Sie sind auf Seite 1von 3

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

01 April 2013

3 pages Ref.: attached photographs taken today Comments/Replies Arrivals - backfill/compacting for longitudinal ground beams Departure grids A-D backfill/compacting in sections without services Departure grids D-J de-shutter of ground beams ERT & GSE rebar/formwork for column bases of steel supports of shade structures Arrivals - backfill/compacting for longitudinal ground beams Departure grids A-D backfill/compacting in sections without services Departure grids D-J complete de-shutter ground beams, commence application of bitumen paint ERT & GSE rebar/formwork for column bases of steel supports of shade structures Not yet issued, pending approval of Galfars offer for the Sheel&Core Contract OXY-MUK query the lack of earth-moving plant on site, to be discussed at Meeting 02/04/2013 at 15.00h, in Galfar R+B offices. submitted by Galfar, based on W.I. No. 371Shell&Corestill to be issued formally, also to be discussed tomorrow.

Status on Site General Issues 1) Scheduled work 31/03/2013

Action Galfar not started not started almost completed ongoing Galfar Galfar Galfar Galfar OXY-HO Galfar/OXY-MUK Civil/QAQC/Huckle OXY-HO

2) Scheduled work today

3) New Work Instruction No. 371 4) Plant on Site

5) Revised Construction Programme

Architectural 4) Sewage tank 5) Water tank

Drawing with setting-out dimensions issued to OXY-HO for approval. Drawing with setting-out dimensions issued to OXY-HO for approval.

OXY-HO OXY-HO

Structural 6) Structural steelwork 7) Revisions 8) MAS a) anti-termite treatment 9) Method Statement a) Anti-termite treatment MEP 10) X-ray scanning cable duct

Including accessories, bolts etc., to be hot-dipped galvanized as per Structural Specification. Issued to OXY-HO for approval Revision submitted, under review Revision submitted, under review

Galfar OXY-HO OXY-MUK/Huckle OXY-MUK/Huckle

To be coordinated by MEP-first fix Contractor to be appointed by OXY-HO Herbert Krause HK Resident Lead Consultant Huckle and Partners LLC

OXY-HO

Prepared by:

Date: 01 April 2013

Distribution: OXY-HO various, OXY-Muk various, Huckle-HO, Oman Designers, Hoehler-Partner, Galfar E&C various,

Site form

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

01 April 2013

3 pages

Site form

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

01 April 2013

3 pages