contra huella Y = 0.18
Losa e = 0.15
= 30.96
cos = 0.86
[m]
[m]
[m]
[]
HA =
b
c
b
3
25 [KN/m ]
3
20 [KN/m ]
HS =
Piso y Contrapiso ep,c = 0.03 [m]
Reves. Contrahuella ech = 0.02 [m]
Cielo Raso ecr = 0.02 [m]
Analisis de Carga Escalera:
Losa:
g1 = e* HA/cos =
4.37
Peldao:
g2 =0,5*Y* HS =
1.80
Piso y Contrapiso:
g3 =ep,c* HS =
0.60
Revestimiento contrahuella:
g4 =ech*Y* HS/X =
0.24
Cielo Raso:
g5 =ecr* HS/cosx =
0.47
Huella
Losa
Contra huella
2
[KN/m ]
2
[KN/m ]
[KN/m ]
2
[KN/m ]
2
[KN/m ]
2
7.48 [KN/m ]
Total g`=
Carga viva para escaleras:
2
q` =
5.00 [KN/m ]
2.00 [KN/m]
0.03 [KN/m]
0.01 [KN/m]
Total g6 =
2.04 [KN/m]
g1 = g`*b =
q1 =q`*b =
Bard =2*g6 =
Total P1 =
b
2
2= 21/2"X2= 3.86E-04 [m ]
2
Barandado:
HA g61=b*h*hA =
21/2" g62=A1*A =
1" g63=3*A2*h`*A =
h`
2.45 [m]
18.33
12.25
4.07
34.65
[KN/m]
[KN/m]
[KN/m]
[KN/m]
1= 1"X1,5= 1.13E-04 [m ]
b=
0.10 [m]
h=
0.80 [m]
h` =
0.20 [m]
A =
3
78.50 [KN/m ]
Cargas Mayorada:
(Control Intenso)
g1u =
q1u =
Bard =
Total P1u =
24.74
18.38
5.50
48.61
[KN/m]
[KN/m]
[KN/m]
[KN/m]
_____________________________________________________________________________________
50
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Descanso:
Losa:
g71 = h 1* HA =
2
3.75 [KN/m ]
0.63 [KN/m ]
g8 =ep* HS =
Cielo raso:
0.60 [KN/m ]
g9 =ecr* HS =
0.40 [KN/m ]
Total g`=
5.38 [KN/m ]
h1 =
0.15 [m]
h2=
Piso ep =
0.20 [m]
0.03 [m]
2
2
Barandado:
Bard. = g 6*(2d+2*b+c)/d =
8.49 [KN/m]
h1
h2
Cargas Mayorada:
(Control Intenso)
5.10 [m]
[KN/m]
[KN/m]
[KN/m]
[KN/m]
g2u =
q2u =
Bard =
Total P2u =
Resumen de Cargas:
Escalera:
Carga Muerta =
30.24 [KN/m]
Carga Viva =
18.38 [KN/m]
Total =
48.61 [KN/m]
Resumen de Solicitaciones:
Descanso:
Carga Muerta =
Carga Viva =
Total =
Descripcin Pos.
Nudo
Tramo
Nudo
27.41
25.5
8.49
61.40
Unid.
1 V[KN]
3 H[KN]
1-2,3-2 M[KN-m]
2 V[KN]
2-3,2-1 M[KN-m]
2 M[KN-m]
Seccin escalera:
b = 2,45 m
Primer
59.40
15.80
22.20
420.70
109.80
219.50
Estados de Carga
Segundo
26.90
15.80
4.40
355.60
109.80
219.50
As = 5,94 cm 2
B500S
As = 20,69 cm 2
h = 0,20 m
rec. = 1,5 cm
[KN/m]
[KN/m]
[KN/m]
[KN/m]
48.47 [KN/m]
38.25 [KN/m]
86.72 [KN/m]
Tercer
71.20
8.80
33.90
311.00
61.30
122.70
Solicitacin
de diseo
71.20
15.80
33.90
420.70
109.80
219.50
h = 0,15 m
rec. = 1,5 cm
H25
Seccin Descanso:
b = 5,10 m
37.01
38.25
11.46
86.72
8 c/17.5
12 c/12.5
12 c/20
As = 2,42 cm /m
As = 8,44 cm /m
M2 = 219,50[KN-m]
As = 28,62 cm 2
As = 5,61 cm /m
_____________________________________________________________________________________
51
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
H 25
B500S
gu = 5.06 [KN/m]
q =82.50[KN/m]
g = 5.06[KN/m]
284.68
223.28KN
223.28KN
5.1m
6
Vs s la resistencia proporcionada por el acero con:
Vs =
Av * fy * d
S
0.85 * 125 +
* 50 * 48 > 223.28
S
Av
, Para e6 dos ramas tenemos Av=0.57 cm2
0.057
S = 10.00 cm
S<
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
53
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
54
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
5. GRADERAS PREFABRICADAS
5.1. GEOMETRA
5cm
23cm
36cm
14cm
2cm
38cm
5cm
2cm
2cm
8cm
66cm
Ycg Ycgp
Xcg
Y
X
Xcgp
_____________________________________________________________________________________
- 5355
-
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
14cm
[cm ]
4
[cm ]
4
[cm ]
[cm4]
-0.4617
-12.3923
40177.96
366280.74
0.00
406458.70
7.10
21.43
-0.0241
-1.3807
[cm ]
[cm4]
4
[cm ]
[cm4]
[cm]
[cm]
2cm
38cm
5cm
2cm
2cm
8cm
66cm
Ycg Ycgp
Xcg
Y
X
Xcgp
_____________________________________________________________________________________
56
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
5.3. MATERIALES:
Hormign H25
Acero B500S
yd = 434.78/200 = 2.17/oo
5.4. CARGAS:
rea de la seccin
A = 0.08 m2
Volumen
V = 0.08*5.4 = 0.43 m3
CV = 1.5*5.00*0.60
= 6.30 [KN/m]
Sistema esttico:
CV=6.30 KN/m
5.40 m
CM=2.70 KN/m
5.40 m
Solicitaciones:
Md =
(CM + CV) * L2
= 32.81[KN-m]
8
A efectos de clculo es til sustituir la seccin, si eliminamos una de las alas, tenemos
seccin rectangular.
Md
Ycgp
Cg.ac
Mdx
z = 11.40
Z
Xcgp
Mdy
_____________________________________________________________________________________
- 5557
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Mdx
fyd * z
Donde:
As1 : Armadura de traccin.
Mdx: Componente del Momento aplicado en el eje X
fyd: Resistencia de calculo del acero.
z: Distancia vertical del centro de gravedad del rea comprimida al punto Z de la
armadura.
Remplazando valores en la anterior ecuacin tenemos As = 6.47 cm2.
Junta de 2 cm
de separacin
Apoyo de mortero
Prticos
Estructura de apoyo
_____________________________________________________________________________________
- 5658
-
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
59
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Sin embargo, existen importantes ventajas en las estructuras continuas. Para claros y cargas
dadas, los momentos de diseo son menores que para las estructuras determinadas, la rigidez se
aumenta y las deflexiones se disminuyen. Mediante la continuidad en el postesado de los
tendones a lo largo de varios claros, se requieren menos anclajes y los costos de mano de obra
para el tensado se reducen grandemente. La rigidez en los nudos de los prticos continuos
proporciona un importante mecanismo para resistir las cargas horizontales tales como las
inducidas por el viento, las explosiones o las fuerzas ssmicas.
Estas estructuras han probado ser tanto funcionales como altamente econmicas. Se han
desarrollado muchos arreglos ingeniosos para evitar los problemas mencionados anteriormente,
tales como las altas perdidas por friccin del preesfuerzo, y la necesidad de adaptarse a la
variacin de los momentos a lo largo de los claros.
En la medida que se cuenta con un mayor desarrollo tcnico la construccin continua presforzada
es cada vez mas utilizada.
6.1.2. Anlisis Elstico de los efectos del Presforzado
Cando una fuerza pretensora excntrica se aplica a una viga estticamente determinada, se
inducen momentos flectores iguales al producto de la fuerza por la distancia entre el centroide del
acero y el centroide del concreto. Al presforzarse la viga se deflexionar, combndose
generalmente hacia arriba, sin que se produzcan reacciones exteriores. Si se excluye el efecto del
peso propio del miembro, la resultante de los esfuerzos de compresin C coincide con el
centroide del acero de preesfuerzo, segn se muestra.
_____________________________________________________________________________________
60
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
V
Centroide del acero
b)
c)
V
R=0
V=0
a) Perfil de la viga.
_____________________________________________________________________________________
- 5961
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Puesto que los momentos secundarios en cualquier viga continua presforzada son producidos por
fuerzas quo actan nicamente en los apoyos, estos momentos secundarios deben siempre variar
linealmente entre apoyos, como se muestra en la figura.
Los puntos con momento de flexin nulo deben identificarse con puntos de inflexin de la curva
de deflexin de la figura.
_____________________________________________________________________________________
- 6062
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
En cualquier caso, la magnitud de los momentos secundarios depender del perfil particular
seleccionado para el tendn. A menudo ellos son comparables a los momentos primarios, y en
muchos casos pueden ser mayores, aun cuando se los denomine secundarios.
Por lo general, el centroide de la distribucin de esfuerzos en el concreto para una viga continua,
no se encontrar al mismo nivel que el centroide del acero, tal como si lo era para el caso de
vigas simplemente apoyadas, debido a la existencia de momentos secundarios. Este
desplazamiento "M2/V" del centro de presin o lnea de empujes es igual al momento secundario
dividido por la tuerza pretensora, tal como se muestra en la figura.
Hay que destacar que los momentos primarios son directamente proporcionales a la fuerza
pretensora. En consecuencia las reacciones debidas al presfuerzo, y los momentos secundarios
son tambin proporcionales a la fuerza pretensora, como lo son los momentos totales generados
por el presfuerzo. Se concluye que el desplazamiento " M2/V " de la lnea de empujes desde el
centroide del acero no cambia a medida en que las perdidas reducen gradualmente la fuerza
pretensora desde Pi hasta Pf. La ubicacin de la lnea de empujes para un perfil dado del acero es
fija.
Los esfuerzos en el concrete resultante de presforzar una viga continua se pueden hallar con las
formulas corrientes, excepto que la excentricidad de la lnea de empujes con respecto al
centroide del concrete "e*", debe sustituirse por ue", la excentricidad del centroide del acero.
As, para una viga continua, los esfuerzos longitudinales en la cara superior e inferior del
concrete son:
e *c
* 1 2 1
r
fi = -
P
Ac
f2 = -
P e * c2
* 1
Ac
r2
Donde e* es la distancia desde la lnea de empujes hasta el centroide del concrete, e* ser
negativo cuando la lnea de empujes se encuentra por encima del eje neutro.
6.1.3. Anlisis de Cargas Equivalentes
_____________________________________________________________________________________
- 6163
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
automticamente calcula las reacciones por coaccin y los resultados que presenta y se
manejan corresponden a Momentos Totales de pretensado.
Esto permite obviar la morosa separacin de Momentos Primarios y Mementos Secundarios
inclusive en los estados de cargas de anlisis en rotura, ya que no se consideran los efectos del
Pretensado como cargas externas equivalentes y se restan estas de las cargas vivas y de las
de peso propio para posteriormente trabajar solo con la porcin de cargas desbalanceadas
(mtodo de balanceo de cargas). Es decir se mantiene en toda condicin la totalidad del efecto
de Pretensado multiplicado por un factor de 1.0, como tambin la totalidad de las otras cargas
mayoradas por el factor correspondiente, incluso en los estados de rotura cuando se llega a estados
no lineales de esfuerzos.
6.2. DEFINICIN DE LA GEOMETRA
La geometra se ha definido en base al sistema de ejes y elevaciones resultantes del
diseo arquitectnico (ver de planos arquitectnicos).
Para la simulacin ms prxima posible de la realidad el modelo estructural ha sido concebido
como un sistema de prticos tridimensionales de modo que se obtengan resultados ms precisos
en cuanto a esfuerzos y deformaciones.
Presentamos a continuacin una vista isomtrica de la estructura a disear:
_____________________________________________________________________________________
- 6365
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
BLOQUE 1
10,8m
10,8m
32,4m
10,8m
10,8m
JUNTA
BLOQUE 2
16,2m
37,8m
10,8m
10,8m
BLOQUE 3
10,8m
10,8m
32,4m
En este proyecto se han utilizado los Estados Lmites ltimos como base para el diseo
general de la estructura, se ha formulado un prtico tridimensional de la totalidad de la
estructura por cada bloque.
Para contemplar la muy alta rigidez en el plano de las losas de piso, se ha utilizado la opcin
de Diafragmas Rgidos. Los diafragmas de piso son modelados como planos horizontales
rgidos paralelos al plano global X-Y, de esta manera ningn punto perteneciente al plano de
la losa (en cada piso) puede tener movimientos relativos entre ellos.
Tpicamente cada diafragma de piso es establecido por un nudo, perteneciente a ese plano,
llamado Nudo Maestreo.
En el anlisis de cargas horizontales, tales como viento y sismo, se debe tener cuidado con la
ubicacin del nudo maestro este debe ser elegido de manera tal de representar la resultante
exacta de las cargas aplicadas, tanto en magnitud como en punto de aplicacin ya que de otra
manera se podra no tomar en cuenta posibles esfuerzos importantes de torsin.
_____________________________________________________________________________________
- 6466
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Todos los otros nudos pertenecientes al plano son conectados al Nudo Maestro a travs de
uniones rgidas y sus desplazamientos son dependientes de los desplazamientos de los Nudos
Maestros.
Como ya se indico lneas arriba las fuerzas horizontales actuantes en el piso debern aplicarse
como cargas concentradas en el Nudo Maestro correspondiente, es por esta razn que los
esfuerzos de viento se calcularan para la totalidad del rea de exposicin de cada piso.
La secuencia completa de clculos incluidas todas las formulas y parmetros de
consideracin, se encuentran detalladas mas adelante.
6.4.1. ANLISIS DE CARGAS
6.4.1.1.Carga por Tabiquera
Ladrillo:
9
9
9
9
9
9
a) Muro en soguilla:
_____________________________________________________________________________________
- 6567
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
_____________________________________________________________________________________
- 6868
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
6.4.1.2.Determinacin de cargas
Seccin tpica de losa:
Acabado en ceramica
Carpeta de Nivelacin
3cm
5cm
40cm
Losa de HA
10cm
Aligerante (Styropor)
40cm
15cm
2,5cm
10cm
10cm
Cielo Raso
(Revoque Pasta de Yeso)
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DETERMINACIN DE CARGAS LOSAS
LOSA EN UNA DIRECCIN
AMBIENTE: LOCALES PARA REUNION CON ASIENTOS FIJOS
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
2
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
2
0.60 [KN/m ]
Cielo Raso
20
2
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
0.00 [KN/m ]
2
3.31 [KN/m ]
gu =
q=
2
3.00 [KN/m ]
qu =
2
4.47 [KN/m ]
2
4.50 [KN/m ]
Pu =
2
8.97 [KN/m ]
Sobrecarga
AMBIENTE: BAOS
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
0.60 [KN/m ]
Cielo Raso
2
2
2
20
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
2.00 [KN/m ]
2
5.31 [KN/m ]
gu =
7.17 [KN/m ]
q=
2
2.00 [KN/m ]
qu =
2
3.00 [KN/m ]
Sobrecarga
2
Pu = 10.17 [KN/m ]
_____________________________________________________________________________________
70
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DETERMINACIN DE CARGAS LOSAS
LOSA EN UNA DIRECCIN
AMBIENTE: OFICINAS
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
2
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
2
0.60 [KN/m ]
Cielo Raso
20
2
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
2.00 [KN/m ]
2
5.31 [KN/m ]
gu =
q=
2
2.50 [KN/m ]
qu =
Sobrecarga
2
7.17 [KN/m ]
2
3.75 [KN/m ]
2
Pu = 10.92 [KN/m ]
AMBIENTE: CORREDORES
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
0.60 [KN/m ]
Cielo Raso
2
2
2
20
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
0.00 [KN/m ]
2
3.31 [KN/m ]
gu =
4.47 [KN/m ]
q=
2
4.00 [KN/m ]
qu =
2
6.00 [KN/m ]
Sobrecarga
2
Pu = 10.47 [KN/m ]
_____________________________________________________________________________________
71
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DETERMINACIN DE CARGAS LOSAS
LOSA EN UNA DIRECCIN
AMBIENTE:TRIBUNAS CON ASIENTOS FIJOS
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
2
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
2
0.60 [KN/m ]
Cielo Raso
20
2
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
0.00 [KN/m ]
2
3.31 [KN/m ]
gu =
q=
2
5.00 [KN/m ]
qu =
Sobrecarga
2
4.47 [KN/m ]
2
7.50 [KN/m ]
2
Pu = 11.97 [KN/m ]
AMBIENTE:COMEDOR
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
0.60 [KN/m ]
Cielo Raso
2
2
2
20
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.10 [KN/m ]
Tabiqueria
g=
0.00 [KN/m ]
2
3.31 [KN/m ]
gu =
4.47 [KN/m ]
q=
2
4.00 [KN/m ]
qu =
2
6.00 [KN/m ]
Sobrecarga
2
Pu = 10.47 [KN/m ]
_____________________________________________________________________________________
72
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DETERMINACIN DE CARGAS LOSAS
LOSA EN UNA DIRECCIN
AMBIENTE: AZOTEAS INACCESIBLES
Dimensiones de elementos aligerantes:
Ancho:
Profundidad :
Alto :
Espesor de la losa de compresin:
Alto total de losa:
Dimensin de viguetas:
a=
b=
c=
e=
h=
d=
0.40
0.40
0.15
0.05
0.20
0.10
[m]
[m]
[m]
[m]
[m]
[m]
CARGAS DE DISEO:
Losa de Compresin
0.05 x 25
1.25 [KN/m2]
Nervios
0.75 [KN/m ]
Aligerante
5.00 x 0.06
2
0.30 [KN/m ]
Carpeta de nivelacin
0.03 x
2
0.00 [KN/m ]
Cielo Raso
20
2
0.31 [KN/m ]
0.025 x 12.5
Acabado en Ceramica
2
0.00 [KN/m ]
Tabiqueria
g=
0.00 [KN/m ]
2
2.61 [KN/m ]
gu =
q=
2
1.00 [KN/m ]
qu =
2
3.53 [KN/m ]
2
1.50 [KN/m ]
Pu =
2
5.03 [KN/m ]
Sobrecarga
_____________________________________________________________________________________
73
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
74
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
75
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CALCULO DE CARGAS SOBRE VIGAS
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
1 PISO
CARGAS PROVENIENTES DE :
ESCALERA Y TABIQUERIA
TABIQUERIA Y BARANDADO
Carga Muerta
Carga viva
Carga Muerta
Carga viva
[KN/m]
[KN/m]
[KN/m]
[KN/m]
1 =
4.60
wq 1 =
0.00
Tab.
wg 16 = 11.70
wq 16 = 3.20
2 =
2.30
wq 2 =
0.00
Baran.
wg 17 = 11.70
wq 17 = 3.20
3 =
2.30
wq 3 =
0.00
Baran.
wg 18 = 11.70
wq 18 = 3.20
4 =
2.30
wq 4 =
0.00
Baran.
wg 19 = 4.60
wq 19 = 0.00
5 =
2.30
wq 5 =
0.00
Baran.
wg 20 = 4.60
wq 20 = 0.00
6 =
4.60
wq 6 =
0.00
Tab.
wg 21 = 4.60
wq 21 = 0.00
7 =
4.60
wq 7 =
0.00
Tab.
wg 22 = 4.60
wq 22 = 0.00
8 =
4.60
wq 8 =
0.00
Tab.
wg 23 = 4.60
wq 23 = 0.00
9 =
4.60
wq 9 =
0.00
Tab.
wg 24 = 4.60
wq 24 = 0.00
10 =
4.60
wq 10 =
0.00
Tab.
wg 25 = 4.60
wq 25 = 0.00
11 =
4.60
wq 11 =
0.00
Tab.
wg 26 = 4.60
wq 26 = 0.00
12 =
4.60
wq 12 =
0.00
Tab.
wg 27 = 4.60
wq 27 = 0.00
13 =
4.60
wq 13 =
0.00
Tab.
wg 28 = 4.60
wq 28 = 0.00
14 =
4.60
wq 14 =
0.00
Tab.
15 =
4.60
wq 15 =
0.00
Tab.
Esc.
Esc.
Esc.
Tab.
Tab.
Tab.
Tab.
Tab.
Tab.
Tab.
Tab.
Tab.
Tab.
Wq
Wg
L
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
2 PISO
CARGAS PROVENIENTES DE :
TABIQUERIA Y BARANDADO
ESCALERA Y TABIQUERIA
Carga Muerta
Carga viva
Carga Muerta
Carga viva
[KN/m]
[KN/m]
[KN/m]
[KN/m]
29 =
2.30
wq 29 =
0.00
Baran.
wg 43 = 11.70
wq 43 = 3.20
30 =
2.30
wq 30 =
0.00
Baran.
wg 44 = 11.70
wq 44 = 3.20
31 =
2.30
wq 31 =
0.00
Baran.
wg 45 = 11.70
wq 45 = 3.20
32 =
2.30
wq 32 =
0.00
Baran.
33 =
2.30
wq 33 =
0.00
Baran.
34 =
2.30
wq 34 =
0.00
Baran.
35 =
2.30
wq 35 =
0.00
Tab.
36 =
2.30
wq 36 =
0.00
Tab.
Wq
Wg
37 =
2.30
wq 37 =
0.00
Tab.
38 =
2.30
wq 38 =
0.00
Tab.
L
39 =
2.30
wq 39 =
0.00
Tab.
40 =
2.30
wq 40 =
0.00
Tab.
41 =
2.30
wq 41 =
0.00
Tab.
42 =
2.30
wq 42 =
0.00
Tab.
Esc.
Esc.
Esc.
_____________________________________________________________________________________
76
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
wg
CARGAS PROVENIENTES DE :
GRADERIAS
VOLADO EN MENSULA
Carga viva
Carga Muerta
Carga viva
Carga Muerta
[KN/m]
[KN/m]
[KN/m]
[KN/m]
46 =
9.70
wq 46 = 16.20
wg 68 =
2.00
wq 68 =
3.50
47 = 15.40
wq 47 = 32.40
wg 69 =
2.00
wq 69 =
3.50
48 = 15.40
wq 48 = 32.40
wg 70 =
2.00
wq 70 =
3.50
49 = 15.40
wq 49 = 32.40
wg 71 =
2.00
wq 71 =
3.50
50 = 15.40
wq 50 = 32.40
wg 72 =
2.00
wq 72 =
3.50
51 = 15.40
wq 51 = 32.40
wg 73 =
2.00
wq 73 =
3.50
52 =
7.70
wq 52 = 16.20
wg 74 =
2.00
wq 74 =
3.50
53 =
7.70
wq 53 = 32.40
wg 75 =
2.00
wq 75 =
3.50
54 = 15.40
wq 54 = 32.40
wg 76 =
2.00
wq 76 =
3.50
55 = 15.40
wq 55 = 32.40
wg 77 =
2.00
wq 77 =
3.50
56 = 15.40
wq 56 = 32.40
wg 78 =
2.00
wq 78 =
3.50
57 = 15.40
wq 57 = 32.40
wg 79 =
2.00
wq 79 =
3.50
58 = 15.40
wq 58 = 32.40
wg 80 =
2.00
wq 80 =
3.50
59 = 15.40
wq 59 = 32.40
wg 81 =
2.00
wq 81 =
3.50
60 =
7.70
wq 60 = 16.20
wg 82 =
2.00
wq 82 =
3.50
61 =
7.70
wq 61 = 16.20
wg 83 =
2.00
wq 83 =
3.50
62 = 15.40
wq 62 = 32.40
wg 84 =
2.00
wq 84 =
3.50
63 = 15.40
wq 63 = 32.40
wg 85 =
2.00
wq 85 =
3.50
64 = 15.40
wq 64 = 32.40
wg 86 =
2.00
wq 86 =
3.50
65 = 15.40
wq 65 = 32.40
wg 87 =
2.00
wq 87 =
3.50
66 = 15.40
wq 66 = 32.40
wg 88 =
2.00
wq 88 =
3.50
67 =
9.70
wq 67 = 16.20
Wq
Wg
L
_____________________________________________________________________________________
77
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Lx =
Ly =
H=
Ve =
18.50
32.70
11.30
132.00
[m]
[m]
[m]
[Km/h]
Transversal
Longitudinal
Tt =
36.0009 *Q
Ks = 1.000
Ks = 1.000
qe = 58.96
qe = 58.964
Sentido Long.
Ct = 1.300
= 1.054
= 0.150
= 0.360
= 0.770
; Li = Ly
Tt =
19.5185 *Q
Li = Lx
PISO
PB
P1
P2
P3
0.23645 [seg]
0.17785 [seg]
SENTIDO LONGITUDINAL
cota
p/viento
T tranv.
cota
p/viento
T
tranversal
[m]
[m]
[daN/m]
[KN]
[daN/m]
[KN]
4.70
3.60
3.00
0.00
4.70
8.30
11.30
0.00
51.72
56.76
60.58
H=
0.00
0.00
87.51
4.70
73.57
8.30
65.42
11.30
226.50 [KN]
0.00
51.72
56.76
60.58
H=
0.00
47.45
39.88
35.47
122.80 [KN]
_____________________________________________________________________________________
78
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Lx =
Ly =
H=
Ve =
18.50
38.10
11.30
132.00
[m]
[m]
[m]
[Km/h]
Transversal
Longitudinal
Tt =
41.9460 *Q
Ks = 1.000
Ks = 1.000
qe = 58.96
qe = 58.96
Sentido Long.
Ct = 1.300
= 1.054
= 0.150
= 0.360
= 0.770
; Li = Ly
Tt =
19.5185 *Q
Li = Lx
PISO
PB
P1
P2
P3
0.23645 [seg]
0.16476 [seg]
SENTIDO LONGITUDINAL
cota
p/viento
T tranv.
cota
p/viento
T
tranversal
[m]
[m]
[daN/m]
[KN]
[daN/m]
[KN]
4.70
3.60
3.00
0.00
4.70
8.30
11.30
0.00
51.72
56.76
60.58
H=
0.00
0.00
101.96
4.70
85.71
8.30
76.23
11.30
263.90 [KN]
0.00
51.72
56.76
60.58
H=
0.00
47.45
39.88
35.47
122.80 [KN]
_____________________________________________________________________________________
79
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CARGA TOTAL
AREA
2
PISO
UNID.
[KN]
368.98
184.49
[KN]
308.13
239.38
[KN]
2285.52 1441.19
[KN]
171.63
105.50
[KN]
430.01
215.00
332.50
263.75
[KN]
538.73
382.01
3672.97 2352.56
[KN]
2
[m ]
[KN/m ]
[KN-s2/m]
257.53
2663.69 1680.22
33.75
171.63
105.50
25.46
PESO/m
MASA
82.49
14.56
90.00
87.29
627.83
445.19
49.91
484.72
604.95
408.75
212.55
704.85
476.25
247.65
6.07
374.79
5.76
240.06
0.74
15.94
6.00
431.19
5.69
276.50
1.96
49.46
Jm =
( Ix + Iy ) * masa
Area
PISO
UNID.
Lx [m]
Ly [m]
A [m2]
4
Ix [m ]
408.75
17253.68 5322.27
212.55
704.85
476.25
247.65
871.93
CENTRO DE MASA
PISO
UNID.
Xcg [m]
Ycg [m]
16.35
6.25
16.35
3.25
19.05
6.25
19.05
3.25
_____________________________________________________________________________________
80
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
Tn
5.33
R* =
1.00
1.60
2.16
2.63
2.95
3.09
3.04
2.87
2.62
2.35
2.08
1.83
1.61
1.42
1.25
1.11
0.99
0.89
0.80
0.72
0.65
0.59
0.54
0.50
0.46
0.42
B
1
III
7
0.85
Categoria Edificio
Zona Ssmica
Tipo de Suelo
Coeficicente Ro
T* =
Sa/g
0.0056
0.0090
0.0122
0.0148
0.0166
0.0174
0.0171
0.0162
0.0148
0.0132
0.0117
0.0103
0.0091
0.0080
0.0071
0.0063
0.0056
0.0050
0.0045
0.0040
0.0037
0.0033
0.0030
0.0028
0.0026
0.0024
I
Ao/g
To
T*
p
0.02
0.002
0.004
0.006
0.008
0.01
0.012
0.014
0.016
0.018
1.20
0.025
0.75
0.85
1.00
Sa/g
0.2
0.4
0.6
T*
0.8
Tn
1.2
1.4
1.6
1.8
T
1 + 4,5 n
T0
=
3
Tn
1+
T0
T*
0,10T0 +
R0
IA0
R*
R* = 1 +
Sa =
ESPECTRO
LA PAZ - BOLIVIA
2.2
2.4
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
81
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Geometria:
h
b
Materiales:
b=
h=
d=
1.00
0.20
0.18
m
m
m
H 25
B 500 S
Primer piso:
Losa Tipo 1
Momentos KN-m
Tramo
32.70
Apoyo
34.90
Tramo
13.20
4.34
212
Tramo
42.00
4.64
10c/15
Apoyo
40.90
1.71
210
Tramo
11.00
5.64
212+110
5.48
12c/20
1.42
210
Segundo piso:
Losa Tipo 3
Momentos KN-m
Tramo
47.10
6.36
212 + 110
Tramo
59.30
8.14
216
_____________________________________________________________________________________
82
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
83
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
84
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
85
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
86
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
6.8. PRETENSADO
6.8.1.
6.8.2.
6.8.3.
6.8.4.
6.8.5.
6.8.6.
UBICACIN DE VIGAS
DATOS GEOMTRICOS
DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
TRAZADO DE CABLES
FUERZA DE PRETENSADO
PRDIDA PARCIAL DE LA FUERZA DE PRETENSADO
UBICACIN DE VIGAS
DATOS GEOMTRICOS
DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
TRAZADO DE CABLES
FUERZA DE PRETENSADO
PRDIDA PARCIAL DE LA FUERZA DE PRETENSADO
_____________________________________________________________________________________
- 8687
-
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
88
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DISEO DE VIGAS POSTENSADAS BLOQUE 1 y 3
GEOMETRA DE VIGAS TIPO
Numero de vanos: 3
Seccin de la viga:
tf1
L1 =
10.8
[m]
L2 =
10.8
[m]
t2 = 0.40 [m]
L3 =
10.8
[m]
t3 = 0.80 [m]
t3
tf = 0.20 [m]
Materiales:
tw = 0.15 [m]
fc =
35 [Mpa]
tfb = 0.20 [m]
fs`= 1890 [Mpa]
t2b = 0.40 [m]
tfb1
tf1 = 0.10 [m]
tfb1 = 0.10 [m]
t2
tf
tw
tfb
t2b
L1
L2
L3
Propiedades Geometricas.
GEOMETRIA
0.80
4
5
6
7
8
9
10(A) 11(X)
0.70
X i+1[m] y i+1[m]X( i+1)+XY( i+1)+YX( i+1)-X Y( i+1)-Yi [9*6]/2 *[6^2+8^
0.00
0.10
0.00
0.10
0.00
0.10
0.00
0.00
0.60
0.13
0.20
0.13
0.30
0.13
0.10
0.01
0.00
0.13
0.60
0.25
0.80
0.00
0.40
0.05
0.00
0.50
0.00
0.70
0.13
1.30
-0.13
0.10
0.01
0.00
0.40
0.00
0.80
0.00
1.50
0.00
0.10
0.00
0.00
0.40
0.80
0.40
1.60
0.40
0.00
0.00
0.00
0.30
0.40
0.70
0.80
1.50
0.00
-0.10
-0.04
-0.01
0.28
0.60
0.68
1.30
-0.13
-0.10
-0.03
-0.01
0.20
0.28
0.20
0.55
0.80
0.00
-0.40
-0.11
-0.02
0.10
0.40
0.10
0.68
0.30
0.13
-0.10
-0.03
-0.01
0.40
0.00
0.80
0.10
0.00
-0.10
-0.04
-0.01
0.00
0.00
0.00 0.00 0.40
0.00
-0.40
0.00
0.00
0.20
0.40
0.60
0.80 0.00
X[m]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Y[m]
INTRODUCCION
DE COORDENADAS
1
2
3
Punto
x[m]
y[m]
1
0.00
0.00
2
0.00
0.10
3
0.13
0.20
4
0.13
0.60
5
0.00
0.70
6
0.00
0.80
7
0.40
0.80
8
0.40
0.70
9
0.28
0.60
10
0.28
0.20
11
0.40
0.10
12
0.40
0.00
13
0.00
0.00
-0.20
A=
X=
v` =
v =
r2 =
e =
Ki =
0.1950
0.2000
0.4000
0.4000
0.0736
0.4602
0.1841
[m ]
[m]
[m]
[m]
[m2]
[rad]
[m]
Ixx =
Iyy =
Ixy =
Si =
Ss =
0.0144
0.0016
0.0000
0.0359
0.0359
-0.04
[m ]
[m4]
4
[m ]
3
[m ]
[m3]
Ks = 0.1841 [m]
_____________________________________________________________________________________
89
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
Aplicamos tesado de 1 lado:
Tramo A - B
Tramo
A - B
B - B`
B` - C
C - C`
C` - D
D - D
D - E
E - E
E - F
F -G
Tramo B - B`
x [m]
5.40
3.24
2.16
2.16
3.24
3.24
2.16
2.16
3.24
5.40
e [m]
0.20
0.26
0.24
0.24
0.26
0.26
0.24
0.24
0.26
0.20
=
k=
arctan
2
l 1 +
0.2500
0.0049
fB
e
l
8 2 l
3 e
fA e
arctan
2
e
l
fB e
3.25 [m]
fC
1281.49 [Mpa]
arctan
2
l 1 +
Tramo C - C`
8 2 l
3 e
fC e
fC
8 2 l
3 e
fB e
2.18 [m]
1124.41 [Mpa]
l 1 +
arctan
2
fD
e
l
8 2 l
3 e
fD e
2.18 [m]
1200.39 [Mpa]
8 2 l
3 e
fC e
fD
0.15914 [rad]
3.25 [m]
1063.40 [Mpa]
Tramo D - E
arctan
2
l 1 +
0.21867 [rad]
0.21867 [rad]
Tramo D - D
1355.02 [Mpa]
Tramo C` - D
arctan
2
l 1 +
5.40 [m]
0.15914 [rad]
3
e
l 1 +
8 2 l
fB
0.07394 [rad]
Tramo B` - C
fs`= 1890.00 [Mpa]
fB = 1355.02 [Mpa]
fs`=
0.00 [Mpa]
fD` = 1005.69 [Mpa]
0.15914 [rad]
3.25 [m]
1005.69 [Mpa]
arctan
2
l 1 +
fE
e
l
8 2 l
3 e
fD e
0.21867 [rad]
2.18 [m]
942.04 [Mpa]
_____________________________________________________________________________________
90
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Tramo E - E
Tramo E - F
fs`= 1890.00 [Mpa]
fE= 942.04 [Mpa]
arctan
2
l 1 +
fE
8 2 l
l
0.21867 [rad]
3 e
fE e
fs`=
fE` =
882.42 [Mpa]
fF
e
l
0.15914 [rad]
8 2 l
3 e
l 1 +
2.18 [m]
arctan
2
0.00 [Mpa]
882.42 [Mpa]
fE e
3.25 [m]
834.53 [Mpa]
Tramo F - G
fs`= 1124.41 [Mpa]
fE= 834.53 [Mpa]
arctan
2
l 1 +
fG
e
l
0.07394 [rad]
8 2 l
3 e
fF e
5.40 [m]
797.75 [Mpa]
Perdidas instantaneas:
Como la estructura es simetrica entonces:
E[Mpa]
h[m]
l[m]
196000
0.006
16.20
tf
th
tf = fA - fD =
( E h l)
tf
619.75
5.54
[Mpa]
[m]
th =
422.65
[Mpa]
fmi = fA - tf =
797.75
[Mpa]
fmax =
1351.75 [Mpa]
0,8m
P=
fmp =
Atoron =
1150.0 [KN]
1102.4 [MPa]
2
0.987 [cm ]
Ntorones=
0,2m
5,4m
3,24m
2,16m
total
11
0,3m
Atoron* fmp
2,16m
= 10.57
0,3m
3,24m
torones
_____________________________________________________________________________________
91
f [MPa]
12
1124
15
X [m]
1063
18
1006
DIAGRAMA DE TENSIONES
fC`
fD
fD`
fE
1026.42 965.41 907.70 844.05
XC`
XD
XD`
XE
12.96
16.20
19.44
21.60
1114.39 1048.14 985.49 916.39
fE`
784.43
XE`
23.76
851.65
fE`
882.42
XE`
23.76
958.04
942
21
24
882
fmax
736.54
XF
27.00
799.67
fF
834.53
XF
27.00
906.05
27
835
fG
699.76
XG
32.40
759.73
fG
797.75
XG
32.40
866.12
30
fA`
994.85
XA`
0.00
32.4
33
798
fmax
1351.75
Xmax
5.54
26.86
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
92
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 1 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
10.57
1150.00 [KN]
2
Ap=P/fmp =
10.43 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
11
P = 1256.39 [KN]
= 0.92
fp/fs = 0.61
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
16.94 [Mpa]
5.00 [Mpa]
Ppi =
28926.65 [Mpa]
1022.77 [KN]
3.89 [Mpa]
Ss = 0.0359 [m3]
M g = 87.36 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
P`= P-FES =
fcir =
fcds =
18.39 [KN]
1004.38 [KN]
2.72 [Mpa]
2.36 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
32.38 [Mpa]
Dfs = ES + CR + SH + RE =
97.99 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
897
850
800
750
700
650
1355
1352
1254
1281
1200
1184
1124
1063
1102
1006
1026
942
965
882
908
835
798
844
784
737
700
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
93
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 2 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
19.74
2100.00 [KN]
2
Ap=P/fmp =
19.48 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
20
P = 2341.98 [KN]
= 0.90
fp/fs = 0.63
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
36.07 [Mpa]
10.65 [Mpa]
Ppi =
28926.65 [Mpa]
1859.59 [KN]
10.38 [Mpa]
Ss = 0.0359 [m3]
M g = 102.99 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
P`= P-FES =
fcir =
fcds =
71.20 [KN]
1788.38 [KN]
6.30 [Mpa]
5.34 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
31.35 [Mpa]
Dfs = ES + CR + SH + RE =
122.58 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
872
850
800
750
700
650
1355
1352
1281
1200
1229
1159
1124
1063
1078
1006
942
1002
882
941
835
883
798
819
760
712
675
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
94
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 3 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
16.78
1800.00 [KN]
2
Ap=P/fmp =
16.56 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
17
P = 1990.24 [KN]
= 0.90
fp/fs = 0.63
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
34.05 [Mpa]
10.05 [Mpa]
Ppi =
28926.65 [Mpa]
1580.65 [KN]
2.81 [Mpa]
Ss = 0.0359 [m3]
M g = 51.58 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
P`= P-FES =
fcir =
fcds =
57.14 [KN]
1523.51 [KN]
6.38 [Mpa]
6.12 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
31.73 [Mpa]
Dfs = ES + CR + SH + RE =
113.38 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
881
850
800
750
700
650
1355
1352
1281
1238
1200
1168
1124
1063
1087
1006
1011
942
950
882
835
892
798
829
769
721
684
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
95
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 4 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
16.68
1800.00 [KN]
2
Ap=P/fmp =
16.46 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
17
P = 1979.19 [KN]
= 0.91
fp/fs = 0.62
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
29.56 [Mpa]
8.73 [Mpa]
Ppi =
28926.65 [Mpa]
1580.65 [KN]
0.44 [Mpa]
Ss = 0.0359 [m3]
M g = 99.18 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
P`= P-FES =
fcir =
fcds =
49.60 [KN]
1531.05 [KN]
5.09 [Mpa]
5.05 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
32.01 [Mpa]
Dfs = ES + CR + SH + RE =
106.79 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
888
850
800
750
700
650
1355
1352
1281
1245
1200
1175
1124
1063
1094
1006
1018
942
957
882
835
899
798
835
776
728
691
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
96
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 5 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
9.26
1000.00 [KN]
2
Ap=P/fmp =
9.14 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
10
P = 1105.10 [KN]
= 0.90
fp/fs = 0.59
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
17.82 [Mpa]
5.26 [Mpa]
Ppi =
28926.65 [Mpa]
929.79 [KN]
11.86 [Mpa]
Ss = 0.0359 [m3]
M g = 53.72 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
17.59 [KN]
P`= P-FES =
fcir =
fcds =
912.20 [KN]
3.18 [Mpa]
4.28 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
32.02 [Mpa]
Dfs = ES + CR + SH + RE =
106.49 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
888
850
800
750
700
650
1355
1352
1281
1245
1200
1175
1124
1063
1094
1006
1018
942
957
882
835
899
798
836
776
728
691
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
97
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 6 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.30 [m]
P =
r =
0.074
# de cables =
9.19
1000.00 [KN]
2
Ap=P/fmp =
9.07 [cm ]
2
0.987 [cm ]
942.04 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
10
P = 1096.94 [KN]
= 0.91
fp/fs = 0.59
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.195
=
16.01 [Mpa]
4.73 [Mpa]
Ppi =
28926.65 [Mpa]
929.79 [KN]
5.05 [Mpa]
Ss = 0.0359 [m3]
M g = 72.96 [KN-m]
42.8 W
Eci
fci
FES =Apt*ES =
Sc = 0.0502 [m ]
15.80 [KN]
P`= P-FES =
fcir =
fcds =
913.99 [KN]
2.65 [Mpa]
3.12 [Mpa]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
44.78 [Mpa]
32.37 [Mpa]
Dfs = ES + CR + SH + RE =
98.21 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
995
950
900
897
850
800
750
700
650
1355
1352
1254
1281
1200
1183
1124
1063
1102
1006
1026
942
965
882
907
835
798
844
784
736
700
12
15
18
21
24
27
30
33
X [m]
_____________________________________________________________________________________
98
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
99
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DISEO DE VIGAS POSTENSADAS BLOQUE 2
GEOMETRA DE VIGAS TIPO
Numero de vanos: 3
Seccin de la viga:
tf1
L1 =
10.8
[m]
L2 =
16.2
[m]
t2 = 0.40 [m]
L3 =
10.8
[m]
t3 = 1.00 [m]
t3
tf = 0.20 [m]
Materiales:
tw = 0.15 [m]
fc =
35 [Mpa]
tfb = 0.20 [m]
fs`= 1890 [Mpa]
t2b = 0.40 [m]
tfb1
tf1 = 0.10 [m]
tfb1 = 0.10 [m]
t2
tf
tw
tfb
t2b
L1
L2
L3
Propiedades Geometricas.
GEOMETRIA
4
51.00
6
7
8
9
10(A) 11(X)
0.90
i+1)+XY( i+1)+YX( i+1)-X Y( i+1)-Yi [9*6]/2 *[6^2+8^
X i+1[m] y i+1[m]X(
0.00
0.10
0.00
0.10
0.00
0.10
0.00
0.00
0.80
0.13
0.20
0.13
0.30
0.13
0.10
0.01
0.00
0.70
0.13
0.80
0.25
1.00
0.00
0.60
0.08
0.00
0.60
0.00
0.90
0.13
1.70
-0.13
0.10
0.01
0.00
0.50
0.00
1.00
0.00
1.90
0.00
0.10
0.00
0.00
0.40
1.00
0.40
2.00
0.40
0.00
0.00
0.00
0.40
0.40
0.90
0.80
1.90
0.00
-0.10
-0.04
-0.01
0.30
0.28
0.80
0.68
1.70
-0.13
-0.10
-0.03
-0.01
0.20
0.28
0.20
0.55
1.00
0.00
-0.60
-0.17
-0.02
0.40
0.10
0.68
0.30
0.13
-0.10
-0.03
-0.01
0.10
0.40
0.00
0.80
0.10
0.00
-0.10
-0.04
-0.01
0.00
0.00
0.00 0.00 0.40 0.20 0.00 0.40-0.40 0.60 0.00 0.80 0.001.00 0.00
X[m]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Y[m]
INTRODUCCION
DE COORDENADAS
1
2
3
Punto
x[m]
y[m]
1
0.00
0.00
2
0.00
0.10
3
0.13
0.20
4
0.13
0.80
5
0.00
0.90
6
0.00
1.00
7
0.40
1.00
8
0.40
0.90
9
0.28
0.80
10
0.28
0.20
11
0.40
0.10
12
0.40
0.00
13
0.00
0.00
-0.23
A=
X=
v` =
v =
r2 =
e =
Ki =
0.2250
0.2000
0.5000
0.5000
0.1157
0.4630
0.2315
[m ]
[m]
[m]
[m]
[m2]
[rad]
[m]
Ixx =
Iyy =
Ixy =
Si =
Ss =
0.0260
0.0017
0.0000
0.0521
0.0521
-0.05
[m ]
4
[m ]
4
[m ]
[m3]
[m3]
Ks = 0.2315 [m]
_____________________________________________________________________________________
100
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
DIAGRAMA DE TENSIONES DEL CABLE DE ACERO
Aplicamos tesado de 2 lados:
Primer tesado:
Tramo A - B
Tramo
A - B
B - B`
B` - C
C - C`
C` - D
x [m]
5.40
3.24
2.16
3.24
4.86
e [m]
0.20
0.28
0.32
0.32
0.28
=
k=
l 1 +
0.2500
0.0049
fB
Tramo B - B`
arctan
2
e
l
8 2 l
3 e
fA e
arctan
2
l 1 +
8 2 l
3 e
fB e
fB
3.26 [m]
l 1 +
fC
1277.63 [Mpa]
arctan
2
fC
8 2 l
3 e
fC e
8 2 l
3 e
fB e
0.28806 [rad]
2.19 [m]
1176.11 [Mpa]
0.19502 [rad]
3.26 [m]
e
l
8 2 l
3 e
fC e
0.11472 [rad]
4.87 [m]
1045.79 [Mpa]
Tramo G - F
fs`= 1890.00 [Mpa]
fG = 0,75*fs` = 1417.50 [Mpa]
0.2500
0.0049
fD
1102.32 [Mpa]
arctan
2
l 1 +
1355.02 [Mpa]
Tramo C` - D
arctan
2
l 1 +
5.40 [m]
0.17115 [rad]
Tramo C - C`
0.07394 [rad]
Tramo B` - C
fs`= 1890.00 [Mpa]
fB = 1355.02 [Mpa]
arctan
2
l 1 +
fF
e
l
8 2 l
3 e
fG e
0.07394 [rad]
5.40 [m]
1355.02 [Mpa]
_____________________________________________________________________________________
101
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Tramo F - E`
Tramo E` - E
fs`= 1890.00 [Mpa]
fF = 1355.02 [Mpa]
arctan
2
l 1 +
8 2 l
l
arctan
2
0.17115 [rad]
3 e
fF e
fE
fE
1277.63 [Mpa]
Tramo E - D`
fE e
fD
1176.11 [Mpa]
e
l
8 2 l
l
arctan
2
0.19502 [rad]
3 e
fE e
3.26 [m]
fD
1102.32 [Mpa]
fD e
( E h l)
tf
0.11472 [rad]
3 e
tf = fA - fD =
X
8 2 l
l 1 +
Perdidas instantaneas:
Como la estructura es simetrica entonces:
E[Mpa]
h[m]
l[m]
196000
0.006
18.90
tf
th
2.19 [m]
Tramo D` - D
arctan
2
l 1 +
0.28806 [rad]
3 e
8 2 l
l 1 +
3.26 [m]
th =
4.87 [m]
1045.79 [Mpa]
371.71
[Mpa]
7.73
[m]
284.10
[Mpa]
1299.31 [Mpa]
1m
P=
fmp =
Atoron =
1100.0 [KN]
1067.3 [MPa]
2
]
0.987 [cm0,2m
Ntorones=
0,4m
P
Atoron* fmp
= 10.44
0,4m
5,4m
3,24m
2,16m
total
3,24m
11
4,86m
torones
_____________________________________________________________________________________
102
f [MPa]
1000
1050
1100
1150
1200
1250
1300
1133
1299
1278
1176
12
1102
15
18
X [m]
1046
21
24
1102
27
1176
30
1278
1299
33
fG
1024.55
XG
37.80
1355
1112.35
fG
1417.50
XG
37.80
1538.98
36
fA`
1133.40
XA`
0.00
37.8
1133
1418
fmax
1299.31
Xmax
7.73
30.07
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
103
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 7 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
10.44
1100.00 [KN]
2
Ap=P/fmp =
10.31 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
11
P = 1218.18 [KN]
= 0.90
fp/fs = 0.59
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
19.47 [Mpa]
5.75 [Mpa]
Ss = 0.0521 [m3]
M g = 175.85 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 1276.90 [KN]
12.67 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
21.13 [KN]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1025
1000
950
900
850
0
3
44.78 [Mpa]
31.92 [Mpa]
Dfs = ES + CR + SH + RE =
108.85 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1190
1169
1176
1102
1102
1190
1169
1133
1046
1067
1067
993
1025
993
937
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
104
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 8 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
23.30
2400.00 [KN]
2
Ap=P/fmp =
23.00 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
24
P = 2714.06 [KN]
= 0.88
fp/fs = 0.61
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
52.71 [Mpa]
15.56 [Mpa]
Ss = 0.0521 [m3]
M g = 226.3 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 2785.97 [KN]
4.16 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
124.86 [KN]
f [MPa]
Kre =
J=
C=
35.00
0.04
1.00
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1000
1001
950
900
850
0
3
44.78 [Mpa]
30.93 [Mpa]
Dfs = ES + CR + SH + RE =
132.58 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1167
1145
1176
1102
1167
1102
1133
1145
1046
1044
1044
970
1001
970
913
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
105
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 9 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
24.05
2400.00 [KN]
2
Ap=P/fmp =
23.74 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
24
P = 2791.36 [KN]
= 0.86
fp/fs = 0.62
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
60.11 [Mpa]
17.74 [Mpa]
Ss = 0.0521 [m3]
M g = 112.5 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 2785.97 [KN]
30.74 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
142.39 [KN]
f [MPa]
Kre =
J=
C=
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1000
968
950
900
850
0
35.00
0.04
1.00
44.78 [Mpa]
29.57 [Mpa]
Dfs = ES + CR + SH + RE =
165.21 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1176
1102
1134
1112
1102
1134
1046
1133
1112
1011
1011
937
968
937
881
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
106
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 10 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
23.52
2400.00 [KN]
2
Ap=P/fmp =
23.21 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
24
P = 2736.60 [KN]
= 0.88
fp/fs = 0.61
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
51.62 [Mpa]
15.24 [Mpa]
Ss = 0.0521 [m3]
M g = 243.02 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 2785.97 [KN]
15.15 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
122.28 [KN]
f [MPa]
Kre =
J=
C=
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1000
991
950
900
850
0
35.00
0.04
1.00
44.78 [Mpa]
30.54 [Mpa]
Dfs = ES + CR + SH + RE =
142.10 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1176
1157
1136
1102
1157
1102
1133
1136
1046
1034
1034
960
991
960
904
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
107
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 11 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
19.83
2000.00 [KN]
2
Ap=P/fmp =
19.57 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
20
P = 2304.78 [KN]
= 0.87
fp/fs = 0.62
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
49.21 [Mpa]
14.53 [Mpa]
Ss = 0.0521 [m3]
M g = 107.26 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 2321.64 [KN]
30.37 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
97.15 [KN]
f [MPa]
Kre =
J=
C=
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1000
979
950
900
850
0
35.00
0.04
1.00
44.78 [Mpa]
30.03 [Mpa]
Dfs = ES + CR + SH + RE =
154.40 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1176
1145
1123
1102
1145
1102
1133
1123
1046
1022
1022
948
979
948
891
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
108
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
CLCULO DE LAS PERDIDAS SEGN ACI-318-02
VIGA 12 HP
Acero: Grado 270, Monotoron 7 Hilos, Bajo relajamiento, 1/2"
Hormign:
fs = 1890.00 [Mpa]
e = 0.40 [m]
P =
r =
0.116
# de cables =
19.54
2000.00 [KN]
2
Ap=P/fmp =
19.29 [cm ]
2
0.987 [cm ]
1176.11 [Mpa]
35.00 [Mpa]
Ap =
fcl =
fci =
[m2]
adoptamos
20
P = 2274.99 [KN]
= 0.88
fp/fs = 0.61
3
W=
23.544 [KN/m ]
1. Acortamiento elstico del hormign (ES)
Ac =
Kes = 0.50
Es = 196000 [Mpa]
Kcir =
1.00
[m2]
0.225
=
45.87 [Mpa]
13.54 [Mpa]
Ss = 0.0521 [m3]
M g = 158.68 [KN-m]
42.8 W
Eci
fci
28926.65 [Mpa]
Ppi = 2321.64 [KN]
18.00 [Mpa]
FES =Apt*ES =
Sc = 0.0691 [m ]
90.55 [KN]
f [MPa]
Kre =
J=
C=
1418
1450
1400
1350
1300
1250
1200
1150
1133
1100
1050
1000
994
950
900
850
0
35.00
0.04
1.00
44.78 [Mpa]
30.65 [Mpa]
Dfs = ES + CR + SH + RE =
139.31 [Mpa]
[Mpa]
DIAGRAMA DE TENSIONES
1418
1355
1299
1355
1278
1278
1299
1176
1160
1138
1176
1102
1160
1102
1133
1138
1046
1037
1037
963
994
963
906
12
15
18
X [m]
21
24
27
30
33
36
_____________________________________________________________________________________
109
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
6.9.1.1.Cargas a balancear
En el caso de la Estructura sobre la cual este proyecto de grado se est desarrollando,
por razones de practicidad el balanceo de cargas se lo realizar para el total de la carga
viva.
En teora se podra balancear las cargas de manera perfecta, sin embargo el proceso
sigue una curva asinttica en el grado de dificultad, es decir, cuanto menor es la
tolerancia admitida es ms difcil lograrlo, y en tolerancias pequeas empieza a
suceder que al corregir un tendn se desbalancean otros, hasta que para valores aun ms
pequeos ya se manifiesta una imposibilidad prctica de lograrlo, por razones geomtricas,
por requerimientos de normas a cumplir, y otros.
En este sentido y por los resultados obtenidos en las distintas verificaciones se constat
que el balanceo de cargas es suficientemente adecuado para nuestra estructura.
6.9.2.1.Consideraciones
Verificaremos a continuacin las tensiones y deformaciones admisibles en estado de servicio y
las adecuadas condiciones de funcionamiento de la estructura y la adecuacin del diseo a
normas correspondientes.
6.9.2.2.Esfuerzos lmites
La mayora de las especificaciones para la construccin de concreto presforzado imponen ciertas
limitaciones a los esfuerzos en el concreto y en el acero para cada estado en particular, tales como
aquellas que se imponen durante el tensado del acero, aquellas para inmediatamente despus de
las transferencia de la fuerza pretensora al concreto, y para cuando acta la totalidad de la carga
de servicio.
Estas limitaciones en el esfuerzo tratan de evitar daos al miembro durante la construccin y
asegurar buenas condiciones de servicio mediante la limitacin indirecta del ancho de las grietas
y la deflexin.
Los lmites en el esfuerzo del concreto que impone el Cdigo ACI se resumen en la siguiente
tabla. Aqu fci es la resistencia a la compresin del concreto al momento del preesfuerzo inicial, y
fc es la resistencia especificada a la compresin para el concreto. Ambas se expresan en MPa., en
la misma forma los esfuerzos resultantes.
_____________________________________________________________________________________
- 110111
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Frmula de verificacin:
f =
P
A
M
f adm
W
Considerando que las distintas secciones a verificar son constantes e iguales en cada bloque,
utilizaremos factores constantes que nos permitan introducir en la formula los valores de P en
[KN] y los M [KN-m] y obtener los esfuerzos en [MPa].
De este modo trabajamos con:
BLOQUE 1: f =
BLOQUE 2: f =
(3.92P 19.91M )
1000
(3.51P 14.46M )
1000
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
tambin puede darse el caso en que existan secciones en las cuales no se verifican las tensiones
admisibles para las cuales ser necesario aadir refuerzo no presforzado segn la necesidad de la
seccin.
Para el clculo del esfuerzo no presforzado se utilizar el programa de anlisis estructural, el cual
nos da directamente la seccin necesaria de refuerzo longitudinal y trasversal no presforzado en
cada viga presforzada as como tambin en los elementos de hormign armado.
6.9.2.3.Deformaciones mximas
Otra caracterstica muy importante en el estado de servicio son las deformaciones mximas
admisibles.
La deformacin mxima admisible que consideramos segn la ACI ser la correspondiente a
L/360.
De las distintas luces existentes en planta tomaremos la menor de todas, de modo de verificar en
la condicin ms exigente:
5.40 m/360 = 0.015 m = 15 mm
A continuacin verificaremos en el estado de servicio con la totalidad de la carga viva COMB 2 y
el estado con la carga viva totalmente retirada COMB 1.
Total de carga Viva:
Deformacin mxima (dir. z)
Bloque 1 Nudo 41 = 7.88 mm < 15 mm
Bloque 2 Nudo 81 = 13.45 mm < 15 mm
Sin carga Viva:
Deformacin mxima (dir. +z)
Bloque 1 Nudo 27 = 4.19 mm < 15 mm
Bloque 2 Nudo 83 = 6.23 mm < 15 mm
_____________________________________________________________________________________
- 112113
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Donde:
p = 0.28 para alambre y cordones de baja relajain
1 = 0.80 para fc = 35 MPa
Una vez que se conoce el valor de fps, la resistencia nominal al momento de una seccin, se
puede calcular de la siguiente manera.
_____________________________________________________________________________________
- 115114
-
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
Mn
Para secciones en T:
Mn
As fps d 1 0.6 p
fc
fps
fc
fps
Vcw
0.6 fc bd + Vd + Vi
( 0.3
Mcr
Mmax
fc + 0.3fpc ) bd + Vp
Wi 0.5 fc + fpe
Mcr
Vs
A v f sy d
S
Vu Vn
_____________________________________________________________________________________
- 116115
-
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN DE TENSIONES EN LA ETAPA INICIAL BLOQUE 1 Y 3
2
3
0.195 [m ]
W = 0.036 [m ]
f = ( 5.13 *P (+/-) 27.86 *M )/1000
fc = 35.00 [Mpa]
VIGA 1 HP APOYO E
1.48 ok
M=
-87.35 [KN-m]
f1 = -2.81 [Mpa]
<
-21.00 ok
P = -1022.77 [KN]
f2 = -7.68 [Mpa]
>
A=
VIGA 1 HP TRAMO F
M=
72.36 [KN-m]
P = -906.05 [KN]
f1 =
f2 =
-2.63 [Mpa]
-6.66 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 2 HP APOYO E
M = -103.12 [KN-m]
P = -1859.59 [KN]
f1 = -6.66 [Mpa]
f2 = -12.41 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 2 HP TRAMO F
M=
81.75 [KN-m]
P = -1647.37 [KN]
f1 = -6.17 [Mpa]
f2 = -10.73 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 3 HP APOYO E
M=
-51.57 [KN-m]
P = -1580.65 [KN]
f1 =
f2 =
-6.67 [Mpa]
-9.54 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 3 HP TRAMO F
M=
30.26 [KN-m]
P = -1400.26 [KN]
f1 =
f2 =
-6.34 [Mpa]
-8.02 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 4 HP APOYO E
M=
-99.43 [KN-m]
P = -1580.65 [KN]
f1 = -5.34 [Mpa]
f2 = -10.88 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 4 HP TRAMO F
M=
80.54 [KN-m]
P = -1400.26 [KN]
f1 =
f2 =
-4.94 [Mpa]
-9.42 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 5 HP APOYO E
M=
-53.72 [KN-m]
P = -929.79 [KN]
f1 =
f2 =
-3.27 [Mpa]
-6.26 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 5 HP TRAMO F
M=
30.87 [KN-m]
P = -823.68 [KN]
f1 =
f2 =
-3.36 [Mpa]
-5.08 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 6 HP APOYO E
M=
-72.98 [KN-m]
P = -929.79 [KN]
f1 =
f2 =
-2.74 [Mpa]
-6.80 [Mpa]
<
>
1.48 ok
-21.00 ok
VIGA 6 HP TRAMO F
M=
64.04 [KN-m]
P = -823.68 [KN]
f1 =
f2 =
-2.44 [Mpa]
-6.01 [Mpa]
<
>
1.48 ok
-21.00 ok
_____________________________________________________________________________________
116
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN DE TENSIONES EN LA ETAPA INICIAL BLOQUE 2
2
0.225 [m ]
f = ( 4.44 *P (+/-)
VIGA 7 HP APOYO C
M = -176.11 [KN-m]
P = -1276.90 [KN]
A=
W=
19.19 *M )/1000
0.052
[m ]
fc =
35.00 [Mpa]
f1 =
f2 =
-2.29 [Mpa]
-9.06 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 7 HP TRAMO D
M=
119.75 [KN-m]
P = -1135.41 [KN]
f1 =
f2 =
-2.75 [Mpa]
-7.34 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 8 HP APOYO C
M = -231.09 [KN-m]
P = -2785.97 [KN]
f1 =
f2 =
-7.95 [Mpa]
-16.82 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 8 HP TRAMO D
M=
178.25 [KN-m]
P = -2477.26 [KN]
f1 =
f2 =
-7.59 [Mpa]
-14.43 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 9 HP APOYO C
M = -108.88 [KN-m]
P = -2785.97 [KN]
f1 =
f2 =
-10.29 [Mpa]
-14.47 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 9 HP TRAMO D
M=
64.42 [KN-m]
P = -2477.26 [KN]
f1 =
f2 =
-9.77 [Mpa]
-12.25 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 10 HP APOYO C
M = -231.76 [KN-m]
P = -2785.97 [KN]
f1 =
f2 =
-7.93 [Mpa]
-16.83 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 10 HP TRAMO D
M=
175.14 [KN-m]
P = -2477.26 [KN]
f1 =
f2 =
-7.65 [Mpa]
-14.37 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 11 HP APOYO C
M = -107.23 [KN-m]
P = -2321.64 [KN]
f1 =
f2 =
-8.26 [Mpa]
-12.38 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 11 HP TRAMO D
M=
66.07 [KN-m]
P = -2064.38 [KN]
f1 =
f2 =
-7.91 [Mpa]
-10.44 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 12 HP APOYO C
M = -157.83 [KN-m]
P = -2321.64 [KN]
f1 =
f2 =
-7.29 [Mpa]
-13.35 [Mpa]
<
>
1.48
ok
-21.00 ok
VIGA 12 HP TRAMO D
M=
100.87 [KN-m]
P = -2064.38 [KN]
f1 =
f2 =
-7.24 [Mpa]
-11.11 [Mpa]
<
>
1.48
ok
-21.00 ok
_____________________________________________________________________________________
117
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN DE TENSIONES EN LA ETAPA DE SERVICIO BLOQUE 1 Y 3
2
3
0.255 [m ]
W = 0.050 [m ]
f = ( 3.92 *P (+/-) 19.91 *M )/1000
fc = 35.00 [Mpa]
VIGA 1 HP APOYO E
2.96 ok
M = -138.80 [KN-m]
f1 = -0.83 [Mpa]
<
P = -916.39 [KN]
-15.75 ok
f2 = -6.36 [Mpa]
>
A=
VIGA 1 HP TRAMO F
M=
239.92 [KN-m]
P = -799.67 [KN]
f1 =
f2 =
1.64 [Mpa]
-7.91 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 2 HP APOYO E
M = -451.35 [KN-m]
P = -1617.61 [KN]
f1 = 2.64 [Mpa]
f2 = -15.33 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 2 HP TRAMO F
M=
397.22 [KN-m]
P = -1405.39 [KN]
f1 = 2.40 [Mpa]
f2 = -13.42 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 3 HP APOYO E
M = -204.11 [KN-m]
P = -1390.40 [KN]
f1 =
f2 =
-1.39 [Mpa]
-9.52 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 3 HP TRAMO F
M=
43.75 [KN-m]
P = -1210.02 [KN]
f1 =
f2 =
-3.87 [Mpa]
-5.62 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 4 HP APOYO E
M = -395.08 [KN-m]
P = -1401.46 [KN]
f1 = 2.37 [Mpa]
f2 = -13.36 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 4 HP TRAMO F
M=
314.45 [KN-m]
P = -1221.07 [KN]
f1 = 1.47 [Mpa]
f2 = -11.05 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 5 HP APOYO E
M = -230.36 [KN-m]
P = -824.69 [KN]
f1 =
f2 =
1.35 [Mpa]
-7.82 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 5 HP TRAMO F
M=
77.20 [KN-m]
P = -718.58 [KN]
f1 =
f2 =
-1.28 [Mpa]
-4.35 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 6 HP APOYO E
M = -189.58 [KN-m]
P = -832.86 [KN]
f1 =
f2 =
0.51 [Mpa]
-7.04 [Mpa]
<
>
2.96 ok
-15.75 ok
VIGA 6 HP TRAMO F
M=
67.61 [KN-m]
P = -726.75 [KN]
f1 =
f2 =
-1.50 [Mpa]
-4.20 [Mpa]
<
>
2.96 ok
-15.75 ok
_____________________________________________________________________________________
118
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN DE TENSIONES EN LA ETAPA DE SERVICIO BLOQUE 2
2
0.285 [m ]
f = ( 3.51 *P (+/-)
VIGA 7 HP APOYO C
M = -416.11 [KN-m]
P = -1158.73 [KN]
A=
W=
14.46 *M )/1000
0.069
[m ]
fc =
35.00 [Mpa]
f1 =
f2 =
1.95 [Mpa]
-10.08 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 7 HP TRAMO D
M=
150.76 [KN-m]
P = -1017.24 [KN]
f1 =
f2 =
-1.39 [Mpa]
-5.75 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 8 HP APOYO C
M = -450.60 [KN-m]
P = -2471.91 [KN]
f1 =
f2 =
-2.16 [Mpa]
-15.19 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 8 HP TRAMO D
M=
193.89 [KN-m]
P = -2163.20 [KN]
f1 =
f2 =
-4.79 [Mpa]
-10.39 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 9 HP APOYO C
M=
84.89 [KN-m]
P = -2394.61 [KN]
f1 =
f2 =
-7.17 [Mpa]
-9.63 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 9 HP TRAMO D
M = -432.76 [KN-m]
P = -2085.90 [KN]
f1 =
f2 =
-1.06 [Mpa]
-13.58 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 10 HP APOYO C
M = -486.56 [KN-m]
P = -2449.38 [KN]
f1 =
f2 =
-1.56 [Mpa]
-15.63 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 10 HP TRAMO D
M=
191.10 [KN-m]
P = -2140.67 [KN]
f1 =
f2 =
-4.75 [Mpa]
-10.28 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 11 HP APOYO C
M=
78.70 [KN-m]
P = -2016.86 [KN]
f1 =
f2 =
-5.94 [Mpa]
-8.21 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 11 HP TRAMO D
M = -284.14 [KN-m]
P = -1759.60 [KN]
f1 =
f2 =
-2.06 [Mpa]
-10.28 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 12 HP APOYO C
M=
-1.94 [KN-m]
P = -2046.65 [KN]
f1 =
f2 =
-7.15 [Mpa]
-7.21 [Mpa]
<
>
2.96
ok
-15.75 ok
VIGA 12 HP TRAMO D
M = -261.71 [KN-m]
P = -1789.39 [KN]
f1 =
f2 =
-2.49 [Mpa]
-10.06 [Mpa]
<
>
2.96
ok
-15.75 ok
_____________________________________________________________________________________
119
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN A LA ROTURA BLOQUE 1 Y 3
fs= 1890.00 [Mpa]
fc= 35.00 [Mpa]
p = 0.28 Acero de baja relajacin
1 = 0.80
A=
0.195
[m2]
b=
0.40
[m]
b =
0.15 [m]
VIGA 1 HP APOYO E
0.0056
p =
fps 1690.11 [Mpa]
2
As = 0.00109 [m ]
Mu = 186.23 [KN-m]
a=
0.15 [Mpa]
Mn = 1023.63 [KN-m]
>
186.23 ok
VIGA 1 HP TRAMO F
0.0056
p =
fps 1690.11 [Mpa]
As = 0.00109 [m ]
Mu = 283.40 [KN-m]
a=
0.15 [Mpa]
Mn = 1023.63 [KN-m]
>
283.40 ok
VIGA 2 HP APOYO E
0.0101
p =
fps 1526.66 [Mpa]
Mu = 540.57 [KN-m]
As = 0.00197 [m ]
a=
0.25 [Mpa]
Mn = 1473.12 [KN-m]
>
540.57 ok
VIGA 2 HP TRAMO F
0.0101
p =
fps 1526.66 [Mpa]
2
As = 0.00197 [m ]
Mu = 473.13 [KN-m]
a=
0.25 [Mpa]
Mn = 1473.12 [KN-m]
>
473.13 ok
VIGA 3 HP APOYO E
0.0086
p =
fps 1581.15 [Mpa]
2
Mu = 287.82 [KN-m]
As = 0.00168 [m ]
a=
0.22 [Mpa]
Mn = 1352.83 [KN-m]
>
287.82 ok
VIGA 3 HP TRAMO F
0.0086
p =
fps 1581.15 [Mpa]
2
As = 0.00168 [m ]
Mu =
a=
0.22 [Mpa]
Mn = 1352.83 [KN-m]
>
VIGA 4 HP APOYO E
0.0086
p =
fps 1581.15 [Mpa]
2
Mu = 474.68 [KN-m]
As = 0.00168 [m ]
a=
0.22 [Mpa]
Mn = 1352.83 [KN-m]
>
474.68 ok
VIGA 4 HP TRAMO F
0.0086
p =
fps 1581.15 [Mpa]
2
As = 0.00168 [m ]
Mu = 381.53 [KN-m]
a=
0.22 [Mpa]
Mn = 1352.83 [KN-m]
>
381.53 ok
VIGA 5 HP APOYO E
0.0051
p =
fps 1708.33 [Mpa]
2
Mu = 297.19 [KN-m]
As = 0.00099 [m ]
a=
0.14 [Mpa]
Mn =
955.07 [KN-m]
>
297.19 ok
VIGA 5 HP TRAMO F
0.0051
p =
fps 1708.33 [Mpa]
As = 0.00099 [m ]
Mu = 111.29 [KN-m]
a=
0.14 [Mpa]
Mn =
955.07 [KN-m]
>
111.29 ok
VIGA 6 HP APOYO E
0.0051
p =
fps 1708.33 [Mpa]
2
Mu = 241.00 [KN-m]
As = 0.00099 [m ]
a=
0.14 [Mpa]
Mn =
955.07 [KN-m]
>
241.00 ok
VIGA 6 HP TRAMO F
0.0051
p =
fps 1708.33 [Mpa]
2
As = 0.00099 [m ]
Mu = 103.12 [KN-m]
a=
0.14 [Mpa]
Mn =
955.07 [KN-m]
>
103.12 ok
92.96 [KN-m]
92.96 ok
_____________________________________________________________________________________
120
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN A LA ROTURA BLOQUE 2
fs= 1890.00 [Mpa]
fc= 35.00 [Mpa]
p = 0.28 Acero de baja relajacin
1 = 0.80
A=
0.225
[m2]
b=
0.40
[m]
b =
0.15 [m]
VIGA 7 HP APOYO C
0.0048
p =
fps 1716.76 [Mpa]
As = 0.00109 [m ]
Mu = 505.22 [KN-m]
a=
0.16 [Mpa]
Mn = 1367.63 [KN-m]
>
505.22 ok
VIGA 7 HP TRAMO D
0.0048
p =
fps 1716.76 [Mpa]
2
As = 0.00109 [m ]
Mu = 213.76 [KN-m]
a=
0.16 [Mpa]
Mn = 1367.63 [KN-m]
>
213.76 ok
VIGA 8 HP APOYO C
0.0105
p =
fps 1512.10 [Mpa]
2
Mu = 849.02 [KN-m]
As = 0.00237 [m ]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
849.02 ok
VIGA 8 HP TRAMO D
0.0105
p =
fps 1512.10 [Mpa]
As = 0.00237 [m ]
Mu = 456.60 [KN-m]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
456.60 ok
VIGA 9 HP APOYO C
0.0105
p =
fps 1512.10 [Mpa]
2
Mu = 460.65 [KN-m]
As = 0.00237 [m ]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
460.65 ok
VIGA 9 HP TRAMO D
0.0105
p =
fps 1512.10 [Mpa]
2
As = 0.00237 [m ]
Mu = 634.84 [KN-m]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
634.84 ok
VIGA 10 HP APOYO C
0.0105
p =
fps 1512.10 [Mpa]
2
Mu = 803.60 [KN-m]
As = 0.00237 [m ]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
803.60 ok
VIGA 10 HP TRAMO D
0.0105
p =
fps 1512.10 [Mpa]
2
As = 0.00237 [m ]
Mu = 468.44 [KN-m]
a=
0.30 [Mpa]
Mn = 2226.84 [KN-m]
>
468.44 ok
VIGA 11 HP APOYO C
0.0088
p =
fps 1575.11 [Mpa]
Mu = 393.94 [KN-m]
As = 0.00197 [m ]
a=
0.26 [Mpa]
Mn = 2028.65 [KN-m]
>
393.94 ok
VIGA 11 HP TRAMO D
0.0088
p =
fps 1575.11 [Mpa]
As = 0.00197 [m ]
Mu = 496.12 [KN-m]
a=
0.26 [Mpa]
Mn = 2028.65 [KN-m]
>
496.12 ok
VIGA 12 HP APOYO C
0.0088
p =
fps 1575.11 [Mpa]
2
Mu = 323.11 [KN-m]
As = 0.00197 [m ]
a=
0.26 [Mpa]
Mn = 2028.65 [KN-m]
>
323.11 ok
VIGA 12 HP TRAMO D
0.0088
p =
fps 1575.11 [Mpa]
2
As = 0.00197 [m ]
Mu = 470.94 [KN-m]
a=
0.26 [Mpa]
Mn = 2028.65 [KN-m]
>
470.94 ok
_____________________________________________________________________________________
121
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN AL CORTE BLOQUE 1 Y 3
fs= 1890.00 [Mpa]
fc= 35.00 [Mpa]
3
Wi = 0.0359 [m ]
A=
VIGA 1 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
VIGA 2 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
VIGA 3 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
0.195 [m2]
APOYO E
91.46 [KN]
205.68 [KN-m]
339.255 [KN]
7.68 [Mpa]
381.91 [Mpa]
145.91 [KN]
366.33 [KN]
APOYO E
159.36 [KN]
372.26 [KN-m]
556.677 [KN]
12.41 [Mpa]
551.71 [Mpa]
276.70 [KN]
366.33 [KN]
APOYO E
198.54 [KN]
358.8 [KN-m]
452.602 [KN]
9.54 [Mpa]
448.68 [Mpa]
88.66 [KN]
366.33 [KN]
d=
0.70
b=
0.40
Av =
[m]
1.57 [cm2]
b = 0.15 [m]
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
101.50
245.86
801.15
253.2134
4.17
0.38
526.61
[KN]
[KN-m]
[KN-m]
[KN-m]
>
86.97 ok
S
[cm]
Adoptamos 10c15
[KN]
>
339.25 ok
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
160.99
423.59
1403.55
378.2115
7.91
0.20
632.86
[KN]
[KN-m]
[KN-m]
[KN-m]
>
86.97 ok
S
[cm]
Adoptamos 10c15
[KN]
>
556.68 ok
VIGA 4 HP APOYO E
Vcm =
158.1 [KN]
Mcm =
353.91 [KN-m]
Vu =
579.55 [KN]
fpe =
10.88 [Mpa]
Mcr = 496.79 [Mpa]
Vs =
308.60 [KN]
Vst =
366.33 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
172.28
404.64
1338.56
373.2225
8.82
0.18
628.62
[m2]
Mu = 474.68 [KN-m]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
86.97 ok
S
[cm]
Adoptamos 10c15
[KN]
>
579.55 ok
VIGA 5 HP APOYO E
Vcm = 140.67 [KN]
Mcm =
268.44 [KN-m]
Vu = 344.524 [KN]
6.26 [Mpa]
fpe =
Mcr = 330.93 [Mpa]
Vs =
93.53 [KN]
Vst =
366.33 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
74.46
146.21
666.39
311.7897
2.67
0.59
576.40
[m2]
Mu = 297.19 [KN-m]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
86.97 ok
S
[cm]
Adoptamos 10c15
[KN]
>
344.52 ok
VIGA 6 HP APOYO E
Vcm = 114.04 [KN]
Mcm =
229.29 [KN-m]
Vu = 309.015 [KN]
fpe =
6.80 [Mpa]
Mcr = 350.31 [Mpa]
Vs =
70.91 [KN]
Vst =
366.33 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
74.05
141.94
606.23
292.6373
2.03
0.77
560.13
[m2]
Mu = 241.00 [KN-m]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
86.97 ok
S
[cm]
Adoptamos 10c15
[KN]
>
309.01 ok
_____________________________________________________________________________________
122
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
VERIFICACIN AL CORTE BLOQUE 2
fs= 1890.00 [Mpa]
fc= 35.00 [Mpa]
Wi = 0.0521 [m3]
A=
VIGA 7 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
VIGA 8 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
VIGA 9 HP
Vcm =
Mcm =
Vu =
fpe =
Mcr =
Vs =
Vst =
0.225 [m ]
APOYO C
144.48 [KN]
409.88 [KN-m]
534.381 [KN]
9.06 [Mpa]
626.14 [Mpa]
271.73 [KN]
471.00 [KN]
APOYO C
262.96 [KN]
787.62 [KN-m]
870.573 [KN]
16.22 [Mpa]
999.18 [Mpa]
457.92 [KN]
471.00 [KN]
APOYO C
224.02 [KN]
563.54 [KN-m]
555.003 [KN]
10.29 [Mpa]
690.22 [Mpa]
156.01 [KN]
471.00 [KN]
d=
0.90
b=
0.40
Av =
[m]
1.57 [cm2]
b = 0.15 [m]
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
159.63
480.07
1575.08
356.9523
6.04
0.26
703.76
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
534.38 ok
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
243.54
849.48
2868.13
566.2835
10.18
0.15
881.69
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
870.57 ok
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
121.50
309.19
1403.85
496.9342
3.47
0.45
822.74
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
555.00 ok
VIGA 10 HP APOYO C
Vcm = 281.27 [KN]
Mcm =
798.09 [KN-m]
Vu = 918.713 [KN]
16.83 [Mpa]
fpe =
Mcr = 1030.96 [Mpa]
Vs =
465.75 [KN]
Vst =
471.00 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
254.75
829.17
2837.65
615.0915
10.35
0.15
923.18
[m2]
Mu = 474.68 [KN-m]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
918.71 ok
VIGA 11 HP APOYO C
Vcm = 180.16 [KN]
Mcm =
454.63 [KN-m]
Vu = 464.377 [KN]
fpe =
12.38 [Mpa]
Mcr = 799.11 [Mpa]
Vs =
50.58 [KN]
Vst =
471.00 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
106.02
269.46
1176.02
495.7478
1.12
1.40
821.74
2
Mu = 297.19 [KN-m]
[m ]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
464.38 ok
VIGA 12 HP APOYO C
Vcm = 206.66 [KN]
Mcm =
514.8 [KN-m]
Vu = 492.054 [KN]
13.35 [Mpa]
fpe =
Mcr = 849.65 [Mpa]
Vs =
30.73 [KN]
Vst =
471.00 [KN]
As =
Vcv =
Mcv =
Mu =
Vci =
Av =
S=
Vn =
0.00000
102.90
255.71
1224.39
548.1551
0.68
2.30
866.28
[m ]
Mu = 241.00 [KN-m]
[KN]
[KN-m]
[KN-m]
[KN-m]
>
111.81 ok
S
[cm]
Adoptamos 10c15
[KN]
>
492.05 ok
_____________________________________________________________________________________
123
PROYECTODE
DEGRADO
GRADO
ESTADIO
ALTO IRPAVI
IRPAVI
PROYECTO
ESTADIO ATLTICO
ATLTICO ALTO
_____________________________________________________________________________________
6.10.
DISEO DE CIMIENTOS
OutputCase
Text
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Joint
Text
1
1
5
5
6
6
10
10
15
15
19
19
20
20
24
24
29
29
35
35
36
36
40
40
48
48
54
54
55
55
59
59
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
CaseType
Text
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
StepType
Text
9.00
-29.21
12.31
-44.50
4.71
-17.83
34.62
12.27
16.10
-33.47
27.97
-52.76
8.48
-20.61
54.66
17.11
21.98
-37.47
36.94
-62.79
12.07
-23.15
55.25
16.79
22.85
-46.81
34.80
-70.01
12.56
-29.36
36.29
11.03
589.28
261.56
572.45
195.34
374.27
178.93
300.88
68.13
1437.34
646.43
1257.13
484.08
945.90
487.67
699.85
195.27
1655.69
738.59
1413.50
567.95
1052.87
553.56
714.47
181.80
696.28
271.19
553.40
171.52
411.35
200.23
333.81
28.40
Solicitaciones Ultimas
U2
U3
KN
KN
3.69
-6.93
6.77
-7.94
4.07
-6.21
-0.25
-47.68
1.13
-21.33
0.52
-24.15
2.47
-19.67
-20.04
-48.14
9.36
-12.09
8.83
-12.80
6.54
-14.98
36.93
11.27
1.58
-10.59
3.13
-13.08
1.24
-10.44
40.28
-9.48
U1
KN
2.64
-4.95
4.83
-5.67
2.91
-4.44
-0.18
-34.06
0.81
-15.24
0.37
-17.25
1.76
-14.05
-14.31
-34.39
6.68
-8.63
6.31
-9.14
4.67
-10.70
26.38
8.05
1.13
-7.57
2.23
-9.34
0.89
-7.46
28.77
-6.77
6.43
-20.86
8.79
-31.78
3.36
-12.74
24.73
8.76
11.50
-23.90
19.98
-37.69
6.06
-14.72
39.04
12.22
15.70
-26.77
26.38
-44.85
8.62
-16.53
39.46
11.99
16.32
-33.44
24.86
-50.01
8.97
-20.97
25.92
7.88
420.92
186.83
408.89
139.53
267.33
127.81
214.92
48.67
1026.67
461.74
897.95
345.77
675.65
348.33
499.89
139.48
1182.64
527.57
1009.64
405.68
752.05
395.40
510.34
129.86
497.34
193.71
395.29
122.52
293.82
143.02
238.44
20.28
Solicitaciones Minoradas
U1
U2
U3
KN
KN
KN
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
125
OutputCase
Text
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Joint
Text
1
1
7
7
8
8
12
12
20
20
26
26
27
27
31
31
46
46
52
52
53
53
57
57
65
65
71
71
72
72
76
76
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
CaseType
Text
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
StepType
Text
22.33
-39.88
33.39
-60.67
12.15
-25.02
33.75
9.26
26.23
-35.08
44.48
-57.10
14.56
-22.02
55.14
14.73
26.23
-35.08
44.48
-57.10
14.56
-22.02
55.14
14.73
22.33
-39.88
33.39
-60.67
12.15
-25.02
33.75
9.26
615.72
262.73
478.01
151.27
337.72
156.91
278.93
27.10
2121.15
939.32
1654.85
623.37
1360.75
703.14
920.64
257.58
2121.09
939.30
1654.86
623.37
1358.06
702.63
920.64
257.58
615.72
262.74
478.04
151.28
338.00
156.96
278.94
27.10
Solicitaciones Ultimas
U2
U3
KN
KN
-0.57
-2.18
-0.26
-2.78
-1.58
-2.59
-29.57
-41.02
0.99
-1.41
11.73
0.79
3.23
-0.08
7.89
-12.85
1.41
-0.99
-0.79
-11.73
0.08
-3.23
12.84
-7.89
2.18
0.57
2.78
0.26
2.59
1.59
41.01
29.57
U1
KN
-0.41
-1.56
-0.18
-1.98
-1.13
-1.85
-21.12
-29.30
0.71
-1.01
8.38
0.56
2.30
-0.06
5.64
-9.18
1.01
-0.70
-0.56
-8.38
0.06
-2.31
9.17
-5.64
1.56
0.41
1.98
0.18
1.85
1.13
29.30
21.12
15.95
-28.49
23.85
-43.34
8.68
-17.87
24.11
6.61
18.74
-25.06
31.77
-40.78
10.40
-15.73
39.39
10.52
18.74
-25.06
31.77
-40.78
10.40
-15.73
39.39
10.52
15.95
-28.48
23.85
-43.34
8.68
-17.87
24.11
6.61
439.80
187.67
341.43
108.05
241.23
112.08
199.24
19.35
1515.11
670.94
1182.04
445.27
971.96
502.24
657.60
183.98
1515.06
670.93
1182.05
445.27
970.04
501.88
657.60
183.98
439.80
187.67
341.46
108.06
241.43
112.12
199.24
19.36
Solicitaciones Minoradas
U1
U2
U3
KN
KN
KN
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
126
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SUPERFICIE
Unidad:
m3
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
N de
Rep.
Z1A
Z2A
Z3A
Z4A
Z5A
Z1B
Z2B
Z3B
Z4B
Z5B
Z1C
Z2C
Z3C
Z4C
Z5C
Z1D
Z2D
Z3D
Z4D
Z5D
1.10
1.50
1.50
1.65
1.90
1.40
2.10
2.30
2.05
2.40
1.40
2.30
2.50
2.35
2.80
1.90
1.90
1.90
1.75
2.20
1.40
1.80
1.80
1.60
2.10
1.70
2.30
2.50
2.00
2.60
1.70
2.50
2.70
2.30
3.00
2.10
2.10
2.10
1.70
2.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.54
2.70
2.70
2.64
3.99
2.38
4.83
5.75
4.10
6.24
2.38
5.75
6.75
5.41
8.40
3.99
3.99
3.99
2.98
5.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.54
2.70
2.70
2.64
3.99
2.38
4.83
5.75
4.10
6.24
2.38
5.75
6.75
5.41
8.40
3.99
3.99
3.99
2.98
5.50
1.54
2.70
2.70
2.64
3.99
2.38
4.83
5.75
4.10
6.24
2.38
5.75
6.75
5.41
8.40
3.99
3.99
3.99
2.98
5.50
ZTE
1.40
1.60
1.00
2.24
3.00
2.24
6.72
92.72
185.44
Cantidad
Parcial Total
TOTAL
DESCRIPCIN
m3
Largo
[m]
Ancho
[m]
Vol 1
[m3]
Unidad:
Vol 2 N de
[m3]
Rep.
Z1A
Z2A
Z3A
Z4A
Z5A
Z1B
Z2B
Z3B
Z4B
Z5B
Z1C
Z2C
Z3C
Z4C
Z5C
Z1D
Z2D
Z3D
Z4D
Z5D
1.10
1.50
1.50
1.65
1.90
1.40
2.10
2.30
2.05
2.40
1.40
2.30
2.50
2.35
2.80
1.90
1.90
1.90
1.75
2.20
1.40
1.80
1.80
1.60
2.10
1.70
2.30
2.50
2.00
2.60
1.70
2.50
2.70
2.30
3.00
2.10
2.10
2.10
1.70
2.50
1.54
2.70
2.70
2.64
3.99
2.38
4.83
5.75
4.10
6.24
2.38
5.75
6.75
5.41
8.40
3.99
3.99
3.99
2.98
5.50
0.56
1.00
1.00
1.13
1.55
0.79
1.98
2.46
1.98
2.96
0.79
2.46
3.35
2.91
4.34
0.54
1.46
1.46
1.36
2.36
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.98
1.70
1.70
1.51
2.44
1.59
2.85
3.29
2.12
3.28
1.59
3.29
3.40
2.49
4.06
3.45
2.53
2.53
1.62
3.14
0.98
1.70
1.70
1.51
2.44
1.59
2.85
3.29
2.12
3.28
1.59
3.29
3.40
2.49
4.06
3.45
2.53
2.53
1.62
3.14
ZTE
1.40
1.60
2.24
0.91
1.33
3.99
53.58
107.15
Cantidad
Parcial Total
TOTAL
_____________________________________________________________________________________
127
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Columnas de HA
DESCRIPCIN
m3
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
Z1A
Z2A
Z3A
Z4A
Z5A
Z1B
Z2B
Z3B
Z4B
Z5B
Z1C
Z2C
Z3C
Z4C
Z5C
Z1D
Z2D
Z3D
Z4D
Z5D
ZC
ZD
0.30
0.30
0.30
0.60
0.30
0.30
0.40
0.40
0.60
0.40
0.30
0.40
0.40
0.60
0.40
0.30
0.40
0.40
0.60
0.40
0.20
0.20
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.30
0.30
1.60
1.55
1.55
1.45
1.50
5.20
5.00
4.95
4.95
4.90
8.80
8.55
8.50
8.45
8.40
8.70
8.70
8.70
8.65
8.60
3.00
3.00
0.18
0.18
0.18
0.36
0.18
0.18
0.24
0.24
0.36
0.24
0.18
0.24
0.24
0.36
0.24
0.18
0.24
0.24
0.36
0.24
0.06
0.06
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7
7
0.29
0.28
0.28
0.52
0.27
0.94
1.20
1.19
1.78
1.18
1.58
2.05
2.04
3.04
2.02
1.57
2.09
2.09
3.11
2.06
0.18
0.18
0.29
0.28
0.28
0.52
0.27
0.94
1.20
1.19
1.78
1.18
1.58
2.05
2.04
3.04
2.02
1.57
2.09
2.09
3.11
2.06
1.26
1.26
ZTE
0.20
0.30
6.80
0.06
0.41
1.22
33.32
66.64
Cantidad
Parcial Total
TOTAL
DESCRIPCIN
m3
Largo
[m]
Ancho
[m]
Alto
[m]
Vol.
[m3]
Unidad:
N de
Rep.
Z1A
Z2A
Z3A
Z4A
Z5A
Z1B
Z2B
Z3B
Z4B
Z5B
Z1C
Z2C
Z3C
Z4C
Z5C
Z1D
Z2D
Z3D
Z4D
Z5D
1.10
1.50
1.50
1.65
1.90
1.40
2.10
2.30
2.05
2.40
1.40
2.30
2.50
2.35
2.80
1.90
1.90
1.90
1.75
2.20
1.40
1.80
1.80
1.60
2.10
1.70
2.30
2.50
2.00
2.60
1.70
2.50
2.70
2.30
3.00
2.10
2.10
2.10
1.70
2.50
0.30
0.35
0.35
0.45
0.40
0.30
0.50
0.55
0.55
0.60
0.30
0.55
0.60
0.65
0.70
0.40
0.40
0.40
0.45
0.50
0.43
0.88
0.88
1.03
1.32
0.66
1.86
2.35
1.81
2.86
0.66
2.35
3.25
2.78
4.27
0.43
1.32
1.32
1.15
2.24
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0.43
0.88
0.88
1.03
1.32
0.66
1.86
2.35
1.81
2.86
0.66
2.35
3.25
2.78
4.27
0.43
1.32
1.32
1.15
2.24
0.43
0.88
0.88
1.03
1.32
0.66
1.86
2.35
1.81
2.86
0.66
2.35
3.25
2.78
4.27
0.43
1.32
1.32
1.15
2.24
ZTE
1.40
1.60
0.50
0.88
0.88
2.64
36.49
72.98
Item: Zapata de HA
Cantidad
Parcial Total
TOTAL
_____________________________________________________________________________________
128
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Sup.
[m2]
Unidad:
N de
Rep.
Largo
[m]
Ancho
[m]
Alto
[m]
32.40
32.40
12.00
6.00
388.80
194.40
1
1
388.80
194.40
388.80
194.40
L1-B1
L2-B2
18.90
18.90
12.00
6.00
226.80
113.40
1
1
226.80
113.40
226.80
113.40
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
5.70
5.20
0.20
0.20
0.30
0.30
0.06
0.06
7
11
0.34
0.02
2.39
0.20
TRANS.
5.40
0.20
0.30
0.06
18
0.32
5.83
8.42
16.85
Sup.
[m2]
Unidad:
N de
Rep.
Largo
[m]
Ancho
[m]
Alto
[m]
5.40
0.25
0.40
0.10
18
0.54
9.72
LONG.
5.15
0.15
0.40
0.06
9.5
0.31
2.94
VIG. ESC.
4.90
0.30
0.50
0.15
0.74
2.21
14.86
29.72
Sup.
[m2]
Unidad:
N de
Rep.
0.15
0.15
0.11
0.11
11
2
220
20
Sup.
[m2]
Unidad:
N de
Rep.
0.08
0.08
0.08
180
10
10
N
Tipo 1
Tipo 2
Peldaos 1
Peldaos 2
Largo
[m]
14.00
7.00
0.60
0.60
Ancho
[m]
0.25
0.25
0.25
0.25
Alto
[m]
0.60
0.60
0.36
0.36
N
Tipo 1
Tipo 2
Tipo 3
Largo
[m]
5.40
3.60
1.80
Ancho
[m]
0.60
0.60
0.60
Alto
[m]
0.36
0.36
0.36
TOTAL
m3
Cantidad
Parcial Total
TRANS.
923.40
TOTAL
1846.80
m3
Unidad:
Cantidad
N de
Rep.
Parcial Total
TRANS.
LONG.
Item: Vigas de HA
DESCRIPCIN
Cantidad
Parcial Total
L1-B1
L2-B2
m2
Largo
[m]
29.90
Ancho
[m]
13.50
Alto
[m]
Sup.
[m2]
403.65
TOTAL
m3
Cantidad
Parcial Total
2.10
1.05
0.03
0.03
TOTAL
m3
Cantidad
Parcial Total
0.43
0.29
0.05
23.10
2.10
5.94
0.54
31.68
63.36
77.76
2.88
0.48
81.12
TOTAL
162.24
m2
Unidad:
Cantidad
N de
Rep.
Parcial Total
1
403.65
TOTAL
403.65
403.65
807.30
_____________________________________________________________________________________
129
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Mensula de HA
DESCRIPCIN
Largo
[m]
Ancho
[m]
Alto
[m]
0.25
Sup.
[m2]
Unidad:
N de
Rep.
0.43
11
SUPERFICIE
Cantidad
Parcial Total
0.11
TOTAL
m3
Cantidad
Parcial Total
1.18
1.18
2.37
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
Z1A
Z2A
Z3A
Z4A
Z5A
Z1B
Z2B
Z3B
Z4B
Z5B
Z1C
Z2C
Z3C
Z4C
Z5C
Z1D
Z2D
Z3D
Z4D
Z5D
1.10
1.50
1.50
1.65
1.90
1.40
2.10
2.30
2.05
2.40
1.40
2.30
2.50
2.35
2.80
1.90
1.90
1.90
1.75
2.20
1.40
1.80
1.80
1.60
2.10
1.70
2.30
2.50
2.00
2.60
1.70
2.50
2.70
2.30
3.00
2.10
2.10
2.10
1.70
2.50
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
1.54
2.70
2.70
2.64
3.99
2.38
4.83
5.75
4.10
6.24
2.38
5.75
6.75
5.41
8.40
3.99
3.99
3.99
2.98
5.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.08
0.14
0.14
0.13
0.20
0.12
0.24
0.29
0.21
0.31
0.12
0.29
0.34
0.27
0.42
0.20
0.20
0.20
0.15
0.28
0.08
0.14
0.14
0.13
0.20
0.12
0.24
0.29
0.21
0.31
0.12
0.29
0.34
0.27
0.42
0.20
0.20
0.20
0.15
0.28
ZTE
1.40
1.60
0.05
2.24
3.00
0.11
0.34
4.64
9.27
Sup.
[m2]
Unidad:
N de
Rep.
m3
Ancho
[m]
Largo
[m]
M1-L1
M1-L2
M1-L3
M1-L4
M1-L5
4.80
3.00
1.80
4.40
3.30
1.62
1.62
1.62
1.62
1.62
1.00
1.00
1.00
1.00
1.00
7.78
4.86
2.92
7.13
5.35
7.78
4.86
2.92
7.13
5.35
M2-L1
M2-L2
M2-L3
M2-L4
M2-L5
4.80
3.00
1.80
4.40
3.30
1.62
1.62
1.62
1.62
1.62
1.00
1.00
1.00
1.00
1.00
7.78
4.86
2.92
7.13
5.35
7.78
4.86
2.92
7.13
5.35
M3-L1
M3-L2
M3-L3
M3-L4
M3-L5
4.80
3.00
1.80
4.40
3.30
1.62
1.62
1.62
1.62
1.62
1.00
1.00
1.00
1.00
1.00
7.78
4.86
2.92
7.13
5.35
7.78
4.86
2.92
7.13
5.35
M1-P1
M2-P2
M3-P3
1.80
1.80
1.80
0.03
0.03
0.03
24.00
25.00
26.00
0.05
0.05
0.05
1.30
1.35
1.40
88.13
88.13
0.30
0.30
0.30
Alto
[m]
TOTAL
m3
Cantidad
Parcial Total
0.20
0.20
0.20
TOTAL
_____________________________________________________________________________________
130
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Escalera de Hortm,ign Armado
DESCRIPCIN
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
2.45
2.45
2.45
2.45
1.18
1.18
1.18
1.18
1.00
1.00
1.00
1.00
2.88
2.88
2.88
2.88
2.88
2.88
2.88
2.88
B2-T1
B2-T2
B2-T3
B2-T4
2.45
2.45
2.45
2.45
1.18
1.18
1.18
1.18
1.00
1.00
1.00
1.00
2.88
2.88
2.88
2.88
2.88
2.88
2.88
2.88
B3-T1
B3-T2
B3-T3
B3-T4
2.45
2.45
2.45
2.45
1.18
1.18
1.18
1.18
1.00
1.00
1.00
1.00
2.88
2.88
2.88
2.88
2.88
2.88
2.88
2.88
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
PORTICO 1
PORTICO 2
PORTICO 3
PORTICO 4
PORTICO 5
PORTICO 6
PORTICO 7
PORTICO 8
PORTICO INTERMEDIO TIPO 1
PORTICO INTERMEDIO TIPO 2
PORTICO DE INGRESO A GRADERIAS
VIGA 1
VIGA 2
VIGA 3
VIGA 4
VIGA 5
VIGA 6
PELDAOS
LOSA ALIVIANADA C/ PLASTOFORM
GRADERIAS PRERFABRICADAS
ZAPATAS
ESCALERA
34.60
TOTAL
34.60
Unidad:
Kg
Cantidad
N de
Rep.
Parcial Total
2
2
2
2
1
1
1
1
4
6
4
1
1
1
1
1
1
480
2
380
2
6
Sup.1
[m2]
Unidad:
Sup.2 N de
[m2]
Rep.
13.42
10.50
14.46
10.01
20.46
18.46
9.60
12.88
0.00
0.00
4.10
0.00
4.10
4.10
0.00
0.00
Cantidad
Parcial Total
B1-T1
B1-T2
B1-T3
B1-T4
m3
N
A1
A2
A3
A4
A5
A6
A7
A8
Largo
[m]
Ancho
[m]
2.00
2.00
2.00
2.00
2.00
6.00
3.00
7.00
916.41
1037.30
1139.94
1003.80
1003.80
1139.90
1139.90
1003.80
238.18
308.34
89.67
49.81
49.81
196.48
175.41
175.41
180.42
1.77
7491.81
53.26
1522.80
305.85
TOTAL
1832.82
2074.60
2279.88
2007.60
1003.80
1139.90
1139.90
1003.80
952.72
1850.04
358.68
49.81
49.81
196.48
175.41
175.41
180.42
849.60
14983.62
20238.80
3045.60
1835.10
57423.80
m2
Cantidad
Parcial Total
13.42
10.50
10.36
10.01
16.36
14.36
9.60
12.88
TOTAL
26.84
21.00
20.72
20.02
32.72
86.16
28.80
90.16
326.42
_____________________________________________________________________________________
131
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Muro de Ladrillo de 6 Huecos e=0.10m
DESCRIPCIN
PLANTA PRIMER PISO
Largo
[m]
Ancho
[m]
Largo
[m]
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
A17
A18
A19
A20
A21
A22
A23
A24
A25
A26
A27
A28
A29
A30
A31
A32
A33
A34
A35
A36
A37
A38
A39
A40
A41
A42
A43
A44
A45
5.15
5.15
5.50
5.50
1.58
3.58
5.15
5.50
5.50
10.80
2.40
1.15
0.40
2.10
2.25
5.50
2.10
2.55
3.10
9.40
2.40
2.20
5.00
5.00
5.40
3.85
3.25
4.90
2.25
1.75
5.10
3.80
10.25
2.00
3.40
3.50
1.35
0.45
3.50
5.25
2.70
16.20
10.95
3.50
5.00
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
2.00
2.00
2.00
3.70
3.70
2.00
2.00
2.00
3.70
3.70
3.70
3.40
3.40
3.40
3.40
3.40
2.00
2.00
2.00
3.40
2.50
2.50
3.40
3.40
3.40
2.00
2.00
3.40
3.40
2.90
2.90
2.90
2.90
1.40
1.00
0.00
0.00
2.05
1.00
2.00
2.00
1.00
0.00
4.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.80
0.00
2.00
0.00
1.00
2.00
0.00
1.00
0.00
0.00
0.00
1.00
0.70
0.00
1.00
4.00
0.90
2.00
0.00
0.00
0.00
0.00
2.00
0.80
0.90
1.80
0.00
0.00
Unidad:
Ancho N de
[m]
Rep.
2.10
0.00
0.00
2.10
2.10
1.00
1.00
2.10
0.00
1.00
0.00
0.00
0.00
0.00
2.10
2.10
0.00
2.10
0.00
1.00
0.00
2.10
2.00
0.00
2.10
0.00
0.00
0.00
1.00
2.10
0.00
2.10
1.00
2.10
1.00
0.00
0.00
0.00
0.00
1.00
2.10
2.10
1.90
0.00
0.00
1.00
21.00
1.00
1.00
7.00
7.00
1.00
1.00
14.00
2.00
3.00
10.00
18.00
8.00
1.00
1.00
2.00
3.00
1.00
1.00
1.00
2.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
19.00
2.00
2.00
2.00
2.00
4.00
18.00
16.00
1.00
1.00
10.00
1.00
1.00
15.00
11.00
m2
Cantidad
Parcial Total
16.96
19.06
20.35
16.05
3.75
11.25
17.06
18.25
20.35
35.96
8.88
2.29
0.80
4.20
6.23
18.25
4.20
3.42
6.20
32.78
8.88
6.04
13.00
17.00
16.26
13.09
11.05
9.80
3.50
2.03
17.34
7.40
21.63
4.91
9.56
11.90
2.70
0.90
11.90
15.85
6.15
45.09
28.34
10.15
7.00
TOTAL
16.96
400.16
20.35
16.05
26.22
78.72
17.06
18.25
284.90
71.92
26.64
22.90
14.40
33.60
6.23
18.25
8.40
10.26
6.20
32.78
8.88
12.08
13.00
34.00
32.52
13.09
11.05
9.80
3.50
4.06
329.46
14.80
43.25
9.82
19.12
47.60
48.60
14.40
11.90
15.85
61.50
45.09
28.34
152.25
77.00
2191.18
_____________________________________________________________________________________
132
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Hormign simple tipo P
DESCRIPCIN
N
Viga 1 HP
Viga 2 HP
Viga 3 HP
Viga 4 HP
Viga 5 HP
Viga 6 HP
Viga 7 HP
Viga 8 HP
Viga 9 HP
Viga 10 HP
Viga 11 HP
Viga 12 HP
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
32.40
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
0.80
0.80
0.80
0.80
0.80
0.80
1.00
1.00
1.00
1.00
1.00
0.20
0.20
0.20
0.20
0.20
0.20
0.23
0.23
0.23
0.23
0.23
1
1
1
1
1
1
1
1
1
1
1
37.80
1.00
0.23
m3
Cantidad
Parcial Total
6.32
6.32
6.32
6.32
6.32
6.32
8.51
8.51
8.51
8.51
8.51
8.51
6.32
6.32
6.32
6.32
6.32
6.32
8.51
8.51
8.51
8.51
8.51
8.51
88.94
TOTAL
N
Viga 1 HP
Viga 2 HP
Viga 3 HP
Viga 4 HP
Viga 5 HP
Viga 6 HP
Viga 7 HP
Viga 8 HP
Viga 9 HP
Viga 10 HP
Viga 11 HP
Viga 12 HP
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
N
Viga 1 HP
Viga 2 HP
Viga 3 HP
Viga 4 HP
Viga 5 HP
Viga 6 HP
Viga 7 HP
Viga 8 HP
Viga 9 HP
Viga 10 HP
Viga 11 HP
Viga 12 HP
Kg
Cantidad
Parcial Total
32.40
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
0.80
0.80
0.80
0.80
0.80
0.80
1.00
1.00
1.00
1.00
1.00
1
1
1
1
1
1
1
1
1
1
1
807.78
810.90
810.90
810.90
807.78
807.78
977.66
976.91
976.91
976.91
976.91
37.80
1.00
976.91
TOTAL
Unidad:
N de
Rep.
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
807.78
810.90
810.90
810.90
807.78
807.78
977.66
976.91
976.91
976.91
976.91
976.91
10718.25
ml
Cantidad
Parcial Total
32.40
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
0.80
0.80
0.80
0.80
0.80
0.80
1.00
1.00
1.00
1.00
1.00
1
2
2
2
1
1
1
2
2
2
2
32.56
32.56
32.56
32.56
32.56
32.56
38.00
38.00
38.00
38.00
38.00
37.80
1.00
38.00
TOTAL
32.56
65.12
65.12
65.12
32.56
32.56
38.00
76.00
76.00
76.00
76.00
76.00
711.04
_____________________________________________________________________________________
133
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Item: Anclajes 1/2" sistema Freyssinet
DESCRIPCIN
N
Viga 1 HP
Viga 2 HP
Viga 3 HP
Viga 4 HP
Viga 5 HP
Viga 6 HP
Viga 7 HP
Viga 8 HP
Viga 9 HP
Viga 10 HP
Viga 11 HP
Viga 12 HP
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
N
Viga 1 HP
Viga 2 HP
Viga 3 HP
Viga 4 HP
Viga 5 HP
Viga 6 HP
Viga 7 HP
Viga 8 HP
Viga 9 HP
Viga 10 HP
Viga 11 HP
Viga 12 HP
Pza.
Cantidad
Parcial Total
32.40
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
0.80
0.80
0.80
0.80
0.80
0.80
1.00
1.00
1.00
1.00
1.00
1
2
2
2
1
1
1
2
2
2
2
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
37.80
1.00
2.00
TOTAL
Unidad:
N de
Rep.
Largo
[m]
Ancho
[m]
Alto
[m]
Sup.
[m2]
Unidad:
N de
Rep.
2.00
4.00
4.00
4.00
2.00
2.00
2.00
4.00
4.00
4.00
4.00
4.00
40.00
ml.
Cantidad
Parcial Total
32.40
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
0.60
0.60
0.60
0.60
0.60
0.60
0.80
0.80
0.80
0.80
0.80
11
20
17
17
10
10
11
24
24
24
20
32.56
32.56
32.56
32.56
32.56
32.56
38.00
38.00
38.00
38.00
38.00
37.80
0.80
20
38.00
TOTAL
358.16
651.20
553.52
553.52
325.60
325.60
418.00
912.00
912.00
912.00
760.00
760.00
7441.60
_____________________________________________________________________________________
134
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
6.11.2. ANALISIS DE COSTOS POR ACTIVIDAD ALTERNATIVA CON VIGAS DE HORMIGN PRETENSADO
CODIGO
ACTIVIDAD
UNID.
CANT.
P. U.
[Bs.]
TOTAL
1. TRABAJOS PRELIMINARES
INS-002 INSTALACION DE FAENAS
REP-001 REPLANTEO Y TRAZADO
GLB
1.00 2434.82
GLB
1.00
603.99
Total Trabajos Preliminares:
2. MOVIMIENTO DE TIERRAS
EXC-008 EXCAV. 0 - 2m. S/AGOTAMIENTO TERR. SEMIDURO
REL-003 RELLENO Y COMPACTADO CON TIERRA COMUN
HOR-016
HOR-015
HOR-023
HOR-023
HOR-023
HOR-023
HOR-024
CUB-010
HOR-023
HOR-001
HOR-005
HOR-019
ACE-001
MUR-004
MUR-005
3. OBRA GRUESA
HORMIGON SIMPLE PARA COLUMNAS
HORMIGON SIMPLE P/LOSA ALIVIANADA C/ PLASTOFORM
HORMIGON SIMPLE PRA VIGAS DE ENCADENADO
HORMIGON SIMPLE PRA VIGAS DE HA
HORMIGON SIMPLE PRA VIGAS INCLINADAS
HORMIGON SIMPLE PRA GRADERIAS PRERFABRICADAS
HOMIGON SIMPLE PARA ZAPATAS
CUBIERTA CON TEJA ASFALTICA + ESTUCTUTA
HORMIGON SIMPLE PRA MENSULA
HORMIGON POBRE
HORMIGN CICLOPEO CON 50% DE PIEDRA DESPLAZADORA
HORMIGN SIMPLE PARA ESCALERA
ACERO DE REFUERZO
MURO DE LADRILLO DE 6 HUECOS e=0.10m
MURO DE LADRILLO DE 6 HUECOS e=0.15m
m
185.44
25.58
3
m
107.15
21.29
Total Movimiento de Tierras:
3
m
2
m
3
m
3
m
3
m
3
m
3
m
2
m
3
m
3
m
3
m
3
m
Kg
2
m
2
m
66.64
1846.80
16.85
29.72
63.36
162.24
72.98
807.30
2.37
9.27
88.13
34.60
57423.80
2191.18
326.42
2434.82
603.99
3038.81
4743.56
2281.26
7024.82
838.20
131.71
1049.74
1049.74
1049.74
1049.74
862.43
223.19
1049.74
387.13
419.96
1061.70
13.44
64.67
87.67
55854.30
243242.03
17686.02
31199.32
66511.53
170309.82
62940.14
180181.29
2482.64
3589.47
37010.23
36738.85
771775.87
141703.87
28617.24
1849842.61
88.94 1230.39
10718.25
13.44
711.04
27.20
40.00 1508.88
7441.60
11.36
Total Viga Postensada:
COSTO TOTAL Bs.
COSTO TOTAL Sus.
109428.43
144053.28
19340.29
60355.20
84536.58
417713.77
2277620.01
295794.81
4. VIGAS POSTENSADAS
HOR-029
ACE-001
VAI-001
ANC-001
ACR-002
m3
Kg
ml
Pza.
ml
_____________________________________________________________________________________
135
PRTICO 1
VIGA 2 HP
VIGA 1 HP
VIGA 3 DE HA
PRTICO 2
VIGA 3 HP
VIGA 4 HP
VIGA 5 HP
VIGA 6 HP
VIGA 1 DE HA
VIGA 2 DE HA
PRTICO 4
PRTICO 3
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
136
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
137
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
138
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Version
Text
9.0.3
ProgLevel
Text
Advanced
CurrUnits
Text
KN, m, C
ConcCode
Text
ACI 318-02
UY
Yes/No
Yes
UZ
Yes/No
Yes
RX
Yes/No
Yes
RY
Yes/No
Yes
RZ
Yes/No
Yes
Type
Text
LinStatic
LinModal
LinStatic
LinStatic
LinStatic
LinStatic
LinRespSpec
InitialCond
Text
Zero
Zero
Zero
Zero
Zero
Zero
ModalCase
Text
MODOS DE VIB.
ModeType
Text
Eigen
MaxNumModes
Unitless
6
MinNumModes
Unitless
1
EigenShift
Cyc/sec
0
EigenCutoff
Cyc/sec
0
EigenTol
Unitless
0.0000001
ModalCombo
Text
CQC
DirCombo
Text
SRSS
DampingType
Text
Constant
ConstDamp
Unitless
0.05
LoadType
Text
Acceleration
Acceleration
LoadName
Text
U1
U2
CoordSys
Text
GLOBAL
GLOBAL
Function
Text
SPECTRO
SPECTRO
Angle
Degrees
0
0
TransAccSF
m/sec2
1
1
LoadType
Text
Load case
Load case
Load case
Load case
Load case
LoadName
Text
Carga Muerta
Carga Viva
PRETENSADO
VIENTO-X
VIENTO-Y
LoadSF
Unitless
1
1
1
1
1
_____________________________________________________________________________________
139
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
ComboType
CaseType
CaseName
Text
Text
Text
Text
COMB 1
Linear Add
COMB 1
COMB 2
Linear Add
Linear Static
CM
Linear Static
PRETENSADO
ScaleFactor ConcDesign
Unitless
Yes/Yes
1.4
Yes
Linear Static
CM
1.2
Linear Static
CV
1.6
Linear Static
PRETENSADO
Linear Static
CM
1.2
COMB 3
Linear Static
CV
COMB 3
Linear Static
PRETENSADO
COMB 3
Linear Static
VIENTO-X
1.6
Linear Static
CM
1.2
COMB 2
COMB 2
COMB 3
COMB 4
Linear Add
Linear Add
COMB 4
Linear Static
CV
Linear Static
PRETENSADO
Linear Static
VIENTO-Y
1.6
Linear Static
CM
1.2
COMB 5
Linear Static
CV
COMB 5
Linear Static
PRETENSADO
COMB 5
Linear Static
VIENTO-Y
-1.6
Linear Static
CM
0.9
Linear Static
PRETENSADO
Linear Static
VIENTO-X
1.6
Linear Static
CM
0.9
Linear Static
PRETENSADO
Linear Static
VIENTO-Y
1.6
Linear Static
CM
0.9
Linear Static
PRETENSADO
COMB 5
COMB 6
Linear Add
Linear Add
COMB 6
COMB 6
COMB 7
Linear Add
COMB 7
COMB 7
COMB 8
Linear Add
COMB 8
COMB 8
-1.6
1.2
Linear Static
CV
COMB 9
Response Spectrum
SPECTRO
COMB 9
Linear Static
PRETENSADO
Linear Static
CM
Response Spectrum
SPECTRO
COMB 10
Linear Static
PRETENSADO
ENVOLVENTE Envelope
Response Combo
COMB 1
ENVOLVENTE
Response Combo
COMB 2
ENVOLVENTE
Response Combo
COMB 3
ENVOLVENTE
Response Combo
COMB 4
ENVOLVENTE
Response Combo
COMB 5
ENVOLVENTE
Response Combo
COMB 6
ENVOLVENTE
Response Combo
COMB 7
ENVOLVENTE
Response Combo
COMB 8
ENVOLVENTE
Response Combo
COMB 9
ENVOLVENTE
Response Combo
COMB 10
Linear Static
CM
SERV.
Linear Static
PRETENSADO
SERV.
Linear Static
CV
Linear Add
COMB 10
SERV.
Linear Add
Yes
Yes
VIENTO-Y
COMB 10
Yes
CM
COMB 9
Yes
Linear Static
Linear Add
Yes
Linear Static
COMB 9
Yes
COMB 4
COMB 4
Yes
Yes
1
0.9
Yes
Yes
Yes
_____________________________________________________________________________________
140
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Connectivity - Frame
Frame
JointI
JointJ
Text
Text
Text
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
1
3
2
5
6
7
8
10
11
13
15
17
16
19
20
21
22
24
25
27
29
32
33
30
35
36
37
38
40
41
43
41
45
46
48
51
52
49
54
55
56
57
59
8
31
32
49
30
33
52
22
38
4
18
34
60
2
2
4
4
3
4
9
8
12
14
16
16
18
18
17
18
23
22
26
28
30
31
30
34
34
33
34
39
38
42
42
44
43
47
49
50
49
53
53
52
53
58
57
22
50
51
50
31
32
51
38
57
18
34
53
61
Length
m
CentroidX
m
9.10
6.00
7.00
5.50
9.10
12.00
1.00
1.90
7.00
1.00
9.10
6.00
7.00
5.50
9.10
12.00
1.00
1.90
7.00
1.00
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
3.00
6.00
7.00
3.00
1.00
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
10.80
10.80
10.80
3.00
3.00
3.00
3.00
10.80
10.80
10.80
10.80
10.80
10.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.40
5.40
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
16.20
16.20
21.60
21.60
21.60
21.60
21.60
21.60
21.60
21.60
21.60
27.00
27.00
27.00
27.00
27.00
32.40
32.40
32.40
32.40
32.40
32.40
32.40
32.40
32.40
5.40
27.00
27.00
32.40
21.60
21.60
32.40
16.20
27.00
5.40
16.20
27.00
5.40
CentroidY
m
12.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
9.00
-0.50
12.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
9.00
-0.50
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
12.00
15.00
9.00
18.00
-0.50
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
0.00
12.00
18.00
12.00
12.00
18.00
18.00
0.00
0.00
6.00
6.00
6.00
12.00
CentroidZ
m
3.55
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
6.30
0.90
3.55
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
6.30
0.90
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
9.60
11.10
6.30
9.60
0.90
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
0.90
11.10
11.10
9.60
9.60
9.60
9.60
0.90
0.90
4.50
4.50
4.50
4.50
SectionType
Text
AnalSect
Text
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
COL-30X60
VIGA-25X40
VIGA-25X60
COL-30X60
COL-30X60
VIGA-25X40
VIGA-25X40
COL-30X60
VIGA-25X60
VIGA-25X40
COL-40X60
VIGA-25X40
VIGA-25X60
COL-40X60
COL-40X60
VIGA-25X40
VIGA-25X40
COL-30X60
VIGA-25X60
VIGA-25X40
COL-40X60
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-40X60
COL-40X60
VIGA-25X40
VIGA-25X40
COL-30X60
COL-20X30
VIGA-20X30
VIGA-25X60
COL-20X30
VIGA-25X40
COL-30X60
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-30X60
COL-30X60
VIGA-25X40
VIGA-25X40
COL-30X60
VIGA.I-HP80
VIGA-20X30
VIGA-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
_____________________________________________________________________________________
141
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Connectivity - Frame
Frame
JointI
JointJ
Text
Text
Text
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
61
62
7
21
37
3
17
33
2
16
30
53
44
34
26
18
12
4
67
65
68
69
71
72
73
75
76
77
79
80
81
9
14
23
28
39
47
62
63
21
37
56
17
33
52
16
30
49
57
46
38
27
22
13
8
66
68
69
70
72
73
74
76
77
78
80
81
82
14
23
28
39
47
58
Length
m
CentroidX
m
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
5.40
5.40
5.40
5.40
5.40
5.40
16.20
27.00
5.40
16.20
27.00
5.40
16.20
27.00
5.40
16.20
27.00
32.40
27.00
21.60
16.20
10.80
5.40
0.00
19.80
0.00
0.00
0.00
10.80
10.80
10.80
21.60
21.60
21.60
32.40
32.40
32.40
2.70
8.10
13.50
18.90
24.30
29.70
CentroidY
m
12.00
12.00
18.00
18.00
18.00
18.00
18.00
18.00
12.00
12.00
12.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
9.00
3.00
9.00
15.00
3.00
9.00
15.00
3.00
9.00
15.00
3.00
9.00
15.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
CentroidZ
m
4.50
4.50
4.50
4.50
4.50
8.10
8.10
8.10
8.10
8.10
8.10
2.70
2.70
2.70
2.70
2.70
2.70
2.70
6.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.90
0.90
0.90
0.90
0.90
0.90
SectionType
Text
AnalSect
Text
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA.I-HP80
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
_____________________________________________________________________________________
142
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Frame Section Properties 01 - General
SectionName
Material
Shape
Text
Text
COL-20X30
COL-30X60
COL-40X60
VIGA-15X40
VIGA-20X30
VIGA-25X40
VIGA-25X60
VIGA.I-HP80
CONC
CONC
CONC
CONC
CONC
CONC
CONC
PRETENSADO
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
AS3
S33
cm2
cm2
cm3
cm3
cm3
t2
20
30
40
40
30
40
60
80
30
60
60
15
20
25
25
40
cm3
Text
Text
KN-s2/m
Global
Global
Global
Global
Global
Global
Global
Global
tf
tw
15
cm
t3
cm cm cm cm cm cm
15
40
AS2
500.00
1500.00
2000.00
500.00
500.00
833.33
1250.00
1200.00
Text
240.06
2.66
2.66
2.66
2.66
2.66
2.66
374.79
KN-s2/m
240.06
2.66
2.66
2.66
2.66
2.66
2.66
374.79
Mass3
KN-s2/m
cm
600
1800
2400
600
600
1000
1500
15 1950
TorsConst
I33
I22
cm4
cm4
cm4
46953.09
370785.94
751249.38
34386.27
46953.09
127345.16
230674.79
114356.25
Yes/No
5.77 8.66
8.66 17.32
11.55 17.32
11.55 4.33
8.66 5.77
11.55 7.22
17.32 7.22
27.23 9.45
Yes
Yes
Yes
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
MMI1
MMI2
45000.00
540000.00
720000.00
11250.00
20000.00
52083.33
78125.00
174062.50
MMI3
KN-m-s2
0
0
0
0
0
0
0
0
20000.00
135000.00
320000.00
80000.00
45000.00
133333.33
450000.00
1446250.00
ConcCol ConcBeam
Yes/No
KN-m-s2
0
0
0
0
0
0
0
0
cm2
KN-m-s2
0
0
0
0
0
0
0
0
24516.64
246.16
246.16
246.16
246.16
246.16
246.16
44086.31
Length
Text
Text
Text
75
76
77
78
79
80
8
4
60
2
7
3
57
53
63
49
56
52
32.56
32.56
32.56
32.56
32.56
32.56
_____________________________________________________________________________________
143
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint
OutputCase
CaseType
Text
Text
Text
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
R1
Radians
R2
Radians
R3
Radians
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
0.00
0.00
14.71
-3.32
14.77
-3.45
13.12
-2.94
0.00
0.00
0.00
0.00
13.35
-3.11
3.81
2.26
1.86
0.65
0.00
0.00
14.71
-3.32
13.12
-2.94
2.90
1.38
1.71
0.47
0.00
0.00
14.71
-3.32
14.77
-3.45
13.12
-2.94
0.00
0.00
0.00
0.00
13.35
-3.11
2.03
0.54
1.39
0.15
0.00
0.00
14.71
-3.32
13.12
-2.94
1.21
-0.27
1.01
-0.22
0.00
0.00
3.18
-0.68
3.18
-0.68
3.21
-0.68
0.00
0.00
0.00
0.00
3.21
-0.68
2.73
-0.65
2.74
-0.65
0.00
0.00
3.52
-0.90
3.48
-0.90
2.36
-1.20
2.36
-1.20
0.00
0.00
3.86
-1.13
3.86
-1.13
3.76
-1.12
0.00
0.00
0.00
0.00
3.76
-1.12
3.09
-1.12
3.09
-1.12
0.00
0.00
4.20
-1.36
4.03
-1.34
2.69
-1.62
2.69
-1.62
0.00
0.00
-0.38
-0.93
-0.26
-0.55
-0.22
-0.67
0.00
0.00
0.00
0.00
-0.20
-0.43
-0.03
-0.12
1.18
-0.30
0.00
0.00
0.90
-6.80
0.81
-7.28
0.55
-4.77
0.90
-3.02
0.00
0.00
-0.74
-1.77
-0.56
-1.10
-0.42
-1.13
0.00
0.00
0.00
0.00
-0.43
-0.84
-0.08
-0.29
1.10
-0.52
0.00
0.00
4.12
-0.28
4.15
-0.47
4.19
2.11
4.50
3.70
0.00023
-0.00090
0.00044
0.00010
0.00005
0.00002
-0.00007
-0.00012
0.00029
-0.00105
0.00020
-0.00086
0.00008
-0.00003
0.00016
-0.00156
0.00027
-0.00118
0.00039
-0.00132
0.00315
0.00088
-0.00006
-0.00043
-0.00038
-0.00258
-0.00002
-0.00175
0.00036
-0.00101
0.00058
0.00015
0.00000
-0.00004
-0.00005
-0.00011
0.00045
-0.00115
0.00032
-0.00097
0.00007
-0.00009
0.00030
-0.00194
0.00043
-0.00116
0.00066
-0.00143
0.00328
0.00093
-0.00016
-0.00059
-0.00033
-0.00252
0.00010
-0.00167
0.00324
-0.00109
0.00149
-0.00038
0.00066
-0.00013
0.00179
-0.00043
0.00306
-0.00151
0.00320
-0.00117
0.00087
-0.00004
0.00144
-0.00006
0.00213
0.00012
0.00268
0.00122
0.00019
-0.00010
0.00018
-0.00021
0.00005
-0.00019
0.00010
-0.00025
0.00374
-0.00060
-0.00030
-0.00073
-0.00006
-0.00022
-0.00027
-0.00084
0.00386
-0.00055
0.00366
-0.00070
0.00000
-0.00034
-0.00037
-0.00079
-0.00047
-0.00085
0.00191
0.00062
0.00013
0.00003
0.00018
0.00005
0.00000
-0.00001
0.00002
-0.00002
0.00002
-0.00006
0.00006
-0.00004
0.00006
-0.00004
0.00005
-0.00004
0.00019
0.00004
0.00005
-0.00002
0.00005
-0.00004
-0.00051
-0.00098
-0.00197
-0.00225
-0.00044
-0.00092
0.00006
-0.00004
0.00005
-0.00004
-0.00011
-0.00036
-0.00110
-0.00137
0.00004
-0.00003
0.00006
-0.00004
0.00006
-0.00004
0.00005
-0.00004
0.00006
-0.00006
0.00005
-0.00003
0.00005
-0.00004
-0.00008
-0.00035
-0.00045
-0.00067
-0.00006
-0.00036
0.00006
-0.00004
0.00005
-0.00004
0.00006
-0.00019
0.00005
-0.00017
_____________________________________________________________________________________
144
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint
OutputCase
CaseType
Text
Text
Text
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
36
37
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
46
46
47
47
48
48
49
49
50
50
51
51
52
52
53
53
54
54
55
55
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
R1
Radians
R2
Radians
R3
Radians
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
0.00
0.00
14.71
-3.32
14.71
-3.32
14.77
-3.45
14.77
-3.45
13.12
-2.94
0.00
0.00
0.00
0.00
13.35
-3.11
0.38
-1.09
0.63
-0.60
0.00
0.00
14.71
-3.32
14.71
-3.32
14.77
-3.45
13.12
-2.94
14.77
-3.45
-0.48
-1.96
0.31
-0.92
0.00
0.00
14.71
-3.32
14.71
-3.32
14.77
-3.45
14.77
-3.45
13.12
-2.94
0.00
0.00
0.00
0.00
0.00
0.00
4.54
-1.58
4.54
-1.58
4.54
-1.58
4.54
-1.58
4.31
-1.56
0.00
0.00
0.00
0.00
4.31
-1.56
3.51
-1.56
3.51
-1.56
0.00
0.00
4.88
-1.81
4.88
-1.81
4.88
-1.81
4.58
-1.78
4.88
-1.81
3.23
-2.21
3.23
-2.21
0.00
0.00
5.22
-2.04
5.22
-2.04
5.22
-2.04
5.22
-2.04
4.86
-2.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.86
-2.07
-0.89
-2.16
-0.66
-1.25
-0.64
-1.22
-0.50
-1.27
0.00
0.00
0.00
0.00
-0.49
-0.94
-0.08
-0.30
1.28
-0.71
0.00
0.00
0.51
-7.88
0.44
-8.02
-0.29
-3.37
0.61
-7.74
-0.26
-3.33
0.60
-4.85
1.07
-3.06
0.00
0.00
-0.40
-1.15
-0.43
-1.24
-0.32
-0.65
-0.30
-0.62
-0.19
-0.65
0.00
0.00
0.00
0.00
0.00049
-0.00115
0.00061
0.00015
-0.00026
-0.00046
0.00043
0.00025
-0.00001
-0.00005
-0.00009
-0.00020
0.00062
-0.00131
0.00044
-0.00111
0.00008
-0.00011
0.00049
-0.00212
0.00061
-0.00133
0.00089
-0.00165
0.00259
0.00070
-0.00047
-0.00083
0.00083
0.00024
-0.00006
-0.00036
-0.00009
-0.00030
-0.00038
-0.00275
0.00000
-0.00194
0.00062
-0.00138
0.00043
0.00009
-0.00024
-0.00042
0.00040
0.00024
-0.00001
-0.00006
0.00000
-0.00008
0.00076
-0.00165
0.00057
-0.00129
0.00316
-0.00113
0.00072
0.00033
0.00107
-0.00005
0.00061
0.00011
0.00034
0.00016
0.00077
0.00026
0.00316
-0.00108
0.00336
-0.00097
0.00054
0.00018
0.00084
0.00041
0.00086
0.00048
-0.00008
-0.00121
0.00012
-0.00019
0.00003
-0.00013
0.00000
-0.00008
0.00022
-0.00019
0.00004
-0.00009
0.00017
-0.00006
0.00023
-0.00009
0.00397
-0.00078
0.00032
-0.00160
-0.00016
-0.00094
-0.00021
-0.00057
0.00005
-0.00074
0.00047
-0.00178
0.00424
-0.00095
0.00398
-0.00073
0.00004
-0.00003
0.00006
-0.00004
0.00006
-0.00004
0.00006
-0.00004
0.00006
-0.00004
0.00005
-0.00004
0.00001
-0.00011
0.00004
-0.00004
0.00005
-0.00004
0.00017
-0.00010
0.00056
0.00035
0.00015
-0.00015
0.00006
-0.00004
0.00006
-0.00004
0.00006
-0.00004
0.00005
-0.00004
0.00006
-0.00004
0.00024
0.00001
0.00124
0.00099
0.00007
-0.00002
0.00006
-0.00004
0.00006
-0.00004
0.00006
-0.00004
0.00006
-0.00004
0.00005
-0.00004
-0.00013
-0.00029
0.00003
-0.00004
_____________________________________________________________________________________
145
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint
OutputCase
CaseType
Text
Text
Text
56
56
57
57
58
58
59
59
60
60
61
61
62
62
63
63
64
64
65
65
66
66
67
67
68
68
69
69
70
70
71
71
72
72
73
73
74
74
75
75
76
76
77
77
78
78
79
79
80
80
81
81
82
82
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
R1
Radians
R2
Radians
R3
Radians
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
13.35
-3.11
-1.39
-2.87
0.13
-1.08
0.00
0.00
13.24
-3.02
13.24
-3.02
13.24
-3.02
13.24
-3.02
13.18
-2.98
2.47
1.22
13.13
-2.93
14.71
-3.32
3.03
-1.48
3.21
-1.08
3.18
-1.15
1.70
0.54
3.82
-0.55
3.71
-0.60
3.63
-0.69
-0.03
-1.05
3.14
-1.06
3.14
-1.12
3.34
-0.96
-0.59
-1.99
4.18
-0.93
3.92
-0.77
3.94
-0.72
14.77
-3.45
4.86
-2.00
4.24
-1.82
4.24
-1.82
0.00
0.00
3.21
-0.68
3.76
-1.12
4.31
-1.56
4.86
-2.00
4.03
-1.34
1.34
-0.38
4.19
-1.55
4.44
-1.51
1.02
-0.28
0.88
-0.22
0.85
-0.19
1.46
-0.65
1.13
-0.44
0.99
-0.35
0.96
-0.32
1.68
-0.88
1.28
-0.61
1.13
-0.48
1.10
-0.43
2.13
-1.00
1.61
-0.74
1.35
-0.60
1.27
-0.56
5.22
-2.21
-0.23
-0.48
-0.01
-0.14
1.86
-0.83
0.00
0.00
-0.30
-0.69
-0.57
-1.29
-0.66
-1.49
-0.31
-0.82
0.00
0.00
-0.01
-0.07
0.56
-1.33
0.36
-1.72
-0.04
-0.13
-0.06
-0.13
-0.04
-0.08
-0.04
-0.15
-0.08
-0.21
-0.11
-0.24
-0.08
-0.16
-0.04
-0.16
-0.09
-0.23
-0.12
-0.28
-0.09
-0.17
-0.01
-0.07
-0.04
-0.12
-0.06
-0.15
-0.04
-0.09
4.50
-8.02
0.00011
-0.00020
0.00068
-0.00224
0.00077
-0.00184
0.00101
-0.00211
0.00000
-0.00014
0.00000
-0.00016
0.00001
-0.00018
0.00004
-0.00023
0.00000
0.00000
0.00034
-0.00144
-0.00101
-0.00275
0.00279
0.00100
0.00024
-0.00088
0.00019
-0.00079
0.00018
-0.00079
0.00059
-0.00162
0.00038
-0.00100
0.00031
-0.00091
0.00030
-0.00091
0.00082
-0.00184
0.00052
-0.00114
0.00043
-0.00105
0.00041
-0.00104
0.00095
-0.00223
0.00063
-0.00139
0.00053
-0.00121
0.00052
-0.00118
0.00328
-0.00275
0.00001
-0.00092
0.00015
-0.00133
-0.00007
-0.00213
-0.00055
-0.00216
0.00072
-0.00027
-0.00018
-0.00054
0.00088
0.00044
0.00013
-0.00092
0.00000
0.00000
0.00204
0.00121
0.00106
0.00013
0.00113
0.00037
0.00295
-0.00141
0.00315
-0.00104
0.00313
-0.00111
0.00119
0.00033
0.00371
-0.00055
0.00361
-0.00060
0.00354
-0.00068
0.00017
-0.00067
0.00308
-0.00102
0.00309
-0.00107
0.00327
-0.00093
-0.00069
-0.00157
0.00405
-0.00090
0.00381
-0.00075
0.00383
-0.00071
0.00424
-0.00216
0.00005
-0.00004
0.00076
0.00033
0.00214
0.00189
0.00068
0.00025
0.00005
-0.00004
0.00005
-0.00004
0.00005
-0.00004
0.00005
-0.00004
0.00005
-0.00004
-0.00044
-0.00092
0.00008
0.00000
0.00012
-0.00006
0.00019
0.00004
0.00002
-0.00006
0.00005
-0.00002
-0.00006
-0.00036
0.00006
-0.00006
0.00004
-0.00003
0.00005
-0.00003
0.00015
-0.00015
0.00001
-0.00011
0.00004
-0.00003
0.00004
-0.00004
0.00068
0.00025
-0.00013
-0.00029
0.00007
-0.00002
0.00003
-0.00004
0.00214
-0.00225
_____________________________________________________________________________________
146
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
1
0.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
4.55
ENVOLVENTE
1
5.50
ENVOLVENTE
1
5.50
ENVOLVENTE
1
9.10
ENVOLVENTE
1
0.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
4.55
ENVOLVENTE
1
5.50
ENVOLVENTE
1
5.50
ENVOLVENTE
1
9.10
ENVOLVENTE
2
0.00
ENVOLVENTE
2
3.00
ENVOLVENTE
2
6.00
ENVOLVENTE
2
0.00
ENVOLVENTE
2
3.00
ENVOLVENTE
2
6.00
ENVOLVENTE
3
0.00
ENVOLVENTE
3
3.50
ENVOLVENTE
3
7.00
ENVOLVENTE
3
0.00
ENVOLVENTE
3
3.50
ENVOLVENTE
3
7.00
ENVOLVENTE
4
0.00
ENVOLVENTE
4
1.00
ENVOLVENTE
4
1.00
ENVOLVENTE
4
2.75
ENVOLVENTE
4
5.50
ENVOLVENTE
4
0.00
ENVOLVENTE
4
1.00
ENVOLVENTE
4
1.00
ENVOLVENTE
4
2.75
ENVOLVENTE
4
5.50
ENVOLVENTE
5
0.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
4.55
ENVOLVENTE
5
5.50
ENVOLVENTE
5
5.50
ENVOLVENTE
5
9.10
ENVOLVENTE
5
0.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
4.55
ENVOLVENTE
5
5.50
ENVOLVENTE
5
5.50
ENVOLVENTE
5
9.10
ENVOLVENTE
6
0.00
ENVOLVENTE
6
6.00
ENVOLVENTE
6
6.00
ENVOLVENTE
6
12.00
ENVOLVENTE
6
0.00
ENVOLVENTE
6
6.00
ENVOLVENTE
6
6.00
ENVOLVENTE
6
12.00
ENVOLVENTE
7
0.00
ENVOLVENTE
7
0.50
ENVOLVENTE
7
1.00
ENVOLVENTE
7
0.00
ENVOLVENTE
7
0.50
ENVOLVENTE
7
1.00
ENVOLVENTE
8
0.00
ENVOLVENTE
8
0.95
ENVOLVENTE
8
1.00
ENVOLVENTE
8
1.00
ENVOLVENTE
8
1.90
ENVOLVENTE
8
0.00
ENVOLVENTE
8
0.95
ENVOLVENTE
8
1.00
ENVOLVENTE
CaseType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
P
KN
-261.16
-257.11
-248.98
-234.61
-230.76
-110.25
-95.67
-588.49
-583.09
-572.15
-552.98
-547.85
-305.93
-286.49
0.00
0.00
0.00
0.00
0.00
0.00
17.06
-4.73
-26.52
-62.95
-121.17
-179.38
-194.33
-190.28
-182.44
-175.35
-164.22
-573.29
-567.89
-555.94
-546.49
-531.64
-178.86
-174.81
-169.84
-155.46
-151.61
-76.37
-61.79
-373.74
-368.34
-360.60
-341.43
-336.30
-160.28
-140.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.59
-1.59
-1.59
-2.03
-2.03
-2.03
-68.12
-64.27
-64.07
-62.75
-59.11
-300.89
-295.76
-295.49
V2
KN
6.93
6.93
6.99
6.99
6.99
16.78
16.78
-3.69
-3.69
-3.39
-3.39
-3.39
-32.07
-32.07
-12.35
1.98
21.04
-19.28
0.52
13.48
-35.12
5.70
102.72
-91.91
0.61
36.93
7.94
7.94
7.44
7.44
7.44
-6.76
-6.76
-7.98
-7.98
-7.98
6.21
6.21
6.18
6.18
6.18
9.10
9.10
-4.07
-4.07
-4.08
-4.08
-4.08
-21.90
-21.90
-18.91
29.40
-19.59
29.03
-30.24
18.43
-30.61
18.51
-10.42
-8.40
-6.37
-29.93
-27.24
-24.54
47.68
47.68
47.68
48.15
48.15
0.35
0.35
0.35
V3
KN
29.23
29.23
3.85
3.85
3.85
18.37
18.37
-9.02
-9.02
-0.56
-0.56
-0.56
4.43
4.43
0.00
0.00
0.00
0.00
0.00
0.00
1.52
1.52
1.52
-3.84
-3.84
-3.84
44.54
44.54
0.53
0.53
0.53
-12.36
-12.36
-1.70
-1.70
-1.70
17.85
17.85
8.63
8.63
8.63
6.89
6.89
-4.72
-4.72
1.65
1.65
1.65
-0.58
-0.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
49.08
49.08
49.08
43.81
43.81
43.81
-12.25
-12.25
-12.25
46.89
46.89
-34.64
-34.64
-34.64
T
KN-m
0.00
0.00
0.50
0.50
0.50
0.14
0.14
0.00
0.00
-0.09
-0.09
-0.09
-0.03
-0.03
0.58
0.58
0.58
-1.86
-1.86
-1.86
0.16
0.16
0.16
-0.87
-0.87
-0.87
0.00
0.00
-0.50
-0.50
-0.50
0.00
0.00
-1.51
-1.51
-1.51
0.00
0.00
0.03
0.03
0.03
0.14
0.14
0.00
0.00
-0.16
-0.16
-0.16
-0.03
-0.03
0.55
0.55
0.36
0.36
0.25
0.25
-2.38
-2.38
-1.78
-1.78
-1.78
-10.50
-10.50
-10.50
0.00
0.00
0.00
-2.12
-2.12
0.00
0.00
0.00
M2
KN-m
0.00
9.02
4.57
6.56
7.09
14.23
-14.48
0.00
-29.23
-11.06
-24.73
-28.38
1.29
-51.89
0.00
0.00
0.00
0.00
0.00
0.00
5.43
0.45
13.68
-13.19
-0.07
-5.22
0.00
12.36
6.73
9.59
14.09
0.00
-44.54
-23.20
-24.14
-25.61
0.00
4.72
6.74
0.87
-0.70
14.00
-0.57
0.00
-17.85
-3.50
-34.13
-42.32
-3.53
-12.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.61
19.23
-4.76
38.42
16.53
-5.92
0.00
32.91
34.64
40.18
65.08
0.00
11.64
12.25
M3
KN-m
0.00
3.69
4.04
16.07
19.28
28.28
66.05
0.00
-6.93
-6.89
-31.72
-38.36
-49.38
-32.14
-11.51
9.32
-14.90
-18.29
6.04
-25.48
-35.42
65.39
-41.10
-86.44
23.91
-124.91
0.00
6.76
4.33
18.29
40.23
0.00
-7.94
-7.12
-20.14
-40.60
0.00
4.07
4.02
18.51
22.38
14.35
38.79
0.00
-6.21
-6.28
-28.20
-34.07
-40.05
-18.40
-17.92
-16.68
-19.86
-17.23
-30.51
-28.01
-31.85
-27.10
-8.19
-3.49
0.89
-26.83
-12.56
-0.32
0.00
-0.33
-0.35
1.79
0.58
0.00
-45.30
-47.68
_____________________________________________________________________________________
147
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
8
8
9
9
9
9
9
9
10
10
10
10
10
10
11
11
11
11
11
11
11
11
11
11
11
11
11
11
12
12
12
12
12
12
13
13
13
13
13
13
14
14
14
14
14
14
14
14
14
14
15
15
15
15
15
15
15
15
15
15
15
15
15
15
16
16
16
16
16
16
16
1.00
1.90
0.00
3.50
7.00
0.00
3.50
7.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
P
KN
-290.55
-285.69
243.64
143.95
44.27
57.23
26.21
-4.82
1.06
1.06
1.06
0.36
0.36
0.36
-645.08
-639.68
-631.77
-612.60
-607.47
-287.46
-268.02
-1438.36
-1431.16
-1420.26
-1394.70
-1387.86
-805.14
-779.22
0.00
0.00
0.00
0.00
0.00
0.00
18.91
-12.12
-43.14
-109.11
-208.79
-308.47
-485.35
-479.95
-472.35
-462.90
-448.05
-1256.05
-1248.85
-1236.77
-1224.17
-1204.37
-487.59
-482.19
-479.24
-460.07
-454.94
-228.11
-208.67
-946.09
-938.89
-930.05
-904.49
-897.65
-440.03
-414.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
V2
KN
1.35
1.35
-40.07
34.92
201.06
-131.63
11.23
62.93
-22.36
-21.23
-20.11
-58.04
-56.54
-55.04
21.32
21.32
21.28
21.28
21.28
63.14
63.14
-1.13
-1.13
-1.05
-1.05
-1.05
22.04
22.04
-6.32
1.82
11.19
-9.82
0.41
7.16
-48.86
8.74
174.88
-157.92
2.32
54.03
24.17
24.17
24.50
24.50
24.50
-0.52
-0.52
-0.83
-0.83
-0.83
19.66
19.66
19.63
19.63
19.63
35.62
35.62
-2.46
-2.46
-2.44
-2.44
-2.44
7.38
7.38
-6.61
9.62
-6.77
10.08
-11.38
5.43
-10.93
V3
KN
-40.73
-40.73
1.42
1.42
1.42
-0.63
-0.63
-0.63
43.62
43.62
43.62
39.87
39.87
39.87
33.41
33.41
7.69
7.69
7.69
36.21
36.21
-16.04
-16.04
-1.42
-1.42
-1.42
11.53
11.53
0.00
0.00
0.00
0.00
0.00
0.00
2.61
2.61
2.61
0.83
0.83
0.83
52.68
52.68
3.40
3.40
3.40
-27.87
-27.87
0.71
0.71
0.71
20.58
20.58
12.46
12.46
12.46
3.06
3.06
-8.45
-8.45
0.08
0.08
0.08
-3.93
-3.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T
KN-m
-3.57
-3.57
0.34
0.34
0.34
0.02
0.02
0.02
1.20
1.20
1.20
-0.72
-0.72
-0.72
0.00
0.00
0.18
0.18
0.18
0.28
0.28
0.00
0.00
-0.30
-0.30
-0.30
-0.06
-0.06
1.17
1.17
1.17
0.50
0.50
0.50
0.35
0.35
0.35
-0.08
-0.08
-0.08
0.00
0.00
0.68
0.68
0.68
0.00
0.00
-0.72
-0.72
-0.72
0.00
0.00
0.08
0.08
0.08
0.28
0.28
0.00
0.00
-0.16
-0.16
-0.16
-0.06
-0.06
0.51
0.51
0.76
0.76
0.35
0.35
0.12
M2
KN-m
7.70
-22.75
4.83
0.01
2.21
-2.22
-0.14
-5.10
35.03
13.26
-7.10
32.74
12.75
-8.55
0.00
16.04
8.94
13.99
15.34
33.05
-28.86
0.00
-33.41
-12.61
-39.92
-47.22
8.93
-101.81
0.00
0.00
0.00
0.00
0.00
0.00
9.16
0.05
-3.01
2.79
-0.15
-9.07
0.00
27.87
18.90
17.66
15.72
0.00
-52.68
-28.53
-34.47
-43.81
0.00
8.45
9.42
8.93
8.85
9.86
8.78
0.00
-20.58
-5.06
-49.09
-60.93
-10.30
-6.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
KN-m
-48.47
-91.81
-4.44
154.38
-83.27
-15.53
45.28
-259.59
-20.49
-9.60
0.73
-58.48
-29.86
-1.99
0.00
1.13
1.16
4.89
5.89
105.60
-39.05
0.00
-21.32
-21.35
-96.88
-117.09
40.30
-121.69
-6.35
3.85
-8.79
-9.84
1.04
-17.90
-47.17
107.92
-64.98
-153.94
33.34
-213.55
0.00
0.52
-0.16
1.28
3.55
0.00
-24.17
-22.04
-64.91
-132.28
0.00
2.46
2.39
11.06
13.38
62.36
-10.85
0.00
-19.66
-19.72
-89.40
-108.05
15.71
-65.86
-5.98
-1.96
-6.45
-5.43
-15.18
-7.55
-12.77
_____________________________________________________________________________________
148
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
16
17
17
17
17
17
17
18
18
18
18
18
18
18
18
18
18
19
19
19
19
19
19
20
20
20
20
20
20
21
21
21
21
21
21
21
21
21
21
21
21
21
21
22
22
22
22
22
22
23
23
23
23
23
23
24
24
24
24
24
24
25
25
25
25
25
25
25
25
25
25
12.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
0.95
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
3.50
7.00
0.00
3.50
7.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
2.75
5.50
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
P
KN
0.00
1.22
1.22
1.22
0.49
0.49
0.49
-195.21
-191.37
-191.16
-190.45
-186.80
-699.93
-694.80
-694.53
-688.84
-683.98
210.22
110.53
10.85
32.89
1.87
-29.16
0.72
0.72
0.72
0.06
0.06
0.06
-744.29
-738.89
-731.03
-711.86
-706.73
-347.97
-328.53
-1651.45
-1644.25
-1633.36
-1607.80
-1600.96
-968.95
-943.03
3.74
3.74
3.74
-43.94
-43.94
-43.94
0.00
0.00
0.00
0.00
0.00
0.00
44.23
13.20
-17.82
-138.12
-237.80
-337.49
-577.67
-572.27
-564.89
-555.44
-540.59
-1406.21
-1399.01
-1386.77
-1374.17
-1354.37
V2
KN
6.22
-11.16
-10.04
-8.91
-55.43
-53.94
-52.44
48.15
48.15
48.15
47.91
47.91
20.13
20.13
20.13
20.44
20.44
-40.02
35.39
201.53
-131.40
11.04
62.75
-26.00
-24.87
-23.75
-60.78
-59.28
-57.78
12.09
12.09
11.97
11.97
11.97
-13.31
-13.31
-9.35
-9.35
-9.38
-9.38
-9.38
-51.31
-51.31
1.53
5.65
11.05
-10.96
-5.63
-1.58
-5.43
2.61
11.61
-9.89
-0.60
6.15
-48.71
8.69
174.83
-158.37
2.08
53.78
12.75
12.75
13.51
13.51
13.51
-8.87
-8.87
-8.71
-8.71
-8.71
V3
KN
0.00
17.15
17.15
17.15
15.68
15.68
15.68
-17.14
-17.14
-17.14
50.92
50.92
-54.61
-54.61
-54.61
-91.27
-91.27
0.78
0.78
0.78
-0.58
-0.58
-0.58
1.32
1.32
1.32
-0.23
-0.23
-0.23
37.61
37.61
9.23
9.23
9.23
44.25
44.25
-22.20
-22.20
-1.96
-1.96
-1.96
10.49
10.49
0.22
0.22
0.22
-0.61
-0.61
-0.61
0.00
0.00
0.00
0.00
0.00
0.00
-0.19
-0.19
-0.19
-1.67
-1.67
-1.67
62.76
62.76
1.24
1.24
1.24
-36.92
-36.92
-0.33
-0.33
-0.33
T
KN-m
0.12
1.54
1.54
1.54
0.68
0.68
0.68
0.00
0.00
0.00
0.48
0.48
0.00
0.00
0.00
-1.01
-1.01
-0.06
-0.06
-0.06
-0.15
-0.15
-0.15
0.22
0.22
0.22
-0.25
-0.25
-0.25
0.00
0.00
0.28
0.28
0.28
0.28
0.28
0.00
0.00
-0.20
-0.20
-0.20
-0.06
-0.06
0.11
0.11
0.11
-0.35
-0.35
-0.35
-0.28
-0.28
-0.28
-0.93
-0.93
-0.93
0.21
0.21
0.21
-0.11
-0.11
-0.11
0.00
0.00
1.62
1.62
1.62
0.00
0.00
0.18
0.18
0.18
M2
KN-m
0.00
13.11
4.96
-2.95
12.53
4.30
-4.27
0.00
51.88
54.61
61.77
130.45
0.00
16.29
17.14
10.41
-21.94
2.80
0.09
2.11
-1.92
0.05
-2.68
0.41
0.15
0.25
0.00
-0.25
-0.90
0.00
22.20
12.37
19.32
21.18
42.78
-28.92
0.00
-37.61
-13.83
-46.58
-55.35
8.83
-116.51
0.66
0.00
1.82
-1.85
-0.01
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
-0.61
0.08
5.75
-5.91
-0.09
0.73
0.00
36.92
24.46
24.76
25.22
0.00
-62.76
-35.40
-37.56
-40.96
M3
KN-m
-9.13
-9.51
-4.22
2.10
-53.15
-25.84
-0.85
0.00
-19.12
-20.13
-19.41
-37.81
0.00
-45.74
-48.15
-50.20
-93.32
-1.99
159.04
-79.68
-10.05
47.56
-257.21
-23.85
-11.14
1.00
-61.33
-31.35
-2.11
0.00
9.35
9.19
42.48
51.38
-29.35
92.43
0.00
-12.09
-12.23
-54.71
-66.08
-92.29
18.58
13.58
4.71
13.96
-20.28
2.93
-20.75
-3.68
3.69
-6.08
-10.53
0.90
-20.19
-44.28
111.00
-64.81
-155.23
32.90
-210.02
0.00
8.87
8.62
23.87
47.82
0.00
-12.75
-10.39
-34.04
-71.20
_____________________________________________________________________________________
149
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
26
26
26
26
26
26
26
26
26
26
26
26
26
26
27
27
27
27
27
27
27
27
28
28
28
28
28
28
29
29
29
29
29
29
29
29
29
29
30
30
30
30
30
30
31
31
31
31
31
31
32
32
32
32
32
32
33
33
33
33
33
33
34
34
34
34
34
34
35
35
35
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
12.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
0.95
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.00
1.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
P
KN
-538.97
-533.57
-531.06
-511.89
-506.76
-236.32
-216.88
-1064.75
-1057.55
-1048.20
-1022.64
-1015.80
-487.60
-461.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.29
1.29
1.29
0.46
0.46
0.46
-182.63
-178.78
-178.58
-178.51
-174.86
-713.36
-708.23
-707.96
-701.55
-696.69
-31.29
-29.27
-27.24
-84.39
-81.69
-78.99
-7.71
-7.71
-7.71
-65.39
-65.39
-65.39
174.42
74.74
-24.95
15.72
-15.30
-46.32
-10.56
-8.54
-6.51
-26.45
-23.75
-21.05
1.08
1.08
1.08
0.19
0.19
0.19
-274.12
-270.07
-262.19
V2
KN
V3
KN
14.97
14.97
15.00
15.00
15.00
0.90
0.90
-6.54
-6.54
-6.46
-6.46
-6.46
-25.14
-25.14
-6.66
9.47
-6.98
9.80
-11.53
5.28
-11.21
6.03
-10.78
-9.66
-8.53
-55.70
-54.20
-52.71
-11.26
-11.26
-11.26
-11.84
-11.84
-36.80
-36.80
-36.80
-36.92
-36.92
10.32
10.32
10.32
-1.20
-1.20
-1.20
2.31
6.36
10.85
-12.15
-6.75
-1.79
-36.67
35.92
202.06
-139.17
6.09
57.79
10.75
10.75
10.75
-0.77
-0.77
-0.77
-21.84
-20.71
-19.59
-58.64
-57.14
-55.65
10.59
10.59
10.29
23.07
23.07
14.17
14.17
14.17
9.84
9.84
-11.96
-11.96
-0.96
-0.96
-0.96
-6.76
-6.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-15.94
-15.94
-15.94
-18.26
-18.26
-18.26
-16.77
-16.77
-16.77
66.37
66.37
-55.25
-55.25
-55.25
-107.56
-107.56
23.34
23.34
23.34
-15.98
-15.98
-15.98
0.07
0.07
0.07
-0.03
-0.03
-0.03
1.30
1.30
1.30
-0.60
-0.60
-0.60
10.05
10.05
10.05
-9.52
-9.52
-9.52
-38.37
-38.37
-38.37
-41.60
-41.60
-41.60
46.98
46.98
4.53
T
KN-m
0.00
0.00
0.26
0.26
0.26
0.28
0.28
0.00
0.00
-0.02
-0.02
-0.02
-0.06
-0.06
-0.54
-0.54
0.56
0.56
-0.83
-0.83
0.12
0.12
-0.18
-0.18
-0.18
-0.95
-0.95
-0.95
0.00
0.00
0.00
1.95
1.95
0.00
0.00
0.00
0.49
0.49
0.03
0.03
0.03
0.00
0.00
0.00
0.06
0.06
0.06
-0.03
-0.03
-0.03
0.05
0.05
0.05
-0.33
-0.33
-0.33
0.03
0.03
0.03
0.00
0.00
0.00
0.46
0.46
0.46
-0.85
-0.85
-0.85
0.00
0.00
0.14
M2
KN-m
0.00
11.96
12.01
14.85
15.76
17.04
13.33
0.00
-23.07
-6.40
-56.15
-69.61
-11.01
-18.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-12.86
-4.90
3.71
-14.64
-5.91
2.49
0.00
52.49
55.25
63.61
143.45
0.00
15.93
16.77
8.64
-34.13
50.88
15.87
23.25
-24.69
-0.72
-19.14
0.21
0.00
0.09
-0.09
0.00
-0.21
4.55
0.17
2.28
-1.94
-0.01
-4.58
11.26
1.61
15.26
-14.71
-5.84
-20.27
-31.86
-12.59
7.74
-33.93
-13.19
6.47
0.00
23.09
10.87
M3
KN-m
0.00
6.54
6.66
29.60
35.74
-2.12
45.06
0.00
-14.97
-14.83
-68.07
-82.32
-45.44
-5.36
-6.15
-0.99
-6.82
-4.28
-16.12
-7.08
-13.71
-8.01
-8.93
-3.82
2.34
-53.52
-26.07
-0.99
0.00
34.96
36.80
37.09
70.31
0.00
10.69
11.26
9.19
19.85
15.81
0.90
1.32
-2.29
-0.49
-15.23
15.34
6.53
18.69
-21.83
2.35
-22.80
18.04
158.84
-79.46
-61.02
32.28
-257.45
16.62
0.68
0.91
-1.41
-0.25
-15.64
-19.65
-9.02
1.05
-59.51
-30.59
-2.42
0.00
1.58
1.66
_____________________________________________________________________________________
150
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
35
35
35
35
35
35
35
35
35
35
35
36
36
36
36
36
36
37
37
37
37
37
37
38
38
38
38
38
38
39
39
39
39
39
39
39
39
39
39
40
40
40
40
40
40
40
40
40
40
40
40
40
40
41
41
41
41
41
41
41
41
42
42
42
42
42
42
43
43
43
43
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
12.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
0.95
1.00
1.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
P
KN
-247.81
-243.96
-116.87
-102.29
-693.14
-687.74
-676.62
-657.45
-652.32
-413.51
-394.07
3.56
3.56
3.56
-44.33
-44.33
-44.33
0.00
0.00
0.00
0.00
0.00
0.00
112.72
90.93
69.14
-82.35
-140.56
-198.77
-182.10
-178.05
-170.71
-163.62
-152.48
-544.85
-539.45
-526.79
-517.34
-502.49
-187.84
-183.79
-181.70
-167.32
-163.47
-78.72
-64.14
-416.56
-411.16
-404.29
-385.12
-379.99
-192.46
-173.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.39
-1.39
-1.39
-1.89
-1.89
-1.89
-29.27
-25.42
-25.22
-26.10
V2
KN
10.29
10.29
46.26
46.26
-1.58
-1.58
-1.63
-1.63
-1.63
-5.51
-5.51
1.55
5.70
11.10
-11.00
-5.69
-1.64
-4.99
2.76
11.76
-10.05
-1.27
5.49
-33.99
7.28
104.30
-90.39
1.68
38.00
13.11
13.11
14.69
14.69
14.69
-3.12
-3.12
-2.35
-2.35
-2.35
10.45
10.45
10.46
10.46
10.46
32.49
32.49
-1.24
-1.24
-1.19
-1.19
-1.19
0.48
0.48
-6.32
9.42
-6.87
10.07
-11.79
4.98
-10.94
6.24
-10.09
-8.06
-6.04
-30.28
-27.58
-24.88
9.43
9.43
9.43
8.13
V3
KN
4.53
4.53
25.93
25.93
-23.09
-23.09
-1.87
-1.87
-1.87
3.40
3.40
0.69
0.69
0.69
-0.25
-0.25
-0.25
0.00
0.00
0.00
0.00
0.00
0.00
4.76
4.76
4.76
-0.83
-0.83
-0.83
69.94
69.94
2.34
2.34
2.34
-34.72
-34.72
-0.75
-0.75
-0.75
29.22
29.22
8.83
8.83
8.83
10.58
10.58
-12.37
-12.37
-1.19
-1.19
-1.19
-7.97
-7.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-45.15
-45.15
-45.15
-50.72
-50.72
-50.72
-10.96
-10.96
-10.96
99.91
T
KN-m
0.14
0.14
0.14
0.14
0.00
0.00
-0.48
-0.48
-0.48
-0.03
-0.03
0.35
0.35
0.35
-0.07
-0.07
-0.07
2.00
2.00
2.00
-0.68
-0.68
-0.68
0.65
0.65
0.65
-0.33
-0.33
-0.33
0.00
0.00
2.32
2.32
2.32
0.00
0.00
1.18
1.18
1.18
0.00
0.00
0.15
0.15
0.15
0.14
0.14
0.00
0.00
-0.04
-0.04
-0.04
-0.03
-0.03
0.09
0.09
2.04
2.04
-0.31
-0.31
-0.84
-0.84
11.38
11.38
11.38
1.02
1.02
1.02
0.00
0.00
0.00
4.35
M2
KN-m
17.49
19.26
25.06
-11.37
0.00
-46.98
-19.36
-35.43
-39.73
0.85
-68.30
2.08
0.01
0.75
-0.74
0.00
-2.05
0.00
0.00
0.00
0.00
0.00
0.00
16.56
0.19
2.93
-2.85
-0.31
-16.77
0.00
34.72
19.83
21.14
23.20
0.00
-69.94
-36.70
-40.80
-47.23
0.00
12.36
10.58
14.79
15.92
16.77
14.52
0.00
-29.22
-10.40
-41.75
-50.14
-14.16
-21.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-40.54
-17.96
5.56
-45.63
-20.66
4.24
0.00
34.53
36.35
46.71
M3
KN-m
7.46
9.01
76.13
12.69
0.00
-10.59
-10.80
-47.34
-57.11
-7.15
-90.40
13.61
4.67
14.09
-20.50
2.87
-21.03
-1.92
4.08
-3.82
-12.47
1.84
-19.53
-29.15
66.39
-45.44
-85.29
21.07
-131.68
0.00
3.12
3.54
7.64
14.09
0.00
-13.11
-9.05
-34.75
-75.13
0.00
1.24
1.27
5.50
6.64
59.26
0.74
0.00
-10.45
-10.43
-47.58
-57.52
2.48
-57.69
-5.19
-0.34
-6.44
-5.71
-17.10
-7.77
-12.81
-9.36
-7.56
-3.03
1.19
-27.48
-13.03
-0.62
0.00
38.20
40.21
39.67
_____________________________________________________________________________________
151
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
43
43
43
43
43
43
44
44
44
44
44
44
44
44
45
45
45
45
45
45
45
45
46
46
46
46
46
46
46
46
47
47
47
47
47
47
48
48
48
48
48
48
49
49
49
49
49
49
50
50
50
50
50
50
51
51
51
51
51
51
51
51
52
52
52
52
52
52
52
52
53
1.90
0.00
0.95
1.00
1.00
1.90
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
P
KN
-22.46
-332.72
-327.59
-327.32
-320.73
-315.87
-1056.58
-1059.72
-1017.82
-1017.82
-1089.63
-1092.78
-1053.86
-1053.86
-3.08
-3.08
-2.24
-2.24
-34.30
-34.30
-24.03
-24.03
-3.58
-3.58
-3.34
-3.34
-31.89
-31.89
-21.07
-21.07
-15.06
-13.04
-11.01
-56.48
-53.78
-51.08
-14.96
-12.94
-10.91
-56.56
-53.86
-51.16
-5.55
-3.52
-1.50
-22.44
-19.74
-17.04
-5.60
-3.57
-1.55
-22.34
-19.64
-16.94
-976.88
-976.88
-978.72
-978.72
-1001.29
-1001.29
-1003.51
-1003.52
-1015.87
-1015.87
-1059.91
-1056.76
-1051.85
-1051.85
-1094.54
-1091.40
1.57
V2
KN
8.13
-40.21
-40.21
-40.21
-40.90
-40.90
51.54
-1.38
165.26
226.87
-40.33
-63.67
58.93
90.96
0.35
7.64
1.59
11.31
-8.01
1.71
-5.51
2.66
-0.13
7.72
-0.74
8.98
-5.71
4.01
-5.74
3.01
15.83
15.83
15.83
-0.27
-0.27
-0.27
6.30
6.30
6.30
-6.47
-6.47
-6.47
6.13
6.13
6.13
-3.44
-3.44
-3.44
12.07
12.07
12.07
0.49
0.49
0.49
-65.61
-33.57
116.72
178.33
-175.18
-113.57
35.86
67.89
-87.56
-55.52
70.42
47.08
-223.66
-162.05
6.37
-46.55
34.63
V3
KN
99.91
-36.35
-36.35
-36.35
-83.15
-83.15
-3.11
-3.11
-1.04
-1.04
-14.55
-14.55
-12.36
-12.36
1.04
1.04
0.40
0.40
-0.39
-0.39
-1.11
-1.11
1.07
1.07
0.40
0.40
-0.39
-0.39
-1.14
-1.14
13.97
13.97
13.97
-15.90
-15.90
-15.90
14.45
14.45
14.45
-15.75
-15.75
-15.75
15.97
15.97
15.97
-13.44
-13.44
-13.44
16.17
16.17
16.17
-13.14
-13.14
-13.14
4.22
4.22
3.19
3.19
-5.82
-5.82
-7.50
-7.50
10.08
10.08
10.71
10.71
-1.07
-1.07
-2.05
-2.05
0.00
T
KN-m
4.35
0.00
0.00
0.00
2.69
2.69
0.95
0.95
5.48
5.48
-5.53
-5.53
-1.59
-1.59
0.50
0.50
0.50
0.50
-0.51
-0.51
-0.51
-0.51
0.74
0.74
0.03
0.03
-0.05
-0.05
-0.82
-0.82
0.61
0.61
0.61
-0.21
-0.21
-0.21
0.26
0.26
0.26
-0.64
-0.64
-0.64
0.26
0.26
0.26
-0.67
-0.67
-0.67
0.63
0.63
0.63
-0.20
-0.20
-0.20
1.60
1.60
5.71
5.71
-5.15
-5.15
-2.14
-2.14
1.75
1.75
6.97
6.97
-6.14
-6.14
-2.38
-2.38
0.07
M2
KN-m
95.62
0.00
10.41
10.96
3.33
-60.67
-13.23
33.47
-3.18
33.21
-45.09
3.57
-33.52
2.44
2.46
1.19
1.21
2.66
-0.93
-3.18
-3.35
-0.95
2.51
1.18
1.20
2.71
-0.92
-3.27
-3.43
-0.94
29.05
8.10
20.52
-27.91
-4.06
-13.59
30.49
8.83
20.25
-27.62
-3.99
-13.45
27.93
3.98
13.63
-27.75
-7.59
-21.02
28.05
3.93
13.64
-26.64
-7.07
-21.32
9.92
14.20
7.39
19.28
-17.21
-12.87
-21.22
-9.84
26.28
2.10
23.96
1.75
-3.69
-28.17
-9.32
-33.90
0.00
M3
KN-m
76.48
0.00
-8.96
-9.43
-13.29
-20.61
99.21
278.60
281.20
132.97
-4.31
-37.02
-38.58
-202.87
8.68
6.46
13.37
-0.24
-10.56
-12.87
-5.57
-21.47
7.72
-0.70
6.35
-1.18
-5.28
-11.24
-4.61
-15.89
26.37
2.62
-0.30
-1.10
-0.70
-21.13
10.32
2.29
10.21
-9.21
-0.61
-8.57
10.55
2.24
5.61
-4.72
-0.10
-7.82
19.99
1.88
-1.13
0.33
-0.40
-16.23
186.84
-28.58
-26.71
175.46
-118.71
-234.86
-233.91
-133.87
146.94
280.47
283.40
76.42
-186.23
-41.44
-36.85
-33.97
56.84
_____________________________________________________________________________________
152
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
53
53
53
53
53
53
53
54
54
54
54
54
54
54
54
54
54
54
54
55
55
55
55
55
55
55
55
56
56
56
56
56
56
57
57
57
57
57
57
58
58
58
58
58
58
59
59
59
59
59
59
60
60
60
60
60
60
61
61
61
61
61
61
62
62
62
62
62
62
63
63
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
9.00
9.00
10.80
0.00
5.40
5.40
9.00
9.00
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
P
KN
-1.66
-4.99
-20.13
1.57
-1.66
-4.99
-20.13
-28.67
-7.23
-3.83
10.46
2.23
-33.49
-28.67
-7.23
-4.82
9.46
0.24
-35.48
-20.13
-4.99
-1.66
1.57
-20.13
-4.99
-1.66
1.57
-0.08
-2.85
-15.83
-0.08
-2.85
-15.83
-24.57
-6.20
-24.57
-24.57
-6.20
-24.57
-15.83
-2.85
-0.08
-15.83
-2.85
-0.08
-0.04
-1.58
-8.79
-0.04
-1.58
-8.79
-13.65
-3.44
-13.65
-13.65
-3.44
-13.65
-8.79
-1.58
-0.04
-8.79
-1.58
-0.04
-0.04
-1.58
-8.79
-0.04
-1.58
-8.79
-13.65
-3.44
V2
KN
-21.49
271.78
461.96
-97.94
-117.74
97.03
250.89
-240.51
-69.83
189.21
-18.02
152.90
567.14
-425.67
-218.67
55.57
-175.88
-83.80
318.33
-256.80
-102.94
134.90
115.10
-479.16
-288.98
32.55
-23.57
8.41
55.18
390.96
-111.42
30.36
241.48
-214.57
13.51
363.71
-348.87
0.62
226.16
-267.67
-27.39
154.12
-425.93
-51.27
23.81
-8.50
44.15
277.38
-100.99
18.84
156.29
-142.41
3.05
303.65
-255.44
-14.20
171.70
-170.75
-15.32
128.78
-297.43
-40.23
30.10
-4.34
36.42
254.74
-85.37
19.03
145.30
-145.81
4.63
V3
KN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
5.66
5.66
0.00
0.00
0.38
0.38
-6.88
-6.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T
KN-m
0.07
0.93
0.93
-0.98
-0.98
0.02
0.02
-0.33
-0.33
-3.66
-3.66
22.55
22.55
-1.40
-1.40
-9.58
-9.58
8.03
8.03
0.44
0.44
1.39
1.39
-1.03
-1.03
-0.20
-0.20
0.01
0.01
0.01
-0.04
-0.04
-0.04
0.00
0.00
0.00
-0.02
-0.02
-0.02
0.03
0.03
0.03
-0.06
-0.06
-0.06
-0.01
-0.01
-0.01
-0.09
-0.09
-0.09
0.01
0.01
0.01
-0.02
-0.02
-0.02
0.02
0.02
0.02
-0.11
-0.11
-0.11
-0.06
-0.06
-0.06
-0.10
-0.10
-0.10
0.17
0.17
M2
KN-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.55
-1.16
6.06
7.89
0.00
0.00
0.19
-6.25
-4.49
-4.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
KN-m
419.99
426.47
64.26
-83.69
-57.90
-58.93
-492.02
130.46
68.32
69.59
247.51
244.45
42.16
-399.48
-305.19
-301.36
92.16
94.71
-542.63
48.25
472.22
473.13
23.05
-540.57
-48.03
-42.80
-129.38
74.75
33.11
56.22
-79.99
-122.65
-263.10
177.39
-267.32
114.78
-114.15
-364.61
-194.21
37.53
92.18
23.55
-287.82
-78.62
-146.48
47.70
78.24
-10.02
-69.62
-45.27
-286.39
63.67
-75.41
-1.37
-197.15
-166.72
-286.54
-14.20
110.97
4.93
-297.19
-19.95
-122.22
23.03
56.61
0.30
-47.37
-62.36
-223.97
37.83
-60.02
_____________________________________________________________________________________
153
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
63
63
63
63
64
64
64
64
64
64
64
64
65
65
65
65
65
65
65
65
66
66
66
66
66
66
66
66
66
66
66
66
67
67
67
67
67
67
67
67
68
68
68
68
68
68
69
69
69
69
69
69
70
70
70
70
70
70
71
71
71
71
71
71
72
72
72
72
72
72
73
10.80
0.00
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
9.00
9.00
10.80
0.00
5.40
5.40
9.00
9.00
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
P
KN
V2
KN
-13.65
-13.65
-3.44
-13.65
-9.58
-2.37
-0.79
0.75
-9.58
-2.37
-0.79
0.75
1.35
-1.43
-4.27
-17.25
1.35
-1.43
-4.27
-17.25
-24.57
-6.20
-5.39
6.86
6.24
-24.38
-24.57
-6.20
-6.30
5.95
4.42
-26.20
-17.25
-4.27
-1.43
1.35
-17.25
-4.27
-1.43
1.35
184.26
126.05
84.05
-92.06
-113.84
-151.85
112.49
17.50
-13.53
43.05
7.33
-92.35
184.07
85.29
54.27
-73.47
-105.40
-205.09
111.75
13.56
-17.46
39.50
6.98
-92.71
164.01
66.29
35.26
-53.69
-86.67
-186.36
114.10
257.55
-252.49
0.42
150.29
-149.73
-23.46
-6.97
100.55
-266.78
-48.46
-26.84
11.50
26.82
-2.46
182.08
421.11
-116.53
-57.48
60.07
210.78
-195.23
-30.10
100.86
-26.09
81.59
461.99
-375.16
-121.71
21.57
-164.26
-124.65
226.31
-218.70
-67.99
80.07
139.12
-446.24
-207.20
11.40
-17.88
-28.31
8.01
96.95
-123.99
-26.97
17.43
-59.71
-8.00
140.07
-193.44
-27.30
42.48
-45.21
6.50
162.74
-192.24
-26.10
35.50
-58.86
-7.15
139.13
-195.59
-29.45
42.11
-47.47
4.24
160.87
-189.39
-23.25
37.96
-59.68
V3
KN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.05
3.05
7.80
7.80
0.00
0.00
-2.07
-2.07
-2.24
-2.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.91
13.91
13.91
1.02
1.02
1.02
8.90
8.90
8.90
-0.63
-0.63
-0.63
6.45
6.45
6.45
-2.54
-2.54
-2.54
7.56
7.56
7.56
-1.90
-1.90
-1.90
8.48
8.48
8.48
-1.39
-1.39
-1.39
6.69
T
KN-m
0.17
-0.16
-0.16
-0.16
7.43
7.43
5.56
5.56
-5.70
-5.70
-7.28
-7.28
7.97
7.97
-2.15
-2.15
2.29
2.29
-7.56
-7.56
7.94
7.94
0.28
0.28
-7.01
-7.01
2.27
2.27
-2.11
-2.11
-19.62
-19.62
7.71
7.71
-0.61
-0.61
0.33
0.33
-8.14
-8.14
0.34
0.34
0.34
-2.72
-2.72
-2.72
0.00
0.00
0.00
-0.63
-0.63
-0.63
0.00
0.00
0.00
-0.86
-0.86
-0.86
0.66
0.66
0.66
0.25
0.25
0.25
0.83
0.83
0.83
0.02
0.02
0.02
0.82
M2
KN-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.36
4.18
6.20
4.29
0.00
0.00
-3.32
-6.64
0.27
-7.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.36
-0.30
-5.57
1.57
-2.00
-48.96
31.03
0.11
1.58
-2.81
-0.61
-31.21
22.84
0.29
8.82
-8.94
-0.16
-22.26
26.67
0.26
6.29
-7.01
-0.36
-26.19
30.30
0.65
5.09
-4.61
0.24
-29.00
24.24
M3
KN-m
14.93
-183.00
-158.81
-211.25
-1.76
104.14
103.12
4.65
-241.00
-43.91
-43.31
-85.65
43.82
315.35
315.68
84.39
-89.00
-94.27
-95.12
-404.57
153.83
-47.72
-48.18
205.81
200.92
116.25
-297.65
-336.82
-336.98
93.28
93.07
-384.75
65.87
378.80
381.53
23.48
-474.68
-70.86
-63.89
-142.32
-26.66
92.66
48.12
-171.40
8.85
-113.52
-80.10
137.35
-15.52
-255.03
32.09
-72.62
-47.06
128.02
16.04
-253.93
20.65
-179.86
-82.98
128.23
-20.10
-265.42
32.49
-72.19
-51.21
126.41
5.00
-245.55
24.42
-168.73
-83.29
_____________________________________________________________________________________
154
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
73
73
73
73
73
74
74
74
74
74
74
81
81
81
81
81
81
82
82
82
82
82
82
83
83
83
83
83
83
84
84
84
84
84
84
85
85
85
85
85
85
86
86
86
86
86
86
87
87
87
87
87
87
88
88
88
88
88
88
89
89
89
89
89
89
90
90
90
90
90
90
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
P
KN
V2
KN
17.67
-13.35
45.19
10.49
-89.20
116.51
58.30
22.26
-39.77
-61.56
-105.52
55.48
5.83
-42.23
17.55
-12.81
-97.30
25.56
25.56
25.56
-78.60
-78.60
-78.60
14.84
14.84
14.84
-34.60
-34.60
-34.60
6.38
6.38
6.38
-9.22
-9.22
-9.22
51.73
51.73
51.73
-83.13
-83.13
-83.13
23.15
23.15
23.15
-33.84
-33.84
-33.84
9.51
9.51
9.51
-9.10
-9.10
-9.10
67.99
67.99
67.99
-98.81
-98.81
-98.81
31.24
31.24
31.24
-37.29
-37.29
-37.29
12.42
12.42
12.42
-10.32
-10.32
-10.32
-7.97
139.61
-194.41
-28.27
42.00
-35.09
1.23
90.78
-116.26
-19.24
24.55
-35.66
2.16
142.97
-94.96
0.56
80.67
-1.12
4.28
9.68
-5.13
-1.08
2.97
-2.08
3.13
8.53
-5.41
-0.82
3.23
-2.19
2.99
8.39
-5.39
-0.69
3.36
-0.57
4.83
10.23
-5.84
-1.79
2.26
-1.63
3.55
8.95
-5.57
-1.29
2.76
-1.76
3.44
8.84
-5.38
-1.11
2.95
0.07
5.47
10.87
-6.55
-2.50
1.55
-1.14
4.03
9.43
-6.06
-1.78
2.27
-1.29
3.95
9.35
-5.75
-1.54
2.51
V3
KN
6.69
6.69
-3.40
-3.40
-3.40
3.36
3.36
3.36
-8.19
-8.19
-8.19
0.29
0.29
10.21
-2.57
-2.57
7.36
-0.47
-0.47
-0.47
-1.00
-1.00
-1.00
0.24
0.24
0.24
0.02
0.02
0.02
0.00
0.00
0.00
-0.06
-0.06
-0.06
0.24
0.24
0.24
-0.31
-0.31
-0.31
0.05
0.05
0.05
-0.08
-0.08
-0.08
0.02
0.02
0.02
-0.05
-0.05
-0.05
0.66
0.66
0.66
0.12
0.12
0.12
0.00
0.00
0.00
-0.10
-0.10
-0.10
0.09
0.09
0.09
-0.01
-0.01
-0.01
T
KN-m
0.82
0.82
0.29
0.29
0.29
2.74
2.74
2.74
-0.18
-0.18
-0.18
0.66
0.66
1.77
0.21
0.21
1.32
0.79
0.79
0.79
-2.14
-2.14
-2.14
0.40
0.40
0.40
-0.14
-0.14
-0.14
0.00
0.00
0.00
-0.14
-0.14
-0.14
2.05
2.05
2.05
-0.71
-0.71
-0.71
0.03
0.03
0.03
-0.17
-0.17
-0.17
-0.01
-0.01
-0.01
-0.14
-0.14
-0.14
2.37
2.37
2.37
-0.29
-0.29
-0.29
0.03
0.03
0.03
-0.12
-0.12
-0.12
0.17
0.17
0.17
0.04
0.04
0.04
M2
KN-m
0.84
11.98
-11.78
0.10
-22.55
14.23
2.48
29.63
-27.71
0.96
-9.26
0.57
0.05
8.24
-9.06
-0.58
-2.12
-2.12
-0.52
2.43
-3.57
-0.80
0.71
0.91
0.19
-0.02
0.12
0.05
-0.57
0.00
0.00
0.16
-0.23
-0.05
-0.03
0.48
-0.09
0.83
-1.01
-0.25
-0.98
0.15
0.04
0.20
-0.29
-0.05
-0.12
0.07
0.01
0.16
-0.15
-0.01
-0.08
1.95
0.13
-0.24
0.49
-0.03
-2.01
-0.02
0.00
0.23
-0.39
-0.08
-0.03
0.25
0.01
0.02
-0.01
0.00
-0.26
M3
KN-m
131.80
-17.95
-257.71
35.05
-69.49
-42.34
80.56
12.28
-156.47
16.88
-85.05
-7.11
145.53
-11.69
-17.69
53.41
-32.13
8.46
3.73
-0.97
-7.48
1.85
-17.19
4.15
3.16
-1.68
-6.60
1.93
-14.61
3.56
3.14
-2.02
-6.13
2.00
-14.35
10.25
3.85
0.94
-9.82
1.63
-18.74
5.41
3.16
-0.30
-8.04
1.90
-15.87
4.93
3.15
-0.76
-7.40
1.99
-15.72
12.32
4.01
2.89
-12.09
1.47
-20.49
6.87
3.14
1.13
-9.57
1.86
-17.33
6.45
3.15
0.52
-8.70
1.99
-17.24
_____________________________________________________________________________________
155
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
91
91
91
91
91
91
92
92
92
92
92
92
93
93
93
93
93
93
94
94
94
94
94
94
95
95
95
95
95
95
96
96
96
96
96
96
97
97
97
97
97
97
98
98
98
98
98
98
99
99
99
99
99
99
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
P
KN
66.37
66.37
66.37
-130.44
-130.44
-130.44
32.40
32.40
32.40
-62.84
-62.84
-62.84
11.18
11.18
11.18
-20.39
-20.39
-20.39
-43.81
-43.81
-43.81
-49.08
-49.08
-49.08
-87.44
-87.44
-87.44
-89.07
-89.07
-89.07
-104.00
-104.00
-104.00
-105.49
-105.49
-105.49
-104.22
-104.22
-104.22
-105.90
-105.90
-105.90
-86.67
-86.67
-86.67
-89.09
-89.09
-89.09
-45.15
-45.15
-45.15
-50.72
-50.72
-50.72
V2
KN
1.27
6.67
12.07
-6.98
-2.93
1.12
-0.52
4.81
10.21
-6.29
-2.17
1.88
-0.79
4.49
9.89
-6.12
-1.95
2.10
-6.37
2.47
28.66
-24.54
1.32
9.82
-10.29
1.17
27.36
-26.38
-3.15
5.36
-3.56
4.95
28.82
-25.08
1.11
11.94
-11.81
-0.99
25.20
-28.96
-5.09
3.42
-5.11
3.39
26.65
-27.51
-1.32
10.12
-9.47
-0.97
24.88
-28.99
-2.80
6.04
V3
KN
1.30
1.30
1.30
0.69
0.69
0.69
-0.05
-0.05
-0.05
-0.28
-0.28
-0.28
0.06
0.06
0.06
-0.01
-0.01
-0.01
-1.59
-1.59
-1.59
-2.03
-2.03
-2.03
-0.84
-0.84
-0.84
-1.39
-1.39
-1.39
-0.02
-0.02
-0.02
-0.47
-0.47
-0.47
0.37
0.37
0.37
-0.10
-0.10
-0.10
1.33
1.33
1.33
0.75
0.75
0.75
1.89
1.89
1.89
1.39
1.39
1.39
T
KN-m
3.86
3.86
3.86
0.54
0.54
0.54
0.20
0.20
0.20
-0.31
-0.31
-0.31
0.10
0.10
0.10
-0.07
-0.07
-0.07
0.32
0.32
0.32
-0.89
-0.89
-0.89
1.10
1.10
1.10
-0.41
-0.41
-0.41
0.44
0.44
0.44
-1.00
-1.00
-1.00
1.11
1.11
1.11
-0.56
-0.56
-0.56
0.43
0.43
0.43
-1.23
-1.23
-1.23
1.19
1.19
1.19
-0.62
-0.62
-0.62
M2
KN-m
4.35
0.68
-1.46
2.69
0.42
-3.43
-0.28
-0.11
0.58
-1.12
-0.27
0.00
0.21
0.05
0.04
-0.01
0.00
-0.15
-4.76
-0.44
5.05
-5.92
-0.48
3.81
-2.59
-0.34
3.38
-4.11
-0.36
1.92
-0.31
-0.25
1.01
-1.52
-0.26
-0.21
0.74
-0.26
-0.01
-0.53
-0.27
-1.26
3.23
-0.33
-2.36
1.71
-0.35
-3.93
4.65
-0.45
-4.24
3.26
-0.49
-5.56
M3
KN-m
16.18
4.26
4.15
-13.45
1.42
-23.86
9.38
3.21
2.29
-10.74
1.85
-19.50
8.12
3.17
1.79
-9.93
2.00
-18.82
-1.78
20.59
-10.51
-10.50
3.94
-22.21
-10.54
14.18
2.98
-21.70
5.76
-24.54
3.86
8.73
-18.63
-23.63
1.97
-33.88
-18.41
8.71
4.35
-34.13
2.00
-24.07
3.56
14.21
-9.95
-24.80
5.86
-22.50
-9.53
20.45
-1.02
-23.22
3.80
-11.38
_____________________________________________________________________________________
156
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
157
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
158
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
159
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
160
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
_____________________________________________________________________________________
161
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
162
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
163
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
Version
Text
9.0.3
ProgLevel
Text
Advanced
CurrUnits
Text
KN, m, C
ConcCode
Text
ACI 318-02
UY
Yes/No
Yes
UZ
Yes/No
Yes
RX
Yes/No
Yes
RY
Yes/No
Yes
RZ
Yes/No
Yes
Type
Text
LinStatic
LinModal
LinStatic
LinStatic
LinStatic
LinRespSpec
InitialCond
Text
Zero
Zero
Zero
Zero
Zero
ModalCase
Text
MODOS DE VIB.
ModeType
Text
Eigen
MaxNumModes
Unitless
6
MinNumModes
Unitless
1
EigenShift
Cyc/sec
0
EigenCutoff
Cyc/sec
0
EigenTol
Unitless
0.0000001
ModalCombo
Text
CQC
DirCombo
Text
SRSS
DampingType
Text
Constant
ConstDamp
Unitless
0.05
LoadType
Text
Acceleration
Acceleration
LoadName
Text
U1
U2
CoordSys
Text
GLOBAL
GLOBAL
Function
Text
SPECTRO
SPECTRO
Angle
Degrees
0
0
TransAccSF
m/sec2
0.01
0.01
LoadType
Text
Load case
Load case
Load case
Load case
LoadName
Text
Carga Muerta
Carga Viva
PRETENSADO
VIENTO-Y
LoadSF
Unitless
1
1
1
1
_____________________________________________________________________________________
164
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
ComboType
CaseType
CaseName
ScaleFactor
ConcDesign
Text
Text
Text
Text
Unitless
Yes/No
1.4
Yes
COMB 1
Linear Add
COMB 1
COMB 2
Linear Add
Linear Static
CM
Linear Static
PRETENSADO
Linear Static
CM
1.2
Linear Static
CV
1.6
Linear Static
PRETENSADO
Linear Static
CM
1.2
COMB 3
Linear Static
CV
COMB 3
Linear Static
PRETENSADO
COMB 3
Linear Static
VIENTO-Y
1.6
COMB 2
COMB 2
COMB 3
COMB 4
Linear Add
Linear Static
CM
1.2
Linear Static
CV
COMB 4
Linear Static
PRETENSADO
COMB 4
Linear Static
VIENTO-Y
-1.6
0.9
Linear Add
COMB 5
COMB 5
COMB 6
Linear Add
COMB 6
COMB 6
Linear Static
CM
Linear Static
PRETENSADO
Linear Static
VIENTO-Y
1.6
Linear Static
CM
0.9
Linear Static
PRETENSADO
VIENTO-Y
-1.6
1.2
COMB 7
Linear Static
PRETENSADO
COMB 7
Linear Static
CV
COMB 7
Response Spectrum
SPECTRO
Linear Add
COMB 8
COMB 8
Linear Static
CM
Linear Static
PRETENSADO
0.9
1
1
Response Spectrum
SPECTRO
COMB 1
ENVOLVENTE
Response Combo
COMB 2
ENVOLVENTE
Response Combo
COMB 3
ENVOLVENTE
Response Combo
COMB 4
ENVOLVENTE
Response Combo
COMB 5
ENVOLVENTE
Response Combo
COMB 6
ENVOLVENTE
Response Combo
COMB 7
ENVOLVENTE
Response Combo
COMB 8
Linear Static
CM
SERV.
Linear Static
PRETENSADO
SERV.
Linear Static
CV
SERV.
Envelope
Linear Add
Yes
Response Combo
ENVOLVENTE
Yes
CM
COMB 8
Yes
Linear Static
Linear Add
Yes
Linear Static
COMB 7
Yes
COMB 4
COMB 5
Linear Add
Yes
Yes
Yes
Yes
_____________________________________________________________________________________
165
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Connectivity - Frame
Frame
JointI
JointJ
Text
Text
Text
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
1
4
5
2
7
8
9
10
12
13
15
13
17
18
20
23
24
21
26
27
28
29
31
32
34
32
36
37
39
41
39
43
44
46
49
50
47
51
53
54
55
57
58
60
58
62
63
65
68
69
66
71
72
73
74
76
10
2
3
2
6
6
5
6
11
10
14
14
16
15
19
21
22
21
25
25
24
25
30
29
33
33
35
34
38
40
40
42
41
45
47
48
47
51
52
50
51
56
55
59
59
61
60
64
66
67
66
70
70
69
70
75
74
29
Length
m
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
3.00
6.00
7.00
3.00
1.00
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
3.00
6.00
7.00
3.00
1.00
3.00
6.00
7.00
3.00
1.00
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
3.00
6.00
7.00
3.00
1.00
9.10
6.00
6.00
7.00
5.50
9.10
12.00
1.00
1.90
10.80
CentroidX
m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.40
5.40
5.40
5.40
5.40
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
10.80
16.20
16.20
16.20
16.20
16.20
21.60
21.60
21.60
21.60
21.60
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
27.00
32.40
32.40
32.40
32.40
32.40
37.80
37.80
37.80
37.80
37.80
37.80
37.80
37.80
37.80
5.40
CentroidY
m
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
12.00
15.00
9.00
18.00
-0.50
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
12.00
15.00
9.00
18.00
-0.50
12.00
15.00
9.00
18.00
-0.50
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
12.00
15.00
9.00
18.00
-0.50
12.00
15.00
15.00
9.00
6.00
18.00
12.00
-0.50
0.00
0.00
CentroidZ
m
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
9.60
11.10
6.30
9.60
0.90
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
9.60
11.10
6.30
9.60
0.90
9.60
11.10
6.30
9.60
0.90
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
9.60
11.10
6.30
9.60
0.90
3.55
11.10
8.10
6.30
1.75
3.55
4.50
0.90
-0.05
0.90
SectionType
Text
AnalSect
Text
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
COL-30X60
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-30X60
COL-30X60
VIGA-25X40
VIGA-25X40
COL-30X60
COL-20X30
VIGA-20X30
VIGA-25X60
COL-20X30
VIGA-25X40
COL-50X70
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-40X60
COL-40X60
VIGA-25X40
VIGA-25X40
COL-30X60
COL-20X30
VIGA-20X30
VIGA-25X60
COL-20X30
VIGA-25X40
COL-20X30
VIGA-20X30
VIGA-25X60
COL-20X30
VIGA-25X40
COL-50X70
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-40X60
COL-40X60
VIGA-25X40
VIGA-25X40
COL-30X60
COL-20X30
VIGA-20X30
VIGA-25X60
COL-20X30
VIGA-25X40
COL-30X60
VIGA-20X30
VIGA-25X40
VIGA-25X60
COL-30X60
COL-30X60
VIGA-25X40
VIGA-25X40
COL-30X60
VIGA.I-HP100
_____________________________________________________________________________________
166
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Connectivity - Frame
Frame
JointI
JointJ
Text
Text
Text
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
94
96
97
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
3
4
5
2
21
24
47
50
66
69
70
51
61
42
35
25
16
6
29
55
6
25
51
77
78
79
2
21
47
5
24
50
9
28
54
85
87
84
88
89
91
92
93
95
96
97
99
100
101
11
19
30
38
45
56
64
67
68
4
3
22
23
48
49
67
68
74
55
63
44
37
29
18
10
55
74
25
51
70
78
79
80
21
47
66
24
50
69
28
54
73
81
86
88
89
90
92
93
94
96
97
98
100
101
102
19
30
38
45
56
64
75
Length
m
37.80
37.80
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00
16.20
10.80
10.80
16.20
10.80
10.80
16.20
10.80
10.80
16.20
10.80
10.80
16.20
10.80
10.80
16.20
10.80
7.00
7.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
5.40
5.40
5.40
5.40
5.40
5.40
5.40
CentroidX
m
18.90
18.90
0.00
0.00
10.80
10.80
27.00
27.00
37.80
37.80
37.80
27.00
32.40
21.60
16.20
10.80
5.40
0.00
18.90
32.40
5.40
18.90
32.40
5.40
18.90
32.40
5.40
18.90
32.40
5.40
18.90
32.40
5.40
18.90
32.40
18.00
19.80
0.00
0.00
0.00
10.80
10.80
10.80
27.00
27.00
27.00
37.80
37.80
37.80
2.70
8.10
13.50
18.90
24.30
29.70
35.10
CentroidY
m
12.00
18.00
18.00
12.00
12.00
18.00
12.00
18.00
12.00
18.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
0.00
0.00
6.00
6.00
6.00
12.00
12.00
12.00
12.00
12.00
12.00
18.00
18.00
18.00
18.00
18.00
18.00
9.00
9.00
3.00
9.00
15.00
3.00
9.00
15.00
3.00
9.00
15.00
3.00
9.00
15.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
CentroidZ
m
11.10
11.10
9.60
9.60
9.60
9.60
9.60
9.60
9.60
9.60
2.70
2.70
2.70
2.70
2.70
2.70
2.70
2.70
0.90
0.90
4.50
4.50
4.50
4.50
4.50
4.50
8.10
8.10
8.10
8.10
8.10
8.10
4.50
4.50
4.50
6.30
6.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.90
0.90
0.90
0.90
0.90
0.90
0.90
SectionType
Text
AnalSect
Text
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
I/Wide Flange
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
VIGA-20X30
VIGA-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
COL-20X30
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA-25X60
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA.I-HP100
VIGA-25X60
VIGA-25X60
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-20X30
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
VIGA-15X40
_____________________________________________________________________________________
167
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Frame Section Properties 01 - General
SectionName
Material
Shape
t3
t2
tf
tw
Text
Text
Text
cm
cm cm cm cm cm
COL-20X30
COL-30X60
COL-40X60
COL-50X70
VIGA-15X40
VIGA-20X30
VIGA-25X40
VIGA-25X60
VIGA.I-HP100
CONC
CONC
CONC
CONC
CONC
CONC
CONC
CONC
PRETENSADO
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
I/Wide Flange
20
30
40
50
40
30
40
60
100
30
60
60
70
15
20
25
25
40
15
15
TorsConst
I33
I22
cm4
cm4
cm4
cm2
600
46953.09
20000.00
45000.00
1800
370785.94
135000.00
540000.00
2400
751249.38
320000.00
720000.00
3500 1632637.88
729166.67 1429166.67
600
34386.27
80000.00
11250.00
600
46953.09
45000.00
20000.00
1000
127345.16
133333.33
52083.33
1500
230674.79
450000.00
78125.00
15 2250
136856.25 2618750.00
179687.50
40
Z22
R33
R22
ConcCol
ConcBeam
cm2
cm2
cm3
cm3
cm3
cm3
cm
cm
Yes/No
Yes/No
500.00
1500.00
2000.00
2916.67
500.00
500.00
833.33
1250.00
1500.00
500.00
1500.00
2000.00
2916.67
500.00
500.00
833.33
1250.00
1000.00
2000.00
9000.00
16000.00
29166.67
4000.00
3000.00
6666.67
15000.00
52375.00
3000.00
18000.00
24000.00
40833.33
1500.00
2000.00
4166.67
6250.00
8984.38
3000.00
13500.00
24000.00
43750.00
6000.00
4500.00
10000.00
22500.00
69375.00
4500.00
27000.00
36000.00
61250.00
2250.00
3000.00
6250.00
9375.00
15937.50
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Text
3
4
14
15
22
23
33
34
40
41
48
49
59
60
67
68
82
83
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
KN-s2/m
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
431.19
276.50
KN-s2/m
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
3.10
431.19
276.50
Mass3
5.77 8.66
8.66 17.32
11.55 17.32
14.43 20.21
11.55 4.33
8.66 5.77
11.55 7.22
17.32 7.22
34.12 8.94
MMI1
KN-s2/m
MMI2
KN-m-s2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
MMI3
KN-m-s2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
KN-m-s2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
384.84
64457.69
37047.16
_____________________________________________________________________________________
168
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Connectivity - Tendon
Tendon
JointI
JointJ
Length
Text
Text
Text
93
95
98
99
100
101
10
6
77
2
9
5
74
70
80
66
73
69
38.00
38.00
38.00
38.00
38.00
38.00
_____________________________________________________________________________________
169
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint OutputCase
CaseType
Text
Text
Text
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
0.00
0.00
0.04
-0.04
0.20
-0.03
0.14
-0.05
0.04
-0.04
0.03
-0.03
0.00
0.00
0.00
0.00
0.03
-0.03
2.48
2.43
1.02
0.97
0.00
0.00
0.04
-0.04
0.16
-0.04
0.12
-0.05
0.03
-0.03
0.04
-0.04
1.75
1.70
0.86
0.81
0.00
0.00
0.04
-0.04
0.13
-0.04
0.09
-0.05
0.04
-0.04
0.03
-0.03
0.00
0.00
0.00
0.00
0.03
-0.03
0.00
0.00
4.15
-1.97
2.03
-7.68
1.96
-7.69
4.15
-1.97
4.01
-1.89
0.00
0.00
0.00
0.00
4.01
-1.89
3.49
-1.73
3.49
-1.73
0.00
0.00
4.15
-1.97
5.13
-6.06
5.03
-6.26
4.01
-1.89
4.15
-1.97
3.88
-1.10
3.88
-1.10
0.00
0.00
4.15
-1.97
6.37
-4.45
6.11
-4.50
4.15
-1.97
4.01
-1.89
0.00
0.00
0.00
0.00
4.01
-1.89
0.00
0.00
-0.37
-0.96
-0.42
-1.05
-0.24
-0.53
-0.23
-0.51
-0.18
-0.60
0.00
0.00
0.00
0.00
-0.17
-0.38
-0.01
-0.12
1.52
-0.81
0.00
0.00
2.42
-0.40
2.33
-0.56
2.17
0.73
2.48
-0.41
2.21
0.78
1.12
-0.33
1.37
0.83
0.00
0.00
-0.82
-1.94
-0.88
-2.11
-0.85
-1.66
-0.84
-1.63
-0.53
-1.43
0.00
0.00
0.00
0.00
-0.62
-1.21
R1
Radians
0.00059
-0.00114
0.00052
0.00010
0.00149
-0.00002
0.00225
0.00048
0.00018
0.00003
-0.00002
-0.00011
0.00072
-0.00135
0.00054
-0.00107
0.00009
-0.00013
0.00066
-0.00187
0.00077
-0.00149
0.00096
-0.00173
0.00287
0.00051
0.00061
-0.00119
0.00166
-0.00011
0.00010
-0.00023
0.00135
-0.00069
-0.00013
-0.00216
0.00023
-0.00134
0.00055
-0.00104
0.00040
0.00006
0.00046
-0.00101
0.00126
-0.00040
0.00003
-0.00008
-0.00003
-0.00009
0.00072
-0.00121
0.00051
-0.00102
0.00008
-0.00009
R2
Radians
0.00036
0.00009
0.00001
-0.00070
0.00025
-0.00007
0.00017
-0.00004
-0.00025
-0.00062
0.00005
-0.00076
0.00041
0.00002
0.00039
0.00023
-0.00047
-0.00077
0.00026
-0.00020
0.00107
-0.00005
0.00198
0.00181
0.00009
-0.00024
0.00007
-0.00003
0.00009
0.00006
0.00008
-0.00031
0.00013
0.00003
-0.00001
-0.00025
0.00001
-0.00034
0.00008
-0.00001
0.00123
0.00009
0.00082
-0.00016
0.00015
-0.00021
0.00041
-0.00001
0.00140
0.00009
-0.00003
-0.00068
0.00001
-0.00021
0.00040
0.00000
R3
Radians
-0.00001
-0.00003
0.00000
0.00000
0.00032
0.00011
0.00030
0.00009
0.00000
0.00000
0.00000
0.00000
0.00014
0.00012
0.00000
-0.00001
0.00000
0.00000
-0.00039
-0.00052
-0.00174
-0.00184
-0.00034
-0.00046
0.00000
0.00000
0.00034
0.00021
0.00033
0.00021
0.00000
0.00000
0.00000
0.00000
-0.00016
-0.00018
-0.00100
-0.00111
0.00000
-0.00001
0.00000
0.00000
0.00001
-0.00016
0.00001
-0.00016
0.00000
0.00000
0.00000
0.00000
0.00003
0.00002
0.00001
0.00000
0.00000
0.00000
_____________________________________________________________________________________
170
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint OutputCase
CaseType
Text
Text
Text
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
36
37
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
46
46
47
47
48
48
49
49
50
50
51
51
52
52
53
53
54
54
55
55
56
56
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
1.05
1.00
0.57
0.51
0.00
0.00
0.04
-0.04
0.08
-0.05
0.06
-0.05
0.03
-0.03
0.04
-0.04
0.35
0.33
0.20
0.17
0.04
-0.04
0.05
-0.07
0.05
-0.05
0.03
-0.03
0.04
-0.04
-0.33
-0.35
-0.17
-0.20
0.00
0.00
0.04
-0.04
0.04
-0.13
0.05
-0.09
0.04
-0.04
0.03
-0.03
0.00
0.00
0.00
0.00
0.03
-0.03
-1.00
-1.05
-0.51
-0.57
3.22
-1.84
3.22
-1.84
0.00
0.00
4.15
-1.97
5.71
-8.44
5.62
-8.65
4.01
-1.89
4.15
-1.97
4.13
-3.58
4.13
-3.58
4.15
-1.97
5.71
-8.45
5.62
-8.66
4.01
-1.89
4.15
-1.97
4.13
-3.58
4.13
-3.58
0.00
0.00
4.15
-1.97
6.37
-4.45
6.11
-4.50
4.15
-1.97
4.01
-1.89
0.00
0.00
0.00
0.00
4.01
-1.89
3.22
-1.84
3.22
-1.84
-0.11
-0.39
1.05
-0.93
0.00
0.00
4.34
-11.85
4.26
-11.99
4.91
-1.23
4.47
-12.21
4.93
-1.18
2.01
-7.21
1.99
-4.87
4.34
-11.85
4.26
-11.99
4.92
-1.17
4.47
-12.21
4.94
-1.12
2.01
-7.21
1.99
-4.87
0.00
0.00
-0.82
-1.94
-0.88
-2.11
-0.85
-1.66
-0.84
-1.62
-0.53
-1.43
0.00
0.00
0.00
0.00
-0.62
-1.21
-0.11
-0.39
1.05
-0.93
R1
Radians
0.00063
-0.00200
0.00081
-0.00118
0.00103
-0.00150
0.00314
0.00050
0.00169
-0.00120
0.00275
-0.00014
0.00012
-0.00068
0.00210
-0.00105
-0.00002
-0.00312
0.00029
-0.00233
0.00314
0.00050
0.00169
-0.00120
0.00276
-0.00014
0.00012
-0.00068
0.00210
-0.00105
-0.00002
-0.00312
0.00029
-0.00233
0.00055
-0.00104
0.00040
0.00006
0.00046
-0.00101
0.00126
-0.00039
0.00003
-0.00008
-0.00003
-0.00009
0.00072
-0.00121
0.00051
-0.00102
0.00008
-0.00009
0.00063
-0.00200
0.00081
-0.00118
R2
Radians
0.00084
0.00007
0.00076
0.00002
0.00075
0.00041
0.00108
-0.00119
0.00080
-0.00039
0.00002
-0.00044
0.00118
-0.00117
-0.00046
-0.00125
0.00077
-0.00053
0.00077
-0.00049
0.00119
-0.00108
0.00039
-0.00080
0.00043
-0.00003
0.00117
-0.00118
0.00125
0.00046
0.00053
-0.00077
0.00049
-0.00077
0.00001
-0.00008
-0.00009
-0.00123
0.00016
-0.00082
0.00021
-0.00015
0.00001
-0.00040
-0.00009
-0.00140
0.00068
0.00003
0.00021
-0.00001
0.00000
-0.00040
-0.00007
-0.00084
-0.00002
-0.00076
R3
Radians
-0.00004
-0.00026
-0.00053
-0.00060
-0.00002
-0.00023
0.00000
0.00000
0.00003
-0.00039
0.00003
-0.00039
0.00000
0.00000
0.00000
0.00000
0.00010
-0.00023
-0.00017
-0.00019
0.00000
0.00000
0.00039
-0.00003
0.00039
-0.00003
0.00000
0.00000
0.00000
0.00000
0.00023
-0.00010
0.00019
0.00017
0.00001
0.00000
0.00000
0.00000
0.00016
-0.00001
0.00016
-0.00001
0.00000
0.00000
0.00000
0.00000
-0.00002
-0.00003
0.00000
-0.00001
0.00000
0.00000
0.00026
0.00004
0.00060
0.00053
_____________________________________________________________________________________
171
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint OutputCase
CaseType
Text
Text
Text
57
57
58
58
59
59
60
60
61
61
62
62
63
63
64
64
65
65
66
66
67
67
68
68
69
69
70
70
71
71
72
72
73
73
74
74
75
75
76
76
77
77
78
78
79
79
80
80
81
81
82
82
83
83
84
84
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
0.00
0.00
0.04
-0.04
0.04
-0.16
0.05
-0.11
0.03
-0.03
0.04
-0.04
-1.70
-1.75
-0.81
-0.86
0.00
0.00
0.04
-0.04
0.03
-0.19
0.05
-0.14
0.04
-0.04
0.03
-0.03
0.00
0.00
0.00
0.00
0.03
-0.03
-2.43
-2.48
-0.97
-1.02
0.00
0.00
0.03
-0.03
0.03
-0.03
0.03
-0.03
0.03
-0.03
0.03
-0.03
0.03
-0.03
0.04
-0.04
1.80
1.68
0.00
0.00
4.15
-1.97
5.13
-6.06
5.04
-6.26
4.01
-1.89
4.15
-1.97
3.88
-1.10
3.88
-1.10
0.00
0.00
4.15
-1.97
2.03
-7.68
1.96
-7.69
4.15
-1.97
4.01
-1.89
0.00
0.00
0.00
0.00
4.01
-1.89
3.49
-1.73
3.49
-1.73
0.00
0.00
4.01
-1.89
4.01
-1.89
4.01
-1.89
4.01
-1.89
4.17
-1.86
4.01
-1.89
4.15
-1.97
1.75
-0.95
0.00
0.00
2.42
-0.40
2.33
-0.56
2.17
0.72
2.48
-0.41
2.20
0.76
1.12
-0.33
1.37
0.83
0.00
0.00
-0.37
-0.96
-0.42
-1.05
-0.24
-0.53
-0.23
-0.51
-0.18
-0.60
0.00
0.00
0.00
0.00
-0.17
-0.38
-0.01
-0.12
1.52
-0.81
0.00
0.00
-0.28
-0.69
-0.61
-1.37
-0.61
-1.37
-0.28
-0.69
6.13
-13.45
0.00
0.00
6.23
-13.18
-0.01
-0.06
R1
Radians
0.00103
-0.00150
0.00287
0.00051
0.00061
-0.00119
0.00166
-0.00011
0.00010
-0.00023
0.00135
-0.00069
-0.00013
-0.00216
0.00023
-0.00134
0.00059
-0.00114
0.00052
0.00010
0.00149
-0.00002
0.00225
0.00048
0.00018
0.00003
-0.00002
-0.00011
0.00072
-0.00135
0.00054
-0.00107
0.00009
-0.00013
0.00066
-0.00187
0.00077
-0.00149
0.00096
-0.00173
0.00003
-0.00018
0.00005
-0.00020
0.00005
-0.00020
0.00003
-0.00018
-0.00058
-0.00165
0.00000
0.00000
0.00206
0.00056
0.00090
-0.00183
R2
Radians
-0.00041
-0.00075
0.00024
-0.00009
0.00003
-0.00007
-0.00006
-0.00009
0.00031
-0.00008
-0.00003
-0.00013
0.00025
0.00001
0.00034
-0.00001
-0.00009
-0.00036
0.00070
-0.00001
0.00007
-0.00025
0.00004
-0.00017
0.00062
0.00025
0.00076
-0.00005
-0.00002
-0.00041
-0.00023
-0.00039
0.00077
0.00048
0.00020
-0.00026
0.00005
-0.00107
-0.00181
-0.00198
-0.00021
-0.00071
-0.00001
-0.00015
0.00015
0.00001
0.00071
0.00021
0.00034
-0.00047
0.00000
0.00000
0.00000
0.00000
0.00137
0.00137
R3
Radians
0.00023
0.00002
0.00000
0.00000
-0.00021
-0.00034
-0.00021
-0.00033
0.00000
0.00000
0.00000
0.00000
0.00018
0.00016
0.00111
0.00100
0.00003
0.00001
0.00000
0.00000
-0.00011
-0.00032
-0.00009
-0.00030
0.00000
0.00000
0.00000
0.00000
-0.00012
-0.00014
0.00001
0.00000
0.00000
0.00000
0.00052
0.00039
0.00184
0.00174
0.00046
0.00034
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00010
-0.00001
0.00000
0.00000
0.00000
0.00000
-0.00034
-0.00046
_____________________________________________________________________________________
172
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Joint Displacements
Joint OutputCase
CaseType
Text
Text
Text
85
85
86
86
87
87
88
88
89
89
90
90
91
91
92
92
93
93
94
94
95
95
96
96
97
97
98
98
99
99
100
100
101
101
102
102
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
U1
mm
U2
mm
U3
mm
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
Max
Min
0.04
-0.04
0.03
-0.03
0.04
-0.04
0.39
0.01
0.35
0.09
0.38
0.22
0.69
0.44
-0.03
-0.67
0.08
-0.01
0.01
-0.20
-0.44
-0.69
0.67
0.03
0.01
-0.08
0.20
-0.01
-1.68
-1.80
-0.01
-0.39
-0.09
-0.35
-0.22
-0.38
2.48
-2.48
4.14
-1.97
4.17
-1.86
4.14
-1.97
1.32
-0.70
1.12
-0.58
1.05
-0.53
1.53
-1.02
1.19
-0.70
1.03
-0.54
1.01
-0.51
1.53
-1.02
1.19
-0.70
1.03
-0.54
1.01
-0.51
1.75
-0.95
1.32
-0.70
1.12
-0.58
1.05
-0.53
6.37
-8.66
6.00
-13.05
6.13
-13.45
6.00
-13.05
-0.04
-0.11
-0.05
-0.13
-0.03
-0.07
-0.06
-0.20
-0.10
-0.26
-0.11
-0.25
-0.12
-0.22
-0.06
-0.20
-0.10
-0.26
-0.11
-0.25
-0.12
-0.22
-0.01
-0.06
-0.04
-0.11
-0.05
-0.13
-0.03
-0.07
6.23
-13.45
R1
Radians
0.00206
0.00056
-0.00058
-0.00165
0.00206
0.00056
0.00060
-0.00114
0.00051
-0.00100
0.00050
-0.00098
0.00096
-0.00169
0.00060
-0.00107
0.00050
-0.00097
0.00048
-0.00097
0.00096
-0.00169
0.00060
-0.00107
0.00050
-0.00097
0.00048
-0.00097
0.00090
-0.00183
0.00060
-0.00114
0.00051
-0.00100
0.00050
-0.00098
0.00
0.00
R2
Radians
0.00033
-0.00047
0.00047
-0.00034
0.00047
-0.00033
0.00037
0.00001
0.00032
0.00008
0.00035
0.00020
0.00056
0.00052
-0.00003
-0.00061
0.00007
-0.00001
0.00001
-0.00019
-0.00052
-0.00056
0.00061
0.00003
0.00001
-0.00007
0.00019
-0.00001
-0.00137
-0.00137
-0.00001
-0.00037
-0.00008
-0.00032
-0.00020
-0.00035
0.00
0.00
R3
Radians
0.00002
-0.00001
0.00001
-0.00010
0.00001
-0.00002
0.00014
0.00012
-0.00001
-0.00003
0.00000
-0.00001
-0.00002
-0.00023
0.00003
0.00002
0.00000
-0.00001
0.00001
0.00000
0.00023
0.00002
-0.00002
-0.00003
0.00001
0.00000
0.00000
-0.00001
0.00046
0.00034
-0.00012
-0.00014
0.00003
0.00001
0.00001
0.00000
0.00
0.00
_____________________________________________________________________________________
173
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
1
0.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
4.55
ENVOLVENTE
1
5.50
ENVOLVENTE
1
5.50
ENVOLVENTE
1
9.10
ENVOLVENTE
1
0.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
1.00
ENVOLVENTE
1
4.55
ENVOLVENTE
1
5.50
ENVOLVENTE
1
5.50
ENVOLVENTE
1
9.10
ENVOLVENTE
2
0.00
ENVOLVENTE
2
3.00
ENVOLVENTE
2
6.00
ENVOLVENTE
2
0.00
ENVOLVENTE
2
3.00
ENVOLVENTE
2
6.00
ENVOLVENTE
3
0.00
ENVOLVENTE
3
3.00
ENVOLVENTE
3
6.00
ENVOLVENTE
3
0.00
ENVOLVENTE
3
3.00
ENVOLVENTE
3
6.00
ENVOLVENTE
4
0.00
ENVOLVENTE
4
3.50
ENVOLVENTE
4
7.00
ENVOLVENTE
4
0.00
ENVOLVENTE
4
3.50
ENVOLVENTE
4
7.00
ENVOLVENTE
5
0.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
2.75
ENVOLVENTE
5
5.50
ENVOLVENTE
5
0.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
1.00
ENVOLVENTE
5
2.75
ENVOLVENTE
5
5.50
ENVOLVENTE
6
0.00
ENVOLVENTE
6
1.00
ENVOLVENTE
6
1.00
ENVOLVENTE
6
4.55
ENVOLVENTE
6
5.50
ENVOLVENTE
6
5.50
ENVOLVENTE
6
9.10
ENVOLVENTE
6
0.00
ENVOLVENTE
6
1.00
ENVOLVENTE
6
1.00
ENVOLVENTE
6
4.55
ENVOLVENTE
6
5.50
ENVOLVENTE
6
5.50
ENVOLVENTE
6
9.10
ENVOLVENTE
7
0.00
ENVOLVENTE
7
6.00
ENVOLVENTE
7
6.00
ENVOLVENTE
7
12.00
ENVOLVENTE
7
0.00
ENVOLVENTE
7
6.00
ENVOLVENTE
7
6.00
ENVOLVENTE
7
12.00
ENVOLVENTE
8
0.00
ENVOLVENTE
8
0.50
ENVOLVENTE
8
1.00
ENVOLVENTE
8
0.00
ENVOLVENTE
8
0.50
ENVOLVENTE
8
1.00
ENVOLVENTE
9
0.00
ENVOLVENTE
9
0.95
ENVOLVENTE
CaseType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
StepType
Text
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
P
KN
-246.46
-242.41
-234.52
-220.14
-216.30
-120.09
-105.51
-585.79
-580.39
-569.34
-550.17
-545.04
-354.10
-334.66
4.90
4.90
4.90
-24.07
-24.07
-24.07
0.00
0.00
0.00
0.00
0.00
0.00
52.27
33.72
15.17
-103.50
-157.39
-211.28
-168.26
-164.21
-156.84
-149.75
-138.61
-513.11
-507.71
-495.40
-485.95
-471.10
-155.32
-151.27
-149.08
-134.70
-130.85
-83.31
-68.73
-334.38
-328.98
-319.87
-300.70
-295.57
-170.53
-151.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.69
-1.69
-1.69
-1.81
-1.81
-1.81
-30.24
-26.39
V2
KN
2.30
2.30
2.38
2.38
2.38
21.41
21.41
0.59
0.59
0.69
0.69
0.69
3.15
3.15
1.60
6.66
12.06
-3.67
0.72
4.77
-5.02
3.15
12.15
-8.94
0.31
7.06
-28.75
6.56
96.38
-83.50
1.94
32.85
2.80
2.80
2.15
2.15
2.15
0.13
0.13
-0.71
-0.71
-0.71
2.59
2.59
2.59
2.59
2.59
21.27
21.27
1.59
1.59
1.60
1.60
1.60
11.14
11.14
-6.32
9.63
-6.96
9.95
-11.37
5.32
-11.05
6.20
-10.25
-8.22
-6.20
-28.88
-26.18
-23.48
40.98
40.98
V3
KN
38.04
38.04
4.19
4.19
4.19
22.75
22.75
-21.76
-21.76
-1.93
-1.93
-1.93
5.98
5.98
0.51
0.51
0.51
0.15
0.15
0.15
0.00
0.00
0.00
0.00
0.00
0.00
1.73
1.73
1.73
-0.02
-0.02
-0.02
58.03
58.03
1.07
1.07
1.07
-32.55
-32.55
-1.10
-1.10
-1.10
24.12
24.12
7.91
7.91
7.91
11.53
11.53
-11.82
-11.82
-0.86
-0.86
-0.86
0.31
0.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.15
46.15
46.15
43.97
43.97
43.97
-9.23
-9.23
T
KN-m
0.00
0.00
0.22
0.22
0.22
0.00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
0.02
0.02
0.02
-0.07
-0.07
-0.07
0.17
0.17
0.17
-0.57
-0.57
-0.57
0.30
0.30
0.30
-0.25
-0.25
-0.25
0.00
0.00
-1.01
-1.01
-1.01
0.00
0.00
-1.19
-1.19
-1.19
0.00
0.00
0.05
0.05
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.13
-0.13
0.11
0.11
-0.60
-0.60
-0.57
-0.57
-1.67
-1.67
-1.67
-11.05
-11.05
-11.05
0.00
0.00
M2
KN-m
0.00
21.75
10.12
16.96
18.79
19.96
-18.48
0.00
-38.04
-15.21
-30.08
-34.06
3.06
-61.92
1.50
-0.01
-0.46
0.43
-0.02
-1.53
0.00
0.00
0.00
0.00
0.00
0.00
6.02
0.12
0.20
-0.05
-0.15
-6.22
0.00
32.55
18.35
20.27
23.29
0.00
-58.03
-30.73
-32.60
-35.53
0.00
11.82
10.32
13.36
14.18
18.21
-7.64
0.00
-24.11
-7.61
-35.71
-43.23
-6.53
-23.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.94
17.89
-4.95
38.87
16.91
-5.27
0.00
31.85
M3
KN-m
0.00
-0.59
-0.63
-3.09
-3.75
38.59
-3.62
0.00
-2.30
-2.36
-10.80
-13.06
7.71
-38.47
15.99
4.55
-5.28
-0.96
2.87
-23.95
-1.41
4.61
-8.04
-6.45
2.56
-20.33
-24.43
62.41
-37.98
-74.72
19.93
-120.59
0.00
-0.13
-1.30
-0.06
1.88
0.00
-2.80
-3.58
-7.35
-13.27
0.00
-1.59
-1.49
-7.16
-8.68
39.70
-17.97
0.00
-2.59
-2.57
-11.76
-14.22
22.13
-36.88
-5.13
-1.99
-6.69
-5.44
-15.48
-7.70
-12.78
-8.77
-7.86
-3.25
0.80
-26.25
-12.50
-0.54
0.00
-27.91
_____________________________________________________________________________________
174
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
9
9
9
9
9
9
9
9
10
10
10
10
10
10
11
11
11
11
11
11
12
12
12
12
12
12
13
13
13
13
13
13
14
14
14
14
14
14
15
15
15
15
15
15
15
15
15
15
15
15
15
15
16
16
16
16
16
16
17
17
17
17
17
17
18
18
18
18
18
18
19
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
P
KN
-26.19
-25.90
-22.25
-280.56
-275.43
-275.16
-268.69
-263.83
-38.09
-36.07
-34.04
-88.84
-86.14
-83.44
-13.74
-13.74
-13.74
-59.89
-59.89
-59.89
135.22
35.54
-20.89
12.42
-18.60
-92.89
-17.33
-15.31
-13.28
-27.44
-24.29
-21.14
1.18
1.18
1.18
0.75
0.75
0.75
-992.98
-985.11
-977.23
-949.27
-941.79
-532.78
-504.43
-2221.11
-2210.61
-2199.63
-2162.35
-2152.38
-1404.73
-1366.93
-13.60
-13.60
-13.60
-65.50
-65.50
-65.50
0.00
0.00
0.00
0.00
0.00
0.00
41.70
10.68
-20.35
-104.46
-204.14
-303.83
-601.53
V2
KN
V3
KN
40.98
41.56
41.56
29.38
29.38
29.38
30.11
30.11
1.16
1.16
1.16
-0.52
-0.52
-0.52
-0.81
3.24
8.61
-7.54
-2.14
1.94
-38.62
34.47
200.61
-134.97
9.79
61.49
-0.13
-0.13
-0.13
-0.73
-0.73
-0.73
-20.98
-19.85
-18.73
-59.98
-58.48
-56.99
2.75
2.75
2.82
2.82
2.82
4.54
4.54
0.03
0.03
0.29
0.29
0.29
-97.51
-97.51
-1.46
2.83
8.23
-7.71
-2.55
1.50
-5.94
1.80
11.05
-9.95
-0.08
6.67
-49.83
5.86
172.00
-160.61
1.54
53.25
-0.69
-9.23
78.65
78.65
-33.53
-33.53
-33.53
-76.64
-76.64
12.49
12.49
12.49
-7.18
-7.18
-7.18
0.55
0.55
0.55
0.35
0.35
0.35
0.66
0.66
0.66
-0.20
-0.20
-0.20
4.54
4.54
4.54
-5.03
-5.03
-5.03
38.66
38.66
38.66
34.59
34.59
34.59
49.12
49.12
15.03
15.03
15.03
43.59
43.59
-35.27
-35.27
-5.30
-5.30
-5.30
7.00
7.00
0.02
0.02
0.02
-0.28
-0.28
-0.28
0.00
0.00
0.00
0.00
0.00
0.00
-0.23
-0.23
-0.23
-3.23
-3.23
-3.23
51.66
T
KN-m
M2
KN-m
M3
KN-m
0.00
-2.11
-2.11
0.00
0.00
0.00
-2.67
-2.67
0.55
0.55
0.55
0.35
0.35
0.35
0.07
0.07
0.07
0.01
0.01
0.01
0.24
0.24
0.24
-0.03
-0.03
-0.03
0.54
0.54
0.54
0.34
0.34
0.34
1.24
1.24
1.24
-0.31
-0.31
-0.31
0.00
0.00
0.39
0.39
0.39
0.00
0.00
0.00
0.00
0.07
0.07
0.07
0.00
0.00
-0.03
-0.03
-0.03
-0.56
-0.56
-0.56
-0.17
-0.17
-0.17
-1.87
-1.87
-1.87
0.00
0.00
0.00
-0.52
-0.52
-0.52
0.00
33.53
40.71
86.16
0.00
8.76
9.23
1.38
-45.88
31.96
13.23
12.38
-9.14
1.62
-5.49
1.64
0.00
-1.04
1.03
-0.01
-1.66
2.22
0.01
0.68
-0.70
-0.12
-2.41
4.66
-0.23
6.36
-8.72
-3.10
-8.97
31.62
12.30
-6.46
28.10
10.82
-7.01
0.00
35.27
23.80
42.60
47.63
36.39
-31.57
0.00
-49.12
-27.03
-80.37
-94.65
-6.37
-120.53
0.06
0.00
0.84
-0.84
0.00
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
-0.79
0.25
11.55
-11.05
0.00
0.79
0.00
-29.38
-28.28
-55.37
0.00
-38.93
-40.98
-40.16
-77.56
2.08
0.35
0.76
-0.80
-0.02
-1.39
6.55
5.80
4.12
-8.71
2.91
-12.89
2.94
146.69
-87.97
-45.78
36.72
-264.52
-0.14
0.05
1.01
-1.17
-0.08
0.24
-18.83
-8.63
1.01
-60.18
-30.59
-1.75
0.00
-0.03
0.61
-0.42
-0.69
20.28
238.23
0.00
-2.75
-2.62
-12.62
-15.30
-112.79
3.94
4.66
4.70
4.67
-10.62
2.94
-12.30
-4.81
4.30
-7.27
-9.81
2.15
-16.45
-52.17
104.72
-62.97
-166.69
31.59
-207.69
0.00
_____________________________________________________________________________________
175
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
19
19
19
19
19
19
19
19
19
20
20
20
20
20
20
20
20
20
20
20
20
20
20
21
21
21
21
21
21
21
21
22
22
22
22
22
22
23
23
23
23
23
23
23
23
23
23
24
24
24
24
24
24
25
25
25
25
25
25
26
26
26
26
26
26
27
27
27
27
27
27
1.00
1.00
2.75
5.50
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
12.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
0.95
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.50
3.00
0.00
1.50
3.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
P
KN
-596.13
-588.89
-579.44
-564.59
-1585.39
-1578.19
-1566.11
-1553.51
-1533.71
-696.43
-691.03
-688.81
-669.64
-664.51
-373.72
-354.28
-1348.88
-1341.68
-1332.66
-1307.10
-1300.26
-702.84
-676.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.08
1.08
1.08
-0.18
-0.18
-0.18
-260.02
-256.17
-255.97
-255.50
-251.86
-921.28
-916.15
-915.88
-909.06
-904.20
-35.45
-33.43
-31.40
-81.79
-79.09
-76.39
-14.28
-14.28
-14.28
-59.82
-59.82
-59.82
175.64
88.22
-11.46
22.60
3.84
-28.86
-16.08
-14.05
-12.03
-26.22
-23.52
-20.82
V2
KN
V3
KN
-0.69
-0.94
-0.94
-0.94
-10.98
-10.98
-11.65
-11.65
-11.65
0.08
0.08
0.06
0.06
0.06
0.38
0.38
-3.23
-3.23
-3.28
-3.28
-3.28
-28.83
-28.83
-6.04
10.11
-6.66
9.94
-10.91
5.60
-11.06
6.01
-14.81
-13.69
-12.56
-58.75
-57.26
-55.76
12.87
12.87
12.87
13.07
13.07
-7.64
-7.64
-7.64
-7.17
-7.17
5.18
5.18
5.18
-6.11
-6.11
-6.11
-1.15
2.90
6.95
-9.62
-4.22
1.18
-17.81
31.25
197.39
-118.14
9.77
61.47
5.52
5.52
5.52
1.48
1.48
1.48
51.66
6.37
6.37
6.37
-41.72
-41.72
0.48
0.48
0.48
19.44
19.44
14.12
14.12
14.12
4.62
4.62
-11.24
-11.24
-2.88
-2.88
-2.88
-7.00
-7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.81
20.81
20.81
12.77
12.77
12.77
-15.48
-15.48
-15.48
59.58
59.58
-54.06
-54.06
-54.06
-124.94
-124.94
13.54
13.54
13.54
-7.32
-7.32
-7.32
0.04
0.04
0.04
-0.66
-0.66
-0.66
-0.06
2.88
2.88
-5.68
-2.74
-2.74
4.60
4.60
4.60
-3.26
-3.26
-3.26
T
KN-m
M2
KN-m
M3
KN-m
0.00
-0.40
-0.40
-0.40
0.00
0.00
-0.55
-0.55
-0.55
0.00
0.00
-0.05
-0.05
-0.05
0.00
0.00
0.00
0.00
-0.15
-0.15
-0.15
0.00
0.00
0.91
0.91
-0.53
-0.53
0.32
0.32
-3.12
-3.12
1.20
1.20
1.20
0.58
0.58
0.58
0.00
0.00
0.00
-0.65
-0.65
0.00
0.00
0.00
-1.62
-1.62
0.04
0.04
0.04
-0.64
-0.64
-0.64
-0.03
-0.03
-0.03
-0.64
-0.64
-0.64
0.61
-0.01
-0.01
0.25
-0.37
-0.37
0.04
0.04
0.04
-0.64
-0.64
-0.64
41.72
27.33
26.48
25.16
0.00
-51.66
-26.01
-37.15
-54.67
0.00
11.24
10.37
20.07
22.81
10.70
11.84
0.00
-19.44
-3.73
-53.31
-66.72
-13.34
-5.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.94
6.55
-2.13
10.63
4.25
-3.85
0.00
51.35
54.06
61.98
156.48
0.00
14.71
15.48
5.07
-30.59
30.85
10.53
12.25
-9.69
1.28
-9.78
0.12
0.00
1.98
-1.98
0.00
-0.12
9.72
0.18
9.76
-9.78
0.01
-10.08
3.42
0.61
5.51
-7.27
-6.47
-13.36
10.98
9.56
29.95
61.98
0.00
0.69
0.13
1.77
4.35
0.00
3.23
3.08
14.74
17.86
0.60
51.96
0.00
-0.08
-0.13
-0.35
-0.40
-51.82
-0.77
-4.48
-2.65
-5.90
-5.08
-14.10
-9.01
-14.43
-8.80
-12.95
-5.83
2.70
-56.33
-27.36
-1.10
0.00
7.26
7.64
8.57
15.02
0.00
-12.23
-12.87
-12.39
-24.16
9.11
1.35
8.71
-9.63
-0.46
-6.42
5.38
5.95
10.51
-14.81
2.75
-12.04
3.36
158.30
-88.39
-46.41
36.22
-241.67
9.63
1.36
-1.40
3.03
0.81
-6.92
_____________________________________________________________________________________
176
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
28
28
28
28
28
28
29
29
29
29
29
29
30
30
30
30
30
30
31
31
31
31
31
31
32
32
32
32
32
32
33
33
33
33
33
33
34
34
34
34
34
34
34
34
34
34
34
34
34
34
35
35
35
35
35
35
36
36
36
36
36
36
37
37
37
37
37
37
38
38
38
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
2.75
4.50
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
P
KN
0.81
0.81
0.81
-0.13
-0.13
-0.13
-35.45
-33.43
-31.40
-81.77
-79.07
-76.37
-14.28
-14.28
-14.28
-59.82
-59.82
-59.82
175.67
88.25
-11.43
22.60
3.84
-28.85
-16.10
-14.08
-12.05
-26.35
-23.65
-20.95
0.81
0.81
0.81
-0.13
-0.13
-0.13
-992.97
-985.09
-977.21
-949.26
-941.78
-532.77
-504.42
-2221.04
-2210.54
-2199.56
-2162.29
-2152.31
-1404.69
-1366.89
-13.60
-13.60
-13.60
-65.50
-65.50
-65.50
0.00
0.00
0.00
0.00
0.00
0.00
41.70
10.67
-20.35
-104.48
-204.16
-303.85
-564.60
-579.45
-588.90
V2
KN
V3
KN
-19.70
-18.57
-17.45
-54.70
-53.20
-51.70
6.11
6.11
6.11
-5.18
-5.18
-5.18
-1.15
2.90
6.95
-9.63
-4.23
1.17
-17.81
31.25
197.39
-118.14
9.77
61.47
-1.44
-1.44
-1.44
-5.51
-5.51
-5.51
-19.70
-18.57
-17.45
-54.70
-53.20
-51.70
-0.04
-0.04
-0.29
-0.29
-0.29
97.65
97.65
-2.75
-2.75
-2.82
-2.82
-2.82
-4.51
-4.51
-1.46
2.83
8.23
-7.71
-2.55
1.50
-5.95
1.79
11.05
-9.96
-0.08
6.67
-49.83
5.86
172.00
-160.61
1.54
53.25
-0.94
-0.94
-0.94
11.96
11.96
11.96
-2.32
-2.32
-2.32
13.55
13.55
13.55
-7.31
-7.31
-7.31
0.66
0.66
0.66
-0.04
-0.04
-0.04
5.69
2.75
2.75
0.06
-2.88
-2.88
4.60
4.60
4.60
-3.26
-3.26
-3.26
2.32
2.32
2.32
-11.96
-11.96
-11.96
49.12
49.12
15.03
15.03
15.03
43.62
43.62
-35.27
-35.27
-5.30
-5.30
-5.30
7.01
7.01
0.28
0.28
0.28
-0.02
-0.02
-0.02
0.00
0.00
0.00
0.00
0.00
0.00
3.23
3.23
3.23
0.23
0.23
0.23
6.37
6.37
6.37
T
KN-m
M2
KN-m
M3
KN-m
2.14
2.14
2.14
-2.59
-2.59
-2.59
0.64
0.64
0.64
-0.04
-0.04
-0.04
0.64
0.64
0.64
0.03
0.03
0.03
-0.26
0.36
0.36
-0.62
0.01
0.01
0.64
0.64
0.64
-0.04
-0.04
-0.04
2.59
2.59
2.59
-2.14
-2.14
-2.14
0.00
0.00
-0.07
-0.07
-0.07
0.00
0.00
0.00
0.00
-0.39
-0.39
-0.39
0.00
0.00
0.56
0.56
0.56
0.03
0.03
0.03
1.89
1.89
1.89
0.18
0.18
0.18
0.52
0.52
0.52
0.00
0.00
0.00
0.55
0.55
0.55
9.74
3.77
0.41
-1.91
-0.75
-2.20
30.84
10.51
12.25
-9.70
1.28
-9.81
1.97
0.00
0.12
-0.13
0.00
-1.97
9.81
0.00
10.07
-9.69
-0.17
-9.78
3.42
0.61
5.50
-7.27
-6.48
-13.39
1.91
0.75
2.20
-9.75
-3.77
-0.41
0.00
35.27
23.80
42.60
47.63
36.43
-31.59
0.00
-49.12
-27.03
-80.38
-94.65
-6.36
-120.59
0.84
0.00
0.05
-0.06
0.00
-0.84
0.00
0.00
0.00
0.00
0.00
0.00
11.06
0.00
-0.79
0.79
-0.25
-11.56
54.67
37.15
26.01
-17.91
-8.36
0.64
-54.90
-27.95
-1.74
9.63
0.46
6.42
-9.11
-1.35
-8.71
5.38
5.95
10.55
-14.85
2.75
-12.03
3.36
158.30
-88.40
-46.40
36.22
-241.67
-2.97
-0.81
6.91
-9.62
-1.36
1.35
-17.92
-8.36
0.64
-54.90
-27.95
-1.74
0.00
2.75
2.62
12.63
15.31
113.05
-4.00
0.00
0.04
-0.60
0.44
0.72
-20.23
-238.50
4.66
4.70
4.67
-10.62
2.94
-12.30
-4.81
4.30
-7.27
-9.81
2.15
-16.44
-52.17
104.72
-62.97
-166.68
31.59
-207.70
-4.35
-1.77
-0.13
_____________________________________________________________________________________
177
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
38
38
38
38
38
38
38
39
39
39
39
39
39
39
39
39
39
39
39
39
39
40
40
40
40
40
40
40
40
41
41
41
41
41
41
42
42
42
42
42
42
42
42
42
42
43
43
43
43
43
43
44
44
44
44
44
44
45
45
45
45
45
45
46
46
46
46
46
46
47
47
4.50
5.50
0.00
2.75
4.50
4.50
5.50
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
12.00
0.00
0.50
1.00
0.00
0.50
1.00
0.00
0.95
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
0.50
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
P
KN
-596.14
-601.54
-1533.73
-1553.53
-1566.13
-1578.20
-1585.40
-695.92
-690.52
-688.30
-669.13
-664.00
-373.21
-353.77
-1346.20
-1339.00
-1329.98
-1304.42
-1297.58
-700.14
-674.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.08
1.08
1.08
-0.18
-0.18
-0.18
-260.01
-256.17
-255.96
-255.50
-251.86
-921.28
-916.15
-915.88
-909.06
-904.20
-38.10
-36.07
-34.05
-88.84
-86.14
-83.44
-13.74
-13.74
-13.74
-59.89
-59.89
-59.89
135.19
35.51
-20.89
12.41
-18.61
-92.92
-17.33
-15.30
-13.28
-27.43
-24.28
-21.13
1.18
1.18
V2
KN
V3
KN
-0.69
-0.69
-11.65
-11.65
-11.65
-10.98
-10.98
3.23
3.23
3.29
3.29
3.29
28.55
28.55
-0.08
-0.08
-0.06
-0.06
-0.06
-0.43
-0.43
-6.04
10.11
-6.66
9.94
-10.91
5.60
-11.06
6.01
-14.81
-13.69
-12.56
-58.75
-57.26
-55.76
7.64
7.64
7.64
7.17
7.17
-12.87
-12.87
-12.87
-13.07
-13.07
0.52
0.52
0.52
-1.15
-1.15
-1.15
-0.81
3.24
8.62
-7.54
-2.14
1.94
-38.62
34.47
200.61
-134.97
9.79
61.49
0.73
0.73
0.73
0.13
0.13
0.13
-20.98
-19.85
51.66
51.66
0.48
0.48
0.48
-41.72
-41.72
19.44
19.44
14.12
14.12
14.12
4.63
4.63
-11.24
-11.24
-2.88
-2.88
-2.88
-6.97
-6.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-12.77
-12.77
-12.77
-20.81
-20.81
-20.81
-15.48
-15.48
-15.48
59.57
59.57
-54.06
-54.06
-54.06
-124.94
-124.94
12.48
12.48
12.48
-7.18
-7.18
-7.18
-0.35
-0.35
-0.35
-0.55
-0.55
-0.55
0.20
0.20
0.20
-0.66
-0.66
-0.66
4.54
4.54
4.54
-5.03
-5.03
-5.03
-34.59
-34.59
T
KN-m
M2
KN-m
M3
KN-m
0.00
0.00
0.40
0.40
0.40
0.00
0.00
0.00
0.00
0.15
0.15
0.15
0.00
0.00
0.00
0.00
0.05
0.05
0.05
0.00
0.00
-0.32
-0.32
3.12
3.12
-0.91
-0.91
0.53
0.53
-0.58
-0.58
-0.58
-1.20
-1.20
-1.20
0.00
0.00
0.00
1.62
1.62
0.00
0.00
0.00
0.65
0.65
-0.35
-0.35
-0.35
-0.55
-0.55
-0.55
-0.01
-0.01
-0.01
-0.07
-0.07
-0.07
0.03
0.03
0.03
-0.24
-0.24
-0.24
-0.34
-0.34
-0.34
-0.54
-0.54
-0.54
0.31
0.31
51.66
0.00
-25.16
-26.48
-27.33
-41.72
0.00
0.00
11.24
10.37
20.07
22.81
10.71
11.78
0.00
-19.44
-3.73
-53.32
-66.73
-13.30
-5.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-10.63
-4.25
3.85
-16.94
-6.55
2.13
0.00
51.35
54.06
61.98
156.48
0.00
14.71
15.48
5.07
-30.59
31.97
13.24
12.38
-9.14
1.62
-5.48
-1.03
0.01
1.66
-1.64
0.00
1.04
0.70
0.12
2.40
-2.21
-0.01
-0.68
4.67
-0.23
6.37
-8.72
-3.09
-8.96
-28.10
-10.82
-0.69
0.00
-61.98
-29.95
-9.56
-10.98
0.00
0.00
0.08
0.13
0.34
0.40
51.57
0.92
0.00
-3.23
-3.09
-14.76
-17.89
-0.65
-51.21
-4.48
-2.64
-5.90
-5.08
-14.11
-9.01
-14.43
-8.80
-12.95
-5.83
2.70
-56.33
-27.36
-1.10
0.00
12.23
12.87
12.39
24.15
0.00
-7.26
-7.64
-8.57
-15.02
0.80
0.02
1.39
-2.08
-0.35
-0.76
6.56
5.80
4.11
-8.70
2.91
-12.89
2.94
146.69
-87.97
-45.78
36.72
-264.52
1.17
0.08
-0.24
0.14
-0.05
-1.01
-18.83
-8.63
_____________________________________________________________________________________
178
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
47
47
47
47
48
48
48
48
48
48
48
48
48
48
48
48
48
48
49
49
49
49
49
49
50
50
50
50
50
50
51
51
51
51
51
51
52
52
52
52
52
52
52
52
52
52
53
53
53
53
53
53
53
53
53
53
53
53
53
53
54
54
54
54
54
54
54
54
55
55
55
1.00
0.00
0.50
1.00
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
2.75
5.50
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
1.00
1.00
4.55
5.50
5.50
9.10
0.00
6.00
6.00
12.00
0.00
6.00
6.00
12.00
0.00
0.50
1.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
V3
KN
T
KN-m
M2
KN-m
M3
KN-m
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
1.18
0.75
0.75
0.75
-246.46
-242.41
-234.52
-220.15
-216.30
-120.09
-105.51
-585.79
-580.39
-569.34
-550.17
-545.04
-354.08
-334.64
4.90
4.90
4.90
-24.07
-24.07
-24.07
0.00
0.00
0.00
0.00
0.00
0.00
52.25
33.70
15.15
-103.57
-157.46
-211.35
-168.27
-164.22
-156.84
-149.76
-138.62
-513.15
-507.75
-495.44
-485.99
-471.14
-155.37
-151.32
-149.13
-134.75
-130.91
-83.36
-68.78
-334.65
-329.25
-320.14
-300.97
-295.84
-170.80
-151.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.69
-1.69
-1.69
-18.73
-59.98
-58.48
-56.99
-0.59
-0.59
-0.69
-0.69
-0.69
-3.11
-3.11
-2.30
-2.30
-2.38
-2.38
-2.38
-21.40
-21.40
1.59
6.66
12.06
-3.67
0.72
4.77
-5.02
3.15
12.15
-8.94
0.31
7.06
-28.75
6.56
96.38
-83.50
1.94
32.85
-0.13
-0.13
0.71
0.71
0.71
-2.80
-2.80
-2.15
-2.15
-2.15
-1.59
-1.59
-1.60
-1.60
-1.60
-11.06
-11.06
-2.59
-2.59
-2.59
-2.59
-2.59
-21.26
-21.26
-6.32
9.63
-6.96
9.95
-11.37
5.32
-11.05
6.20
-10.25
-8.22
-6.20
-34.59
-38.66
-38.66
-38.66
38.04
38.04
4.19
4.19
4.19
22.75
22.75
-21.76
-21.76
-1.93
-1.93
-1.93
5.98
5.98
-0.15
-0.15
-0.15
-0.51
-0.51
-0.51
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.02
-1.73
-1.73
-1.73
58.02
58.02
1.07
1.07
1.07
-32.55
-32.55
-1.10
-1.10
-1.10
24.11
24.11
7.92
7.92
7.92
11.53
11.53
-11.82
-11.82
-0.86
-0.86
-0.86
0.30
0.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-43.97
-43.97
-43.97
0.31
-1.24
-1.24
-1.24
0.00
0.00
-0.10
-0.10
-0.10
0.00
0.00
0.00
0.00
-0.22
-0.22
-0.22
0.00
0.00
0.07
0.07
0.07
-0.02
-0.02
-0.02
0.56
0.56
0.56
-0.17
-0.17
-0.17
0.25
0.25
0.25
-0.30
-0.30
-0.30
0.00
0.00
1.19
1.19
1.19
0.00
0.00
1.01
1.01
1.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.05
-0.05
-0.05
0.00
0.00
0.60
0.60
0.57
0.57
0.13
0.13
-0.11
-0.11
11.05
11.05
11.05
7.01
-31.62
-12.30
6.46
0.00
21.76
10.12
16.96
18.79
19.96
-18.48
0.00
-38.04
-15.21
-30.08
-34.06
3.06
-61.92
-0.43
0.02
1.53
-1.50
0.01
0.47
0.00
0.00
0.00
0.00
0.00
0.00
0.06
0.15
6.21
-6.02
-0.12
-0.21
0.00
32.55
18.35
20.27
23.29
0.00
-58.02
-30.73
-32.59
-35.53
0.00
11.82
10.33
13.36
14.18
18.21
-7.63
0.00
-24.11
-7.61
-35.71
-43.23
-6.54
-23.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-38.87
-16.91
5.27
1.01
-60.18
-30.59
-1.75
0.00
2.30
2.36
10.80
13.07
-7.65
38.46
0.00
0.59
0.63
3.09
3.75
-38.58
3.56
15.99
4.55
-5.28
-0.96
2.87
-23.94
-1.41
4.61
-8.04
-6.45
2.56
-20.33
-24.43
62.41
-37.98
-74.72
19.93
-120.59
0.00
2.80
3.58
7.35
13.27
0.00
0.13
1.30
0.06
-1.88
0.00
2.59
2.57
11.76
14.22
-22.03
36.85
0.00
1.59
1.49
7.18
8.70
-39.69
17.79
-5.13
-2.00
-6.69
-5.44
-15.47
-7.70
-12.78
-8.77
-7.86
-3.25
0.80
_____________________________________________________________________________________
179
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
55
55
55
56
56
56
56
56
56
56
56
56
56
57
57
57
57
57
57
57
57
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
59
0.00
0.50
1.00
0.00
0.95
1.00
1.00
1.90
0.00
0.95
1.00
1.00
1.90
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
10.80
16.20
16.20
18.90
21.60
21.60
27.00
27.00
32.40
32.40
37.80
0.00
5.40
5.40
10.80
10.80
16.20
16.20
18.90
21.60
21.60
27.00
27.00
32.40
32.40
37.80
0.00
5.40
5.40
10.80
10.80
16.20
16.20
18.90
21.60
21.60
27.00
27.00
32.40
32.40
37.80
0.00
5.40
5.40
10.80
10.80
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Min
Min
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
P
KN
-1.81
-1.81
-1.81
-30.24
-26.39
-26.19
-25.90
-22.25
-280.57
-275.44
-275.17
-268.70
-263.84
-1008.34
-1011.35
-975.15
-975.15
-1019.46
-1022.46
-982.95
-982.95
-0.40
-0.40
-1.28
-1.28
-1.09
-1.09
4.31
4.31
4.31
-1.09
-1.09
-1.28
-1.28
-0.40
-0.40
-9.49
-9.49
-8.82
-8.82
-15.08
-15.08
-20.80
-20.80
-20.80
-15.08
-15.08
-8.83
-8.83
-9.49
-9.49
-0.15
-0.15
-0.51
-0.51
0.07
0.07
5.44
5.44
5.44
0.07
0.07
-0.52
-0.52
-0.16
-0.16
-7.88
-7.88
-7.52
-7.52
-9.41
V2
KN
V3
KN
-28.88
-26.18
-23.48
-29.38
-29.38
-29.38
-30.10
-30.10
-40.98
-40.98
-40.98
-41.56
-41.56
55.44
9.65
199.97
266.15
-4.03
-19.10
69.14
104.60
-1.30
7.62
-4.38
5.34
-0.51
6.78
-3.64
0.00
5.67
-0.17
9.55
-0.73
7.31
-5.80
3.92
-3.92
5.80
-7.31
0.73
-9.55
0.17
-5.67
0.00
3.64
-6.78
0.51
-5.34
4.38
-7.62
1.30
-1.50
7.62
-6.41
3.58
-0.23
7.39
-3.64
0.04
5.68
-5.68
4.04
-0.80
7.76
-5.76
3.73
-3.73
5.76
-7.76
0.79
-4.09
-46.15
-46.15
-46.15
-9.23
-9.23
-9.23
78.65
78.65
-33.53
-33.53
-33.53
-76.64
-76.64
-8.13
-8.13
2.75
2.75
-11.53
-11.53
-4.26
-4.26
-0.17
-0.17
0.13
0.13
1.32
1.32
0.00
0.00
0.00
0.08
0.08
0.82
0.82
0.75
0.75
-0.75
-0.75
-0.82
-0.82
-0.08
-0.08
0.00
0.00
0.00
-1.32
-1.32
-0.13
-0.13
0.17
0.17
-0.14
-0.14
0.13
0.13
1.32
1.32
0.00
0.00
0.00
0.08
0.08
0.83
0.83
0.73
0.73
-0.73
-0.73
-0.83
-0.83
-0.09
T
KN-m
M2
KN-m
M3
KN-m
1.67
1.67
1.67
0.00
0.00
0.00
2.67
2.67
0.00
0.00
0.00
2.11
2.11
2.48
2.48
5.75
5.75
-6.29
-6.29
-2.52
-2.52
-0.64
-0.64
0.16
0.16
1.15
1.15
0.01
0.01
0.01
0.21
0.21
0.14
0.14
1.21
1.21
-1.21
-1.21
-0.14
-0.14
-0.21
-0.21
0.00
0.00
0.00
-1.16
-1.16
-0.16
-0.16
0.64
0.64
-0.44
-0.44
-0.12
-0.12
1.46
1.46
0.01
0.01
0.01
-0.12
-0.12
0.50
0.50
0.87
0.87
-0.87
-0.87
-0.50
-0.50
0.12
-40.94
-17.89
4.95
0.00
31.85
33.53
40.71
86.16
0.00
8.76
9.23
1.38
-45.88
-25.80
28.72
5.95
12.55
-33.56
18.10
-10.47
-8.88
-0.64
1.99
0.53
2.67
3.77
0.21
0.05
0.05
0.04
0.21
3.78
2.67
0.53
1.99
-0.64
-2.04
0.25
-1.78
-0.16
-0.23
-3.34
-0.72
-0.73
-0.73
-3.35
-0.23
-0.16
-1.78
0.25
-2.04
-0.58
1.94
0.52
2.67
3.77
0.22
0.05
0.05
0.05
0.22
3.78
2.67
0.52
1.94
-0.58
-1.99
0.18
-1.82
-0.16
-0.24
-26.25
-12.50
-0.54
0.00
38.93
40.98
40.16
77.56
0.00
27.91
29.38
28.27
55.37
77.97
119.38
116.84
89.47
57.52
-98.34
-100.95
-482.17
2.76
-6.31
-4.85
5.05
5.66
8.31
-1.03
5.53
-1.03
8.31
5.66
5.05
-4.85
-6.31
2.76
-1.25
-10.07
-10.67
-7.42
-17.01
-11.26
-4.91
0.04
-4.91
-11.26
-17.01
-7.42
-10.67
-10.07
-1.25
2.26
-8.44
-8.76
5.02
6.43
-6.20
-4.16
2.30
-4.36
-6.34
6.44
5.03
-8.73
-8.41
2.26
0.14
-10.14
-10.67
-0.38
-2.02
_____________________________________________________________________________________
180
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
59
59
59
59
59
59
59
59
59
59
60
60
60
60
60
60
61
61
61
61
61
61
62
62
62
62
62
62
63
63
63
63
63
63
64
64
64
64
64
64
65
65
65
65
65
65
66
66
66
66
66
66
67
67
67
67
67
67
68
68
68
68
68
68
69
69
69
69
69
69
70
16.20
16.20
18.90
21.60
21.60
27.00
27.00
32.40
32.40
37.80
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
1.50
3.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
V3
KN
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
-9.41
-8.40
-8.40
-8.40
-9.37
-9.37
-7.54
-7.54
-7.89
-7.89
-4.04
-2.02
0.01
-12.71
-10.01
-7.31
-20.12
-18.10
-16.07
-53.48
-50.78
-48.08
-26.82
-24.79
-22.77
-92.69
-89.99
-87.29
-6.71
-4.69
-2.66
-21.25
-18.55
-15.85
-26.82
-24.79
-22.77
-92.69
-89.99
-87.29
-6.70
-4.68
-2.65
-21.21
-18.51
-15.81
-20.12
-18.10
-16.07
-53.48
-50.78
-48.08
-4.04
-2.02
0.01
-12.72
-10.02
-7.32
146.32
92.42
56.57
-89.48
-108.03
-144.62
161.49
65.61
34.59
-97.54
-132.36
-232.05
126.75
5.63
-5.66
0.01
3.65
-7.40
0.22
-3.58
6.41
-7.61
1.50
2.16
2.16
2.16
0.51
0.51
0.51
2.52
2.52
2.52
-0.51
-0.51
-0.51
0.23
0.23
0.23
-6.56
-6.56
-6.56
0.68
0.68
0.68
-1.73
-1.73
-1.73
6.56
6.56
6.56
-0.23
-0.23
-0.23
1.67
1.67
1.67
-0.70
-0.70
-0.70
0.51
0.51
0.51
-2.52
-2.52
-2.52
-0.49
-0.49
-0.49
-2.16
-2.16
-2.16
-23.16
7.76
89.31
-112.70
-22.88
16.31
-42.87
8.84
166.24
-188.75
-22.61
37.84
-60.24
-0.09
0.00
0.00
0.00
-1.32
-1.32
-0.13
-0.13
0.14
0.14
-0.84
-0.84
-0.84
-16.17
-16.17
-16.17
-3.85
-3.85
-3.85
-19.02
-19.02
-19.02
5.97
5.97
5.97
-7.90
-7.90
-7.90
8.38
8.38
8.38
-5.22
-5.22
-5.22
5.96
5.96
5.96
-7.90
-7.90
-7.90
8.38
8.38
8.38
-5.22
-5.22
-5.22
-3.85
-3.85
-3.85
-19.02
-19.02
-19.02
-0.84
-0.84
-0.84
-16.17
-16.17
-16.17
3.13
3.13
3.13
1.28
1.28
1.28
4.01
4.01
4.01
0.96
0.96
0.96
1.61
T
KN-m
M2
KN-m
M3
KN-m
0.12
0.00
0.00
0.00
-1.46
-1.46
0.12
0.12
0.44
0.44
0.49
0.49
0.49
0.14
0.14
0.14
0.51
0.51
0.51
0.18
0.18
0.18
0.02
0.02
0.02
-0.26
-0.26
-0.26
0.02
0.02
0.02
-0.26
-0.26
-0.26
0.27
0.27
0.27
-0.02
-0.02
-0.02
0.26
0.26
0.26
-0.02
-0.02
-0.02
-0.18
-0.18
-0.18
-0.51
-0.51
-0.51
-0.14
-0.14
-0.14
-0.49
-0.49
-0.49
0.96
0.96
0.96
-0.32
-0.32
-0.32
-0.13
-0.13
-0.13
-2.13
-2.13
-2.13
-0.13
-3.34
-0.72
-0.73
-0.73
-3.35
-0.24
-0.16
-1.81
0.18
-1.99
-2.95
-1.68
16.52
-31.99
-7.74
-0.42
-5.36
0.96
24.89
-32.15
-4.18
6.19
14.04
5.10
11.12
-13.13
-1.29
-4.42
13.48
1.19
4.39
-12.16
-4.61
-12.55
14.04
5.09
11.12
-13.13
-1.29
-4.42
13.48
1.19
4.39
-12.16
-4.61
-12.55
-5.36
0.96
24.89
-32.15
-4.18
6.19
-2.95
-1.68
16.52
-31.99
-7.73
-0.42
9.41
-1.42
-6.21
2.74
-1.85
-12.47
14.21
0.18
-3.40
3.28
-0.06
-13.86
5.35
-12.04
-5.72
-0.17
-5.78
-12.06
-1.93
-0.38
-10.66
-10.13
0.12
4.21
0.96
-0.07
1.46
0.70
-2.28
4.83
1.04
1.18
-0.36
0.41
-2.74
-0.08
-0.42
9.15
-10.51
-0.68
-0.76
0.69
-0.33
2.17
-3.02
-0.42
-1.36
10.51
0.68
0.76
0.08
0.42
-9.15
2.92
0.41
1.37
-0.71
0.33
-2.09
0.36
-0.41
2.74
-4.83
-1.04
-1.18
-1.43
-0.69
2.28
-4.20
-0.96
0.04
-21.13
81.90
33.33
-155.28
5.80
-103.91
-40.43
128.04
6.53
-241.68
19.11
-192.27
-88.80
_____________________________________________________________________________________
181
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
70
70
70
70
70
71
71
71
71
71
71
72
72
72
72
72
72
73
73
73
73
73
73
74
74
74
74
74
74
75
75
75
75
75
75
76
76
76
76
76
76
76
76
76
76
76
76
76
76
77
77
77
77
77
77
77
77
78
78
78
78
78
78
78
78
79
79
79
79
79
79
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
5.40
5.40
8.10
10.80
10.80
16.20
0.00
5.40
5.40
8.10
10.80
10.80
16.20
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
7.20
7.20
8.10
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
P
KN
27.06
-6.56
50.22
19.19
-77.89
98.70
16.76
-14.26
32.79
8.55
-91.14
98.70
16.76
-14.26
32.79
8.55
-91.14
161.49
65.61
34.59
-97.54
-132.36
-232.05
126.75
27.06
-6.56
50.22
19.19
-77.89
146.32
92.43
56.57
-89.47
-108.02
-144.61
-940.65
-933.87
-923.99
-930.77
-923.99
-933.88
-940.66
-973.00
-966.22
-965.45
-972.23
-965.45
-966.22
-973.01
-975.16
-975.16
-1011.35
-1008.34
-982.95
-982.95
-1022.46
-1019.46
1.80
-1.90
-19.90
-19.90
1.80
-1.90
-19.90
-19.90
-21.08
-6.28
9.92
-2.71
-2.69
-4.86
V2
KN
V3
KN
-8.53
138.79
-195.69
-29.55
40.98
-41.92
-10.65
139.68
-173.25
-27.54
39.97
-41.92
-10.65
139.68
-173.25
-27.54
39.97
-42.87
8.84
166.24
-188.75
-22.61
37.84
-60.24
-8.53
138.79
-195.69
-29.55
40.98
-23.16
7.76
89.31
-112.70
-22.88
16.31
-114.51
40.87
102.19
0.01
-86.81
134.55
320.65
-320.65
-134.55
86.81
-0.01
-102.19
-40.87
114.51
-104.60
-69.14
19.10
4.03
-266.15
-199.97
-9.65
-55.44
65.79
-3.54
380.80
482.06
-35.57
-67.43
142.02
205.82
-232.59
92.84
207.42
54.74
77.07
0.02
1.61
1.61
0.85
0.85
0.85
6.03
3.09
3.09
0.87
-2.07
-2.07
-0.87
2.08
2.08
-6.03
-3.09
-3.09
-0.96
-0.96
-0.96
-4.01
-4.01
-4.01
-0.85
-0.85
-0.85
-1.61
-1.61
-1.61
-1.28
-1.28
-1.28
-3.13
-3.13
-3.13
6.15
6.15
0.01
0.01
0.01
7.53
7.53
-7.53
-7.53
-0.01
-0.01
-0.01
-6.15
-6.15
4.26
4.26
11.53
11.53
-2.75
-2.75
8.13
8.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-2.61
-2.61
0.00
0.00
T
KN-m
M2
KN-m
M3
KN-m
-0.13
-0.13
-0.56
-0.56
-0.56
1.47
2.09
2.09
-2.22
-1.60
-1.60
2.22
1.59
1.59
-1.47
-2.10
-2.10
2.13
2.13
2.13
0.13
0.13
0.13
0.56
0.56
0.56
0.13
0.13
0.13
0.32
0.32
0.32
-0.96
-0.96
-0.96
3.49
3.49
0.00
0.00
0.00
9.68
9.68
-9.68
-9.68
0.00
0.00
0.00
-3.49
-3.49
2.52
2.52
6.29
6.29
-5.75
-5.75
-2.48
-2.48
0.45
0.45
0.49
0.49
-0.43
-0.43
-0.47
-0.47
0.53
0.53
-6.19
-6.19
0.00
0.00
-0.27
-3.45
2.46
-0.50
-5.90
11.24
0.13
6.57
-7.55
-0.77
-10.78
7.57
0.77
10.77
-11.22
-0.13
-6.57
-3.28
0.06
13.86
-14.21
-0.18
3.40
-2.46
0.50
5.90
-5.35
0.27
3.45
-2.74
1.85
12.47
-9.41
1.42
6.21
16.21
18.75
2.29
2.29
2.29
18.75
16.21
-21.89
-17.01
-5.04
-5.04
-5.04
-17.01
-21.89
12.55
5.95
28.72
-25.80
-8.88
-10.47
18.10
-33.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-2.02
4.78
6.29
6.30
130.32
-13.83
-263.68
31.49
-72.22
-96.52
137.95
-14.43
-249.72
30.50
-64.58
-96.52
137.95
-14.43
-249.72
30.50
-64.58
-40.43
128.04
6.53
-241.68
19.11
-192.27
-88.80
130.31
-13.83
-263.68
31.49
-72.22
-21.13
81.90
33.33
-155.28
5.80
-103.91
111.18
334.43
328.12
208.22
328.12
334.42
111.18
-503.46
-81.14
-76.96
-217.60
-76.96
-81.14
-503.46
89.47
116.84
119.38
77.96
-482.17
-100.95
-98.34
57.51
32.23
173.63
173.68
269.74
-13.89
-226.43
-230.02
-717.11
269.71
519.15
506.14
350.84
349.72
317.01
_____________________________________________________________________________________
182
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
79
80
80
80
80
80
80
80
80
81
81
81
81
81
81
82
82
82
82
82
82
83
83
83
83
83
83
84
84
84
84
84
84
84
84
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
85
9.00
9.00
10.80
10.80
16.20
0.00
5.40
5.40
7.20
7.20
8.10
9.00
9.00
10.80
10.80
16.20
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
8.10
16.20
0.00
8.10
16.20
0.00
5.40
10.80
0.00
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
7.20
7.20
8.10
8.10
9.00
9.00
10.80
10.80
16.20
0.00
5.40
5.40
7.20
7.20
8.10
8.10
9.00
9.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Min
Min
-2.69
-2.71
9.92
-6.28
-21.08
-21.08
-6.28
9.35
-3.28
-3.83
-5.99
-3.83
-3.29
9.35
-6.28
-21.08
-19.90
-19.90
-1.90
1.80
-19.90
-19.90
-1.90
1.80
-7.21
-10.90
-10.90
-7.21
-10.90
-10.90
-15.80
-15.80
-15.80
-15.80
-15.80
-15.80
-10.90
-10.90
-7.21
-10.90
-10.90
-7.21
1.80
-1.90
-19.90
-19.90
1.80
-1.90
-19.90
-19.90
-21.08
-6.28
9.74
-2.89
-2.34
-4.51
-4.51
-2.34
-2.89
9.74
-6.28
-21.08
-21.08
-6.28
9.18
-3.46
-3.48
-5.64
-5.64
-3.48
-3.46
-70.79
-13.62
-153.81
225.61
588.50
-588.50
-225.61
153.82
13.64
70.80
-0.01
-77.07
-54.74
-207.41
-92.84
232.59
-205.82
-142.02
67.44
35.58
-482.07
-380.80
3.54
-65.79
60.51
86.06
346.28
-41.11
61.72
196.13
-201.59
0.04
390.37
-390.36
-0.03
201.59
-196.13
-61.71
41.13
-346.26
-86.04
-60.50
60.10
33.00
280.43
482.78
-57.34
11.89
113.34
216.51
-246.22
118.58
186.81
47.25
70.51
0.02
0.02
-53.94
6.52
-99.97
167.61
631.59
-631.58
-167.60
99.99
-6.51
53.95
-0.01
-0.01
-70.50
-47.25
V3
KN
T
KN-m
M2
KN-m
M3
KN-m
0.00
8.81
8.81
0.00
0.00
0.00
0.00
-8.81
-8.81
-0.01
-0.01
-0.01
2.61
2.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.24
3.24
-2.70
-2.70
5.57
5.57
0.84
0.84
0.00
0.00
0.00
0.00
-0.84
-0.84
-5.57
-5.57
2.70
2.70
-3.25
0.00
11.52
11.52
2.07
2.07
-2.07
-2.07
-11.52
-11.52
0.00
0.00
0.00
6.19
6.19
-0.53
-0.53
0.47
0.47
0.43
0.43
-0.49
-0.49
-0.45
-0.45
0.04
0.04
0.04
-0.05
-0.05
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
0.05
-0.04
-0.04
-0.04
8.27
8.27
-1.59
-1.59
1.47
1.47
-8.69
-8.69
9.64
9.64
0.70
0.70
0.00
0.00
0.00
0.00
11.42
11.42
-1.54
-1.54
1.54
1.54
-11.42
-11.42
0.00
0.00
0.00
0.00
-0.70
6.30
4.78
-2.02
0.00
0.00
0.00
0.00
-11.08
2.18
-0.65
-0.65
-0.65
2.17
-11.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.39
1.10
-1.24
3.55
3.55
-1.24
1.10
2.40
0.00
0.00
0.00
0.00
-0.42
-3.44
-2.45
0.88
0.88
-2.45
-3.45
349.71
350.84
506.11
519.14
269.71
-825.56
-206.33
-196.00
-436.16
-434.14
-469.65
-434.14
-436.16
-196.01
-206.32
-825.57
269.74
173.70
173.65
32.22
-717.12
-230.02
-226.43
-13.91
83.34
-195.20
405.55
16.32
-337.64
75.99
463.53
-369.14
463.51
-31.39
-639.10
-31.50
405.57
-195.18
83.32
76.10
-337.64
16.25
61.97
31.94
35.01
274.88
-0.21
-272.27
-273.46
-586.73
273.57
439.52
424.48
335.77
334.72
309.59
309.59
334.70
335.76
424.45
439.51
273.55
-864.88
-235.19
-221.44
-436.31
-434.26
-466.82
-466.82
-434.26
-436.31
_____________________________________________________________________________________
183
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
85
85
85
86
86
86
86
86
86
86
86
87
87
87
87
87
87
87
87
88
88
88
88
88
88
88
88
88
88
88
88
88
88
89
89
89
89
89
89
89
89
90
90
90
90
90
90
91
91
91
91
91
91
92
92
92
92
92
92
94
94
94
94
94
94
96
96
96
96
96
96
10.80
10.80
16.20
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
5.40
8.10
10.80
10.80
16.20
0.00
5.40
5.40
8.10
10.80
10.80
16.20
0.00
5.40
5.40
10.80
0.00
5.40
5.40
10.80
0.00
5.40
10.80
0.00
5.40
10.80
0.00
8.10
16.20
0.00
8.10
16.20
0.00
5.40
10.80
0.00
5.40
10.80
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
0.00
3.50
7.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Max
Max
Max
Max
Min
Min
Min
Min
Min
Min
Min
Max
Max
Max
Max
Min
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
9.18
-6.28
-21.08
-19.90
-19.90
-1.90
1.80
-19.90
-19.90
-1.90
1.80
1.50
-1.58
-16.58
-16.58
1.50
-1.58
-16.58
-16.58
-17.56
-5.23
7.96
-4.38
7.96
-5.23
-17.56
-17.56
-5.23
7.96
-4.38
7.96
-5.23
-17.56
-16.58
-16.58
-1.58
1.50
-16.58
-16.58
-1.58
1.50
-6.00
-9.08
-9.08
-6.00
-9.08
-9.08
-13.17
-13.17
-13.17
-13.17
-13.17
-13.17
-9.08
-9.08
-6.00
-9.08
-9.08
-6.00
38.67
8.43
-8.54
14.19
2.37
-22.57
38.67
8.43
-8.53
14.20
2.37
-22.57
-186.80
-118.57
246.22
-216.50
-113.34
-11.88
57.35
-482.76
-280.41
-33.00
-60.10
51.29
69.79
95.05
297.40
-22.90
42.24
60.84
164.01
-188.95
143.46
159.54
4.62
-104.77
-78.43
356.85
-359.27
76.24
102.45
0.87
-159.98
-143.88
188.49
-163.96
-60.79
-42.19
23.16
-297.13
-94.78
-69.53
-51.24
73.08
74.42
252.80
6.93
47.27
132.45
-162.12
0.02
322.21
-322.22
-0.02
162.12
-132.45
-47.27
-6.93
-252.80
-74.42
-73.08
-18.25
3.08
53.48
-47.66
0.99
20.56
-18.25
3.08
53.48
-47.66
0.99
20.56
V3
KN
-3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.11
1.11
1.11
-0.59
-0.59
-0.59
0.59
0.59
0.59
-1.11
-1.11
-1.11
T
KN-m
M2
KN-m
M3
KN-m
-0.70
-9.64
-9.64
8.69
8.69
-1.47
-1.47
1.59
1.59
-8.27
-8.27
4.09
4.09
2.14
2.14
-2.52
-2.52
-4.63
-4.63
7.27
7.27
0.00
0.00
0.00
3.42
3.42
-3.42
-3.42
0.00
0.00
0.00
-7.27
-7.27
4.63
4.63
2.52
2.52
-2.14
-2.14
-4.09
-4.09
0.07
0.07
0.07
-0.02
-0.02
-0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.02
-0.07
-0.07
-0.07
0.02
0.02
0.02
-0.19
-0.19
-0.19
0.19
0.19
0.19
-0.03
-0.03
-0.03
-0.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.90
0.00
1.88
-2.24
-0.18
-3.90
2.25
0.18
3.90
-3.90
0.00
-1.89
-221.45
-235.18
-864.96
274.90
35.01
31.94
61.95
-586.64
-273.47
-272.28
-0.26
54.30
-179.63
-179.77
313.70
18.99
-277.14
-278.31
-40.29
323.21
-50.63
-47.60
-197.06
-56.94
-59.91
323.92
-104.27
-265.01
-255.37
-476.83
-257.14
-266.76
-100.50
314.20
-178.63
-178.48
54.25
-37.67
-278.10
-276.93
18.76
71.15
-254.75
384.41
39.85
-329.77
60.57
393.92
-219.83
393.94
-12.22
-501.65
-12.15
384.38
-254.87
71.13
60.43
-329.80
39.76
11.42
88.81
-6.19
-0.70
30.10
-11.52
11.42
88.81
-6.19
-0.70
30.10
-11.52
_____________________________________________________________________________________
184
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
97
97
97
97
97
97
102
102
102
102
102
102
103
103
103
103
103
103
104
104
104
104
104
104
105
105
105
105
105
105
106
106
106
106
106
106
107
107
107
107
107
107
108
108
108
108
108
108
109
109
109
109
109
109
110
110
110
110
110
110
111
111
111
111
111
111
112
112
112
112
112
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
6.00
0.00
3.00
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
62.24
62.24
62.24
-107.01
-107.01
-107.01
30.79
30.79
30.79
-50.05
-50.05
-50.05
10.96
10.96
10.96
-16.20
-16.20
-16.20
80.54
80.54
80.54
-84.71
-84.71
-84.71
38.33
38.33
38.33
-39.42
-39.42
-39.42
9.77
9.77
9.77
-6.74
-6.74
-6.74
80.54
80.54
80.54
-84.71
-84.71
-84.71
38.33
38.33
38.33
-39.42
-39.42
-39.42
9.77
9.77
9.77
-6.74
-6.74
-6.74
62.25
62.25
62.25
-107.00
-107.00
-107.00
30.79
30.79
30.79
-50.05
-50.05
-50.05
10.96
10.96
10.96
-16.20
-16.20
0.08
5.48
10.88
-6.85
-2.80
1.25
-1.35
3.97
9.37
-6.20
-2.07
1.98
-1.56
3.71
9.11
-6.04
-1.86
2.19
-0.33
5.08
10.48
-6.96
-2.91
1.14
-1.44
3.80
9.20
-6.26
-2.05
2.00
-1.63
3.62
9.02
-6.03
-1.83
2.22
-0.33
5.08
10.48
-6.96
-2.91
1.14
-1.44
3.80
9.20
-6.26
-2.05
2.00
-1.63
3.62
9.02
-6.03
-1.83
2.22
0.08
5.48
10.88
-6.85
-2.80
1.25
-1.35
3.97
9.37
-6.20
-2.07
1.98
-1.56
3.71
9.11
-6.04
-1.86
V3
KN
-0.57
-0.57
-0.57
-0.72
-0.72
-0.72
0.12
0.12
0.12
0.07
0.07
0.07
0.01
0.01
0.01
0.00
0.00
0.00
-0.20
-0.20
-0.20
-0.47
-0.47
-0.47
0.20
0.20
0.20
0.05
0.05
0.05
-0.02
-0.02
-0.02
-0.06
-0.06
-0.06
0.47
0.47
0.47
0.20
0.20
0.20
-0.05
-0.05
-0.05
-0.20
-0.20
-0.20
0.06
0.06
0.06
0.02
0.02
0.02
0.72
0.72
0.72
0.57
0.57
0.57
-0.07
-0.07
-0.07
-0.12
-0.12
-0.12
0.00
0.00
0.00
-0.01
-0.01
T
KN-m
M2
KN-m
M3
KN-m
-0.82
-0.82
-0.82
-1.11
-1.11
-1.11
0.06
0.06
0.06
-0.04
-0.04
-0.04
0.10
0.10
0.10
0.02
0.02
0.02
-0.48
-0.48
-0.48
-0.93
-0.93
-0.93
0.50
0.50
0.50
0.08
0.08
0.08
-0.05
-0.05
-0.05
-0.15
-0.15
-0.15
0.93
0.93
0.93
0.48
0.48
0.48
-0.08
-0.08
-0.08
-0.50
-0.50
-0.50
0.15
0.15
0.15
0.05
0.05
0.05
1.11
1.11
1.11
0.82
0.82
0.82
0.04
0.04
0.04
-0.06
-0.06
-0.06
-0.02
-0.02
-0.02
-0.10
-0.10
-2.11
-0.38
1.68
-2.67
-0.50
1.34
0.49
0.14
-0.11
0.33
0.11
-0.21
0.02
-0.01
0.00
-0.02
-0.02
-0.05
-0.65
-0.04
1.19
-1.62
-0.21
0.57
0.64
0.04
-0.12
0.16
0.02
-0.57
-0.06
0.00
0.15
-0.18
-0.02
0.05
1.62
0.21
-0.57
0.65
0.04
-1.19
-0.16
-0.02
0.57
-0.64
-0.04
0.12
0.18
0.02
-0.05
0.06
0.00
-0.15
2.67
0.50
-1.34
2.11
0.38
-1.68
-0.33
-0.11
0.21
-0.49
-0.14
0.11
0.02
0.02
0.05
-0.02
0.01
12.35
4.01
3.77
-13.01
1.45
-20.54
6.76
3.17
1.99
-10.43
1.86
-17.04
5.78
3.17
1.49
-9.64
2.00
-16.50
10.98
3.86
4.01
-13.46
1.35
-19.47
6.19
3.13
1.91
-10.39
1.84
-16.62
5.47
3.15
1.41
-9.56
2.00
-16.25
10.98
3.86
4.01
-13.46
1.35
-19.47
6.19
3.13
1.91
-10.39
1.84
-16.62
5.47
3.15
1.41
-9.56
2.00
-16.25
12.35
4.01
3.77
-13.01
1.45
-20.54
6.76
3.17
1.99
-10.43
1.86
-17.04
5.78
3.17
1.49
-9.64
2.00
_____________________________________________________________________________________
185
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
TABLE: Element Forces - Frames
Frame
Station
OutputCase
m
Text
Text
112
113
113
113
113
113
113
114
114
114
114
114
114
115
115
115
115
115
115
116
116
116
116
116
116
117
117
117
117
117
117
118
118
118
118
118
118
119
119
119
119
119
119
6.00
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
0.00
2.70
5.40
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
ENVOLVENTE
CaseType
Text
StepType
Text
P
KN
V2
KN
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
Max
Max
Max
Min
Min
Min
-16.20
-43.97
-43.97
-43.97
-46.15
-46.15
-46.15
-79.49
-79.49
-79.49
-83.89
-83.89
-83.89
-96.03
-96.03
-96.03
-100.93
-100.93
-100.93
-93.70
-93.70
-93.70
-112.89
-112.89
-112.89
-96.02
-96.02
-96.02
-100.93
-100.93
-100.93
-79.49
-79.49
-79.49
-83.89
-83.89
-83.89
-43.97
-43.97
-43.97
-46.15
-46.15
-46.15
2.19
-6.20
4.02
30.21
-23.48
1.00
9.50
-9.23
1.18
27.37
-26.78
-2.49
6.02
-6.54
1.96
25.51
-28.39
-2.20
8.94
-8.51
0.00
26.19
-26.19
0.00
8.51
-8.94
2.20
28.39
-25.51
-1.96
6.54
-6.02
2.49
26.78
-27.37
-1.18
9.23
-9.50
-1.00
23.48
-30.21
-4.02
6.20
V3
KN
-0.01
-1.69
-1.69
-1.69
-1.81
-1.81
-1.81
-0.63
-0.63
-0.63
-0.94
-0.94
-0.94
0.13
0.13
0.13
-0.81
-0.81
-0.81
0.00
0.00
0.00
0.00
0.00
0.00
0.81
0.81
0.81
-0.13
-0.13
-0.13
0.94
0.94
0.94
0.63
0.63
0.63
1.81
1.81
1.81
1.69
1.69
1.69
T
KN-m
M2
KN-m
M3
KN-m
-0.10
0.54
0.54
0.54
-0.80
-0.80
-0.80
0.95
0.95
0.95
-0.46
-0.46
-0.46
0.64
0.64
0.64
-1.74
-1.74
-1.74
0.00
0.00
0.00
0.00
0.00
0.00
1.74
1.74
1.74
-0.64
-0.64
-0.64
0.46
0.46
0.46
-0.95
-0.95
-0.95
0.80
0.80
0.80
-0.54
-0.54
-0.54
0.00
-4.95
-0.38
4.50
-5.27
-0.39
4.20
-1.95
-0.24
2.28
-2.81
-0.27
1.46
0.13
-0.18
2.01
-2.37
-0.22
-0.58
-0.18
-0.18
-0.18
-0.19
-0.19
-0.19
2.01
-0.18
0.14
-0.58
-0.22
-2.37
2.28
-0.24
-1.95
1.46
-0.27
-2.81
4.50
-0.38
-4.95
4.20
-0.39
-5.27
-16.50
-1.67
17.00
-9.80
-11.05
3.59
-29.99
-9.73
7.82
-1.00
-29.12
3.70
-30.78
-0.43
12.33
-7.52
-29.58
5.14
-21.20
-10.12
17.47
-10.12
-19.07
0.18
-19.07
-7.52
12.33
-0.43
-21.20
5.14
-29.58
-1.00
7.82
-9.73
-30.78
3.70
-29.12
-9.80
17.00
-1.67
-29.99
3.59
-11.05
_____________________________________________________________________________________
186
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
187
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
188
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
189
PROYECTO DE GRADO
ESTADIO ATLTICO ALTO IRPAVI
_____________________________________________________________________________________
SAP2000
_____________________________________________________________________________________
190