Project : 2x135MW TPP, Nellore Sl. No. A. 1 MND COMMENTS

Doc. no.TSPL-P143-CAL-107, Rev. 0 Design calculation of Thrust Block for CW & ACW Pipes For the horizontal load, the same shall be checked for This clause is not applicable for Thrust Blocks. (self weight of pipe + self weight of footing) x tan > 1.40 times total load as per clause 20.2, page 33 of IS:456:2000, 0.9 times of Dead Load shall be considered as per IS. The designed thrust blocks are applicable only for horizontal bends. The submitted calculation is done as per AWWA M-11, and is applicable for all bends. Note: Please note that as per AWWA M-11, thrust blocks are not required to be provided in case of all-welded pipe lines laid underground.

3 4 5

If there are vertical bends, calculation to be submitted Same as point no. A.2 above separately. The bottom of footing shall be indicated from existing Drawing revised accordingly. Ground Level The structural design of the footings have not been The structural design of Thrust load is not in our scope. Same furnished. shall be designed by customer based on the load data provided by us. However, we recommend to follow the method of construction indicated below: Concrete shall be used for thrust blocks, and they shall be poured in place or pre-cast. Poured in place thrust blocks shall be constructed by pouring concrete between the fitting and the undisturbed wall of the trench. A dry mixture shall be used so that the concrete may be easily shaped into the desired form. Portland cement, water, fine and coarse aggregate, and an airentraining mixture. The water cement ratio shall be 0.55 : 1 (0.55 Kg. of water to 1 Kg. of cement) All aggregates shall be able to pass through a screen with two (2) inch square openings. Concrete used for thrust blocks shall have a 28-day compressive strength of 2,500 psi. When no preliminary strength tests of the concrete to be used are made, the watercement ratio shall not exceed the following values.

For Thermosystems Pvt. Ltd.

23.8.10 07.07.10 Date


PROJECT :

1 Revised as per MND comments 0 SUBMISSION FOR APPROVAL Rev. SUBMISSION

RKS US YADAV KRS RKS US YADAV KRS Prepared Checked Approved

2 X 135MW THERMAL POWER PLANT (PHASE -1)


TAMMINAPATNAM & MUMMIDI VILLAGES, CHILLAKUR MANDAL SPSR NELLORE DISTRICT - 524121, ANDHRA PRADESH - INDIA

OWNER :

SIMHAPURI ENERGY PRIVATE LIMITED


MADHUCON GREENLANDS, BEGUMPET, HYDERABAD - 500 016, AP- INDIA

OWNER ENGINEER : EPC CONTRACTOR : ORIGINATOR : EPC ENGINEER VENDOR/ SUPPLIER : STATUS : FILE NO : UNITS : SCALE : NTS TITLE :

DEVELOPMENT CONSULTANTS PRIVATE LIMITED, KOLKATA MADHUCON PROJECTS LIMITED


ROAD NO.36, JUBILEE HILLS, HYDERABAD - 500 033, AP - INDIA

M.N.DASTUR & COMPANY (P) LIMITED, KOLKATA THERMOSYSTEMS PVT. LTD. HYDERABAD DESIGN CALCULATION OF THRUST BLOCK FOR CW &ACW PIPES
TSPL-P143-CAL-107 SHEET 01 OF 05 REV. 1

DRG NO:

DESIGN CALCULATION OF THRUST BLOCK 1.0 ) THRUST AT CW PUMP DISCHARGE Input data
1. Diameter of pipe = 1600NB 2. Pressure = 5.4 Kg / cm2 (shut off head of CW pump) 3. Fluid = Water 4. Flow = 11550 m3/hr 5 Soil bearing cap. = 3000lb/ ft2 or 14650 kg / m2 (Assumed) Thrust block calculation as per AWWA M 11 Thrust Pressure at 90 Elbow Where, T = The thrust force in kg P = Pressure in Kg/ cm2 (5.4 kg/cm2) A = Cross sectional area of 1600NB pipe in cm2 ( 0.7854xd2 = 20739.46 cm2 ) T = 2 Sin /2 PA = 2 x 0.707106 x 5.4 x 20739.46 = 158381.66 Kg. T = 2 Sin /2 PA

sh. 2 of 5

Now bearing area as per cl 13.5 of AWWA M 11 Bearing area of thurst block = = Thrust force Safe horizontal bearing capacity of soil 158381.66 Kg. 14650 kg / m2

10 % extra margin consider

= 10 .81 m2 = 10.81 x1.1 = 11.89 m2

1. 2.) THRUST Input data


1. 2. 3. 4.

AT

DISCHARGE HEADER

Diameter of pipe = 2200NB Pressure = 5.4 Kg / cm2 (shut off head of CW pump) Fluid = Water Flow = 23100 m3/hr (two pump working) Pressure at 90 Elbow T = 2 Sin /2 PA

Thrust Where,

T = The thrust force in kg

Sh 3of 5 P = Pressure in Kg/ cm2 (5.4 kg/cm2) A = Cross sectional area of 2200NB pipe in cm2 ( 0.7854xd2 =39239.43 cm2 ) T = 2 Sin /2 PA = 2 x 0.707106 x 5.4 x 39239.43 = 299661.51 Kg.

Now bearing area as per cl 13.5 of AWWA M 11 Bearing area of thurst block = = Thrust force Safe horizontal bearing capacity of soil 299661.51 Kg. 14650 kg / m2

10 % extra margin consider

= 20.45 m2 = 20.45 x1.1 = 22.5 m2

2.0.) THRUST AT ACW PUMP DISCHARGE Input data


1. Diameter of pipe = 700NB 2. Pressure = 5.25 Kg / cm2 (shut off head of ACW pump) 3. Fluid = Water 4. Flow = 2100 m3/hr 5 Soil bearing cap. = 3000lb/ ft2 or 14650 kg / m2 (Assumed) Thrust block calculation as per AWWA M 11 Thrust Pressure at 90 Elbow Where, T = The thrust force in kg P = Pressure in Kg/ cm2 (5.25 kg/cm2) A = Cross sectional area of 700NB pipe in cm2 ( 0.7854xd2 = 3970.36 cm2 ) T = 2 Sin /2 PA = 2 x 0.707106 x 5.25 x 3970.36 = 29478.4 Kg. T = 2 Sin /2 PA

Sh 4 of 5 Now bearing area as per cl 13.5 of AWWA M 11 Bearing area of thurst block = = Thrust force Safe horizontal bearing capacity of soil 29478.4 Kg. 14650 kg / m2

10 % extra margin consider

= 2.012 m2 = 2.012 x1.1 = 2.2 m2

2. 2.) THRUST Input data


1. 2. 3. 4.

AT

DISCHARGE HEADER

Diameter of pipe = 900NB Pressure = 525 Kg / cm2 (shut off head of ACW pump) Fluid = Water Flow = 4200 m3/hr (two pump working) Pressure at 90 Elbow T = 2 Sin /2 PA

Thrust Where,

T = The thrust force in kg P = Pressure in Kg/ cm2 (5.25 kg/cm2) A = Cross sectional area of 900NB pipe in cm2 ( 0.7854xd2 =6566.94 cm2 ) T = 2 Sin /2 PA = 2 x 0.707106 x 5.25 x 6566.94 = 48756.98 Kg.

Now bearing area as per cl 13.5 of AWWA M 11 Bearing area of thurst block = = Thrust force Safe horizontal bearing capacity of soil 48756.98 Kg. 14650 kg / m2

= 3.33 m2 10 % extra margin consider =3.33 x1.1 = 3.66 m2