UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUAMANGA

V. CUADRO DE METRADOS
Proyecto

Lugar

TEM

DESCRIPCIN PARTIDAS

01.00.00

ESTRUCTURAS AZOTEA

UND

01.04.00

CONCRETO ARMADO

01.04.03

CONCRETO EN COLUMNAS FC=210KG/CM2


C-1
C-2
C-3
C-4

M3

ENCOFRADO Y DESNECOFRADO NORMAL EN COLUMNAS


C-1
C-2
C-3
C-4

M2

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

KG

01.04.04

01.04.05

02.00.00
02.01.00
02.01.01

02.02.00
02.02.01

02.02.03

02.03.00
02.03.02

L (m)

a (m)

h (m)

Parcial

Total

2.04
6.00
14.00
4.00
7.00

0.25
0.45
0.30
0.25

6.00
14.00
4.00
7.00

0.70
0.90
0.90
1.51

0.25
0.15
0.30
0.15

1.05
1.05
1.05
1.05

0.39
0.99
0.38
0.28

1.05
2.85
2.85
2.85

4.41
35.91
10.26
30.12

80.70

625.24

ARQUITECTURA
ALBAILERA
MURO SOGA LADRILLO CORRIENTE CON C:A
GLOBAL

M2

REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES INCLUIDO COLUMNAS
GLOBAL

M2

MUROS EXTERIORES
MUROS EXTERIORES

88.23
1.00

84.03

1.05

88.23

1.00

84.03

1.00

84.03

1.00

60.50

1.05

63.53

84.03

M2

63.53

PISOS, PAVIMENTOS
PISO DE 2" CONCRETO FC=140KG/CM2 DE CEMENTO PULIDO Y BRUADO S/COLOREAR
M2
GLOBAL
1.00

02.04.00

CONTRAZOCALOS

02.04.01

CONTRAZOCALO DE CEMENTO SIN COLOREAR (H=0.20M)


GLOBAL

03.00.00

N
VECE

41.57
Area =

41.57

41.57

136.67
1.00

136.67

136.67

INSTALACIONES SANITARIAS

03.01.00
03.01.01
03.01.02
03.01.03

APARATOS Y ACCESORIOS SANITARIOS


INODORO TANQUE BAJO, BLANCO
LAVATORIO DE PARED BLANCO 1 LLAVE
ACCESORIOS Y VLVULAS

UND
PZA
GLB

3
3
3

03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12

TUBERA PVC-SAL DE 2"


TUBERA PVC-SAL DE 4"
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
CODO PVC SAL 2"x 90
CODO PVC SAL 4"x 45
CODO PVC SAL 4"x 90
YEE PVC SAL 4" REDUCCION 2"
YEE PVC SAL 2"
SUMIDEROS DE 2"

ML
ML
ML
PZA
PZA
PZA
PZA
PZA
PZA

1
1
3
8
1
2
4
1
2

03.02.00
03.02.01
03.02.02

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA
RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP

PTO
M

1
22

16.00
40.00

3.00
3.00
3.00

3.00
3.00
3.00

16.00
40.00
3.00
8.00
1.00
2.00
4.00
1.00
2.00

16.00
40.00
3.00
8.00
1.00
2.00
4.00
1.00
2.00

1.00
22.00

1.00
22.00

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

C1

5/8

1.65

C2

5/8

14

1.65

C3

5/8

1.65

C4

5/8

1.65

Estribos

3/8

31

1.23

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

59.40
138.60
39.60
46.20

0.25
0.00
0.00
3%
0

266.91
0.56
266.91
149.47
3%
153.95

0.99
0.00
0.00
5%
0.00

1.55
283.80
440.46
7%
471.29
625.24

2.24
0.00
0.00
8%
0.00

D POR EM M.L.
1"

3.97
0.00
0.00
10%
0.00
625.24

UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUAMANGA

V. CUADRO DE METRADOS
Proyecto

Lugar

TEM

DESCRIPCIN PARTIDAS

01.00.00

ESTRUCTURAS 2do piso

UND

01.04.00

CONCRETO ARMADO

01.04.03

CONCRETO EN COLUMNAS FC=210KG/CM2


C-1
C-2
C-3
C-4

M3

ENCOFRADO Y DESNECOFRADO NORMAL EN COLUMNAS


C-1
C-2
C-3
C-4

M2

01.04.05

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

KG

01.04.06

CONCRETO EN VIGAS FC=210 KG/CM2


V - 101 EJE 9-9 Y 8-8
V - 104 EJE 9-9 Y 8-8
V - 103 EJE 7-7 Y 6-6
V - A EJE 2-2, 3-3,4-4 Y 5-5
V - B ENTRE A - D
V - S ENTRE A -A Y D - D
V - 100 EJE C - C ENTRE 2 - 7
V - 100 EJE B - B ENTRE 7 - 10
V - 102 ENTRE A - D
V - 105 ENTRE A - D

M3

ENCOFRADO y DESENCOFRADO NORMAL EN VIGAS


V - 101 EJE 9-9 Y 8-8
V - 104 EJE 9-9 Y 8-8
V - 103 EJE 7-7 Y 6-6
V - A EJE 2-2, 3-3,4-4 Y 5-5
V - B ENTRE A - D
V - S ENTRE A -A Y D - D
V - 100 EJE C - C ENTRE 2 - 7
V - 100 EJE B - B ENTRE 7 - 10
V - 102 ENTRE A - D
V - 105 ENTRE A - D

M2

01.04.08

ACERO ESTRUCTURAL TRABAJADO PARA VIGAS

KG

01.04.09

CONCRETO EN LOSA ALIGERADA FC=210KG/CM2


PAO 01
PAO 02
PAO 04
PAO 05

M3

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA


LOSA Base
LOSA Lateral Perimtricos

M2

01.04.04

01.04.07

01.04.10

L (m)

a (m)

h (m)

Parcial

Total

5.54
6.00
14.00
4.00
7.00

0.25
0.45
0.30
0.25

6.00
14.00
4.00
7.00

0.70
0.90
0.90
1.51

0.25
0.15
0.30
0.15

2.85
2.85
2.85
2.85

1.07
2.69
1.03
0.75

2.85
2.85
2.85
2.85

11.97
35.91
10.26
30.12

88.26

1359.31
8.01
2.00
2.00
2.00
4.00
1.00
2.00
1.00
1.00
4.00
1.00

4.05
2.40
6.45
6.45
16.76
21.85
13.90
8.99
2.20
4.10

0.30
0.45
0.25
0.25
0.15
0.15
0.25
0.25
0.15
0.15

4.00
4.00
4.00
8.00
2.00
4.00
2.00
2.00
8.00
2.00

4.05
2.40
6.45
6.45
16.76
21.85
13.90
8.99
2.20
4.10

0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
0.20
0.20

0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
0.20
0.20

0.49
0.43
0.65
1.29
1.01
2.62
0.70
0.45
0.26
0.12
83.32
3.24
1.92
5.16
10.32
13.41
34.96
5.56
3.60
3.52
1.64

(VER HOJA DE METRADO DEL ACERO)

1220.01

5.83
1.00
1.00
1.00
1.00

Area
Area
Area
Area

=
=
=
=

55.11
18.73
20.65
22.13

1.00
1.00

Area =
59.49

116.60
0.20

0.05
0.05
0.05
0.05

2.76
0.94
1.03
1.11
128.50
116.60
11.90

01.04.11

ACERO ESTRUCTURAL TRABAJADO PARA LOSA LIGERADA

01.04.12

LADRILLO TECHO 30x30x15

01.04.13

CONCRETO EN ESCALERA FC=210 KG/CM2


LOSA ESCALERA (cuerpo)
ESCALERA (Escalones)

M3

ENCOFRADO Y DESENCOFRADO
LOSA ESCALERA Base
Escalones Frontal
Escalones Lateral

M2

ACERO ESTRUCTURAL ESCALERAS

KG

190.44

M2

265.76

01.04.14

01.04.15
02.00.00
02.01.00
02.01.01

KG

N
VECE

UND

(VER HOJA DE METRADO DEL ACERO)


1.00

Area =

116.60

3520.37
116.60

979.47
1.30

1.00
16.00

4.88
1.20
1.20area =

0.15
0.02

0.88
0.42
9.60

1.00
16.00
16.00

4.88
1.20
area =

1.20
0.18
0.02

5.85
3.40
0.35

ARQUITECTURA
ALBAILERA
MURO SOGA LADRILLO CORRIENTE CON C:A

TEM

DESCRIPCIN PARTIDAS

01.00.00

ESTRUCTURAS 2do piso

UND

EJE A-A
EJE D-D
EJE B-B
EJE C-C
EJE 2-2
EJE 2-2 (ventana 03)
EJE 3-3
EJE 3-3 (ventana 08)
EJE 4-4
EJE 4-4 ( ventana 07)
EJE 5-5
EJE 6-6
EJE 6-6 (ventana 07)
EJE 6-6 (ventana 06)
EJE 8-8
EJE 8-8 (ventana 08)
EJE 9-9
EJE 9-9 (ventana 01)
EJE 9-9 (ventana 01)
EJE 9-9
02.02.00
02.02.01

REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES INCLUIDO COLUMNAS
DORMITORIOS 01
VENTANAS 03
PUERTA 03
DORMITORIOS 02
VENTANA 07
PUERTA 03
BAOS
VENTANA 08
PUERTA 04
COCINA
VENTANA 07
PUERTA 03
VACIO 01
VENTANA 07
VENTANA 08
VACIO 02
VENTANA 07
VENTANA 06
SALA COMEDOR PASADIZO 01
PUERTA 02
PUERTA 03
PUERTA 04
VENTANA 07
VENTANA 06
SALA COMEDOR PASADIZO 02
VENTANA O2
PUERTA 02
PUERTA 03
PUERTA 04
VENTANA 07
VENTANA 06
OFICINA
PUERTA 02
PUERTA 04
VENTANA 01
PARAPETO
MUROS EXTERIORES
MUROS EXTERIORES

M2

02.02.04

TARRAJEO EN CIELO RASO


TODOS LOS AMBINTES (GLOBAL)

M2

TARRAJEADO FONDO DE ESCALERA C:A 1:5 E=1.5CM


LOSA ESCALERA Base
Escalones Frontal
Escalones Lateral

02.03.00
02.03.02

CONTRAZOCALOS

02.04.01

CONTRAZOCALO DE CEMENTO SIN COLOREAR (H=0.20M)


GLOBAL

a (m)

h (m)

Parcial

1.00
1.00
1.00
1.00
1.00
-2.00
1.00
-2.00
1.00
-2.00
1.00
1.00
-4.00
-2.00
1.00
-1.00
1.00
-1.00
-1.00
1.00

19.85
20.15
4.20
10.20
6.70
2.00
12.30
0.60
8.00
1.00
8.60
9.84
1.00
1.25
8.55
0.60
6.75
2.49
4.26
2.49

2.60
2.60
2.60
2.60
2.60
1.50
2.60
2.50
2.60
1.50
2.60
2.60
1.50
1.50
2.60
2.50
2.60
1.70
1.70
0.45

51.61
52.39
10.92
26.52
17.42
-6.00
31.98
-3.00
20.80
-3.00
22.36
25.58
-6.00
-3.75
22.23
-1.50
17.55
-4.23
-7.24
1.12

2.00
-2.00
-2.00
2.00
-2.00
-2.00
3.00
-3.00
-3.00
2.00
-2.00
-2.00
1.00
-2.00
-2.00
1.00
-4.00
-2.00
1.00
-1.00
-3.00
-1.00
-1.00
-1.00
1.00
-1.00
-3.00
-3.00
-1.00
-4.00
-2.00
1.00
-1.00
-1.00
-1.00
1.00

13.65
2.00
0.80
9.15
1.00
0.80
6.50
0.60
0.70
10.05
1.00
0.80
8.80
1.00
0.60
7.51
1.00
1.25
30.80
1.00
0.80
0.70
1.00
1.25
51.70
2.49
1.00
0.80
0.70
1.00
1.25
19.89
1.00
0.70
4.15
2.49
189.93

2.60
1.50
2.50
2.60
1.50
2.50
2.60
2.50
2.50
2.60
1.50
2.50
2.60
1.50
2.50
2.60
1.50
1.50
2.60
2.50
2.50
2.50
1.50
1.50
2.60
1.70
2.50
2.50
2.50
1.50
1.50
2.60
2.50
2.50
1.70
0.45

70.98
-6.00
-4.00
47.58
-3.00
-4.00
50.70
-4.50
-5.25
52.26
-3.00
-4.00
22.88
-3.00
-3.00
19.53
-6.00
-3.75
80.08
-2.50
-6.00
-1.75
-1.50
-1.88
134.42
-4.23
-7.50
-6.00
-1.75
-6.00
-3.75
51.71
-2.50
-1.75
-7.06
1.12

Total

427.60

172.71
1.00

60.60

1.00

Area =

116.60

116.60

2.85

172.71

1.00
17.00
17.00

4.88
1.20
area =

1.20
0.18
0.02

5.85
3.61
0.37

Area =

116.60

116.60

116.60

9.83

PISOS, PAVIMENTOS
PISO DE 2" CONCRETO FC=140KG/CM2 DE CEMENTO PULIDO Y BRUADO S/COLOREAR
M2
GLOBAL
1.00

02.04.00

L (m)

M2

02.02.03

02.02.05

N
VECE

116.60

189.93
1.00

189.93

189.93

TEM
01.00.00
02.06.00
02.06.01

02.07.00
02.07.01

DESCRIPCIN PARTIDAS
ESTRUCTURAS 2do piso
CARPINTERIA METALICA
VENTANAS METALICAS INCL. COLOC. Y PINTADO
V-1
V-2
V-3
V-4
V-5
V-6
V-7
V-8
CARPINTERA DE MADERA
PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO CEDRO 2X3"
P-2
P-3
P-4

02.08.00
02.08.01
02.08.02
02.08.03

CERRAJERA
CERRADURA FORTE 226 TRES GOLPES EN PUERTAS
BISAGRA CAPUCHINA 3.5"x3.5"
MANIJA DE BRONCE DE 4" PARA PUERTAS

02.09.00
02.09.01

VIDRIOS CRISTALES Y SIMILARES


VIDRIO SEMIDOBLE
V-1
V-2
V-3
V-4
V-5
V-6
V-7
V-8

02.10.00
02.10.01

02.10.02

02.10.03

02.10.04
02.05.00
02.05.01

03.00.00

PINTURA EN GENERAL
PINTURA LTEX EN MUROS INTERIORES
SUPERFICIE TARRAJEADA

UND

N
VECE

h (m)

Parcial

4.15
2.40
2.00
1.80
1.40
1.25
1.00
0.60

1.70
1.70
1.50
1.50
1.50
1.50
1.50
2.50

11.70
8.20
7.00
13.20
5.80
11.00
30.00
18.60

2.50
2.50
2.50

7.50
12.00
5.25

M2

24.75
3.00
6.00
3.00

PZA
PZA
PZA

1.00
0.80
0.70

17.00
51.00
17.00

17.00
51.00
17.00

P2
4.15
2.40
2.00
1.80
1.40
1.25
1.00
0.60

1.70
1.70
1.50
1.50
1.50
1.50
1.50
2.50

11.70
8.20
7.00
13.20
5.80
11.00
30.00
18.60

M2

M2

PINTURA LATEX 2 MANOS EN CIELO RASO


SUPERFICIE TARRAJEADA

M2

PINTURA EN ZOCALOS Y CONTRAZOCALOS


M
H=0.20
REVESTIMIENTO DE GRADAS Y ESCALERAS
REVESTIMEINTO CON CEMENTO PULIDO-BRUADO PASO Y CONTRAPASO M
ESCALERA

17.00
51.00
17.00

56.90
1.00
1.00
1.00
2.00
1.00
2.00
6.00
3.00

PINTURA LTEX EN MUROS EXTERIORES


SUPERFICIE TARRAJEADA

Total

105.50
1.00
1.00
1.00
2.00
1.00
2.00
6.00
3.00

427.60
1.00

REA

427.60

427.60

1.00

REA

172.71

172.71

1.00

REA

116.60

116.60

1.00

REA

18.50

18.50

172.71

116.60

18.50

20.40
1.00

20.40

20.40

INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO, BLANCO
LAVATORIO DE PARED BLANCO 1 LLAVE
ACCESORIOS Y VLVULAS

UND
PZA
GLB

3
3
3

03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12

TUBERA PVC-SAL DE 2"


TUBERA PVC-SAL DE 4"
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
CODO PVC SAL 2"x 90
CODO PVC SAL 4"x 45
CODO PVC SAL 4"x 90
YEE PVC SAL 4" REDUCCION 2"
YEE PVC SAL 2"
SUMIDEROS DE 2"

ML
ML
ML
PZA
PZA
PZA
PZA
PZA
PZA

1
1
3
8
1
2
4
1
2

03.02.00
03.02.01
03.02.02
03.02.03

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP
VALVULA COMPUERTA DE BRONCE 3/4"

PTO
M
UND

PTO
PTO
PTO
PTO
UND
UND
UND

04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
04.07.00

a (m)

M2

03.01.00
03.01.01
03.01.02
03.01.03

04.00.00

L (m)

3.00
3.00
3.00

3.00
3.00
3.00

16.00
40.00
3.00
8.00
1.00
2.00
4.00
1.00
2.00

16.00
40.00
3.00
8.00
1.00
2.00
4.00
1.00
2.00

17
32
3

17.00
32.00
3.00

17.00
32.00
3.00

23.00
39.00
1.00
1.00
1.00
20.00
1.00

23.00
39.00
1.00
1.00
1.00
20.00
1.00

23.00
39.00
1.00
1.00
1.00
20.00
1.00

16.00
40.00

INSTALACIONES ELCTRICAS
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA PARA TOMACORRIENTE DOBLE
SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO)
SALIDA PARA ANTENA DE TELEVISION CON PVC
TABLERO METALICO DE DISTRIBUCION (TD-1)
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A
POZO PUESTA A TIERRA

TEM

DESCRIPCIN PARTIDAS

01.00.00
04.08.00

ESTRUCTURAS 2do piso

04.09.00
04.10.00

TUBERIA PVC 3/4"


EN PISO
EN TECHO
TUBERIA PVC SAP 1"
LAMPARAS
LAMPARAS 100 W EN AMBIENTES
LAMPARAS 100 W EN PASADIZOS

UND

N
VECE

L (m)

a (m)

h (m)

Parcial

115.00
1.00
1.00
1.00

UND
UND

Total

16.00
7.00

45.00
70.00
32.00

45.00
70.00
32.00
16.00
7.00

32.00
23.00

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

C1

5/8

3.45

C2

5/8

14

3.45

C3

5/8

3.45

C4

5/8

3.45

Estribos

3/8

31

17

1.23

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

124.20
289.80
82.80
96.60

0.25
0.00
0.00
3%
0

648.21
0.56
648.21
363.00
3%
373.89

0.99
0.00
0.00
5%
0.00

1.55
593.40
920.96
7%
985.42
1359.31

2.24
0.00
0.00
8%
0.00

ACERO ESTRUCTURAL TRABAJADO PARA VIGAS


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

V - S eje 2-8

5/8

17.95

V - S eje 8-10

1/2

6.85

V-S

3/8

149

1.30

V - 100 eje 2-7

5/8

14.35

V - 100 eje 7-10

5/8

9.65

V - 100 eje 9-10

1/2

2.25

V - 100

161

1.10

V - 104 EJE
8Y9 ENTRE AB

5/8

3.15

V - 104

1/4

19

1.50

V - 101 EJE
8Y9 ENTRE AB

5/8

4.60

V - 101

1/4

29

1.20

V -103 ENTRE
6 -7

5/8

7.30

V - 103

1/4

46

1.10

V -A ENTRE
2-5

1/2

7.30

V -A

1/4

46

1.10

V - 102 ENTRE
3-4 Y 6-7

1/2

3.00

V - 102

1/4

18

0.90

V - 105 ENTRE
8-9

1/2

5.30

V - 102

1/4

26

0.90

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

143.60
54.80
387.40
86.10
57.90
4.50

50.40
57.00

55.20
69.60
43.80
50.60
36.50
50.60

48.00

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:

64.80
21.20
93.60
0.25
386.20

0.56
387.40

0.99
165.00

1.55
437.00

2.24
0.00

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

95.78
3%
98.650928

216.94
3%
223.45

164.01
678.22
5%
7%
172.21
725.70
1220.01

0.00
8%
0.00

ACERO ESTRUCTURAL TRABAJADO PARA LOSA LIGERADA


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

VIGUETAS

1/2

56

16.40

VIGUETAS

1/2

56

3.49

VIGUETAS

1/2

56

5.32

TEMPT.

1/4

65

15.72

TEMPT.

1/4

82

1.30

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

918.40
390.88
1787.52
1021.80
106.60
0.25
1128.40
279.84
3%
288.2385

0.56
0.00
0.00
3%
0.00

0.99
1.55
3096.80
0.00
3078.22
0.00
5%
7%
3232.13
0.00
3520.37

2.24
0.00
0.00
8%
0.00

ACERO ESTRUCTURAL ESCALERAS


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

LONG.

1/2

5.25

REF.

1/2

3.65

TRANSV.

3/8

29

1.25

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

84.00

58.40

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

0.25
0.00
0.00
3%
0

72.50
0.56
72.50
40.60
3%
41.82

0.99
142.40
141.55
5%
148.62
190.44

1.55
0.00
0.00
7%
0.00

2.24
0.00
0.00
8%
0.00

D POR EM M.L.
1"

3.97
0.00
0.00
10%
0.00

1359.31

D POR EM M.L.
1"

3.97
0.00

0.00
10%
0.00

1220.01

D POR EM M.L.
1"

3.97
0.00
0.00
10%
0.00

3520.37

D POR EM M.L.
1"

3.97
0.00
0.00
10%
0.00
190.44

UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUAMANGA

V. CUADRO DE METRADOS
Proyecto

Lugar

TEM

DESCRIPCIN PARTIDAS

UND

N
VECE

M2
M2

1.00
1.00

25.00
25.00

7.00
7.00

6.00
14.00
2.00
2.00

1.00
0.80
0.90
1.20

1.00
1.20
1.20
1.20

1.00
1.00
1.00
1.00

6.00
13.44
2.16
2.88

1.00
1.00
1.00
1.00
1.00
1.00
1.00

26.68
6.93
38.97
4.65
14.63
2.05
6.53

0.50
0.50
0.40
0.40
0.40
0.50
0.40

1.00
1.00
1.00
0.80
1.00
1.00
0.80

13.34
3.47
15.59
1.49
5.85
1.03
2.09

1.00
1.00
1.00
1.00
1.00
1.00
1.00

26.68
6.93
38.97
4.65
14.63
2.05
6.53

0.50
0.50
0.40
0.40
0.40
0.50
0.40

1.00
1.00
1.00
0.80
1.00
1.00
0.80

13.34
3.47
15.59
1.49
5.85
1.03
2.09

6.00
14.00
2.00
2.00

1.00
0.80
0.90
1.20

1.00
1.20
1.20
1.20

0.10
0.10
0.10
0.10

0.60
1.34
0.22
0.29

1.00
1.00
1.00
1.00
1.00
1.00
1.00

26.68
6.93
38.97
4.65
14.63
2.05
6.53

0.50
0.50
0.40
0.40
0.40
0.50
0.40

0.80
0.80
0.80
0.60
0.80
0.80
0.60

10.67
2.77
12.47
1.12
4.68
0.82
1.57

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

20.67
12.80
9.55
3.40
20.92
6.45
4.40
6.92
4.30
3.30
6.70
1.87

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.39
0.86
0.64
0.23
1.41
0.44
0.30
0.47
0.29
0.22
0.45
0.13

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

20.67
12.80
9.55
3.40
20.92
6.45
4.40
6.92
4.30
3.30
6.70

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

18.60
11.52
8.60
3.06
18.83
5.81
3.96
6.23
3.87
2.97
6.03

01.00.00
01.01.00
01.01.01
01.01.02

ESTRUCTURAS 1RA PLANTA


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR

01.02.00

MOVIMIENTO DE TIERRAS

01.02.01

EXCAVACION PRA ZAPATAS HASTA 1.20M


Z-1
Z-2
Z-3
Z-4

M3

EXCAVACION PARA CIMIENTO HASTA 1.0 M


CORTE 1 - 1
CORTE 2 - 2
CORTE 3 - 3
CORTE 4 - 4
CORTE 5 - 5
CORTE 6 - 6
CORTE 7 - 7

M3

ELIMINACION DE MATERIAL EXCEDENTE


CORTE 1 - 1
CORTE 2 - 2
CORTE 3 - 3
CORTE 4 - 4
CORTE 5 - 5
CORTE 6 - 6
CORTE 7 - 7

M3

01.02.02

01.02.03

01.03.00
01.03.01

01.03.02

01.03.03

01.03.04

CONCRETO SIMPLE
SOLADO PARA ZAPATAS E=2" MEZCLA 1:12 C:H
Z-1
Z-2
Z-3
Z-4

L (m)

a (m)

h (m)

Parcial

175.00
175.00

M3

CONCRETO 1:8+25%PMEN SOBRECIMIENTO CORRIDO


EJE A-A
(MUROS)
EJE B-B
(MUROS)
EJE C-C
(MUROS)
EJE D-D
(MUROS)
EJE E-E
(MUROS)
EJE 1-1 ENTRE A - E
(MUROS)
EJE 3-3 ENTRE A - E
(MUROS)
EJE 4-4 ENTRE A - E
(MUROS)
EJE 5-5 ENTRE A - E
(MUROS)
EJE 6-6 ENTRE A - E
(MUROS)
EJE 7-7 ENTRE A - E
(MUROS)
EJE 8-8 ENTRE A - E
(MUROS)

M3

ENCOFRADO. Y DESENCOFRADO
EJE A-A
(MUROS)
EJE B-B
(MUROS)
EJE C-C
(MUROS)
EJE D-D
(MUROS)
EJE E-E
(MUROS)
EJE 1-1 ENTRE A - E
(MUROS)
EJE 3-3 ENTRE A - E
(MUROS)
EJE 4-4 ENTRE A - E
(MUROS)
EJE 5-5 ENTRE A - E
(MUROS)
EJE 6-6 ENTRE A - E
(MUROS)
EJE 7-7 ENTRE A - E
(MUROS)

M2

175.00
175.00

24.48

42.85

55.70

M2

CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% PG


CORTE 1 - 1
CORTE 2 - 2
CORTE 3 - 3
CORTE 4 - 4
CORTE 5 - 5
CORTE 6 - 6
CORTE 7 - 7

Total

2.45

34.10

6.84

91.15

TEM

DESCRIPCIN PARTIDAS

01.00.00
EJE 8-8 ENTRE A - E

UND

ESTRUCTURAS 1RA PLANTA


(MUROS)

01.04.00

CONCRETO ARMADO

01.04.01

CONCRETO EN ZAPATAS FC=175KG/CM2


Z-1
Z-2
Z-3
Z-4

M3

01.04.02

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS

KG

01.04.03

CONCRETO EN COLUMNAS FC=210KG/CM2


C-1
C-2
C-3
C-4

M3

ENCOFRADO Y DESNECOFRADO NORMAL EN COLUMNAS


C-1
C-2
C-3
C-4

M2

01.04.05

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

KG

01.04.06

CONCRETO EN VIGAS FC=210 KG/CM2


V - 101 EJE 9-9 Y 8-8
V - 104 EJE 9-9 Y 8-8
V - 103 EJE 7-7 Y 6-6
V - A EJE 2-2, 3-3,4-4 Y 5-5
V - B ENTRE A - D
V - S ENTRE A -A Y D - D
V - 100 EJE C - C ENTRE 2 - 7
V - 100 EJE B - B ENTRE 7 - 10
V - 102 ENTRE A - D
V - 105 ENTRE A - D

M3

ENCOFRADO y DESENCOFRADO NORMAL EN VIGAS


V - 101 EJE 9-9 Y 8-8
V - 104 EJE 9-9 Y 8-8
V - 103 EJE 7-7 Y 6-6
V - A EJE 2-2, 3-3,4-4 Y 5-5
V - B ENTRE A - D
V - S ENTRE A -A Y D - D
V - 100 EJE C - C ENTRE 2 - 7
V - 100 EJE B - B ENTRE 7 - 10
V - 102 ENTRE A - D
V - 105 ENTRE A - D

M2

01.04.08

ACERO ESTRUCTURAL TRABAJADO PARA VIGAS

KG

01.04.09

CONCRETO EN LOSA ALIGERADA FC=210KG/CM2


PAO 01
PAO 02
PAO 04
PAO 05

M3

ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA


LOSA Base
LOSA Lateral Perimtricos

M2

01.04.04

01.04.07

01.04.10

01.04.11

ACERO ESTRUCTURAL TRABAJADO PARA LOSA LIGERADA

01.04.12

LADRILLO TECHO 30x30x15

01.04.13

CONCRETO EN ESCALERA FC=210 KG/CM2


ESCALERA (Zapata)
LOSA ESCALERA (cuerpo)
ESCALERA (Escalones)

M3

ENCOFRADO Y DESENCOFRADO
LOSA ESCALERA Base
Escalones Frontal
Escalones Lateral

M2

ACERO ESTRUCTURAL ESCALERAS

KG

01.04.14

01.04.15

KG
UND

N
VECE

L (m)

a (m)

2.00

1.87

6.00
14.00
2.00
2.00

1.00
0.80
0.90
1.20

h (m)

Parcial

0.45

1.68

0.60
0.60
0.60
0.60

3.60
8.06
1.30
1.73

Total

14.69
1.00
1.20
1.20
1.20

352.14
6.70
6.00
14.00
4.00
7.00

0.25
0.45
0.30
0.25

6.00
14.00
4.00
7.00

0.70
0.90
0.90
1.51

0.25
0.15
0.30
0.15

3.45
3.45
3.45
3.45

1.29
3.26
1.24
0.91

3.45
3.45
3.45
3.45

14.49
43.47
12.42
36.47

106.85

3152.25
8.01
2.00
2.00
2.00
4.00
1.00
2.00
1.00
1.00
4.00
1.00

4.05
2.40
6.45
6.45
16.76
21.85
13.90
8.99
2.20
4.10

0.30
0.45
0.25
0.25
0.15
0.15
0.25
0.25
0.15
0.15

4.00
4.00
4.00
8.00
2.00
4.00
2.00
2.00
8.00
2.00

4.05
2.40
6.45
6.45
16.76
21.85
13.90
8.99
2.20
4.10

0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
0.20
0.20

0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
0.20
0.20

0.49
0.43
0.65
1.29
1.01
2.62
0.70
0.45
0.26
0.12
83.32
3.24
1.92
5.16
10.32
13.41
34.96
5.56
3.60
3.52
1.64

(VER HOJA DE METRADO DEL ACERO)

1220.01

5.83
1.00
1.00
1.00
1.00

Area
Area
Area
Area

=
=
=
=

55.11
18.73
20.65
22.13

1.00
1.00

Area =
59.49

116.60
0.20

0.05
0.05
0.05
0.05

2.76
0.94
1.03
1.11
128.50
116.60
11.90

(VER HOJA DE METRADO DEL ACERO)


1.00

Area =

116.60

3520.37
116.60

979.47
1.77

1.00
1.00
17.00

1.20
0.80
4.65
1.20
1.20area =

0.50
0.15
0.02

0.48
0.84
0.45
9.79

1.00
18.00
18.00

4.65
1.20
area =

1.20
0.18
0.02

5.58
3.81
0.40
213.18

TEM

DESCRIPCIN PARTIDAS

01.00.00
02.00.00

ESTRUCTURAS 1RA PLANTA


ARQUITECTURA

02.01.00
02.01.01

ALBAILERA
MURO DE CABEZA LADRILLO CORRIENTE CON C:A
EJE A-A
EJE D-D
EJE B-B
EJE 2-2
EJE 2-2 (ventana 08)
EJE 2-2 (ventana 05)
PUERTA 04
EJE 3-3
EJE 3-3 (ventana 08)
EJE 4-4
EJE 4-4 ( ventana 07)
EJE 5-5
EJE 6-6
EJE 6-6 (ventana 07)
EJE 6-6 (ventana 06)
EJE 8-8
EJE 8-8 (ventana 08)
EJE 9-9
EJE 9-9 (ventana 01)
EJE 9-9 (ventana 01)
EJE 9-9

02.02.00
02.02.01

02.02.03

02.02.04

02.02.05

02.02.06

REVOQUES Y ENLUCIDOS
TARRAJEO EN COLUMNAS
DORMITORIOS PRINCIPAL
VENTANAS 03
PUERTA 03
DORMITORIOS 02
VENTANA 07
PUERTA 03
BAOS
VENTANA 08
PUERTA 04
COCINA
VENTANA 07
PUERTA 03
VACIO 01
VENTANA 07
VENTANA 08
VACIO 02
VENTANA 07
VENTANA 06
SALA COMEDOR PASADIZO 01
PUERTA 02
PUERTA 03
PUERTA 04
VENTANA 07
VENTANA 06
SALA COMEDOR PASADIZO 02
VENTANA O2
PUERTA 02
PUERTA 03
PUERTA 04
VENTANA 07
VENTANA 06
COMERCIO
PUERTA 02
PUERTA 04
PUERTA 01
MUROS INTERIORES Y EXTERIORES
MUROS EXTERIORES

UND

N
VECE

L (m)

a (m)

h (m)

Parcial

M2

252.89
1.00
1.00
1.00
1.00
-1.00
-1.00
-1.00
1.00
-2.00
1.00
-2.00
1.00
1.00
-4.00
-2.00
1.00
-1.00
1.00
-1.00
-1.00
1.00

19.85
20.15
4.20
10.65
0.60

2.60
2.60
2.60
2.60
2.50

51.61
52.39
10.92
27.69
-1.50

12.30
0.60
8.00
1.00
8.60
9.84
1.00
1.25
8.55
0.60
6.75
2.49
4.26
2.49

2.60
2.50
2.60
1.50
2.60
2.60
1.50
1.50
2.60
2.50
2.60
1.70
1.70
0.45

31.98
-3.00
20.80
-3.00
22.36
25.58
-6.00
-3.75
22.23
-1.50
17.55
-4.23
-7.24
1.12

2.00
-2.00
-2.00
2.00
-2.00
-2.00
3.00
-3.00
-3.00
2.00
-2.00
-2.00
1.00
-2.00
-2.00
1.00
-4.00
-2.00
1.00
-1.00
-3.00
-1.00
-1.00
-1.00
1.00
-1.00
-3.00
-3.00
-1.00
-4.00
-2.00
1.00
-1.00
-1.00
-1.00

13.65
2.00
0.80
9.15
1.00
0.80
6.50
0.60
0.70
10.05
1.00
0.80
8.80
1.00
0.60
7.51
1.00
1.25
30.80
1.00
0.80
0.70
1.00
1.25
51.70
2.49
1.00
0.80
0.70
1.00
1.25
19.89
1.00
0.70
4.15

2.60
1.50
2.50
2.60
1.50
2.50
2.60
2.50
2.50
2.60
1.50
2.50
2.60
1.50
2.50
2.60
1.50
1.50
2.60
2.50
2.50
2.50
1.50
1.50
2.60
1.70
2.50
2.50
2.50
1.50
1.50
2.60
2.50
2.50
1.70

70.98
-6.00
-4.00
47.58
-3.00
-4.00
50.70
-4.50
-5.25
52.26
-3.00
-4.00
22.88
-3.00
-3.00
19.53
-6.00
-3.75
80.08
-2.50
-6.00
-1.75
-1.50
-1.88
134.42
-4.23
-7.50
-6.00
-1.75
-6.00
-3.75
51.71
-2.50
-1.75
-7.06

1.00

68.30

3.20

218.56

1.00

Area =

161.60

161.60

1.00
17.00
17.00

4.50
1.20
area =

1.20
0.18
0.02

5.40
3.60
0.37

2.00

3.91

M2

426.48

M2

TARRAJEO EN CIELO RASO


GLOBAL

M2

TARRAJEADO FONDO DE ESCALERA C:A 1:5 E=1.5CM


LOSA ESCALERA Base
Escalones Frontal
Escalones Lateral

DERRAME DE PUERTAS Y VENTANAS


VARIOS GLOBAL
V-1

Total

218.56

161.60

9.37

157.80
1.60

22.04

TEM

DESCRIPCIN PARTIDAS

01.00.00

UND

02.03.02

PISOS, PAVIMENTOS
FALSO PISO MEZCLA C:A E=4"
GLOBAL

02.04.01

CONTRAZOCALO DE CEMENTO SIN COLOREAR (H=0.20M)


GLOBAL

ZOCALO SIN COLOREAR (H=0.30M)


MURO FRONTAL FACHADA
MUROS LATERALES

02.07.00
02.07.01

CARPINTERIA METALICA
VENTANAS METALICAS INCL. COLOC. Y PINTADO
V-5
V-6
V-8
V-9
M1
CARPINTERA DE MADERA
PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO CEDRO 2X3"
P-1
P-2
P-3
P-4
P-5

02.08.00
02.08.01
02.08.02
02.08.03

CERRAJERA
CERRADURA FORTE 226 TRES GOLPES EN PUERTAS
BISAGRA CAPUCHINA 3.5"x3.5"
MANIJA DE BRONCE DE 4" PARA PUERTAS

02.09.00
02.09.01

VIDRIOS CRISTALES Y SIMILARES


VIDRIO SEMIDOBLE
V-5
V-6
V-8
V-9
M1

02.10.00
02.10.01

02.10.02

02.10.03

02.10.04
02.05.00
02.05.01

03.00.00
03.01.00
03.01.01
03.01.02
03.01.03

h (m)

Parcial

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

2.00
2.58
1.95
0.97
1.04
2.00
3.00
3.00
4.20
2.00

1.00

Area =

116.60

116.60

Total

PINTURA EN GENERAL
PINTURA LTEX EN MUROS INTERIORES
SUPERFICIE TARRAJEADA

1.60
1.60
1.10
1.10
1.60
1.60
0.50
0.50
0.90
0.70

14.40
16.72
12.20
8.28
10.56
14.40
14.00
14.00
20.40
10.80

Area =

116.60

116.60

116.60

PISO DE 2" CONCRETO FC=140KG/CM2 DE CEMENTO PULIDO Y BRUADO S/COLOREAR


M2
GLOBAL
1.00
ZOCALOS Y CONTRAZOCALOS

02.06.00
02.06.01

a (m)

M2

02.04.00

02.04.02

L (m)

ESTRUCTURAS 1RA PLANTA


V-2
V-3
V-4
V-5
V-6
V-7
V-8
V-9
P-3
P-5

02.03.00
02.03.01

N
VECE

116.60

47.40
2.00

23.70

47.40

1.00
2.00

7.00
25.00

7.00
50.00

1.00
1.00
2.00
1.00
2.00

0.97
1.25
3.00
0.55
2.45

57.00

M2

48.34
1.10
1.50
0.50
2.50
2.20

4.14
5.50
14.00
6.10
18.60

2.40
2.40
2.10
2.10
2.50

6.00
9.60
7.56
11.55
3.25

M2

37.96
1.00
2.00
4.00
5.00
2.00

PZA
PZA
PZA

2.50
2.00
0.90
1.10
0.65

14.00
42.00
14.00

14.00
42.00
14.00

P2

194.79
1.00
1.00
2.00
1.00
2.00

0.97
1.25
3.00
0.55
2.45

1.10
1.50
0.50
2.50
2.20

11.49
20.18
32.29
14.80
116.03

M2

PINTURA LTEX EN MUROS EXTERIORES


SUPERFICIE TARRAJEADA

M2

PINTURA LATEX 2 MANOS EN CIELO RASO


SUPERFICIE TARRAJEADA

M2

PINTURA EN ZOCALOS Y CONTRAZOCALOS


M
H=0.20
REVESTIMIENTO DE GRADAS Y ESCALERAS
REVESTIMEINTO CON CEMENTO PULIDO-BRUADO PASO Y CONTRAPASO M
ESCALERA

14.00
42.00
14.00

#REF!
1.00

REA

#REF!

#REF!

1.00

REA

218.56

218.56

1.00

REA

161.60

161.60

1.00

REA

18.50

18.50

218.56

161.60

18.50

18.00
1.00

18.00

18.00

INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE BAJO, BLANCO
LAVATORIO DE PARED BLANCO 1 LLAVE
ACCESORIOS Y VLVULAS

UND
PZA
GLB

5
4
2

5.00
4.00
2.00

5.00
4.00
2.00

TEM
01.00.00

DESCRIPCIN PARTIDAS

UND

N
VECE

TUBERA PVC-SAL DE 2"


TUBERA PVC-SAL DE 4"
SALIDAS DE PVC SAL PARA VENTILACION DE 2"
CODO PVC SAL 2"x 90
CODO PVC SAL 4"x 45
CODO PVC SAL 4"x 90
YEE PVC SAL 4" REDUCCION 2"
YEE PVC SAL 2"
SUMIDEROS DE 2"
REGISTROS DE BRONCE DE 4"
CAJA DE REGISTRO DE DESAGE 12" X 24"

ML
ML
ML
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND

1
1
1
8
1
2
4
1
2
1
1

03.02.00
03.02.01
03.02.02
03.02.03

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA
RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP
VALVULA COMPUERTA DE BRONCE 3/4"

PTO
M
UND

PTO
PTO
PTO
PTO
UND
UND
UND
M

04.01.00
04.02.00
04.03.00
04.04.00
04.05.00
04.06.00
04.07.00
04.08.00

04.09.00
04.10.00

a (m)

h (m)

Parcial

Total

ESTRUCTURAS 1RA PLANTA

03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
03.01.09
03.01.10
03.01.11
03.01.12
03.01.13
03.01.14

04.00.00

L (m)

16.00
40.00

16.00
40.00
1.00
8.00
1.00
2.00
4.00
1.00
2.00
1.00
1.00

16.00
40.00
1.00
8.00
1.00
2.00
4.00
1.00
2.00
1.00
1.00

9
54
5

9.00
54.00
5.00

9.00
54.00
5.00

22.00
15.00
1.00
1.00
1.00
27.00
1.00

22.00
15.00
1.00
1.00
1.00
27.00
1.00

22.00
15.00
1.00
1.00
1.00
27.00
1.00
102.00

INSTALACIONES ELCTRICAS
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA PARA TOMACORRIENTE DOBLE
SALIDA PARA TELEFONO DIRECTO (DE SERVICIO PUBLICO)
SALIDA PARA ANTENA DE TELEVISION CON PVC
TABLERO METALICO DE DISTRIBUCION (TD-1)
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A
POZO PUESTA A TIERRA
TUBERIA PVC 3/4"
EN PISO
EN TECHO
TUBERIA PVC SAP 1"
LAMPARAS
LAMPARAS 100 W EN AMBIENTES
LAMPARAS 100 W EN PASADIZOS

1.00
1.00
1.00
UND
UND

12.00
10.00

33.00
69.00
11.00

33.00
69.00
11.00
12.00
10.00

11.00
22.00

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS

Cantidad

# de
Elementos

Longitud del
Elemento

Z1

1/2

14

1.00

Z2

1/2

14

13

1.00

Z3

1/2

15

1.10

Z4

1/2

16

1.20

Descripcin

Diseo de Fierro

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

1"

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

3/4"

1"

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

3/4"

1"

84.00
182.00
33.00
38.40

0.25
0.00
0.00
3%
0

0.56
0.00
0.00
3%
0.00

0.99
337.40
335.38
5%
352.14
352.14

1.55
0.00
0.00
7%
0.00

ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS


Obra:
Ubicacin:

Hecho por:
Fecha:

Descripcin

Cantidad

# de
Elementos

Longitud del
Elemento

C1

5/8

4.15

C2

5/8

14

4.15

C3

5/8

4.15

C4

5/8

4.15

Estribos

3/8

31

88

1.25

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"
149.40
348.60
99.60
116.20

3410.00

0.25
0.00
0.00
3%
0

0.56
3410.00
1909.60
3%
1966.89

0.99
0.00
0.00
5%
0.00

1.55
713.80
1107.82
7%
1185.36
3152.25

ACERO ESTRUCTURAL TRABAJADO PARA VIGAS


Obra:
Ubicacin:

Descripcin

Hecho por:
Fecha:

LONGITUD POR EM M.L.

Cantidad
# de
Elementos

Longitud del
Elemento

V - S eje 2-8

5/8

17.95

V - S eje 8-10

1/2

6.85

V-S

3/8

149

1.30

V - 100 eje 2-7

5/8

14.35

V - 100 eje 7-10

5/8

9.65

V - 100 eje 9-10

1/2

2.25

V - 100

161

1.10

V - 104 EJE
8Y9 ENTRE AB

5/8

3.15

V - 104

1/4

19

1.50

1/4"

3/8"

1/2"

5/8"
143.60

54.80
387.40
86.10
57.90
4.50

50.40
57.00

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar
V - 101 EJE
8Y9 ENTRE AB

5/8

4.60

V - 101

1/4

29

1.20

V -103 ENTRE
6 -7

5/8

7.30

V - 103

1/4

46

1.10

V -A ENTRE
2-5

1/2

7.30

V -A

1/4

46

1.10

V - 102 ENTRE
3-4 Y 6-7

1/2

3.00

V - 102

1/4

18

0.90

V - 105 ENTRE
8-9

1/2

5.30

V - 102

1/4

26

0.90

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

55.20
69.60
43.80
50.60
36.50
50.60
48.00
64.80
21.20
93.60

0.25
386.20
95.78
3%
98.650928

0.56
387.40
216.94
3%
223.45

0.99
1.55
165.00
437.00
164.01
678.22
5%
7%
172.21
725.70
1220.01

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

5/8"

3/4"

1"

0.99
1.55
3096.80
0.00
3078.22
0.00
5%
7%
3232.13
0.00
3520.37

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

5/8"

3/4"

1"

1.55
0.00
0.00
7%
0.00

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

ACERO ESTRUCTURAL TRABAJADO PARA LOSA LIGERADA


Obra:
Ubicacin:

Descripcin

Hecho por:
Fecha:

LONGITUD POR EM M.L.

Cantidad
# de
Elementos

Longitud del
Elemento

VIGUETAS

1/2

56

16.40

VIGUETAS

1/2

56

3.49

VIGUETAS

1/2

56

5.32

TEMPT.

1/4

65

15.72

TEMPT.

1/4

82

1.30

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

1/2"
918.40
390.88
1787.52

1021.80
106.60

0.25
1128.40
279.84
3%
288.238496

0.56
0.00
0.00
3%
0.00

ACERO ESTRUCTURAL ESCALERAS


Obra:
Ubicacin:

Descripcin

Hecho por:
Fecha:

LONGITUD POR EM M.L.

Cantidad
# de
Elementos

Longitud del
Elemento

LONG.

1/2

5.98

REF.

1/2

3.85

TRANSV.

3/8

34

1.25

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

1/4"

3/8"

1/2"
95.68
61.60

85.00

0.25
0.00
0.00
3%
0

0.56
85.00
47.60
3%
49.03

0.99
157.28
156.34
5%
164.15
213.18

UNIVERSIDAD NACIONAL SAN CRISTOBAL DE HUAMANGA

V. CUADRO DE METRADOS
Proyecto

Lugar

TEM

DESCRIPCIN PARTIDAS

01.00.00

CISTERNA

01.02.00
01.02.01
01.02.03

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS

UND

N
VECE

L (m)

a (m)

h (m)

Parcial

M3

9.50
1.00

1.90

2.00

2.50

9.50

1.00

1.90

2.00

2.50

9.50

1.00
1.00
1.00
1.00

0.75
0.30
0.65
0.15

1.90
1.90
1.90
1.90

0.15
0.15
0.15
0.15

0.21
0.09
0.19
0.04

PAREDES

4.00

1.90

2.00

1.90

28.88

LOSA

1.00
-1.00
2.00
2.00

1.90
0.60
0.80
0.60

2.00
0.60
0.10
0.10

0.15
0.15
0.35
0.35

0.57
-0.05
0.06
0.04

ELIMINACION DE MATERIAL EXCEDENTE


GLOBAL

01.04.00

CONCRETO ARMADO

01.04.01

CONCRETO EN ZAPATAS FC=175KG/CM2


LOSA FONDO

M3

ACERO ESTRUCTURAL TRABAJADO PARA CISTERNA

KG

01.04.01

CONCRETO EN TAPA SANITARIA

M3

TAPA

12.35

M3

01.04.02

Total

29.41

711.16
0.04
1.00

0.60

0.60

0.10

0.04

CUADRO DE METRADOS DE ACEROS


Proyecto

Lugar

ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS

Cantidad

# de
Elementos

Longitud del
Elemento

PAREDES

1/2

14

2.60

PAREDES

1/2

14

3.70

LOSA

1/2

14

2.50

PAREDES

3/8

63

7.20

CAJA SUM.

3/8

0.90

CAJA SUM.

3/8

1.23

Descripcin

Diseo de Fierro

1/4"

3/8"

LONGITUD POR EM M.L.


1/2"
5/8"

3/4"

1"

2.24
0.00
0.00
8%
0.00

3.97
0.00
0.00
10%
0.00

145.60
207.20
70.00
453.60
5.40

3.69

TAPA SANIT.

3/8

0.65
5.20

Peso en kilogramos por metro lineal:


Longitud total por en metros lineales:
Sub total en kilogramos por Neto:
Desperdicios:
Sub total:
TOTAL

0.25
0.00
0.00
3%
0

0.56
467.89
262.02
3%
269.88

0.99
422.80
420.26
5%
441.28
711.16

1.55
0.00
0.00
7%
0.00